Project Description : The project is Annual Develpment Programme (ADP) 2016 - 17 of Multan
Circle.The project is launched to improve the provincial and district roads
network in the province. The alignment is mainly traversed in a densely
cultivated area. The project comprises of seven road schemes of district
Vihari.containing roads and box culverts.The road work mainly consists of
formation of embankment from road way and borrow excavation, Sub Grade,
Sub base, WBM base course and Asphaltic Concrete Wearing course. The
combined length of the project is 65 Km.
Description of duties :
Arrange and chair regular meetings with the contractor and other site
staff on scheduled progress ,contractual and technical problems that
may affect the contract objectives.
Supervise and manage the site staff to carry out their responsibilities
and duties and advise them on all aspects of construction supervision
and quality control.
Review of contractor’s Initial and updated construction programs for
compliance with contract completion dates.
Review and prepare interim payment certificates (IPC’s) and
Escalations.
Preparation of daily, weekly and monthly progress reports.
Prepare and Maintain records of the project i.e. Reports, inspections
and testing records.
Assist the contractor in preparation of “As Built” drawings.
Project Description : The project is ADB funded and is located in Azad Jammu and Kashmir. The
project is launched to reconstruct and rehabilitate of about 350 Km the
provincial and district roads including bridges in three districts of AJK namely
Rawalakot,Haveli and Poonch, damaged and effected due to flood in the
year of 2010 and Earth quack. The alignment is mainly traversed in hilly
area. The part of the project comprises of ten road packages, of single lane
carriage way, and of culverts (Box, Slab and Pipe) for cross drainage of
water,Retaining Walls (RCC and Stone Masonary),Drains.,Pre Stressed
RCC Bridges and Suspension Bridges. The road work mainly consists of
formation of embankment from road way and borrow excavation, Water
Bound Macadam and Wearing course.
Project Description : The project Khadim E Aala Punjab Rural Road Project (KPRRP) is launched
to improve the farm to markete road network in the province.The project
comprises the widening,rehabilitation and new construction of old TST and
Earthen roads into Asphaltic pavement roads.
Description of duties : The scope and objectives of the Third Party Validation (TPV) Consultant is
to evaluate the quality of materials and work by performing laboratory as well
as field test of Earth Work,Sub base,WBM and Asphaltic Concrete Wearing
Course.
To check quantities and payments made of work done with strict
adherence to the drawings and cross sections.
Preparation of daily testing reports and submitting the same to Client.
Project Description : The project is ADB funded and is located in Sindh. The project is launched to
reconstruct and rehabilitate the National Highways, including bridges in the
country damaged and effected due to flood in the year of 2010. The
Project Description : The DHA City Karachi (DCK) is the first Planned, Sustainable and Green
City aimed to provide a safe, comfortable, efficient and high quality life style
to its residents .The project is planned on area spanning 11640 acres
comprising of residential, commercial and mixed use elements.DHA City
Karachi (DCK) is located on the Karachi-Hyderabad Superhighway at a
distance of 56 kms from the core city of Karachi. The terrain of the project is
semi hilly with beautiful natural landscaping.
Under Short Term Development Plan, composite of Roads and
Infrastructure works projects are being undertaken.
Sector Development Works includes road works, water supply works
,sewerage network, storm water drainage network, hydraulic structures like
culverts, boundary wall, entry gate, ICT pipe sleeves, electricity pipe sleeves,
gas pipe sleeves and landscaping.
Project Description : The project is ADB funded and is located in Sindh. The project is launched to
reconstruct and rehabilitate of about 984 Km the provincial and district roads
including bridges in the province damaged and effected due to flood in the
year of 2010. The alignment is mainly traversed in a densely cultivated (rice
cultivation on the both side of the road alignment) and water logged area.
The part of the project comprises of five road packages (of district Kamber
Shahdad kot), of single lane carriage way, and of culverts (Box, Slab and
Pipe) for cross drainage of water. The road work mainly consists of formation
of embankment from road way and borrow excavation, Sub Grade, Sub
base, Water Bound Macadam and Wearing course. The combined length of
the packages in the district is 120 Km (aprox).
Description of duties : Assist Resident Engineer in implementing specification, drawings and other
contract documents to ensure quality of work.
Prepare quality control plan for the site supervision of the relevant part
of works.
Assist Resident Engineer in monitoring quality assurance plan and
proper deployment of equipment and staff to site by the contractor to
meet the work schedules.
Review construction drawings and other technical documents.
Verify shop drawings and bar bending schedules, cross sections, interim
payment certificates (IPC’s) and escalations for approval of Resident
Engineer.
Supervise all constructional activities and ensure that the drawings and
specification are met.
Preparation of daily, weekly and monthly progress reports.
Maintain records of the project i.e. Reports, inspections and testing
records.
Project Description : The National Highway (N-65) starts from N-5 at Sukkur (Sindh) and ends
Quetta. The project is located in Sindh. The alignment is mainly traversing in
cultivated plain area. The project comprises of 4 lane carriageway (Dual
Carriageway), 06 Nos. of Pre stressed concrete bridges and 100 Nos. of
culverts (Box and Pipe).The road work mainly consists of formation of
embankment (in cut and in fill), Sub grade, Sub base, Aggregate base
course, Asphaltic base course and Wearing course and DST
(Shoulders).The length of the project is 72.9 Km including 4.9 Km Shikarpur
Bypass.
Description of duties : Assist Resident Engineer in implementing specification, drawings and other
contract documents to ensure quality of work.
Prepare quality control plan or the site supervision of the relevant part of
works.
Review construction drawings and other technical documents.
Verify shop drawings and bar bending schedules of the culverts all
bridge components i.e. Piles, piers, transoms, pile caps, girders, deck
slabs, abutment walls and wing walls.
Supervise all constructional activities related to structures i.e. Load test
of piles, pouring of concrete of culverts and all bridge components,
stressing of PSC Girders, fixation of steel, form work.
Checking of lay out plans for the culverts and bridges.
Involved in the quantity survey of structural elements.
Project Description : The project is ADB funded and is located in Balochistan. The project is
launched to improve the provincial and district roads network in the province.
The alignment is mainly traversed in a densely cultivated and water logged
area. The project comprises of two roads of double lane carriage way, one
Dera Allahyar – Hairdin (40 Km) and other is Dera Allahyar – Usta
Muhammad (50 Km), 02 Nos. of Pre stressed concrete bridges and 285 Nos
of culverts (Box and Slab).The road work mainly consists of formation of
embankment from road way and borrow excavation, Capillary layer of non
plastic (A-3) material, Sub Grade, Sub base, Aggregate base course and
Wearing course. The combined length of the project is 90 Km.
Description of duties : Attend pre construction meetings with contractor under chairman ship of
the team leader.
Arrange and chair regular meetings with the contractor and other site
staff on scheduled progress ,contractual and technical problems that
may affect the contract objectives.
Project Description : The National Highway (N-25) connects Pakistan with Afghanistan. It starts
from Karachi (Sindh) passes through Quetta and ends at chaman (Pak
Afghan Border).The project is located in Balochistan. The alignment is
mainly traversing in hilly and mountainous terrain. The project comprises of
4 lane carriage way in urban area and double lane carriage way in rural
area,07 Nos. of Pre stressed concrete bridges and 330 Nos. of culverts
(Box, Slab and Pipe).The road work mainly consists of formation of
embankment (in cut and in fill),Improved Sub Grade, Sub grade, Sub base,
Aggregate base course, Asphaltic base course and Wearing course and
DST(Shoulders).The length of the project is 120 Km including 14.5 Km Dual
carriage way.
Project Description : The project is located in Balochistan. The Khanozai – Muslim bagh is a hilly
terrain with heavy snow falls and rain falls. The alignment is mainly traversing
Project Description : The project is ADB funded and is located in Balochistan. The project is
launched to improve the provincial and district roads network in the province.
The alignment is mainly traversed in a densely cultivated and water logged
area. The project comprises of two roads of double lane carriage way, one
Dera Allahyar – Hairdin (40 Km) and other is Dera Allahyar – Usta
Muhammad (50 Km), 02 Nos. of Pre stressed concrete bridges and 285 Nos
of culverts (Box and Slab).The road work mainly consists of formation of
embankment from road way and borrow excavation, Capillary layer of non
plastic (A-3) material, Sub Grade, Sub base, Aggregate base course and
Wearing course. The combined length of the project is 90 Km.
Description of duties : Assist Resident Engineer in implementing specification, drawings and other
contract documents to ensure quality of work.
Prepare quality control plan for the site supervision of the relevant part
of works.
Assist Resident Engineer in monitoring quality assurance plan and
proper deployment of equipment and staff to site by the contractor to
meet the work schedules.
Review construction drawings and other technical documents.
Verify shop drawings and bar bending schedules, cross sections, interim
payment certificates (IPC’s) and escalations for approval of Resident
Engineer.
Project Description : The project is World Bank assisted. The project is launched to minimize the
on farm water losses by lining the water courses in Sindh. The water courses
are lined in three geometrical shapes as rectangular, trapezoidal and semi
spherical. Rectangular water courses are lined with PCC bed and Brick
masonary walls with cement plaster and the other two types are lined in
accordance with alignment and grade, with pre cast PCC segments
manufactured according to the design and drawing.
Project Description : The project is located in Balochistan. The alignment is traversing through
barren plain area. The project comprises of double lane carriage way, 225
Nos. of culverts (Box and Slab) for cross water drainage. The road work
mainly consists of formation of embankment from road way and borrow
excavation, Sub Grade, Sub base, Aggregate base course, Asphaltic base
course and Wearing course and DST(Shoulders).The length of the project is
85Kms.
Project Description : The project is located in Balochistan. The alignment is traversing partly through
cultivated and water logged area and partly through barren plain area. The
project comprises of double lane carriage way, 02 Nos. of pre stressed
concrete bridges, 85 Nos. of box culverts for cross water drainage. The road
work mainly consists of formation of embankment from road way and borrow
excavation, Sub Grade, Sub base, Aggregate base course, Asphaltic base
course and Wearing course and DST(Shoulders).The length of the project is
80Kms.