Wo Ogdc 2

Work Order 19-8594 details a pending preventative maintenance scope of jobs for Asset 96349 located in Section Mechanical. The work is to be completed by Muhammad Asad Nazeer between 9:45 AM and 2:00 PM on November 2, 2019 and has a status of APPR (Approved). No tools, equipment, tasks, or spares are listed for this work order, and the estimated and actual total costs are both $0.

Uploaded by

Intelshk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Wo Ogdc 2

Work Order 19-8594 details a pending preventative maintenance scope of jobs for Asset 96349 located in Section Mechanical. The work is to be completed by Muhammad Asad Nazeer between 9:45 AM and 2:00 PM on November 2, 2019 and has a status of APPR (Approved). No tools, equipment, tasks, or spares are listed for this work order, and the estimated and actual total costs are both $0.

Uploaded by

Intelshk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Order 19-8594

Work Order Details


Section: Mechanical

Asset: PTW: 96349

Location: Raise Date: Nov 2, 2019, 9:30 AM

Work Order Description Status APPR


A-1301 Pending PM Scope jobs by M/s OES Classification:
Safety Plan Requested By: Muhammad Asad Nazeer
Work Type: MA

Multi Asset Work Pemit: COLD

Priority:
Equipment
Release:

Instructions Start Finish


Target Nov 2, 2019, 9:45 AM Nov 2, 2019, 2:00 PM
Actual

Work Planning

Tool/Equipment
Description Quantity Line Cost

Tasks
Tasks Description Observation

Trades Planned
Team Labor Quantity Regular Hours

Trades Actual
Team Labor Regular Hours

Spares
Item Description Quantity Unit Cost Line Cost

Estimated Total Cost: 0 Actual Total Cost: 0

Failure Reporting
Failure Class Failure Code
Problem
Cause
Remedy

Supervisor I/C Mechanical Plant Manager

This is Maximo Generated report Printed on: Nov 3, 2019, 7:14 PM