Cost Estimation
Cost Estimation
Cost Estimation
PHE : (DOMESTIC & FLUSHING WATER SUPPLY SYSTEM, SOIL. & WASTE WATER
III DRAINAGE SYSTEM, WATER TREATMENT PLANT, SEWERAGE TREATMENT
PLANT, RAIN/STORM WATER MANAGEMENT SYSTEM, SOLID WASTE
MANAGEMENT
FIRE FIGHTING ( FIRE WATER STORAGE TANK, FIRE WATER PUMPS, FIRE
IV HYDRANT SYSTEM, AUTOMATIC SPRINKLER SYSTEM, WATER CURTAIN SYSTEM,
FIRE DETECTION & ALARM SYSTEM, TWO WAY TALK BACK SYSTEM, PORTABLE
FIRE ESTINGUISHER
V HVAC ( AIR CONDITIONING & SYSTEM DESCRIPTION, BASEMENT VENTILATION
SYSTEM & BMS SYSTEM)
VI LIFT
a 10 PASSENGERS LIFT UPTO 3RD FLOOR
b 10 PASSENGERS LIFT UPTO 10TH FLOOR
TOTAL CIVIL + MEP
DESIGN, VETTING, GRIHA, PERMISSION ETC
TOTAL
LABOUR CESS
TOTAL
OUR QUOTED AMOUNT
city operations and management center (ICOMC) at unit-IX,
on EPC mode
SQ FT 235483
Tentativre Qty
including Wastage Unit Rate Amount SOR Rate Amount (SOR) Remarks
38725
39267
17873
718271922
Detail on award of
job
111265529
Detail on award of
job
41198005
Detail on award of
job
22253106
Detail on award of
job 47685227
12320000
15680000
968673789
19373476
988047265
1% 9880472.7
997927738
997927738