Uncertainties in PV System Yield
Uncertainties in PV System Yield
Uncertainties in PV System
Yield Predictions and Assessments
ISBN 978-3-906042-51-0
Primary Authors:
Anton Driesse
PV Performance Labs, Canada
Guillaume Razongles
Institut National de l'Energie Solaire (INES), France
Mauricio Richter
3E s.a., Belgium
Table of contents
Foreword ............................................................................................................................................ 5
Acknowledgements ............................................................................................................................ 6
1 Introduction ............................................................................................................................. 11
3.5 Soiling.................................................................................................................................46
3
4 Effects of uncertainty ............................................................................................................... 54
4
Foreword
The International Energy Agency (IEA), founded in November 1974, is an autonomous body within
the framework of the Organization for Economic Co-operation and Development (OECD) which
carries out a comprehensive programme of energy co-operation among its member countries.
The European Union also participates in the work of the IEA. Collaboration in research, develop-
ment and demonstration of new technologies has been an important part of the Agency’s Pro-
gramme.
The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative R&D Agree-
ments established within the IEA. Since 1993, the PVPS participants have been conducting a varie-
ty of joint projects in the application of photovoltaic conversion of solar energy into electricity.
The mission of the IEA PVPS Technology Collaboration Programme is: To enhance the internation-
al collaborative efforts which facilitate the role of photovoltaic solar energy as a cornerstone in
the transition to sustainable energy systems. The underlying assumption is that the market for PV
systems is rapidly expanding to significant penetrations in grid-connected markets in an increasing
number of countries, connected to both the distribution network and the central transmission
network.
This strong market expansion requires the availability of and access to reliable information on the
performance and sustainability of PV systems, technical and design guidelines, planning methods,
financing, etc., to be shared with the various actors. In particular, the high penetration of PV into
main grids requires the development of new grid and PV inverter management strategies, greater
focus on solar forecasting and storage, as well as investigations of the economic and technological
impact on the whole energy system. New PV business models need to be developed, as the de-
centralised character of photovoltaics shifts the responsibility for energy generation more into the
hands of private owners, municipalities, cities and regions.
IEA PVPS Task 13 engages in focusing the international collaboration in improving the reliability of
photovoltaic systems and subsystems by collecting, analysing and disseminating information on
their technical performance and failures, providing a basis for their technical assessment, and
developing practical recommendations for improving their electrical and economic output.
The current members of the IEA PVPS Task 13 include Australia, Austria, Belgium, Chile, China,
Denmark, Finland, France, Germany, Israel, Italy, Japan, Malaysia, Netherlands, Norway, Solar-
Power Europe, South Africa, Spain, Sweden, Switzerland, Thailand and the United States of Amer-
ica.
This report focusses on uncertainties in PV system yield predictions and assessments, which may
influence business decisions on long term investments into PV power plants. A first section covers
the uncertainties related to the most important measurands in PV solar energy, i.e. solar irradia-
tion, PV module properties, and PV system performance. Then, the uncertainties of several of the
modelling steps for gains and losses in a PV system, both needed for yield predictions and for
system performance assessment. Finally, the results achieved are combined in two application
cases. The first one is the PV module energy rating, the second application case is the long term
yield prediction of PV power plants.
The editors of this document are Christian Reise and Boris Farnung, Fraunhofer ISE, Freiburg,
Germany.
The report expresses, as nearly as possible, the international consensus of opinion of the Task 13
experts on the subject dealt with. Further information on the activities and results of the Task can
be found at: http://www.iea-pvps.org.
5
Acknowledgements
This report was merged from two different draft documents, featuring Daniela Dirnberger and
Nils H. Reich as principal authors. Although both experts left the PVPS Task 13 expert group a long
time before this report was finished, several of their text fractions are still present with this re-
port.
Many thanks go to Roger French of Case Western Reserve University, Cleveland OH, for his proof
reading as a native speaker of the English language.
Parts of the German contribution to this work have been funded by German Federal Ministry for
Economic Affairs and Energy (BMWi) under Contract No. 0325786-B.
Parts of the contribution of EURAC Research to this work have been funded by the Südtiroler
Stiftung Sparkasse.
6
List of abbreviations
AC Alternating current
AM Air mass
AOI Angle of incidence
APE Average photon energy
ASTM American Section of the International Association for Testing Materials
BIPM Bureau International des Poids et Mesures
BMWi Bundesministerium für Wirtschaft und Energie (German Federal Ministry for Eco-
nomic Affairs and Energy)
BSRN Baseline Surface Radiation Network
CAMS Copernicus Atmosphere Monitoring Service
CdTe Cadmium telluride
CEA Commissariat à l'Énergie Atomique et aux Énergies Alternatives (French Alternative
Energies and Atomic Energy Commission
CIGS Copper indium gallium selenide
CM SAF Satellite Application Facility on Climate Monitoring
CMIP Climate Model Intercomparison Project
CPP Cloud Physical Properties
CZTS Copper zinc tin sulfide
DC Direct current
DWD Deutscher Wetterdienst (German meteorological office)
EC European Commission
GHI Global horizontal irradiation
GHOR Global horizontal irradiation
GPOA Global irradiation in plane of array
GUM Guide to the expression of uncertainty in measurement
HIT Heterojunction with intrinsic thin layer
IAM Incidence angle modifier
IEA International Energy Agency
IEC International Electrotechnical Commission
IEEE Institute of Electrical and Electronics Engineers
INES Institut National de l’Énergie Solaire (French National Solar Energy Institute)
IPCC Intergovernmental Panel on Climate Change
ISE Fraunhofer Institute for Solar Energy Systems ISE
ISO International Organization for Standardization
JCGM Joint Committee for Guides in Metrology
JRC Joint Research Centre
KNMI Koninklijk Nederlands Meteorologisch Instituut (Royal Netherlands Meteorological
Institute)
KPI Key performance indicator
LID Light-induced degradation
LTYP Long term yield prediction
MM Mismatch
MPP Maximum power point
MPR Module performance ratio
MSG Meteosat second generation
NOAA National Oceanic and Atmospheric Administration
NOCT Nominal operating cell temperature
NREL National Renewable Energy Laboratory
OECD Organisation for Economic Co-operation and Development
7
PLR Performance loss rate
PR Performance ratio
PSP Precision spectral pyranometer
PV Photovoltaic
PVPS Photovoltaic Power Systems Programme
RMI Royal Meteorological Institute of Belgium
RMSE Root mean square error
SDE Standard deviation error
SHCP Solar Heating and Cooling Programme
SIT Standard irradiance and temperature
SR Spectral response
STC Standard test conditions
TMY Typical meteorological year
UTC Coordinated universal time
WCRP World Climate Research Programme
WMO World Meteorological Organization
8
Executive summary
Long term yield predictions (LTYP) are a prerequisite for business decisions on long term invest-
ments into photovoltaic (PV) power plants. The preparation of a LTYP report typically relies on
numerical modelling and prediction of the expected electrical yield, based on experience with
previous PV power plants, laboratory measurements and more or less the whole knowledge
gained in the PV community over the past years and decades. However, though PV system model-
ling has been performed for decades, not much effort has been spent on a comprehensive inves-
tigation of the uncertainties related to this task. This report tries to collect some insights into the
field of uncertainties of several technical aspects of PV system yield prediction and assessment.
The first main section lists typical measurements, dealing either with a PV system component’s
properties or with PV system performance. It covers the uncertainties related to the most im-
portant measurands in PV solar energy:
Uncertainty in irradiance measurements is in part related to the instruments, and in part to the
measurement practices. While existing handbooks and guidelines may help to reduce operational
issues, the uncertainties related to the instruments themselves are more difficult to minimize or
reduce. However, if a certain non-ideal behaviour of an instrument is systematic and known, then
a systematic correction can be applied to reduce or remove its influence on the measurement. In
some cases manufacturers already supply information about temperature dependency and/or
non-linearity. In the current PVSENSOR project, a wide range of instruments were characterized,
and many systematic errors were identified and quantified. With such knowledge of instrument
operating conditions it will be possible to quantify each systematic source of measurement error.
STC power measurement of PV modules and the estimation of its uncertainties is a topic that
gained attention in recent years and saw remarkable improvements. For a full uncertainty as-
sessment, it is important that stability issues are considered in addition to pure measurement
uncertainty. There are laboratories with a profound knowledge on their uncertainty budget, typi-
cally those with the smallest overall uncertainties (down to ±1.6%), laboratories where the refer-
ence cell or reference module calibration dominates the uncertainty budget, and laboratories
where apparently uncertainties were not analysed in detail.
System testing looks at the performance of the complete conversion chain of a PV system. The
determination of the observed performance ratio PR is rather easy, including an assessment of its
uncertainty. The determination of the expected PR (as a quality requirement) is the major issue,
as the PR depends on the system design and changes with the system’s operating conditions.
Despite this potential weakness, a PR test can form a valuable tool during the commissioning of a
PV system.
The second major section of this report investigates several of the modelling steps for gains and
losses in a PV system, again along a similar list:
Irradiation data derived from satellite images are increasingly used as input for long-term yield
estimations and as reference yield for monitoring and business reporting. Several authors have
evaluated the quality of satellite-based irradiance data in the past, typical normalized root mean
9
square errors for satellite-based irradiation reported in literature are situated between 4% to 8%
for monthly and 2% to 6% for annual irradiation values.
Solar irradiation at the Earth’s surface is not stable over time for all locations on earth but may
undergo significant long-term variations for particular regions, which is referred to as “global
dimming and brightening”. Consequently, also related uncertainties may not be considered to be
negligible. In the presence of long-term trends, the question for solar resource assessments is no
longer “what is the ‘true’ climatological value?”, but “what is the best predictor for the next
20 years?”. A suitable estimator should be a recent time period, that is long enough to filter the
influence of single years with high anomalies, but which is short enough, to minimize the influ-
ence of past trends. Using irradiance data for the 10 most recent years is proposed as a good
compromise to fulfil these conditions.
The DC energy yield of a PV module depends on module characteristics as well as operating condi-
tions. With respect to uncertainties, the different influencing effects (irradiance level, angle of
incidence, operating temperature, etc.) are typically represented by one individual factor per ef-
fect. The influences are assumed to be independent. Furthermore, these factors are often used in
integrated form, e.g. over one year. The calculation of the influencing factors and the uncertainty
estimation in detail is described and discussed in the main text.
One example deals with the uncertainty of PV module energy rating, i.e. the question, whether
the expected differences in performance between two module types are bigger than the associat-
ed error margins. The results show that significant energy rating is possible already today, at least
if a module reference data set is available, and the difference from a reference energy yield is
evaluated for the rating. Energy rating can already be useful for a number of reasons, but its full
opportunities will only come to life after the IEC 61853 standard is finalized. The work presented
here can be helpful in this process and includes a method suitable for being used as part of the
standard.
As a second case, a framework for the calculation of uncertainty for a complete long term yield
prediction is presented. As the simplified error propagation approach of the first example is not
suitable for a complex LTYP, a Monte-Carlo simulation is used here instead.
The aim is to develop a method to handle all sources of uncertainties influencing lifetime energy
yield predictions and to present the information needed to feed financial models with time de-
pendent yield estimates and exceedance probabilities as desired by investors or stakeholders. The
proposed method is based on a Monte-Carlo simulation which uses Gaussian or triangular distri-
butions for individual modelling steps, including the solar resource data and long term changes of
system behaviour. The parameters may be adjusted to individual sites and system layouts. A
comparison of expected uncertainty and observed variability showed a good agreement.
This method can be seen as a part of a common framework that can assess the impact of tech-
nical risks on the economic performance of a PV project. The proposed approach is an effort to
standardize the procedure of uncertainty calculation of predicted energy yields of PV systems in
order to properly estimate financial investment risk.
10
1 Introduction
Large scale photovoltaic systems, often referred to as PV power plants, are long term invest-
ments. The return on investment depends on a variety of meteorological, technical and contrac-
tual parameters. The solar resource, the system design, the components’ quality, and the opera-
tion and maintenance (O&M) schedule all may influence the energy yield and the financial result
within the expected lifetime, a time frame of 20 to 30 years.
Long term yield predictions (LTYP) are a prerequisite for business decisions on long term invest-
ments into PV power plants. The preparation of a LTYP report typically relies on numerical model-
ling and prediction of the expected electrical yield, based on experience with previous PV power
plants, laboratory measurements and more or less the body of knowledge gained in the PV com-
munity over the past years or decades.
For a proper O&M concept, the continuous assessment of electrical yield (or system performance,
looking at yield in relation to solar input) is one of the main tasks. An analytical performance as-
sessment gives a chance to understand system operation and to develop or improve the numeri-
cal models used for the yield predictions. Thus, numerical modelling forms a feedback loop from
system design to system operation and vice versa. As a complementary task, the components’
characterization also plays its role in both domains. Modelling tools need measured input data, so
measurements and modelling are quite well entangled.
However, even since PV system modelling has been performed for decades, not too much effort
has been spent on a comprehensive investigation of the uncertainties related to this task. This
report tries to collect some insights into the field of uncertainties of several technical aspects of
PV system yield prediction and assessment.
The greater image beyond technical data and electrical yield figures, i.e. the economic aspects of
modelling financial risk of PV projects, are described in detail in another Technical Report of PVPS
Task 13 entitled “Technical Assumptions Used in PV Financial Models – Review of Current Practic-
es and Recommendations” [1].
In this report, we are looking on the technical or engineering side only, with emphasis on:
For that reason, this report starts with two major sections dealing with measurements and with
modelling. In Figure 1, these sections 2 and 3 are placed on both sides of a typical Sankey dia-
gram, which acts as a symbol for the chain of gains and losses seen within a PV power plant. On
the left hand side, typical measurements are listed, dealing either with component’s properties or
with PV system performance. On the right hand side, a large number of the various gain and loss
modelling steps are listed. According to this division, sections 2 and 3 are about to present the
11
major tasks in measurement as well as in modelling, and, at the same time, to discuss their uncer-
tainties.
In the third main section, the results of the previous steps are combined in two application cases.
The first one is the PV module energy rating, an approach to rank a product by its expected
“standard energy delivery” instead of its power under standard test conditions. Naturally, also
this ranking is affected by uncertainties, but even the knowledge of the magnitude of uncertain-
ties might be turned into additional information on a module’s data sheet.
The second application case is the long term yield prediction itself. A LTYP can clearly benefit from
an integral view of input data, models, parameters and related uncertainties, especially when
compared to existing approaches which sometimes only add an error margin to the final result.
12
2 Measurements & uncertainties
Uncertainty assessment of component or system performance is based in measurements and
analysis under certain fixed conditions as well as on extrapolation (called modelling) of compo-
nent or system behaviour to other operating conditions. Therefore, the uncertainties of the
measurements are included in all consecutive steps of assessment or modelling.
For that reason, this section covers the uncertainties related to the most important measurands
in PV solar energy:
Uncertainty in both measured and projected irradiance quantities is a function of the time period
under consideration. In fact, this time period should always be stated along with the uncertainty
figure because integrated irradiance quantities for a specific year, month, day or hour will all have
different uncertainties. In the case of projected quantities, shorter periods are dominated more
by weather variability; whereas for measurements, different instrument characteristics come into
play for different periods. For example, over the course of a year, instrument instability could be a
significant factor, whereas over the course of a particular day this would be insignificant. Similarly,
over the course of a day instrument non-linearity errors may cancel out, but over the course of a
particular hour they are more likely to lead to a bias in the measurements. This situation is re-
flected in the WMO classification of pyranometers, where the required achievable uncertainties
for hourly totals are up to twice the values for daily totals [2].
Uncertainty in irradiance measurements is in part related to the instruments, and in part to the
measurement practices. As an example of the latter, measurements made with an instrument
that was never cleaned, or that was mounted on an unstable platform, will carry a much higher
uncertainty. Best practices to minimize these factors are described in multiple sources [2][3][4].
13
When little is known about the instrument characteristics, other than perhaps a threshold value
for their contribution to measurement error, then little more can be done than assign a single
uncertainty value to all measurements taken with a particular instrument. It is clear though, that
not every irradiance measurement has the same total uncertainty, and the analysis of individual
sources of uncertainty that contribute to this total uncertainty has received considerable atten-
tion [6][7][8]. Table 1 lists many of the sources of uncertainty that are applicable to thermopile
pyranometers; many of them are directly related to the known non-ideal instrument behaviour.
Much of the research on uncertainty analysis will feed directly into the new ASTM “Standard
Guide for Evaluating Uncertainty in Calibration and Field Measurements of Broadband Irradiance
with Pyranometers and Pyrheliometers”, which is under development in collaboration with in-
strument manufacturers. The procedures to be described there will permit the calculation of un-
certainties specific to time, location and instrument, which can then be applied to individual read-
ings or series of reading of arbitrary duration. Figure 3 shows a result of this procedure applied to
a year of hourly GHI measurements taken with a ventilated Eppley PSP and a ventilated Kipp &
Zonen CM22 at NREL in Golden Colorado. Such individual measurement uncertainties can be
propagated into PV system simulations or performance analysis procedures in order to produce a
very high-resolution picture of the system yield uncertainties.
Figure 2: Examples of four non-ideal instrument characteristics: influence of non-linearity (a), tem-
perature (b), angle-of-incidence (c) and spectrum (d).
14
Table 1: Examples of sources of measurement uncertainty for a pyranometer [8].
Figure 3: Absolute uncertainty for hourly GHI sums over a one-year period measured with a venti-
lated Eppley PSP or Kipp & Zonen CM22.
Source: http://www.nrel.gov/midc/radiometer_uncert.xlsx
15
2.1.2 Reducing measurement uncertainties
It has long been known that additional information can be used to reduce irradiance measure-
ment uncertainties. The 1981 IEA Conference on Pyranometer Measurements had the goal to
“determine ways to improve the measurement accuracies of pyranometers currently available by
developing a more complete understanding of the instruments' performance characteristics” [9]
and in 1996 the IEA Solar Heating and Cooling Programme Task 9 studied “Improved Measure-
ments of Solar Irradiance by Means of Detailed Pyranometer Characterization” [10]. The PVSEN-
SOR project that was started in 2014 continues with this approach, looking not only at pyranome-
ters, but also commercial photodiode pyranometers and silicon reference cells [5].
The basic premise is that if one or more of these secondary characteristics are systematic, then a
systematic correction can be applied to reduce or remove its influence on the measurement. In
some cases manufacturers already supply information about temperature dependency and/or
non-linearity so that the user may apply corrections, but because of the additional effort required
by the manufacturer to perform these characterizations, it usually offered only for the most ex-
pensive instruments. In the PVSENSOR project, a wide range of instruments were characterized,
and many systematic errors were identified and quantified. Thus, with knowledge of instrument
operating conditions it is possible to quantify each systematic source of measurement error.
Based on the instrument characteristics gathered in the PVSENSOR project, Figure 4 and Figure 5
demonstrate how such errors evolve over the course of a day and year respectively. It is also seen
that relative errors (%) often give a different impression than absolute errors (W/m²) about where
the biggest sources of uncertainty lie, but for photovoltaic system yield predictions and assess-
ments it is the summation of absolute errors over time that carries the greatest significance.
16
Figure 4: Daily profiles of the measurement error caused by angle-of-incidence, spectrum and
temperature for a reference cell and a pyranometer located in Golden Colorado, tilted 40° South.
17
Figure 5: Annual profiles of the measurement error caused by angle-of-incidence, spectrum and
temperature for a reference cells and a pyranometer located in Golden Colorado, tilted 40° South.
18
2.2 Laboratory (indoor) characterization of PV modules
At different steps of a PV project, laboratory testing of PV modules is valuable. Already in the de-
sign phase, confidence in the quality of the very specific batch of PV modules can be raised by
means of quality benchmarking, with pre-defined quality criteria. Laboratory test can be conduct-
ed to check the power under Standard Tests Conditions (STC, i.e. 1000 W/m² @ 25 °C and a de-
fined spectrum), the light induced degradation of modules (LID) as well as temperature and low
light behaviour. This can include the measurement of I-V curve for the power rating matrix de-
fined in IEC 61853-1. Benchmarking PV modules can thereby help to:
Additional tests may be performed to detect the sensitivity of modules to known failure mecha-
nisms (e.g. snail trails, yellowing, potential induced degradation, …). These testing procedures,
especially for reliability testing, should be derived from the quality criteria of the customer, the
experiences from the field as well as the environmental conditions (installation site, system lay-
out, etc.).
Figure 6: Power loss of a crystalline silicon PV module during the first hours of exposure to light
(here: 1000 W/m²).
19
2.2.1 Sample selection
Upon the arrival of the modules in the laboratory, typically a detailed visual inspection is per-
formed. Electroluminescence images may be taken as well in order to evaluate the modules with
regard to their quality of manufacture. Then, the power at STC is measured. To exclude the risk of
a systematic misjudgement of the modules, the way of sample selection is of particular im-
portance.
Often a specific number of modules is required for testing by the system integrator or the inves-
tor. To simplify matters, modules are picked randomly either before shipment or even on site. In
many cases that means, if e.g. 50 modules are required, just two module palettes are sent to the
laboratory. In this case, most of the modules are from the same serial number range and thus
form the same time frame of production. An example is shown in Figure 7. This example shows
clearly the small range of actual module power covered by the sample. Actually there is no value
in measuring 25 modules out of one single palette with regard to prevent a systematic underper-
formance of the total quantity of purchased modules.
To exclude the risk of a systematic underperformance of the modules, the sampling needs to be
done carefully and should select modules from different time serial number and power ranges as
shown in Figure 8.
Figure 7: Two randomly selected PV module palettes (25 modules each) out of three containers
(520 modules each). Small dots show STC power of all modules according to the manufacturer’s
flash list, squares denote manufacturer’s measurements of the selected modules, circles denote
Fraunhofer ISE’s laboratory measurements. The two palettes cover only two small sections of seri-
al numbers (left graph), these samples are not representative for power distribution of the entity
of all modules (right graph).
20
Figure 8: Proper assessment of a batch of 15,000 modules based on a small sample of 18 mod-
ules. Small dots show STC power of all modules according to the manufacturer’s flash test list,
squares denote manufacturer’s measurements of the selected modules, empty circles denote
Fraunhofer ISE’s laboratory measurements, while filled circles denote measurements of the same
modules after LID (after exposure to 20 kWh/m²). As the selection was based on the flash list sort-
ed by power (instead of serial numbers), these samples are both representative for the power dis-
tribution of the entity of all modules (right graph) as well as for the full range of serial numbers
(left graph).
The uncertainty of STC power as required for energy rating is composed of the measurement un-
certainty, and the uncertainty due to initial or other stability effects:
This section presents results from a survey and several phone interviews with a total number of
eight module test laboratories. All results are presented anonymously, i.e. the different laboratory
names are not disclosed. This policy enabled us to collect more concrete data. Because of this, the
reader will not be able to identify the best laboratory or to judge his current business partner, yet
there is still valuable information available regarding questions like:
21
Which accuracy may be achieved with best effort?
What is the accuracy of a typical laboratory?
A main result of this survey, Figure 9, presents the measurement uncertainties achieved for STC
conditions with different laboratories. The laboratories’ uncertainty estimations may be inter-
preted like this: there are laboratories with a profound knowledge of their uncertainty budget
(Labs 1 and 2), laboratories where the reference cell or reference module calibration dominates
the uncertainty budget (Labs 6, 7, and 9), and laboratories where apparently uncertainties were
not analysed in detail, as the complete uncertainty is attributed to a single effect only (Labs 3, 4, 5
and 8).
Already in 2007, the EC Integrated Project PERFORMANCE made a suggestion on how to harmo-
nize the calculation of uncertainty in indoor measurements [17]. Figure 10 gives an example of an
uncertainty evaluation for indoor power measurements of crystalline Si modules.
The fields in yellow in the upper part are direct input fields where a user may fill in a number of
single uncertainty figures (originating from estimations or specific measurements or instrument
documentation). The fields in yellow in the lower part are also direct input fields concerning the
type and distribution of the uncertainty. The fields in red in the lower part are reduction factors,
which are dependent on the type and distribution of the uncertainties and are based on reasoned
argument to each contribution's overall influence on uncertainty. They might have to be changed
depending on the inputs in the yellow fields (manually, not automatic).
Such a scheme would allow for a more systematic comparison of uncertainty between different
laboratories. However, often in practice, both a lack of somebody requiring such information and
a lack of in-depth knowledge of some details prevent a typical laboratory from performing such
an analysis.
22
The PERFORMANCE tool for an uncertainty evaluation of indoor module power measurements
Created in Feb. 2007 by JRC
Standard uncertainty component Std. uncert. DistributionIrradiance Voltage Current Fill Factor Value Red. Fact.
type (A/B) Gauss/Rect % % % %
Data acquisition error B G ± 0,08 ± 0,08 ± 0,11 ± 0,00 0,2 2,586 0,077
Shunts for current measurement of module A R ± 0,00 ± 0,00 ± 0,12 ± 0,00 0,2 1,732 0,115
Reference Cell / Trans Impedance Amplifier A G ± 0,00 ± 0,00 ± 0,00 ± 0,00 0,0 2,000 0,000
Combined Standard Electrical Uncertainty ± 0,08 ± 0,08 ± 0,16 ± 0,00
Temperature indicators B R ± 0,02 ± 0,13 ± 0,03 ± 0,00 0,7 1,732 0,404
Temperature coefficients (alpha resp. beta). Tamb: 25 °C B R ± 0,03 ± 0,19 ± 0,04 ± 0,00 1,0 1,732 0,577
Non-uniformity of module temperature B R ± 0,00 ± 0,06 ± 0,01 ± 0,00 0,3 1,732 0,173
Contribution of Standard Temperature Uncertainty ± 0,04 ± 0,24 ± 0,05 ± 0,00
Spatial Non-uniformity of irradiance B R ± 0,58 ± 0,03 ± 0,58 ± 0,00 1,0 1,732 0,577
Orientaton of module and reference device B G ± 0,04 ± 0,00 ± 0,04 ± 0,00 4,0 2,586 0,036
Alignment of module and reference device B R ± 0,02 ± 0,00 ± 0,02 ± 0,00 2,0 1,732 0,020
Contribution of Standard Optical Uncertainty ± 0,58 ± 0,03 ± 0,58 ± 0,00
Calibration of reference device A G ± 0,25 ± 0,01 ± 0,25 ± 0,00 0,5 2,000 0,250
Determination of Spectral Mismatch correction factor B G ± 0,00 ± 0,00 ± 0,27 ± 0,00 0,5 2,000 0,270
Reference Cell Drift B R ± 0,17 ± 0,01 ± 0,17 ± 0,00 0,3 1,732 0,173
Contribution of Standard Reference Device Uncertainty ± 0,30 ± 0,02 ± 0,41 ± 0,00
Estimated error in Fill Factor (connections & cabling) A G ± 0,00 ± 0,00 ± 0,00 ± 0,20 0,2 1,000 0,200
Combined Standard Uncertainty ± 0,66 ± 0,26 ± 0,73 ± 0,20
Expanded Combined Uncertainty (k=2) ± 1,32 ± 0,52 ± 1,46 ± 0,40
Isc ± 1,5 %
Voc ± 0,52 %
Expanded Combined Uncertainty (k=2)
Fill Factor ± 0,40 %
Pmax ± 1,6 %
Figure 10: Example of a filled PERFORMANCE tool for the uncertainty evaluation of indoor module
power measurements. The tool was created in Feb. 2007 by the JRC [17].
Today, with higher demands on product characterization and the availability of the IEC 61853
standards on PV module energy rating, more and more laboratories offer comprehensive power
rating measurements, covering a full matrix of irradiance and temperature conditions. Neverthe-
less, the uncertainty of these non-STC measurements is still more or less unknown. A few labora-
tories provided some information on the maximum uncertainty of power measurements at the
related conditions:
23
Table 2: Uncertainty levels for non-STC conditions (first survey).
Uncertainty Conditions
Lab 1 some 5% for extreme temperature/irradiance combinations
Lab 2 3.6% with matrix measurements at low irradiance values
Lab 4 3.2% at 200 W/m² and 65 °C
Lab 7 3.5% at 1000 W/m² and 70 °C
Lab 8 2.2% at 100 W/m² and 75 °C
an outdoor setup extends the range of ambient conditions even for short term measure-
ments (real solar spectrum, continuous illumination instead of pulsed light)
outdoor testing on a longer period is closer to commercial operation of PV modules—up
to a realistic benchmark of different module types in side-by-side operation
The extraction of module characteristics (especially STC power) from outdoor measurements is
sometimes considered an alternative, or seen as complementary, to indoor testing. Depending on
the site of the test, the duration of an outdoor test may vary, and the normalization to STC (or
other reporting conditions) imposes additional uncertainty on the results. The following example
depicts some of the challenges when comparing outdoor to indoor data.
2.2.4.1 Definitions
The (initial) module performance is commonly determined under Standard Tests Conditions (STC,
i.e. 1000 W/m² @ 25 °C and a defined spectrum). However, the initial performance can still deliv-
er a wide range of values (the values below in parentheses are extracted from a commercial mul-
ti-crystalline module, and are shown as well in Figure 11 c):
the module power class labelled (in the case of this module: 250 Wp)
the module flash-test value from the factory (258.4 Wp)
the module flash-test value from a reference laboratory (253.0 Wp)
the on-site Standard Irradiance and Temperature (SIT) conditions, measured around
1000 W/m² and corrected to 25 °C, meaning the equivalent of STC through an outdoor IV
bench
The SIT power itself may be derived from different sets of measurements:
This list is not extensive, and for technologies like amorphous silicon, with an important initial
degradation, the initial performance is even more difficult to handle. For instance, the STC value
given by the manufacturer is much lower than the initial measured value.
24
2.2.4.2 Data comparisons
In this test of a commercial polycrystalline module considered here, the module is facing south,
the fixed tilt is 25°, and the temperature is measured with a thermocouple glued on the middle of
rear side (on the middle of a cell). I-V curves are taken every 5 minutes, while the MPP is tracked
between the I-V curve acquisitions. The modules were mounted in December. The reference
flash-test, called “STC INES” was performed at CEA-INES.
With the frequency of 12 I-V curves per hour, the 1000 ± 20 W/m² irradiance is reached around 5
times per summer day (average value) and 150 times per month.
Figure 11 a) represents the power data filtered at the irradiance 700 W/m² ± 30 W/m² and cor-
rected to 700 W/m². This representation allows to see the evolution of the module even in winter
conditions.
Figure 11 b) shows the filtering at 1000 W/m² ± 20 W/m² that allows the SIT values extraction. In
this graph, the data are corrected to 1000 W/m² and to 25 °C. This representation shows missing
values in the winter, indeed, with the 25° tilt, the 1000 W/m² value is never reached in this peri-
od. So the very initial performance is not extractable for this module.
Figure 11 c) is a zoom on the data corrected at 1000 W/m². It allows one to see the dispersion of
the initial performance values based on the different possible definitions.
In Figure 12, we see the result for another crystalline commercial module placed on another test
bench. Oriented at 163° (17° off south), tilted at 30°, monitored with a flat Pt100, the module has
been mounted in June, and 1000 W/m² is reached during the first days.
Figure 11 c) and Figure 12 show the gaps between the initial values within their possible defini-
tions. Other kinds of deviations are observed on other modules, and it is difficult to observe sys-
tematic deviations.
It is important to note that most of these values fall within the expected uncertainties limits: con-
sidering the results of the previous European Commission projects, Performance Europe and SO-
PHIA, STC uncertainties are known to stand between 2% and 4% while SIT uncertainties stand
between 4% and 6%.
25
Figure 11: a) Power data filtered at the irradiance 700W/m² ±30W/m² and corrected to 700W/m²;
b) Power data filtered at the irradiance 1000W/m² ±20W/m² and corrected to 1000W/m² and to
25°C; c) Zoom on the power data filtered at the irradiance 1000W/m² ±20W/m² and corrected to
1000W/m² and to 25°C. All relevant initial performance values are plotted. STC = Standard Test
Conditions. SIT = Standard Irradiance and Temperature conditions, it is an equivalent of STC in
outdoor conditions.
26
Figure 12: Power data of another crystalline module filtered at the irradiance 1000 W/m² ±
20 W/m² and corrected to 1000 W/m² and to 25 °C. All relevant initial performance values are
plotted. STC = Standard Test Conditions. SIT = Standard Irradiance and Temperature conditions, it
is an equivalent of STC in outdoor conditions.
Although the spectrum of the direct sunlight is often closer to the AM1.5 than a simulator light,
the outdoor operating conditions of the module are much more variable than the indoor ones.
The main deviations between indoor measurements and outdoor measurement are:
Considering these sources of deviation, filters may be tested in order to look for systematic devia-
tions.
27
2.2.4.3 Systematic deviations search
The study concerns 191 modules data from the CEA test benches on the rooftop of the INES site.
These are oriented at 163°, tilted at 30°, and temperature monitored by a flat Pt100. Although
Figure 11 c) shows a high number of different initial values definition, this section will focus on the
deviation between the “STC INES” and the “SIT 1st month” (150 first values around 1000 W/m²).
The filters applied are:
Early degradation influence: modules installed in “winter” (1st October to 31st March) are
excluded
Weather influence: modules that do not have at least 30 days of available data are ex-
cluded. This filter is relevant but does not take into account any LID (Light Induced Degra-
dation) effects.
Flash-testers and their reference devices influence: only STC values originating from the
same flash-tester (INES flash-tester) are used.
Other influences: aberrant data are also excluded (improper temperature data, unreport-
ed amorphous module preconditioning, extreme discarded data, bifacial modules with a
monofacial STC).
After these four restrictive filters, 41 modules could be analysed. The selection is mostly com-
posed of standard multi and mono crystalline silicon modules, and also comprises other technolo-
gies: 8 heterojunction, 5 N-type, 2 CIGS, and 1 IBC module.
Figure 13: SIT/STC plot for the filtered modules, namely the average of the 150 first power values
under an irradiance of 1000 ± 20 W/m² corrected at 1000 W/m² and at 25 °C, divided by the STC
power value measured at INES. Small modules (P < 10 Wp) have been coloured differently as their
standard deviation has been observed higher than large modules (P > 150 Wp). STC = Standard
Test Conditions. SIT = Standard Irradiance and Temperature conditions.
Large modules have a lower standard deviation than the small ones. A systematic deviation seems
to be found between 2% and 3%, but the associated standard deviation weakens this conclusion.
28
2.3 System testing
System testing looks at the performance of the complete conversion chain of a PV system. This
conversion chain includes many steps, from PV module DC output to inverter and transformer
efficiencies, adds mismatch and ohmic losses and also losses due to poor system design or poor
workmanship. Nevertheless the most important test, whether a PV systems meets its expected
performance, needs only two precise measurements: the amount of solar irradiation received in a
certain period of time, and the amount of electric energy delivered at the billing meter in the
same period of time. The numerical ratio of both amounts (when given in kWh/m² and kWh/kW P)
is identical with the system Performance Ratio (PR).
Therefore, the measurement of the PR is rather easy, including an assessment of its uncertainty:
the uncertainty of irradiance measurement is discussed in Section 2.1, the uncertainty of AC bill-
ing meters is rather small (0.5% or 0.2%) and well documented. The determination of the ex-
pected PR (as a quality requirement) is the major issue, as the PR depends on the system design
and changes with the system’s operating conditions. The uncertainties related to PR determina-
tion are dealt with in Section 3. Despite this potential weakness, a PR test can form a valuable tool
during the commissioning of a PV system.
Most of the acceptance testing, initial performance and safety evaluation or plant certification
takes place in the commissioning phase of a project. Beside a visual inspection, safety and com-
ponent testing, actual PR of the system should therefore be validated. By comparing actual
(measured) and expected (simulated) PR, one can obtain valuable information on whether the
system performs as expected. Important input data for the calculation of PR are the actual irradi-
ance and the system output. Thus, both values have to be measured accurately during operation.
It has been observed that in many cases, however, unreliable and inaccurate measurement
equipment is used.
Figure 14: Schematic process of performance verification (left pane) and exemplary results for July
2013 of a utility scale PV system in southern Spain (right pane). Note a failure in the system caused
a drop of PR by almost 10% can discerned for day 24.
Available monitoring data can be validated with data from calibrated and high-quality measure-
ment equipment, temporally installed at the site for a defined time period. If required, monitoring
data is corrected to the calibrated instruments. After validation and correction, existing monitor-
ing can be used to determine the actual Performance Ratio (PR measured). For comparison with
expected PR (PR modelled), the measured weather data (irradiance, temperature) are used to
simulate the PR with an established procedure and the system model and parameters from the
original yield prediction. Over the last years, this procedure for performance verification has been
applied successfully for utility scale PV plants worldwide. It has been shown, that the performance
29
can be accurately evaluated within just a few weeks and as the plants monitoring system is vali-
dated, third party evaluation of existing and future yield data is possible.
A participant uses variable degradation rate for the first 5 years, then fixed from years 5–
30. Generally they assume a 1% to 2% drop in the first year, 0.7% to 0.5% to year 5, then
0.3% to 0.5% up to year 30
Another participant affirms that they also include an initial degradation (LID) of 0.3% to
1.0%, depending on module technology and location (increased degradation caused by
unfavourable environmental conditions)
Another participant uses 0.25%/year for crystalline Silicon based PV
The last participant uses constant degradation over the years with the exception of the
first year where technology specific behaviour is considered. Values are based on exten-
sive (publicly available) literature review
The calculation of the performance loss rate (PLR) from field data, usually expressed in percent-
age of power loss per year, requires:
the adoption of a performance metric, i.e. an index describing the behaviour of the PV
system during a specific time range (e.g. the weekly, monthly, yearly etc. values of per-
formance ratio)
the adoption of a statistical technique, i.e. how the trend of the performance loss is ex-
tracted from the time series of the adopted performance metric. For example, the most
common technique is to derive the PLR from a linear regression of monthly values of the
performance metric.
The overall uncertainty associated to PLR is therefore a combination of the uncertainty related to
the performance metric, which is a result of the uncertainty of the field measurements, and to the
application of the statistical technique.
Let us consider for example the Performance Ratio metric on a monthly level, calculated from 15-
minute interval time-series measurements of power and plane-of-array irradiance:
∑𝑁 𝑃 ∗0.25 𝐺𝑆𝑇𝐶
𝑃𝑅 = ∑𝑁𝑖=1 𝐺𝑖 ∗0.25𝑃𝑛
𝑖=1 𝑖
where N is the total number of records within a month, Pi is the i-th record of power (DC or AC)
output of the PV system, Gi is the i-th record of plane-of-array irradiance, Pn is the nominal power
of the PV system and GSTC is the plane-of-array irradiance at Standard Test Conditions, equal to
1000 W/m2.
The uncertainty affecting Pi, Gi and Pn depends on the quality of the sensors and procedures used
to measure these quantities. For example, the absolute uncertainties listed in Table 3 are consid-
ered for the specific case of seven different PV systems installed in Bolzano (North-East of Italy):
30
Table 3: Uncertainty values associated to the measurement of plane-of-array irradiance, DC-
Power, and to the PV system nominal power.
The uncertainty of the monthly values of PR is calculated by applying the procedure proposed by
the Guide to the Expression of Uncertainty in Measurement (Joint Committee for Guides in Me-
trology 2008a):
𝜕𝑓 2
𝑈(𝑦)2 = ∑𝑁
𝑖 (𝜕𝑥 ) ∗ 𝑈(𝑥1 )
2
𝑖
where y = f(x1,....xN) is a generic linear equation. By applying this to the PR definition above, the
absolute uncertainty of PR is found to be
𝟐
𝟏𝟎𝟎𝟎 𝟐 −𝟏 𝟐
(∑ 𝑷𝑫𝑪𝒊 ∗𝟎.𝟐𝟓)∗𝟏𝟎𝟎𝟎 𝟐
( ) ∗ (√∑(𝟎. 𝟐𝟓 ∗ 𝑼(𝑷𝑫𝑪𝒊 )) ) + ( 𝟐 ∗ ∑ 𝑮𝒊∗𝟎.𝟐𝟓
) ∗ (𝑼(𝑷𝒏) ∗ 𝑷𝒏)𝟐 +
𝑼𝑷𝑹 = √ 𝑷𝒏∗∑ 𝑮𝒊∗𝟎.𝟐𝟓 𝑷𝒏
−𝟏 (∑ 𝑷𝑫𝑪𝒊 ∗𝟎.𝟐𝟓)∗𝟏𝟎𝟎𝟎 𝟐 𝟐
+ ((∑ ∗ ) ∗ (√∑(𝟎. 𝟐𝟓 ∗ 𝑼(𝑮𝒊) ∗ 𝑮𝒊)𝟐 )
𝑮𝒊∗𝟎.𝟐𝟓)𝟐 𝑷𝒏
Figure 15 shows the monthly values of PR, of the absolute uncertainty and of the relative uncer-
tainty on a time range of 5 years for seven investigated PV systems installed in Bolzano, Italy.
The absolute uncertainty of monthly PR is higher in winter than in summer, due to the lower val-
ues of both irradiance and power measurements. This is also true for the relative uncertainty, i.e.
the ratio of absolute uncertainty of PR and PR itself.
Once the monthly values of PR are known, it is possible to perform a linear regression. However,
each value of PR is affected by an error that is supposed to be distributed in a certain way (e.g.,
normally). Therefore, the uncertainty of every single monthly value of PR propagates to the slope
of the linear regression, and to the PLR itself.
Another uncertainty contribution comes from the statistical technique adopted for extracting the
power loss trend. For example, if we consider linear regression, the associated uncertainty corre-
sponds to how well a regression line is able to fit the time series of the performance metric. If, for
example, all the values of the performance metric were perfectly distributed on a line, this uncer-
tainty component would be equal to zero.
In the case of the linear regression technique, the associated uncertainty depends on:
the dimension of the time series: the longer is the number of the available points, the
lower is the uncertainty. Makrides et al. [18] and Jordan et al. [19] indicate 3 years as the
minimum period to achieve reasonable values of uncertainty with this analysis.
the seasonality of the time series: the lower is the seasonality, the lower is the uncertain-
ty because the time series will resemble more to a line.
For the latter reason, other metrics than the PR might be more suitable. Belluardo et al. have car-
ried out an analysis of the linear regression uncertainty using three different metrics. Results may
be found in [20].
31
Figure 15: 2011–2015 monthly series of (top) performance ratio, (centre) absolute uncertainty of
performance ratio and (bottom) relative uncertainty of performance ratio, calculated for seven
different photovoltaic systems installed in Bolzano. (1=January 2011; 60=December 2015).
32
For each of the N time-series of PR, a linear regression is performed. This way, N values of PLR are
retrieved, as well as N values of uncertainty associated to the linear regression. In particular, the
distributions of both PLR and the associated linear regression resembles a Gaussian distribution,
as shown in Figure 17 and Figure 18.
The standard deviation of the N values of PLR correspond to the absolute uncertainty related to
the estimation of the performance metric, while the average of the N values of uncertainty asso-
ciated to the linear regression represents the uncertainty related to the application of this statisti-
cal technique. These values are reported in Table 4 for each of the seven module types under
consideration. The combined uncertainty of the two contributions, calculated with the rule of
squares, is also reported.
Figure 16: N time series of PR for a PV system (pc-Si6) installed in Bolzano. The values are ob-
tained for each month by a generation of N values of PR according to the value of the associated
uncertainty and assuming a normal distribution of the error. Time series related to specific percen-
tiles are also displayed.
Figure 17: Frequency distribution and cumulated frequency distribution of N values of PLR calcu-
lated from the N time series of monthly values as in Figure 16, for a PV system (pc-Si6) installed in
Bolzano.
33
Figure 18: Frequency distribution and cumulated frequency distribution of N values of uncertainty
of the linear regression calculated from the N time series of monthly values as in Figure 16, for a
PV system (pc-Si6) installed in Bolzano.
The displayed results have been calculated with a Monte Carlo technique using N=1000 generated
values of PR. This number is considered statistically significant in the sense that the obtained val-
ues of PLR, the absolute and the relative uncertainty of PLR can be considered stabilized, as
shown in Figure 19.
By comparing Table 4 and Figure 15, it is clear that the technology with the highest absolute un-
certainty in PLR (pc-Si9) has also the highest values of the absolute uncertainty of monthly PR. At
the same time, the technology with the highest absolute uncertainty in regression uncertainty
(mc-Si4) has a strong seasonality coupled with an anomalous loss of performance due to a failure
occurred during a short period at the end of 2011, that made PR deviate from the performance
trend.
Both uncertainties (performance metric and statistical technique) add up to values between 15%
and 140% for all modules without real failures. In this light, the assumption cited at the beginning
of this section (“among the most unexplored effects”) looks more understandable.
Table 4: Values of average PLR, absolute and relative uncertainty of PLR, absolute and relative
uncertainty of the linear regression, and combined uncertainty for seven technologies installed in
Bolzano.
34
Figure 19: values of relative uncertainty of PLR calculated with the above-described methodology
for a PV system (pc-Si6) installed in Bolzano by considering different number N of values of month-
ly PR generated according to the value of associated uncertainty and assuming a normal distribu-
tion of the error.
35
3 Modelling & uncertainties
Modelling the future behaviour of a PV system is an essential part of any yield prediction. Beside,
system modelling is needed for PR assessments, or, more generally, for an analytical understand-
ing of PV system operation. Starting from the needs of a Long Term Yield Prediction, this section
examines the most important contributions to modelling uncertainty.
1. Determination of the solar resource potential in the reference period: Selection or crea-
tion of time series data, which provides information as accurate as possible for direct and
horizontal global and diffuse solar irradiation at the particular location in a historical ref-
erence period. Calculated solar irradiation incident onto the plane-of-array is added to
this time series together with other meteorological parameters (e.g. ambient tempera-
ture, wind speed and direction).
2. Determination of the energy yield in the reference period: Simulation of the PV energy
yield on the basis of irradiation and meteorological time series as determined in step 1 us-
ing mathematical models for the PV system.
3. Determination of the energy yield in the prediction period: Projection of the annual PV
energy yields in the reference period onto the individual years of the prediction period as
well as the determination and consideration of parameters affecting PV energy yield in
the prediction period. These include estimation of inter-annual variability in irradiance
and degradation assumed for the PV modules and other system components.
Analogous to this sequence of steps, sources of uncertainty can be distinguished and related to
each of the three steps individually.
Uncertainties related to the solar resource potential in the reference period can be differentiated
into three separate causes. First, deviations between assumed and actual horizontal solar irradia-
tion in the reference period result from using imperfect models to derive horizontal irradiation
from satellite images. Although these techniques and subsequent modelling are greatly advanced,
uncertainty in the order of 3% constitutes a major part to overall uncertainty. Secondly, subse-
quent modelling applied to global horizontal irradiation (GHI) time series to calculate irradiation
onto the plane-of-array causes additional deviations, which depends on the models used, the
accuracy of underlying meteorological input data such as the direct-diffuse ratio of solar irradia-
tion, the temporal resolution of the time series, as well as the albedo of the ground surface, which
contributes to ground reflected irradiance on the array surface. The accuracy of this irradiation
transposition depends heavily on both the particular location concerned and the particular trans-
position model used. Finally, the long-term average of the solar resource may exhibit multi-
decadal trends, dubbed “global dimming and brightening” (see e.g. [22][23]), Therefore, the cho-
sen time period to be used as the reference period can affect uncertainty [24].
Uncertainty of PV energy yield in the reference period stems from actual modelling of the PV en-
ergy yield, based upon chosen input data of step one. Consequently, in this category uncertainty
is added due to inaccuracies of chosen models and simulation tools. Most simulation tools, such
as e.g. PVsyst, calculate PV energy yield by a chain of subsequent models, comprising various en-
ergy gain and energy loss mechanisms within the PV system. The PV energy yield of the reference
period is calculated using calibrated or best-guess values of model parameters for the various
36
models used in the model chain. In other words, parameters perceived as most likely to be true
within a given parameter space are chosen, inherently introducing uncertainty.
Uncertainty of PV energy yield for the prediction period is related to potential differences of the
PV energy yield caused by reference and prediction periods being different. Although this may
lead to significantly different PV energy yield, this third consideration that may affect uncertainty
is sometimes disregarded in typical LTYP reports.
Long-term changes in PV system characteristics are usually considered by including a simple linear
model of module degradation. Uncertainty related to module degradation and other aspects af-
fecting PV system performance in the long term is usually not considered, although recent publi-
cations that focus on economic aspects started to address these aspects [25][26]. Effects relating
to long term trends in solar resource are usually omitted or rarely regarded as significant (see e.g.
[27][28][29][30]). Consequently, the effect of uncertainties related to long-term changes are not
addressed. Expected deviations of PV energy yield of individual years are often given as relative
standard deviation with respect to the average overall yield in the reference period.
The uncertainty quantification for long-term PV energy yield predictions in a fully complete and
mathematically defined way would need to consider individual uncertainties of meteorological
input data as well as individual uncertainties of each parameter used as input in each model. Fur-
thermore, correlations and interdependencies of the uncertainties of individual models them-
selves and each meteorological input parameter would need to be excluded, as to allow for con-
ducting error propagation accurately. This is of relevance for the overall uncertainty, since overall
uncertainty implies the entire model chain and their related interdependencies are relevant. Un-
certainty associated with meteorological input values and with some individual models is not con-
stant but varies. Daily and seasonal fluctuations cause constantly changing ambient conditions
(e.g. temperature and irradiation levels, incident angles and direct-diffuse ratios) and imply the
need for conditional uncertainties. This is highly complex in itself, and the high number of individ-
ual models and model parameters further add to the difficulty [31][32]. Therefore, uncertainty
quantifications are currently not performed the way outlined in this paragraph.
with GHImean the best estimate of mean annual GHI in the reference period, ∆GPOA mean annual
gain or loss of irradiance transposition to plane-of array (GPOA), ƞ STC the initial module conver-
sion efficiency under STC, Agenerator the area of the PV modules of the system, ∆𝑖,𝑛 the relative gain
or loss of modelling step i in year n, and M the number of all iterative model steps for the predic-
tion of overall yield. Introducing index n allows a simplified (annual) consideration of long term
(annual) changes that affect predicted yield.
Uncertainties of individual factors can be derived by model validations and comparisons of meas-
ured with modelled data. Such comparisons show residuals that can be related to each model and
can be quantified. For the analysis of residuals it is relevant to consider their dependency on envi-
37
ronmental conditions as well as the overall duration of the comparison of measured with mod-
elled data that provides the dataset of residuals. It is recommended to at least consider one year
of data as to include seasonal effects.
An alternative to the “classical” approach is the use of Monte-Carlo techniques, which have been
greatly facilitated by both increasing computational power and decreasing costs of computers.
The next subsections will deal with the isolated uncertainties of the most important modelling
steps, while a Monte-Carlo approach will be presented in Section 4.2.
A variety of solar resource database are used such as SolarGIS, PVGIS, Meteonorm, etc.
One of the organizations highlights the preference towards ground data when available.
In general, one database is preferred against others and it is used as benchmark for vari-
ous sites. Site adaptation techniques are also adopted as routine by some but it does not
seem to be common practice.
Typically, a time resolution of 1 h is taken.
A deviation larger than 3% (1 answer) or 5% (3 answers) is considered as “very different”.
Weighted average is used by the majority of the participants to the survey.
Recently, several new or improved satellite-based irradiance services have become available. In
several of these services, the underlying cloud models increasingly take into account the physical
properties of the clouds. The Solar Bankability project (www.solarbankability.eu) has recently
published a large-scale evaluation of the precision of different methods and services available for
the practical use of satellite-based irradiation as reference yield [1][36]. This validation study
compared the satellite-based irradiance data from seven satellite-based irradiance data services
(Table 5) with data from meteorological stations for the years 2011 to 2015.
The reference data covers measurements from 203 meteorological stations maintained by the
national public weather services of France, Belgium and the Netherlands. The available reference
data sets are listed in Table 6 with the spatial distribution of the stations illustrated in Figure 20.
38
Table 5: Satellite derived irradiance models under evaluation
Table 6: Reference data set of global horizontal irradiation and minimum aggregation period
available for the evaluation
Figure 20: Meteorological stations used as reference dataset for the evaluation.
The satellite derived irradiation data have been evaluated against the reference data by their root
mean square error (RMSE):
39
Figure 21: Exemplary distribution of the error measures RMSE, SDE and Bias for data with daily
(square) and monthly (triangle) aggregation.
The three error measures were computed separately for each station and year. Moreover, the
three error measures were evaluated for monthly, daily, and in the Netherlands also hourly reso-
lution. Finally, the expected error values E(x) for each service, year and time aggregation from the
geometric mean of error x over all stations has been calculated. These values can be interpreted
as mean error values for each service over the region.
The results for daily and monthly data are shown in Figure 22 (a) for 2012 and Figure 22 (c) for
2013. The results are consistent for both years. A relatively high Bias for MACC-RAD is observed.
Notably, no default bias correction is applied to the results of the MACC-RAD model by Coperni-
cus or SoDa. Being the direct outcome of an R&D project, the idea is that users of the model re-
sults would correct for the bias themselves and depending on their particular situation. Further-
more, results show that the HelioClim model improves with each version and the best performing
models for monthly irradiation are HelioClim-3 v4 and v5, EnMetSOL and MSG-CPP.
For hourly data, EnMetSOL and MSG-CPP perform a little bit better than the HelioClim models.
The results for hourly, daily and monthly data for the Netherlands are shown in in Figure 22 (b),
(d), (e) and (f) for different years. The results for data covering 11 months running from April 2014
to February 2015 rather than from January to December 2014 are shown in Figure 22 (f) as this
allowed to include the results from the GSIP model. Data from GSIP for Western Europe have only
been fully available since April 2014.
Overall results show that the bias of most data services lies consistently between 3% and 5%.
However, for individual sites, the bias rather ranges between –5% and 10%. The SDE can be as low
as 2% for monthly irradiation values from the MSG-CPP method. For daily and hourly irradiation,
the SDE and, hence, also the RMSE are much higher. The average SDE for daily values lies above
10% for all services and for hourly value it lies even above 20%. Accordingly, the RMSE values for
the best performing models (EnMetSol, HelioClim-3 v5, MSG-CPP and GSIP) are of 3% to 6% for
monthly and 9% to 11% for daily irradiation. The RMSE for hourly irradiation for the better per-
forming models is much worse, in the range of 19% to 23%.
Finally, the average bias values of the different models over all stations in the Netherlands are
compared in Figure 23.
40
(a) (b)
(c) (d)
(e) (f)
Figure 22: Error measures for the different models for hourly (circles), daily (squares) and monthly
(triangles) irradiation in (a) 2012 all sites, (b) 2012 Netherlands only, (c) 2013 all sites, (d) 2013
Netherlands only, (e) 2011 Netherlands only and (f) 11 months from April 2014 to February 2015,
Netherlands only.
41
Figure 23: Arithmetic average bias over all stations in the Netherlands (31 meteorological sta-
tions) for the different models and years.
When comparing the results to on-site measurements, it is clear that on-site measurements with
calibrated and well-maintained instruments will be much more precise than the satellite-based
data. However, for first and second class pyranometers (ISO 9060 classification) as well as for
silicon irradiance sensors as often used in small to medium size PV plants, the precision of the
satellite services is generally comparable and sometimes even better than that of the on-site
measurement.
The conclusions of this study highlight that satellite-based irradiation data are a valid and reliable
reference for long-term yield estimates as computed by investors, installers and consultants dur-
ing the design phase of a PV plant. Moreover, satellite-based irradiation data can also be used
today as an alternative to on-site measurements for monthly and quarterly performance report-
ing for small to medium-size PV plants. In case of doubt, it is recommended to always evaluate
the quality of the satellite data with ideally one or two years of data from a well-maintained me-
teorological station in the neighbourhood. For fault detection during PV plant operation hourly or
daily resolution is required. Therefore, on-site sensors are the first choice as satellite data are less
precise in this time scale. However, satellite-based irradiation data may be considered as back-up
when the sensors fail or appear to be poorly maintained. Finally, satellite data may also serve to
validate the proper calibration and configuration of irradiance sensors in case of doubt. Particular-
ly for large deviations, cleaning needs or shadowed sensors, the satellite may spare the operator a
site visit and can already indicate what is wrong.
42
for all locations on earth but may undergo significant long-term variations for particular regions,
which is referred to as “global dimming and brightening”.
Evidence that solar irradiation incident on the Earth’s surface is not stable over time but is subject
to long-term trends spanning multiple decades has been reported in numerous studies. A general
decrease (“global dimming”) in surface solar irradiation at many observation sites from the begin-
ning of widespread measurements in the 1950s up to the 1980s was followed by a partial recov-
ery in surface solar irradiation at many of the sites since the mid-1980s, a phenomenon referred
to as “brightening” [22][37]. Increasing and decreasing air pollution and associated aerosol loads,
as well as their effects on clouds, are considered as major contributors to the dimming and
brightening, respectively.
The selected period of historical data becomes highly relevant given these trends of irradiation, as
illustrated in Figure 24 prepared by Müller et al. and also discussed more in depth in [24], where
long-term irradiation measurement time-series made available by Germany’s meteorological in-
stitution Deutscher Wetterdienst (DWD) were analysed regarding dimming and brightening.
In Germany, the period 1951–2010 is clearly divided into a period of dimming, where the annual
average global horizontal irradiance decreased, and a period of brightening, where the GHI in-
creased. The turning point lies in the early 1980s. For the stations analysed, the calculated trend
for the dimming period is (−1.7 ± 1.3) %/decade, and the trend for the brightening period is
(3.3 ± 1.6) %/decade. The observed brightening trend is composed of an increase in the amount
of direct irradiation, and a decrease in diffuse irradiation of smaller magnitude, as seen in data
from 1991 to 2010. As the fraction of direct irradiance increases, the trends are amplified for tilt-
ed or tracked planes.
Figure 24: Different possibilities to estimate future solar resources as published in [24]. The mov-
ing average of the mean GHI anomalies (black) and the trend lines (green for the dimming period
and blue for the brightening period) are shown together with the possible irradiance in the future.
Future irradiance is indicated by the red plane, the mean values for the three scenarios are given
as red lines. The trend of the mean anomalies used to derive scenarios 1 and 3 is 3.3% per decade
(see text).
43
Figure 25 showcases an analysis that suggests the reported brightening effect to be of relevance
for solar PV projects also at locations outside of Germany [37].
Figure 25: Visualization of potential irradiation trends using the openly available CM SAF SARAH
data set of global horizontal irradiation [37].
These trends make it difficult to establish a representative or “true” long-term average value that
could be used to predict future solar energy availability. In fact, historical data from Germany
show that using the average global horizontal irradiance from the past to predict the average of
the subsequent 20 years the dimming and brightening trends create an additional uncertainty of
about 3%. This trend-related uncertainty is estimated to 4% to 5% for global irradiance in a 30°
tilted, south facing plane, about 6% to 7% for global normal irradiance and to 15% for direct nor-
mal irradiance. These values represent significant additional uncertainties for solar resource as-
sessments.
In the presence of these long-term trends, the question for solar resource assessments is no long-
er, what is the “true” climatological value, but what is the best predictor for the next 20 years. A
suitable estimator should be a recent time period, that is long enough to filter the influence of
single years with high anomalies, but which is short enough, to minimize the influence of past
trends. Müller et al. propose to use the solar irradiance data of the 10 most recent years as a
good compromise to fulfil these conditions [24].
Applying this methodology to current solar resource assessments in Germany today, we project
about 3% higher global horizontal irradiance values and up to 5% higher irradiance in tilted planes
compared to a 30-year average. For tracked planes or direct normal irradiance the differences are
even higher. While we recognize the importance of avoiding overly optimistic solar resource as-
sessments, we believe that this new approach will provide more appropriate predictions in gen-
eral. While Müller et al. [24] focused on Germany, the conclusions should also apply in other parts
of the world where substantial long-term variations have been observed, see Figure 25.
44
and ground reflected irradiance components are transformed to the plane of array and recom-
bined again in order to obtain GPOA.
Different combinations of decomposition methods and algorithms for the horizontal to plane of
array conversion were evaluated using more than two years of five minutes data measurements
from two well-maintained secondary standard pyranometers at a site in France. The first pyra-
nometer is placed in the horizontal plane and the second pyranometer is facing south with an
inclination of 25°. The evaluated decomposition models (from global to components) are: Erbs
[38], Ruiz (G0 and G2 variations) [39] and Skartveit [40]. The evaluated algorithms for the horizon-
tal to the plane-of-array conversion are: Isotropic [41], Hay [42], Muneer [43] and Perez [44]. Ta-
ble 7 shows the validation results for the different algorithm combinations. For all combinations,
an albedo of 0.2 and a turbidity of 2.0 are considered. Finally, the effective irradiance on the PV
panel GPOA is calculated by applying the incidence angle modifier (IAM) to the plane of array
irradiance as described in [45] and [46].
The validation shows that, for the analysed case, the highest overall accuracy was obtained using
the Skartveit decomposition algorithm in combination with the Hay conversion algorithm (Table
7). The resulting normalized root mean square error (nrmse) is 4.8% for hourly resolution (Figure
26). Similar values are reported in literature as e.g. in [47] where 4.5% for the Perez model is re-
ported and 5.4% for the Hay model. In [48], the authors highlight that the Hay and the Perez
models have a very similar behaviour and that different results published in the literature may be
influenced by, among others, the reflected component.
Table 7: Validation of the different algorithm combinations (analysed period: May 2010 to Janu-
ary 2013).
45
Figure 26: Carpet plot and scatter plot of the difference between the measured inclined irradiation
and the irradiation calculated from the horizontal measurements using the selected model combi-
nation.
The Hay model is simpler than the Perez model and requires less input parameters. Therefore, it is
often recommended in the literature to use the Perez model only when high quality weather files
are available, as unreliable input data may potentially distort the output of the model. The newest
version of the PVsyst software proposes to use the Perez conversion model as default. However,
the users are informed that the Perez model usually gives yearly averages higher than the Hay
model (up to 2% higher depending on the climate and the plane orientation).
3.5 Soiling
Energetic losses caused by soiling are currently among the most difficult ones to be quantified in
PV energy yield predictions. This is reflected by the fact that no established physical model of PV
soiling mechanisms currently exists, i.e., no specific model is applied in PV energy yield prediction
studies judging the bankability of a project by any of the respondents of the LTYP reporting ques-
tionnaire, but only estimated monthly gross averages are used.
In addition to the current lack of effective soiling modelling methods, the global PV market has
transitioned from being localized in the seasonally very rainy region of central Europe to more
arid regions, with consequently much higher potential energy losses caused by soiling, unless
soiling-limiting designs and/or module cleaning is appropriately implemented.
One part of the challenge to model PV soiling losses is attributable to the broad variety of param-
eters and effects that play a role in mechanisms governing soiling and de-soiling rates, respective-
ly. On top of the sheer amount of influential parameters, some of the basic environmental input
variables that affect soiling exhibit apparent contradictions in their influence on (de-)soiling rates,
and also the time sequence of events is of relevance, as illustrated in the following.
One descriptive example of a contradictory influence is for the effects of wind speed; with high
wind speeds being capable of cleaning soiled PV modules off dry dust, thus lowering soiling losses.
Yet, high wind speeds can also lead to additional deposition of dirt and/or dust onto PV modules,
since wind can transport dust and soil from nearby (or far away) locations, thus increasing soiling
losses. Wind speed is therefore a poor predictor for soiling and de-soiling rates.
Also the time sequence of events are of importance: Whereas heavy rain events may effectively
clean soiled PV modules, light rain or high humidity (e.g. morning dew) can lead to relatively wet
and tenacious soiling compounds on the glass surface of PV modules. When such an effect is sub-
sequently followed by a clear-sky day, the soiling compounds literally get cemented onto the glass
substrate. This cemented soiling of PV modules is hardly to be cleaned by any wind. Also larger
rain events are less likely to clean glass surfaces of this cemented soiling. From the modelling per-
46
spective, time sequences are even more complicated because pro-active cleaning of PV modules
as an O&M activity will reset the soiling condition of a PV array artificially, which is also time-
dependent and last but not least highly project-specific. It is clear from these examples that accu-
rate predictions of energy losses associated with soiling of PV modules for time periods covering
multiple decades can bring along significant uncertainty.
From a survey on LTYP best practises among PVPS Task 13 experts, a variety of answers is docu-
mented:
The answers varied from the use of empirical values of soiling with a fixed derating factor
to more comprehensive analysis including the combination of rainfall information, tilt an-
gle, site specific information (e.g. pollution level) and cleaning practices.
Differentiated climatic zones are not used by all participants to the survey. However as-
sessment of local rainfall is performed by all.
Generally only monthly factors based on rainfall and average humidity are used in the cal-
culation.
As an example, Fraunhofer ISE has developed a simplified procedure to estimate overall energy
losses associated with soiling in a deterministic and consistent manner. It has to be noted that the
underlying assumption of this fairly simplistic procedure, outlined in Table 8, is that appropriate
O&M cleaning schedules limit energy losses caused by soiling to acceptable levels.
Assuming appropriate O&M cleaning schedules, soiling losses are currently estimated by Fraunho-
fer ISE for lifetime PV yield predictions as outlined in Table 8 and uncertainties as stated in LTYP of
Fraunhofer ISE are listed in Table 9. As listed, overall 9 climate regions of the Köppen-Geiger cli-
mate classification systems are distinguished in order to select, from a lookup table that is differ-
entiated into three module tilt classes, the average annual energetic loss to be attributed to soil-
ing. If project specific contractual obligations are in effect, the (maximum) soiling losses defined
there will be used instead of the “default values” given in Table 8.
Table 8: Annually averaged soiling losses to be used as de-rate factors in LTYP simulations at
Fraunhofer ISE as of 2016.
47
Table 9: Uncertainty attributed to annually averaged soiling loss to be included in the overall un-
certainty calculation in LTYP at Fraunhofer ISE as of 2016.
𝑌DC = ∑𝑁
𝑖=1 𝐺𝑃𝑂𝐴,𝑖 𝜂STC 𝐴module 𝑓𝑖 (𝐴𝑂𝐼, spectrum, 𝑇, module characteristics)
where N is the number of available time steps, 𝐺𝑃𝑂𝐴 is the irradiance in module plan, 𝜂𝑆𝑇𝐶 the
module efficiency at STC, 𝐴module the module area in m², and f the factor for efficiency at operat-
ing conditions.
The efficiency change at time i represented by factor fi depends on the combination of module
characteristics and operating conditions. In practice, it is very difficult to determine the complete
influence as a total, so that the different influencing effects (irradiance, temperature, etc.) are
typically represented by one individual factor per effect. The influences are assumed to be inde-
pendent. Furthermore, it is often useful to use the factors in integrated form, e.g. over one year.
These assumptions lead to the following expression used for the calculation of DC yield in this
section:
where 𝐻𝑃𝑂𝐴 is the irradiation (integrated irradiance over one year) in module plane in kWh/m²,
𝜂𝑆𝑇𝐶 the module efficiency at STC, 𝐴module the module area in m², 𝑓AOI the relative influence due
to angle-of-incidence (AOI) effects, 𝑓spectral the relative influence due to the varying spectral irra-
diance, 𝑓G the relative influence due to low light behavior, and 𝑓T the relative temperature influ-
𝑃STC
ence. Note that 𝜂STC 𝐴module = 1𝑘𝑊/𝑚 2 , therefore the terms power and efficiency may be used
DC energy YDC depends on module size, and is thus of limited significance when it comes to com-
paring different module types. Other indicators like the module performance ratio (MPR) are
more useful for this task. MPR is derived from the definition of the PV system performance ratio
(PR), the only difference being that the DC power produced by a module constantly operated at
its maximum power point is used instead of the final AC yield of the system.
𝑌DC
⁄𝑃
𝑀𝑃𝑅 = 𝐻POA STC
= 𝑓AOI 𝑓spectral 𝑓𝐺 𝑓T
⁄1𝑘𝑊/𝑚²
MPR basically indicates how much of the energy that could be produced by a module with given
nominal power at permanent STC conditions is actually produced. As MPR is not dependent on
48
total 𝐻POA (just on the distribution of irradiance and temperature levels), it allows for comparison
of modules at different locations. For this reason, MPR will be used for discussing results in this
section.
In order to evaluate the significance of calculated MPR results, their uncertainty must be consid-
ered in the interpretation. Basic rules for the estimation of uncertainty are described in the ‘Guide
to the expression of uncertainty in measurement’ GUM [49][50]. As the measurement equation
used here is of simple structure, it is easy to calculate the combined uncertainty for MPR:
The calculation of the influencing factors and the uncertainty estimation in detail is described and
discussed in the following subsections. All models and approaches that were used were chosen
because they were readily implemented at Fraunhofer ISE, and partly have been used for many
years. We point out that the focus of this section is to demonstrate general uncertainties in ener-
gy rating, not to compare or benchmark different models.
The module reflection losses are calculated with respect to this reflection characteristic separately
for direct and diffuse irradiation. For losses in direct irradiation, the AOI on the plane of array and
the module reflection behaviour are combined for each time step. Losses in diffuse irradiance are
estimated to be 3.5% for all time steps which assumes that the diffuse part is isotropic, but can be
approximated by using an average AOI between 50° and 60°.
Uncertainties in estimation of 𝑓AOI are on the one hand due to the module characteristics: in the
case here, the actual reflection characteristics can differ from the assumed standard behaviour,
and in case the characteristics were measured, measurement uncertainty would have to be ac-
counted for. On the other hand, the uncertainty is due to the assumption of an isotropic distribu-
tion of diffuse irradiance, which will mostly add to the overall uncertainty at locations with high
shares of diffuse irradiance. The uncertainty for 𝑓AOI is roughly estimated to be 1% for all loca-
tions and modules, which should be analysed in more detail in the future.
49
in recent years and quantified gains or losses in several locations on a monthly or annual time
basis. Just to cite some results and with no aim to fully cover this topic, Alonso-Abella et al. [54]
quantified spectral effects on amorphous silicon-based PV systems to vary between –16% and
+4% and between –3% and +6% on a monthly basis for, respectively, Stuttgart (Germany) and
Tamanrasset (Algeria). On a yearly basis, this turns into –0.35% and +2% for the two locations.
Different indexes are used to quantify spectral effects on photovoltaic systems, like the Average
Photon Energy APE, the average wavelength λave and the spectral mismatch factor MM. The latter
is defined as:
𝑑 𝑏
∫𝑐 𝐺𝑟𝑒𝑓 (𝜆) 𝑆𝑅𝑟𝑒𝑓 (𝜆) 𝑑𝜆 ∫𝑎 𝐺𝑖𝑛 (𝜆) 𝑆𝑅𝑑𝑢𝑡 (𝜆) 𝑑𝜆
𝑀𝑀 = 𝑑 𝑏
∫𝑐 𝐺𝑖𝑛 (𝜆) 𝑆𝑅𝑟𝑒𝑓 (𝜆) 𝑑𝜆 ∫𝑎 𝐺𝑟𝑒𝑓 (𝜆) 𝑆𝑅𝑑𝑢𝑡 (𝜆) 𝑑𝜆
where Gin(λ) is the incoming solar spectrum (either measured or simulated) , Gref (λ) is the ASTM
G173-03 AM 1.5 standard spectrum, SRdut(λ) is the spectral response of the PV device being tested
and SRref (λ) is the reference spectral response, i.e. the spectral response of the device measuring
the reference spectrum. If this is a pyranometer, with spectral response curve compared to quartz
glass, SRref (λ) is assumed equal to 1 for every wavelength and the previous becomes:
𝑑 𝑏
∫𝑐 𝐺𝑟𝑒𝑓 (𝜆) 𝑑𝜆 ∫𝑎 𝐺𝑖𝑛 (𝜆) 𝑆𝑅𝑑𝑢𝑡 (𝜆) 𝑑𝜆
𝑀𝑀 = 𝑑 · 𝑏
∫𝑐 𝐺𝑖𝑛 (𝜆) 𝑑𝜆 ∫𝑎 𝐺𝑟𝑒𝑓 (𝜆) 𝑆𝑅𝑑𝑢𝑡 (𝜆) 𝑑𝜆
Integration limits c and d must include the reference spectral response, while a and b are integra-
tion limits that must include the spectral response of the PV device. MM higher than 1 corre-
sponds to spectral gain compared to STC, while MM lower than 1 corresponds to spectral loss.
The study of Belluardo et al. [55] focuses on the calculation of the uncertainty of the spectral
mismatch factor on seven different photovoltaic technologies: monocrystalline (mc-Si) and poly-
crystalline (pc-Si) Silicon, double junction amorphous Silicon (a-Si), Copper Indium Gallium Sele-
nide (CIGS), Cadmium Telluride (CdTe), organic cell (organic) and Copper Zinc Tin Sulfide (CZTS).
The spectral response SR of the investigated technologies has been measured in laboratory and is
shown in Figure 27.
According to the last equation for MM, and under the hypothesis of neglecting the uncertainty of
the measurement of SR, only the contribution of the uncertainty of the incoming spectrum Gin(λ)
affects the uncertainty of MM. The uncertainty of MM has been calculated using the Monte Carlo
technique. First, a statistically significant number of spectra (in this case, 500) has been simulated
using the tool SDISORT. Each of the spectra has been generated using a set of input parameters,
50
i.e. atmospheric and geometric parameters, randomly retrieved according to the specific Probabil-
ity Density Distribution of their error and a reference set of value, both set by the authors. In par-
ticular, the reference set corresponded to the atmospheric conditions recorded at Kanzelhöhe
observatory (Austria) at 10 AM (UTC) on April 25th, 2013. Once the 500 spectra have been ob-
tained, the corresponding values of MM have been calculated. The pool of values has been there-
fore analysed in a statistical way in order to calculate its standard deviation, its mean value and
the ratio of the two, which corresponds to the relative uncertainty of MM.
Table 10: Values of relative uncertainty for seven different PV technologies, for the reference case,
and for the cases ensuring the minimum and maximum levels of uncertainty.
An extension of the analysis to all the possible sets of atmospheric conditions which are different
from the reference ones defined above requires that different values and combinations of input
parameters have been considered in order to define minimum and maximum levels of uncertain-
ty. Results are shown in Table 10. In general, the uncertainty of MM strictly depends on the tech-
nology. The reference case is much closer to the minimum limit that to the maximum limit. In
general, technologies with a narrower spectral response (e.g. organic and a-Si) are affected by a
higher level of relative uncertainty that might theoretically reach 9%. On the other hand, technol-
ogies with a broader spectral response show lower levels of relative uncertainty, with a limit
around 2% for monocrystalline- and polycrystalline silicon, and CIGS.
where G is the irradiance, 𝑇STC is 25 °C, 𝜂 the module efficiency at specific conditions, and a, b, c
are free or fitting parameters, describing among others the low light behaviour.
This model is a simple efficiency model, which is capable of reproducing the low light behaviour
for all relevant PV technologies sufficiently well based on data sheet values or measured module
efficiencies. The parameters a, b and c are determined from measured module characteristics by
a least square fitting procedure. Modelled and measured efficiencies show good agreements, with
slightly higher deviations up to 2% to 3% at irradiance levels below 200 W/m2 (see Figure 28).
These deviations at very low irradiance levels are however not considered to be energetically
relevant for calculations of annual influencing factors.
The influence on produced energy is calculated for each time step, using the irradiance after re-
flection losses, in order to obtain the factor 𝑓G :
51
∑𝑁
𝑖=0 𝐺i (𝜂STC −𝜂(𝐺i ,𝑇STC ))
𝑓G = 1 − ∑𝑁
𝑖=0 𝐺𝑖 𝜂STC
where G is the irradiance, 𝜂 the module efficiency at specific conditions, and N is the number of
available time steps.
The irradiance factor uncertainty was assumed conservatively to have a rectangular distribution,
with a width equal to the difference between highest and smallest influence calculated from the
different cases as mentioned above. It was found that the uncertainty of the factor 𝑓G does not
significantly vary between the different module types, but with the site-specific conditions: the
larger the share of low light conditions, the higher the uncertainty. The most important influence
is the relative measurement uncertainty, which is directly proportional to the factor’s uncertainty.
Figure 28: Example for the different curves for uncertainty estimation (left: c-Si with uncertainty u
of efficiency at 600 W/m² and 200 W/m² of 0.5% and 1%, respectively, right: CdTe, uncertainty 1%
and 2% respectively). The five curves are: (1) as measured, (2) (1+u) η200 and (1+u) η600, (3) (1 ̶ u)
η200 and (1+u) η600, (4) (1+u) η200 and (1̶ u) η600 (5) (1 ̶ u) η200 and (1 ̶ u) η600.
3.6.4 Temperature
For modelling the module performance at temperatures different from STC, often a simple linear
dependency is used:
52
where 𝑇mod is the module temperature, 𝑇STC is 25 °C, and 𝛾 the temperature coefficient of mod-
ule efficiency (or power). Accordingly, the factor 𝑓T is calculated as follows:
∑𝑁
𝑖=0 𝐺i (𝜂(𝐺i ,𝑇STC )−𝜂(𝐺i ,𝑇mod,i ))
𝑓T = 1 − ∑𝑁
𝑖=0 𝐺i 𝜂(𝐺i ,𝑇STC )
53
4 Effects of uncertainty
After a discussion of uncertainties in measurements (Section 2) and in modelling (Section 3), the
combination of the knowledge gained shall be demonstrated with two examples.
One example deals with the uncertainty of PV module energy rating, i.e. the question, whether
the expected differences in performance between two module types are bigger than the associat-
ed error margins. This is a direct continuation of the investigation in Section 3.6, the full work is
documented in [58].
In a second step, a framework for the calculation of uncertainty for a complete Long Term Yield
Prediction is presented. As the simplified error propagation approach of the first example is not
suitable for a complex LTYP, a Monte-Carlo simulation is used here instead.
These past efforts are now integrated in the series of standards IEC 61853, which aims to establish
“IEC requirements for evaluating PV module performance based on power (watts), energy (watt-
hours) and performance ratio”. Part 1, which deals with power rating measurements, i.e. I-V curve
measurements for PV modules at different irradiance and temperature levels, is already a valid
standard. Part 2 for determination of angle of incidence (AOI) effects, spectral response and oper-
ating temperature is in press. Part 3 for energy rating calculation methods and part 4 for standard
weather data sets covering different climatic regions are in earlier stages of development.
The parts of the standard are consistent with the basic steps of energy rating, which can be very
briefly summarized as follows:
Obtain module characteristics – first of all STC power, then irradiance dependency, tem-
perature coefficients and sometimes also spectral response, angular response and typical
operating temperature. As energy rating is aimed at differentiating modules, the module
characteristics are the most important input data.
Obtain reference weather data – In energy rating, weather data plays the same role as
standard conditions for module power measurement, even though for energy rating, the
reference conditions are much larger data sets. The reference weather data must be
comprised of first the weather of specific climates, and second assumption regarding the
operating situation, such as module tilt and orientation. As predefined and standardized
reference weather data sets are not yet available, alternatively ground-measured data,
typical meteorological years (TMY) or location-specific data from one of many weather
data bases can be used. Weather data should at least contain irradiance and temperature;
spectral irradiance, wind or humidity are rarely available. Suggestions for development of
reference data sets for energy rating are given in [61].
Simulate the energy that the module type under scrutiny will produce under the condi-
tions described by the selected weather data set.
54
These steps are also part of yield predictions for PV systems, which however cover system-related
influences like shading or electrical losses additionally. Yield predictions aim at giving a very realis-
tic indication of the energy yield over the expected system lifetime, and thus also include assump-
tions for degradation. Therefore, the predicted specific yield for a module will always be larger
than that for a PV system.
The uncertainties inherent in yield predictions and module energy rating are consequently of dif-
ferent nature: solar resource assessment is a major contribution to uncertainty for yield predic-
tions, see Section 3.3 for more details and Section 4.2 for a complete assessment. In energy rat-
ing, the dominating uncertainties come with module characterisation, and the results of Section
3.6 are used here in an exemplary manner.
Also, a so called reference data set was derived from measurements in CalLab PV Modules in
2013. The reference is the median of about 100 measurements of irradiance dependency and 100
measurements of temperature dependency.
Irradiation in the plane of array can be calculated straightforward using geometrical relations for
the direct part. Diffuse in-plane irradiance is calculated using the model by Perez et al. [62]. The
albedo of the surrounding was selected to be a fixed value of 0.2, a usual simplification whenever
the local albedo is not known or measured. We furthermore assumed that the modules are ori-
ented due south at an inclination angle of 25°.
Module temperature, which is the crucial influencing factor for calculation of temperature influ-
ence, was estimated from the ambient temperature given in the SolarGIS time series using an
irradiance-dependent offset of 25 K at STC irradiance:
𝐺
𝑇mod = 𝑇amb + 25K 1000W/m²
where 𝑇mod is module temperature, 𝑇amb is ambient temperature, and G is irradiance in module
plane.
55
Table 11: Module types used in this investigation.
ID Technology ID Technology
A1 c-Si B2 CdTe
A2 c-Si C1 CIGS
A3 c-Si / high efficiency C2 CIGS
B1 CdTe D a-Si
Figure 29: Irradiance dependency and temperature coefficient of the efficiency for eight selected
module types. The black line shows the median value for crystalline silicon modules measured at
Fraunhofer ISE’s CalLab PV Modules in 2013 (~100 measurements for temperature dependency
and ~100 for irradiance dependency); the grey area indicates the typical range (5th to 95th percen-
tile).
Figure 30: Spectral response of the selected module types (350 nm data point for C1, C2 and D is
extrapolated).
56
Table 12: Selected locations and relevant information characterizing their climate.
Figure 31: Module Performance Ratio (MPR) for eight different module types and three locations
from different climates (broad caps of error bars indicate expanded uncertainty, narrow lines in
the middle of the error bars indicate standard uncertainty).
57
Table 13: Energy Rating input data, results and uncertainty for all locations.
Norwich A1 A2 A3 B1 B2 C1 C2 D Ref.
fAOI [%] -3.1 -3.1 -3.1 -3.1 -3.1 -3.1 -3.1 -3.1 -3.1
fspectrum [%] 1.4 1.4 1.1 2.4 2.4 1.4 1.5 3.4 1.4
fG [%] -2.6 -1.2 -2.8 2.2 0.1 -1.0 -9.6 -3.7 -2.2
fT [%] -0.7 -0.6 -0.6 -0.3 -0.4 -0.4 -0.9 -0.4 -0.7
MPR [%] 95.1 96.5 94.7 101.1 99.0 96.9 88.1 96.1 95.5
Exp. Uncert. [%] 3.0 3.0 3.2 4.4 4.4 4.0 4.0 4.4
Breisach A1 A2 A3 B1 B2 C1 C2 D Ref.
fAOI [%] -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7
fspectrum [%] 1.4 1.4 1.1 2.4 2.4 1.4 1.5 3.4 1.4
fG [%] -2.0 -0.8 -2.1 1.9 0.2 -0.6 -7.5 -2.9 -1.6
fT [%] -2.5 -2.5 -2.0 -1.3 -1.4 -1.5 -2.8 -1.5 -2.5
MPR [%] 94.3 95.4 94.3 100.3 98.4 96.6 88.7 96.3 94.6
Exp. Uncert. [%] 3.0 3.0 3.1 4.1 4.1 3.6 3.6 4.3
Rafah A1 A2 A3 B1 B2 C1 C2 D Ref.
fAOI [%] -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3
fspectrum [%] 1.4 1.4 1.1 2.4 2.4 1.4 1.5 3.4 1.4
fG [%] -0.7 -0.1 -0.9 1.7 0.6 0.3 -4.0 -1.3 -0.5
fT [%] -7.5 -7.8 -6.2 -4.0 -4.4 -4.5 -8.0 -4.5 -7.7
MPR [%] 91.0 91.3 91.8 97.7 96.2 94.9 87.6 95.2 91.0
Exp. Uncert. [%] 3.2 3.2 3.2 3.9 3.9 3.4 3.6 4.3
Table 14: Uncertainty of influencing factors depending on module type and location (standard
uncertainty, k=1).
Norwich A1 A2 A3 B1 B2 C1 C2 D
uf_AOI [%] 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
uf_spectral [%] 0.9 0.9 1.0 1.4 1.4 1.0 1.0 1.8
uf_G [%] 0.7 0.7 0.7 1.4 1.4 1.4 1.4 0.7
uf_T [%] 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.0
uMPR [%] 1.5 1.5 1.6 2.2 2.2 2.0 2.0 2.2
Breisach A1 A2 A3 B1 B2 C1 C2 D
uf_AOI [%] 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
uf_spectral [%] 0.9 0.9 1.0 1.4 1.4 1.0 1.0 1.8
uf_G [%] 0.6 0.6 0.6 1.1 1.1 1.1 1.1 0.6
uf_T [%] 0.2 0.3 0.2 0.1 0.1 0.1 0.3 0.1
uMPR [%] 1.5 1.5 1.5 2.0 2.0 1.8 1.8 2.1
Rafah A1 A2 A3 B1 B2 C1 C2 D
uf_AOI [%] 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
uf_spectral [%] 0.9 0.9 1.0 1.4 1.4 1.0 1.0 1.8
uf_G [%] 0.4 0.4 0.4 0.8 0.8 0.8 0.8 0.4
uf_T [%] 0.8 0.8 0.6 0.4 0.4 0.4 0.8 0.4
uMPR [%] 1.6 1.6 1.6 1.9 1.9 1.7 1.8 2.1
58
Amongst the relative influences, there are two aspects worth discussing: on the one hand, which
influencing factors are largest, i.e. have the highest impact on absolute MPR, and on the other
hand, which factors vary most between different modules, i.e. have the highest impact on the
rating. Note that only irradiance and temperature dependence and in part spectral impact (loca-
tion-independent values were used) can be evaluated here. AOI losses were calculated using a
generic reflection characteristic for all modules, so that they do not contribute to the difference.
With a magnitude of 2% to 3%, AOI losses are usually the largest or second-largest influence on
MPR for the locations analysed here. This demonstrates that further research aimed at reducing
AOI losses and improving the simulation of these losses is useful. Spectral influences are moder-
ate in magnitude, and contribute moderately to the difference between modules. Irradiance-
related influences are the larger when the share of low irradiance levels at a location is large;
and/or when the low light efficiency is low. Therefore, their absolute influence on MPR highly
depends on location and module type. However, in terms of contribution to the differences be-
tween the module types, irradiance influences are most important with disregard of location.
Temperature influences are largest and contribute stronger to the difference at a hotter location.
The standard and expanded uncertainty is indicated in Figure 31 for each result by error bars with
narrow caps in the middle, and broad caps at the ends, respectively; and the further is given in
numbers for each factor in Table 14 (expanded uncertainty is calculated here by multiplying
standard uncertainty with a coverage factor k=2). Expanded uncertainty means that the true value
of the measurand lies within the range indicated by result and uncertainty limits (e.g. Figure 31,
right side: MPR of A1 at location 1: 93.5±3.7%) with a probability of 95%. For the standard uncer-
tainty range, the probability is 68%.
For interpretation of the MPR values including uncertainty information, a procedure similar to the
one in [15] is used. Each individual result is compared to the reference value, and the difference is
divided by the individual result’s uncertainty to calculate a ‘z-score’:
where MPR is the module performance ratio of the module type under scrutiny, uMPR the associ-
ated uncertainty, and MPRref the module performance ratio obtained with the reference charac-
teristics.
If the z-score is larger than 2, the deviation of predicted energy/performance ratio per module is
larger than the expanded uncertainty, which means there is a significant difference and we can be
sure the module type outperforms the reference data set. In Figure 31, this is easily visible from
the error bar not crossing the indicated reference value. If the z-score is smaller than 1, this
means the difference is smaller than the standard uncertainty and thus not significant. The mod-
ules can be looked at as essentially equal regarding their performance at the specific location (in
the figures: the error bar crosses the average line within half its length).
If the z-score is in between 1 and 2, the situation is not clear, and there is a certain probability for
the modules being equal or different in their actual performance (the error bar crosses the aver-
age in the outer quarters of its length).
Following this approach, five qualitative ranking levels can be defined: ++ or -- for module types
that differ significantly from the reference performance (|z|>2); (+) or (-) for modules with a slight
59
trend to differ from the reference (2>|z|>1), and ‘o’ for modules that do not significantly differ
from reference performance (|z|<1).
A limitation of this approach is that the rating as suggested above does not give continuous re-
sults, which may seem arbitrary in places. This objection could be met by displaying the result
graphically, as shown exemplarily for two module types in Figure 32. The y-axis represents the
calculated z-score, but does explicitly name only the rating result, while the markers indicate the
exact z-score numbers. MPR values and uncertainties were used as given in Table 13.
Figure 32: Exemplary energy rating result as it could be included on a data sheet as qualitative
information of the module type in question. Location 1, 2, and 3 correspond to England, Southern
Germany and Egypt. Module type A2 is a typical crystalline silicon module type, module type D has
a lower-than-average temperature coefficient and average low light behaviour, module type B1
has both above-average temperature coefficient and low light behaviour. The vertical axis repre-
sents the z-score calculated with MPR and uncertainties as presented above.
The results show that significant energy rating is possible already today, at least if a module refer-
ence data set is available, if the modules show typical degradation, and the difference from refer-
ence energy yield is evaluated for the rating. In summary, energy rating can already be useful for
a number of reasons, but its full opportunities will only come to life after the IEC 61853 standard
is finalized. The work presented here can be helpful in this process and includes a method suitable
for being used as part of the standard.
Furthermore, up to now often just an initial yield and the P90 of the initial yield as well as the
average yield over the assumed lifetime of the system and the P90 of the average yield are given.
These numbers may not be adequate to feed financial models taking effects of degradation and
dimming and brightening trends including their uncertainties into account. The same applies to
influences from inter-annual variations and the time they need to cancel out.
The aim of this section is to develop a method to “handle” all sources of uncertainties influencing
lifetime energy yield predictions and to present the information needed to feed financial models
with time dependent yield estimates and exceedance probabilities as desired by investors or
60
stakeholders. This method can be seen as a part of “a common framework that can assess the
impact of technical risks on the economic performance of a PV project” [63].
4.2.2 Definitions
To be clear in this discussion, we should define some terms in advance. First of all, yield is used as
synonym for energy production.
A lifetime energy yield prediction is an estimate of the total energy production for a PV system at
a specific site. The primary aim is to predict the energy production for the Prediction Period. State
of the art yield predictions can be partitioned in three main parts (see Section 3.1) and should
comprise an analysis of uncertainties for the Predicted Yield:
1. Assessment of the solar resource and other meteorological quantities for the Reference
Period as well as the generation or selection of the best possible time series to describe
meteorological conditions for this period
2. Simulation of the PV system energy output based on modelling and parametrization of
the actual PV system and using the meteorological time series from 1) (calculation of Pre-
dicted Reference Yield)
3. Estimation of long-term changes in energy yield over the Prediction Period and applica-
tion of these changes to Predicted Reference Yield from 2) to determine the Predicted
Yield
The best estimate of the mean annual yield for the PV system under consideration within a refer-
ence period in the past. This yield is calculated using a simulation program, best estimates of the
parameters for the simulation program (in other words the most likely values of all possible un-
certain parameters) and the best source of meteorological data for the reference period. It is usu-
ally given as absolute value [kWh] or specific value [kWh/kWp].
Predicted Yield
The predicted yield is derived from predicted reference yield by applying best estimates of ex-
pected changes of the yield within the assumed lifetime of the PV system (the prediction period).
These changes could be changes in system behaviour (e.g. degradation) or climate changes (e.g.
dimming and brightening).
Predicted Yield can be given for individual years (predicted yield in year x) and / or as mean annu-
al yield over the prediction period (predicted mean annual lifetime yield). It can be given as abso-
lute value [kWh], specific value [kWh/kWp] or as percentage of Predicted Reference Yield.
However, as for the prediction of lifetime energy yields of PV systems this approach is difficult to
apply (e.g. the number of models and parameters is high, each uncertainty vary with daily as well
as seasonal cycles and actual site of the PV system…, see e.g. [31] for more details), it is not im-
plemented in state of the art yield predictions. Instead for recent yield predictions the uncertainty
61
is quantified by assigning an uncertainty distribution to the output of each modelling step to de-
rive Predicted Yield.
A first category of uncertainty is resulting from modelling the Predicted Reference Yield. In prac-
tice it is usually considered by assigning uncertainty distributions to the annual losses or gains for
each modelling step calculated by the yield simulation program. For a number of modelling steps
losses or gains are close to zero, while their uncertainty may be quite high. Furthermore it is phys-
ically not meaningful for some modelling steps to show positive results (e.g. it is only meaningful
that soiling, shading… cause losses, not gains). In these situations it may be more appropriate to
assign asymmetric uncertainty distributions to losses or gains that include only physically mean-
ingful results.
To include uncertainties from the conversion of Predicted Reference Yield to Predicted Yield, un-
certainty distributions for the estimated change rates have to be quantified as well. Note that the
uncertainties of Predicted Yield for individual years will increase with time when an uncertainty
for linear change rates is included in the uncertainty quantification: while the effect of e.g. an
actual 0.5%/year deviation from the expected change rate for system behaviour will be small for
the first year of operation, the system will generate 5% less energy in year 10. For consideration
of uncertainty of change rate for system behaviour again an asymmetric uncertainty distribution
may be more appropriate, as observations of degradation rates tend to be asymmetric and posi-
tive degradation rates are physically not meaningful.
As a third category of uncertainty inter-annual variation of the Predicted Yield has to be consid-
ered. The background for the consideration of inter-annual variation as an uncertainty is the fact,
that Predicted Reference Yield and as a follow up Predicted Yield is calculated as an annual value
(it is the yield in a “typical year”). However solar irradiation (as the main influencing factor for
yield variations) and other meteorological quantities will vary from year to year and influence
annual yields. As long as this variation is interpreted as a variation around a possible trend of me-
teorological quantities whose effects on yield are considered when calculating Predicted Yields,
this variation may not influence cumulated Predicted Yields to a high extent but may have a high
impact on annual Predicted Yields.
If asymmetric uncertainty distributions are applied to some of the modelling steps, the law on
propagation of uncertainties may not be applicable. There are other circumstances and conditions
under which the results of a Monte Carlo approach may be preferable (see e.g. [31][50]).
Probability exceedance values are used to deliver information on the uncertainty distribution of
the Predicted Yield. Pxx is the value that is exceeded with the probability xx%. E.g. P50 for Pre-
dicted Yield in year 1 may be 1000 kWh/kWp, which means that 1000 kWh/kWp is the Predicted
Yield that is exceeded with a probability of 50%. If the law of propagation of uncertainties is ap-
plied to propagate uncertainties, Pxx values can be calculated based on the quantile of a normal
distribution. In the case a Monte Carlo approach is used they can be derived from the quantile of
the empirical distribution of all Z realizations of Predicted Yield, where Z is the sample size of the
Monte Carlo approach.
62
Pxx values can be given as absolute value [kWh], specific value [kWh/kWp] or as percentage of
Predicted Reference Yield. They can be given for individual years (Pxx in Year n), for mean annual
yield over the Prediction Period (Pxx of Predicted Mean Annual Lifetime Yield) and/or for cumula-
tive yield over the Prediction Period (Pxx for Predicted Lifetime Yield).
4.2.5 Results
The implementation of a Monte-Carlo simulation technique into PV energy yield simulation soft-
ware means that not only one single simulation is performed, but a large number of simulations
with inputs being randomly chosen from pre-defined probability distributions.
The practical implementation into the software code introduces the drawing of Z realizations from
a pre-defined probability distribution of GHI, which can be denoted uGHI. The probability distribu-
tion of energetic gains related to irradiation transposition can be denoted uGPOA, and similarly
other probability distributions that are deemed necessary to be included.
Similarly, the uncertainty related to predicted PV energy yield is included by drawing Z realizations
reflecting Z possible long-term rates of change in system behaviour (i.e., drawing Z realizations
from predefined probability distribution of degradation rates).
Using appropriate equations for each gain or loss mechanism, the PV energy yield is calculated for
each individual year of assumed PV system lifetime, with the effect of Z realizations that reflect
long-term changes being considered separately for each subsequent year. Next – and independ-
ent from other uncertainty categories – different overall irradiation of each individual year can be
included to reflect the effects of uncertainty related to inter-annual variation of irradiation. This
leads to the incorporation of all described uncertainties for each individual uncertainty category
for each individual year n throughout the assumed PV system lifetime simulated by this Monte-
Carlo approach. Since this procedure can be implemented in simple loops regarding software
coding, it is straightforward to numerically determine the cumulative yields of years 1 through n
for all Z realizations.
Figure 33 depicts example results for this simulation procedure for an assumed PV system lifetime
of 20 years. All values in Figure 33 were normalized to the best estimate of predicted reference
yield. Our assumptions of probability distributions leading to the determination of uncertainties
of individual models are summarized in Table 15.
Due to the incorporation of non-normal uncertainty distributions, one can denote a qualitative
difference between yield predicted deterministically and the P50 yield (Figure 33a). The differ-
ence between these yields increases over time (Figure 33b), since the uncertainty associated with
changing system output over time also exhibits a non-normal probability distribution. Figure 33b
also shows the general increase of uncertainty in the prediction period.
In a final step, we compared observed annual yield values to the uncertainty range as expected
from the Monte-Carlo simulations. We used the performance data of 26 individual PV systems as
described in [21] for this comparison. The parameters given for a single system in Table 15 were
adapted to the specific systems and sites, and subsequently a number of realizations were calcu-
lated for the set of 26 systems. Figure 34 presents both the Monte-Carlo results and the meas-
ured values in a similar presentation as in the lower section of Figure 33. The measured values fit
quite well into the uncertainty range as expected from the Monte-Carlo simulations.
63
4.2.6 Conclusion
A method to calculate uncertainties and the Pxx values for year by year and life-time energy yield
predictions of PV systems is presented. The method is based on a Monte-Carlo simulation which
uses Gaussian or triangular distributions for individual modelling steps, including the solar re-
source data and long term changes of system behaviour. The parameters may be adjusted to indi-
vidual sites and system layouts. A comparison of expected uncertainty and observed variability
showed a good agreement.
Figure 33: Ratio of simulated PV energy yield in the prediction period over PV energy yield in the
reference period for various stages in a Monte-Carlo simulation, notably a) yield in the reference
projected onto prediction period (GHI and irradiation transposition); b) long-term changes (degra-
dation and irradiation trends); c) inter-annual variations of meteorological conditions and d) the
cumulative predicted PV energy yield as an expanded annual average value.
64
Table 15: Uncertainties of individual modelling steps used in the exemplary yield simulation. A
normal (Gaussian) distribution is characterized by mean value µ and standard deviation ϭ, while a
triangular distribution is characterized by minimum a, maximum b, and modus c.
Symmetric Asymmetric
(assuming normal distribu- (individually selecting normal and triangular
Calculation step tions for all parameters) distributions)
65
a) Predicted yield and observed values for 26 b) Cumulative yield and observed values for
systems 26 systems
Figure 34: Predicted yield and observed annual yield values for 26 PV systems located in Germany
and Spain [21]. The Monte-Carlo calculations for a single system as shown in Figure 33c and Figure
33d were adapted to the specific systems and sites. The measured values fit quite well into the
uncertainty range as expected from the Monte-Carlo simulations.
66
References
[1] Richter, Mauricio; Vedde, Jan; Frearson, Lyndon; Stridh, Bengt; Herteleer, Bert; Jahn, Ul-
rike et al.: Technical Assumptions Used in PV Financial Models - Review of Current Prac-
tices and Recommendations. IEA PVPS Task 13, Report IEA-PVPS T13-08:2017.
[2] WMO Guide to Meteorological Instruments and Methods of Observation: WMO No. 8. 7th
edition. Geneva, Switzerland, 2008.
[3] McArthur L. J. B.: Baseline Surface Radiation Network (BSRN). Operations Manual. Version
2.1. WCRP-121, WMO/TD-No. 1274, 2005
[4] Sengupta, M; et al: Best Practices Handbook for the Collection and Use of Solar Resource
Data for Solar Energy Applications. NREL/TP-5D00-63112. Golden, CO: National Renewa-
ble Energy Laboratory, 2015.
[5] Driesse, A.; Zaaiman, W.; Riley, D.; Taylor, N.; and Stein, J.S.: Indoor and Outdoor Evalua-
tion of Global Irradiance Sensors. Proc. 31st European Photovoltaic Solar Energy Confer-
ence, 14-18 September 2015, Hamburg, Germany.
[6] Reda, I.: Method to Calculate Uncertainties in Measuring Shortwave Solar Irradiance Using
Thermopile and Semiconductor Solar Radiometers, National Renewable Energy Laborato-
ry, Golden, CO, 2011.
[7] Vuilleumier, L., M. Hauser, C. Félix, F. Vignola, P. Blanc, A. Kazantzidis, and B. Calpini
(2014): Accuracy of ground surface broadband shortwave radiation monitoring, J. Ge-
ophys. Res. Atmos. 119 (2014), 13,838–13,860, doi:10.1002/2014JD022335.
[8] Habte, A., Sengupta, M., Reda, I., Andreas, A., Konings, J.: Calibration and Measurement
Uncertainty Estimation of Radiometric Data, NREL/CP-5D00-62214. National Renewable
Energy Laboratory, Golden, CO, p. 9, Preprint 2014.
[9] Riches, M.R.; Stoffel, T.L. and Wells, C.V. editors: Proceedings of the International Energy
Agency Conference on Pyranometer Measurements 1982. SERI/TR-642-1156R, Golden,
CO.
[10] Wardle, D.I. et al: Improved Measurements of Solar Irradiance by Means of Detailed Pyra-
nometer Characterization. Report IEA-SHCP-9C-2, IEA Solar Heating and Cooling Pro-
gramme 1996.
[11] Gostein, M.; L. Dunn: Light soaking effects on photovoltaic modules: Overview and litera-
ture review. In Proc. 37th IEEE Photovoltaic Specialists Conference 2011, S. 3126–3131.
[12] Müllejans H, Zaaiman W, Galleano R.: Analysis and mitigation of measurement uncertain-
ties in the traceability chain for the calibration of photovoltaic devices. Measurement Sci-
ence and Technology Jul 2009; 20: 1–12.
[13] Emery K.: Uncertainty analysis of certified photovoltaic measurements at the National
Renewable Energy Laboratory. National Renewable Energy Laboratory (NREL), Golden,
CO. NREL/TP-520-45299, Aug 2009.
67
[15] Dirnberger D, Kräling U, Müllejans H, Salis E, Emery K, Hishikawa Y, Kiefer K.: Progress in
photovoltaic module calibration: results of a worldwide intercomparison between four
reference laboratories. Measurement Science and Technology Sep 2014; 25: 105005.
[18] Makrides, G., Zinsser, B., Schubert, M., Georghiou, G.E.: Performance loss rate of twelve
photovoltaic technologies under field conditions using statistical techniques. Sol. Energy
103 (2014), 28–42.
[19] Jordan, D., Smith, R., Osterwald, C., Gelak, E., Kurtz, S.: Outdoor PV degradation compari-
son. In Proc. 35th IEEE Photovoltaic Specialists Conference, Honolulu, Hawaii 2010, pp.
2694–2697.
[20] Belluardo, Giorgio; Philip Ingenhoven, Wolfram Sparber, Jochen Wagner, Philipp Weihs,
David Moser: Novel method for the improvement in the evaluation of outdoor perfor-
mance loss rate in different PV technologies and comparison with two other methods. So-
lar Energy 117 (2015) 139–152
[21] Müller, Björn; Hardt, Laura; Armbruster, Alfons; Kiefer, Klaus; Reise, Christian: Yield pre-
dictions for photovoltaic power plants: empirical validation, recent advances and remain-
ing uncertainties. In: Prog. Photovolt: Res. Appl. 24 (4), S. 570–583, 2015. DOI:
10.1002/pip.2616.
[22] Wild, Martin: Global dimming and brightening: A review. In: Journal of geophysical re-
search 114 (D10) 2009, S. D00D16. DOI: 10.1029/2008JD011470.
[23] Wild, Martin: How well do IPCC‐AR4/CMIP3 climate models simulate global dim-
ming/brightening and twentieth‐century daytime and nighttime warming? In: J. Geophys.
Res. 114 (D10) 2009. DOI: 10.1029/2008JD011372.
[24] Müller, B.; Wild, M.; Driesse, A.; Behrens, K.: Rethinking solar resource assessments in the
context of global dimming and brightening. In: Sol. Energy 99 (2014), S. 272–282. DOI:
10.1016/j.solener.2013.11.013.
[25] Del Fabbro, Borut; Valentinčič, Aljoša; Gubina, Andrej F.: An adequate required rate of
return for grid-connected PV systems. In: Solar Energy 132 (2016), S. 73–83. DOI:
10.1016/j.solener.2016.03.006.
[26] Leicester, Philip A.; Goodier, Chris I.; Rowley, Paul: Probabilistic evaluation of solar photo-
voltaic systems using Bayesian networks: a discounted cash flow assessment. In: Progress
in Photovoltaics: Research and Applications, 2016, DOI: 10.1002/pip.2754.
[27] Stoffel, Tom: Terms and Definitions. In: Jan Kleissl (Hg.): Solar Energy Forecasting and Re-
source Assessment. Boston: Academic Press, pp 1–19, 2013.
[28] Thevenard, Didier; Pelland, Sophie: Estimating the uncertainty in long-term photovoltaic
yield predictions. In: Sol Energy 91 (2013), S. 432–445. DOI:
10.1016/j.solener.2011.05.006.
68
[29] Vignola, F.; Grover, C.; Lemon, N.; McMahan, A.: Building a bankable solar radiation da-
taset. In: Sol. Energy 86 (8) 2012, pp 2218–2229. DOI: 10.1016/j.solener.2012.05.013.
[30] Gueymard, C. A.; Wilcox, S. M.: Assessment of spatial and temporal variability in the US
solar resource from radiometric measurements and predictions from models using
ground-based or satellite data. In: Sol. Energy 85 (5) 2011, S. 1068–1084. DOI:
10.1016/j.solener.2011.02.030.
[31] Hansen, Clifford W.; Martin, Curtis E.: Photovoltaic System Modeling: Uncertainty and
Sensitivity Analyses. Sandia National Laboratories, Report SAND2015-6700, 2015.
[32] Strobel, M. B.; Betts, T. R.; Friesen, Gabi; Beyer, Hans Georg; Gottschalg, R.: Uncertainty in
Photovoltaic performance parameters – dependence on location and material. In: Solar
Energy Materials and Solar Cells 93 (6-7) 2009, pp 1124–1128. DOI:
10.1016/j.solmat.2009.02.003.
[33] Dirnberger, Daniela: Uncertainties in Energy Rating for Thin-film PV Modules. Dissertation.
Carl von Ossietzky Universität, Oldenburg, 2015.
[34] Ineichen, Pierre: Five satellite products deriving beam and global irradiance validation on
data from 23 ground stations. University of Geneva, 2011. http://archive-
ouverte.unige.ch/unige:23669.
[35] Ineichen, Pierre: Long Term Satellite Global, Beam and Diffuse Irradiance Validation. In:
Proceedings of the 2nd International Conference on Solar Heating and Cooling for Build-
ings and Industry, Freiburg, 2013. (Energy Procedia, 48), S. 1586–1596.
[36] Tjengdrawira, Caroline; Richter, Mauricio: Review and Gap Analysis of Technical Assump-
tions in PV Electricity Costs. Public Report of the Solar Bankability Project, WP3 D3.1,
2016.
[37] Wild, Martin; Folini, Doris; Henschel, Florian; Fischer, Natalie; Müller, Björn: Projections of
long-term changes in solar radiation based on CMIP5 climate models and their influence
on energy yields of photovoltaic systems. In: Solar Energy 116 (2015), S. 12–24. DOI:
10.1016/j.solener.2015.03.039.
[38] Erbs, D.G., S. A. Klein, and J. A. Duffie, “Estimation of the diffuse radiation fraction for
hourly, daily and monthly-average global radiation,” Sol. Energy, vol. 28, no. 4, pp. 293–
302, 1982.
[40] Skartveit, A., J. A. Olseth, and M. E. Tuft, “An Hourly Diffuse Fraction Model with Correc-
tion for Variability and Surface Albedo,” Sol. Energy, vol. 63, no. 3, pp. 173–183, 1998.
[41] Liu, B. Y. H., and R. C. Jordan, “The Interrelationship and Characteristic Distribution of
Direct, Diffuse and Total Solar Radiation,” Sol. Energy, vol. 4, no. 3, pp. 1–19, Jul. 1960.
[42] Hay, J. E., and J. A. Davies, “Calculation of the Solar Radiation Incident on an Inclined Sur-
face,” in Proceedings First Canadian Solar Radiation Workshop, 1980, pp. 59–72.
[43] Muneer, T., Hourly Slope Irradiation and Illuminance, in Solar Radiation and Daylight
Models (Second Edition), Oxford: Butterworth-Heinemann, 2004, pp. 143–220.
69
[44] Perez, R., P. Ineichen, R. Seals, J. Michalsky, and R. Stewart, “Modeling Daylight Availabil-
ity and Irradiance Components from Direct and Global Irradiance,” Sol. Energy, vol. 44, no.
5, pp. 271–289, 1990.
[45] Soto, W. D., S. A. Klein, and W. A. Beckman, “Improvement and validation of a model for
photovoltaic array performance,” Sol. Energy, vol. 80, no. 1, pp. 78–88, 2006.
[46] Sjerps-Koomen, E. A., E. A. Alsema, and W. C. Turkenburg, “A Simple Model for PV Module
Reflection Losses Under Field Conditions,” Sol. Energy, vol. 57, no. 6, pp. 421–432, 1996.
[47] Cameron, Christopher P., William E. Boyson, and Daniel M. Riley, “Comparison of PV sys-
tem performance-model predictions with measured PV system performance,” in Photo-
voltaic Specialists Conference, 2008. PVSC’08. 33rd IEEE, 2008, pp. 1–6.
[48] Ineichen, Pierre.: Global irradiance on tilted and oriented planes: model validations, 2011.
[49] Joint Committee for Guides in Metrology: Evaluation of measurement data - Guide to the
expression of uncertainty in measurement. JCGM 100:2008: Bureau International des
Poids et Mesures (BIPM).
http://www.bipm.org/utils/common/documents/jcgm/JCGM_100_2008_E.pdf.
[50] Joint Committee for Guides in Metrology: Evaluation of measurement data - Supplement
1 to the “Guide to the expression of uncertainty in measurement” - Propagation of distri-
butions using a Monte Carlo method. JCGM 101:2008: Bureau International des Poids et
Mesures (BIPM).
http://www.bipm.org/utils/common/documents/jcgm/JCGM_101_2008_E.pdf.
[51] Williams SR, Betts TR, Gottschalg R, Neumann D, Prast MO, Nositschka A.: Evaluating the
outdoor performance of PV modules with different glass textures. In Proc. 26th European
Photovoltaic Solar Energy Conference and Exhibition, Hamburg, Germany, 2011, 3152–
3156.
[53] Martin N, Ruiz JM.: Calculation of the PV modules angular losses under field conditions by
means of an analytical model. Solar Energy Mat Solar C 2001; 70: 25–38.
[55] Belluardo et al.: Uncertainty analysis of a radiative transfer model using Monte Carlo
method: impact on PV device. In Proc. PV-Symposium Bad Staffelstein 2016
[56] Heydenreich W, Müller B, Reise Ch.: Describing the world with three parameters: a new
approach to PV module power modelling. In Proc. 23rd European Photovoltaic Solar Ener-
gy Conference and Exhibition, Valencia, Spain, 2008, 2786–2789.
[58] Dirnberger D, Müller B, Reise Ch.: PV module energy rating: opportunities and limitations.
Prog. Photovolt: Res. Appl. 2015; 23(12): 1754–70, DOI: 10.1002/pip.2618.
70
[59] Kroposki, B, D. Myers, K. Emery, L. Mrig, C. Whitaker, and J. Newmiller (1996): Photovolta-
ic module energy rating methodology development, Proc. 25th IEEE Photovoltaic Special-
ists Conference, Anaheim, 1996, pp. 1311-1314.
[60] Kenny, R.P., G. Friesen, D. Chianese, A. Bernasconi, and E. D. Dunlop: Energy rating of PV
modules: Comparison of methods and approach," in Proceedings of 3rd World Conference
on Photovoltaic Energy Conversion, Vols a-C, Osaka, Japan, 2003, pp. 2015-2018.
[61] Huld T, Dunlop E, Beyer HG, Gottschalg R.: Data sets for energy rating of photovoltaic
modules. Solar Energy 2013; 93(0): 267–79, DOI: 10.1016/j.solener.2013.04.014.
[62] Perez, R., R. Seals, J. Michalsky, and P. Ineichen, "Geostatistical properties and modeling
of random cloud patterns for real skies," Sol Energy, vol. 51, pp. 7-18, Jul 1993.
[63] Moser D, Del Buono M, Jahn U, Herz M, Richter M, Brabandere K de. Identification of
technical risks in the photovoltaic value chain and quantification of the economic impact.
Prog. Photovolt: Res. Appl. 2017:25 (7), 592-604, DOI: 10.1002/pip.2857.
[64] Belluardo G, Pierro M, Ingenhoven P, Cornaro C, Moser D, Statistical Analysis of the Per-
formance Loss Rate of PV Plants Distributed in a Region: A Real-Case Study in South Tyrol.
Proc. 33rd European Photovoltaic Solar Energy Conference and Exhibition, 1904 – 1908,
2017
For further information about the IEA Photovoltaic Power Systems Programme and Task 13 publi-
cations, please visit www.iea-pvps.org.
71
72