0% found this document useful (0 votes)
635 views8 pages

S/4 Migration Scenarios

S/4 Migration Scenarios

Uploaded by

insomnium1227
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
635 views8 pages

S/4 Migration Scenarios

S/4 Migration Scenarios

Uploaded by

insomnium1227
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

Products
Products Industries
Industries Services and Support
Services Support Training
Training Community
Community Developer
Developer

Partner
Partner About
About

Ask a Question Write a Blog Post

Shakeel Ahmed
January 31, 2018 3 minute read

SAP ERP to S/4 HANA Migration Scenarios


Follow RSS feed Like

11 Likes 26,245 Views 5 Comments

# Purpose of this Article

There have been multiple scenarios while it comes to SAP (ECC) ERP migration to SAP S/4 HANA. It is
important to understand customers current landscape and used functionalities and modules in current SAP
landscape/system to determine the appropriate S/4 HANA migration scenario.

Determination of migration scenario is so important that based on this understanding only scope, team size
and project valuation (bidding value) can be determined. For example, there could be multiple phases (sub
projects) in one simple e.g. ECC6, EhP7 migration to S/4 HANA 1709.

Identi cation of appropriate migration scenario would help you nalizing following things:

1. Magnitude of Work (Scope)


2. Number of Project Phases

https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 1/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

3. Team Size Requirement


4. Project Amount (Bid Amount)

Mainly this article is for sales team involved in approaching customers for SAP migration. I hope it helps them.

Note: This article is mainly for SAP consultants/management who are market goers (Sales Team). Please get
your basics strong before committing anything about S/4 HANA Migration.

In this article we would be focussing on Scenario 6 and Scenario 7. Other Scenarios will be covered in future
articles.

Note: This document is prepared considering that  rst, the migration will take place from ECC environment and
required additional functionality would be activated in the migrated S/4 HANA 1709 environment. With this
your customer would be in your hand.

# SAP S/4 HANA Migration Scenarios

Note: A new scenario has been evolved in S/4 HANA 1709 for customers who are already in SAP ERP with
HANA1 (Suite on HANA) or S/4 HANA with HANA1 (S/4 HANA Finance 1503, 1605 and S/4 HANA 1511, 1610)
and want migrate to S/4 HANA 1709 (which is on HANA2). Migration has to be done in two phases:

Phase1: SAP ERP o HANA (Suite on HANA) to SAP ERP HANA2 (Suite on HANA2)

Phase2: S/4 HANA with HANA1 (S/4 HANA Finance 1503, 1605 and S/4 HANA 1511, 1610) to S/4 HANA 1709
(1709 is on HANA2)

 
https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 2/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

# S/4 HANA Migration Concepts (Doc. Splitting and Parallel Ledger/Accounting/HANA2)

Following points help you determining migration scenario in respect to scenario 6 and scenario 7:

1. There is no concept of ‘New GL or ‘Classic GL’ in S/4 HANA


2. New GL is not a pre-perquisite for migrating to S/4 HANA, you can migrate to S/4 HANA from classic GL
3. Migration from Classic GL to S/4 HANA 1610 (1503, 1511, 1605 and 1610) was possible, but subsequently
document splitting was not possible and due to this SAP recommendation was to activate rst New GL
(Ledger introduction and document splitting) and then migrate to S/4 HANA
4. Migration from Classic GL (without activating to New GL) to S/4 HANA 1709 is possible, additionally, now
subsequent document splitting and ledger introduction is possible in S/4 HANA 1709. This is the reason, now
there is no need of doing a project for New GL activation in ECC environment.
5. Need to keep in mind that there might be possible three separate projects for converting ECC on classic GL
to S/4 HANA with document splitting and parallel accounting (additional ledgers).
6. Subsequent Ledger (Parallel Accounting) introduction was possible from SAP S/4 HANA Finance SAP 1605
and S/4 HANA 1610.
7. A new scenario has been evolved in S/4 HANA 1709 for customers who are already in SAP ERP with HANA1
(Suite on HANA) or S/4 HANA with HANA1 (S/4 HANA Finance 1503, 1605 and S/4 HANA 1511, 1610) and
want migrate to S/4 HANA 1709 (which is on HANA2). Migration has to be done in two phases:

# Project Phases for Migrating SAP ECC System to S/4 HANA 1709

Considering there is one SAP ECC customer with classic GLs and he wants to move to S/4 HANA 1709. He also
wants have functionality such as document splitting and parallel accounting (additional ledgers).

Phase 1: ECC Migration to S/4 HANA

a. Preparatory Phase

System Requirement (Unicode Conversion)


Maintenance Planner
Pre-Checks
Custom Code Pre-Parathion

b. Technical Migration (SUM)

Database Migration
Software Upgrade
Data Conversion

https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 3/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

c. Delta Customization

d. Data (Functional) Migration (Migration Cockpit)

e. Testing

f. Go-Live

Phase2: Ac va on of Parallel Ledger (Non-Leading Ledger Introduc on)

SAP has two approaches to meet mul GAAP repor ng requirements i.e. the account approach and the ledger
approach

1. Preparatory Phase

2. Execu on Phase

3. Post – Processing Phase

https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 4/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

Phase3: Activation of Document Splitting

1. Preparatory Phase

2. Execu on Phase

3. Post – Processing Phase

(Further detailing can be obtained from this blog https://blogs.sap.com/2017/12/11/subsequent-document-


splitting-in-s4-hana- nance-1709-on-premise/#)

Note: No SLO service is required for activating document splitting subsequently. Standard document splitting
activation cockpit is available in IMG node in S/4 HANA 1709.

# Major/Select Changes in S/4 HANA 1709

https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 5/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

If you are going to customer for sales pitch before that please get the understanding of ‘what is new in S/4
HANA 1709’.

New HANA Data Base i.e. HANA 2 DB


Machine Learning capabilities on S/4 HANA 1709 On-Premise
Expanding Core with Embedded
Innovation on Core: Demand Driven Replacement, Advanced Variant Con guration, Real Time Inventory
Management (e.g. Oil & Gas)
New S/4 HANA Migration Cockpit
New
Alert addition to SAP Fiori Lot
Moderator

Assigned tags

SAP S/4HANA | SAP Fiori for SAP S/4HANA | SAP HANA | SAP S/4HANA Cloud | SAP S/4HANA Finance |

View more...

Related Blog Posts

Architecture Of S/4 HANA vs ERP


By KIRAN KUMAR VADREVU , Nov 06, 2015

All About SAP S/4 HANA In A Nutshell–Admin Prespective


By Former Member , Jun 22, 2016
SAP ERP to S/4 HANA
By Vidya Dadi , Feb 27, 2018

Related Questions

STep of SD data migration post conversion in S/4 HANA


By Vishwas Rangari , Jul 23, 2018
S/4HANA Finance 1503 vs. SAP S/4HANA, on-premise edition 1511
By Vladimir Kogan , Dec 15, 2015

SAP S 4 HANA Migration Option using SCI for custom code analysis
By Former Member , Feb 15, 2018

5 Comments

Former Member
https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 6/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs
o e e be

February 1, 2018 at 11:47 am


This blog has motivated me to pick the most ideal approach to redesign my expertise utilizing SAP preparing.

Like (1) Reply Alert Moderator

Former Member

February 6, 2018 at 8:06 am


Hi Shakeel,

very good blog to take this as reference. keep writing this kind of blogs. Great work.

Regards,

G.V.Shivakkumar

Like (1) Reply Alert Moderator

Shakeel Ahmed | Post author

February 6, 2018 at 8:28 am


Thanks Siva. Sure I will try to contribute as much as possible.

Like (0) Reply Alert Moderator

Abdullah Galal

July 7, 2018 at 12:43 pm


Great e orts, very well explained and detailed, thanks a lot for sharing

Like (1) Reply Alert Moderator

Nam Truong

January 10, 2019 at 12:33 am


Excellent information ! Thank you !

Like (0) Reply Alert Moderator

https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 7/8
7/13/2019 SAP ERP to S/4 HANA Migration Scenarios | SAP Blogs

Add Comment

Share & Follow

Privacy Terms of Use

Legal Disclosure Copyright

Trademark Cookie Preferences

Sitemap Newsletter

https://blogs.sap.com/2018/01/31/sap-erp-migration-to-s4-hana-scenarios-sales-proposition-bidding/ 8/8

You might also like