0% found this document useful (0 votes)
117 views

Sharma Enterprises: Contingency Plan For Business Continuity

The contingency plan outlines 9 potential business disruptions including power interruptions, fires, labor shortages, partial curfews, equipment failures, returns, transport strikes, critical material shortages, and disasters. For each contingency, the plan lists action steps such as using backup power generators, storing spare equipment at other locations, addressing employee absences by utilizing temporary workers or adjusting schedules, and maintaining minimum stock levels and alternative suppliers. The overall goal is to ensure continuity of production and deliveries to customers.

Uploaded by

trivesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views

Sharma Enterprises: Contingency Plan For Business Continuity

The contingency plan outlines 9 potential business disruptions including power interruptions, fires, labor shortages, partial curfews, equipment failures, returns, transport strikes, critical material shortages, and disasters. For each contingency, the plan lists action steps such as using backup power generators, storing spare equipment at other locations, addressing employee absences by utilizing temporary workers or adjusting schedules, and maintaining minimum stock levels and alternative suppliers. The overall goal is to ensure continuity of production and deliveries to customers.

Uploaded by

trivesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

SHARMA ENTERPRISES

CONTINGENCY PLAN FOR BUSINESS CONTINUITY


Contingency action plan for bussiness continuity in case of natural calamity, labour unrest, transporters strike etc.

SL NO CONTINGENCIES ACTION PLAN


1 Power interruptions * Run services on standby sources of power supply viz. Diesel generarator
* Use of similar assembly line for production at different location away from plant
2 Major Interruptions, e.g. fire
* Spare Tooling / Dies, Machines are kept at different location away from plant
* Multi skillness chart is available for proper availability of manpwer in case of shortage / absentism
3 Labour shortages (Skilled / Un skilled)
* Availabity of manpower from service centre,
* Match factory timings with the gaps available
* Address of all employees available with HR dept
4 Partial Curfew
* Proper transport facilities during such contingencies e.g - Vehicles owned by company employees
* Facility provided to stay during such emergencies
* Facilities available to provide with the job work from out source agencies
5 Key equipment failure * Alternate equipments can be made available for production purpose from service center when required
* Spares equipments are kept at different location in the plant
6 Field returns * Inventory of raw materials & advancement of finished goods are kept at Sharma Enterprises end
* Discuss or communicate with customer / marketing & ensure delivery before strike
7 Transporters strike
* Explore other means of transport where ever feasible
* Explore the possibility of material via Air lift / Train / self arrangement
8 Criticality of producion material * Maintain min. inventory level according to the customer schedule & component manufacturing lead time
* Explore alternate source of supply
9 Disaster * In Case of disaster we have another units ………

S.NO REV. NO REVISION DETAIL REV.DATE REMARK

Prepared By Approved by
FORM NO - SE/SC/27 REV.NO -01 DATE - 20.02.17

You might also like