Comparative Sheet: Mahagun Mywoods Wing-10 Modification and Reparing of Old Aluminium Form Work
Comparative Sheet: Mahagun Mywoods Wing-10 Modification and Reparing of Old Aluminium Form Work
COMPARATIVE SHEET
PRIME ENGINEERING
SR. NO. PARTICULARS Unit Rate Qty JBM(Amount) Remarks
SERVICE(Amount)
.
F/QS/CIVIL/130-A-MEAS/00
1. FLOORING
1.1 COMBINATION OF WHITE & GRAY GRANITE FLOORING
Location: Passage & Lift lobby
UPPER BASEMENT FLOOR Sqm 664.71 1.00
GROUND FLOOR Sqm 679.25 1.00
FIRST FLOOR Sqm 520.51 1.00
Total Sqm
1.2 SKIRTING
Location: Passage & Lift lobby
UPPER BASEMENT FLOOR Rmt 52.91 1.00
GROUND FLOOR Rmt 49.11 1.00
FIRST FLOOR Rmt 27.27 1.00
Total Rmt
Total Sqm
Total Rmt
RAMP FLOORING
Total Sqm
Total Sq m
Total Rmt
Total Rmt
Total Rmt
Total Rmt
Total Rmt
Total Rmt
Page 3 of 115
F/QS/CIVIL/130-A-MEAS/00
First Floor Plan Rmt 39.00 1.00
Total Rmt
Total Rmt
Total Rmt
Total Sq m
Total Sq m
Total Sq m
Total Sq m
Total Sq m
Total Sq m
Page 4 of 115
F/QS/CIVIL/130-A-MEAS/00
Total Rmt
2.6 300 mm x 900 mm size of Urinal Glass partition (GL-02 : Sandwich Glass)
Location : Gents Toilets
Ground Floor Plan Nos. 3.00 1.00
First Floor Plan Nos. 3.00 1.00
Total Nos.
Total Rmt
FALSE CEILING
FINISHED WITH PT-02 - CEILING AT 3450MM FROM F.F.L.
Location: Passage & Lift lobby
UPPER BASEMENT FLOOR Sqm 214.03 1.00
GROUND FLOOR Sqm 213.66 1.00
FIRST FLOOR Sqm 180.47 1.00
Total Sqm
Total Sqm
FINISHED WITH PT-02 - CEILING IN SLOPE FROM HT. 3727MM TO 3450MM FROM FFL.
Location: Passage & Lift lobby
UPPER BASEMENT FLOOR Sqm 190.39 1.00
GROUND FLOOR Sqm 230.50 1.00
FIRST FLOOR Sqm 0.00 1.00
Total Sqm
FINISHED WITH WD-01- CEILING IN SLOPE FROM HT. 3785MM TO 3727MM FROM FFL.
Location: Passage & Lift lobby
UPPER BASEMENT FLOOR Sqm 24.97 1.00
GROUND FLOOR Sqm 28.97 1.00
FIRST FLOOR Sqm 21.12 1.00
Total Sqm
Page 5 of 115
F/QS/CIVIL/130-A-MEAS/00
GROUND FLOOR Sqm 190.58 1.00
FIRST FLOOR Sqm 115.24 1.00
Total Sqm
Total Sqm
CEILING PAINT
Location: Passage & Lift lobby
UPPER BASEMENT FLOOR Sqm 235.33 1.00
GROUND FLOOR Sqm 206.11 1.00
FIRST FLOOR Sqm 266.19 1.00
Total Sqm
3.1 Railing
Location : Staircase
Lower Floor Plan Rmt 7.99 1.00
Upper Floor Plan Rmt 7.27 1.00
Ground Floor Plan Rmt 23.34 1.00
First Floor Plan Rmt 17.30 1.00
Total Rmt
3.1.1 Railing
Location : Open Staircase
Upper Floor Plan Rmt 10.36 1.00
Total Rmt
DOORS SHUTTER
WOODEN SINGLE LEAF DOORS
FD1- 1200 X 2100
Location: Staircase
UPPER BASEMENT FLOOR Sqm 5.04 1.00
GROUND FLOOR Sqm 5.04 1.00
FIRST FLOOR Sqm 2.52 1.00
Total Sqm
Total Sqm
Page 6 of 115
F/QS/CIVIL/130-A-MEAS/00
GROUND FLOOR Sqm 7.88 1.00
FIRST FLOOR Sqm 7.88 1.00
Total Sqm
Total Sqm
Total Sqm
Total Sqm
Total Sqm
Total Sqm
ALUMINIUM WORK
W : 2630 X 1500
Location: ST-01
UPPER BASEMENT FLOOR Sqm 0.00 1.00
GROUND FLOOR Sqm 3.95 1.00
FIRST FLOOR Sqm 3.95 1.00
Total Sqm
W1 : 2400 X 1500
Location: ST-03
UPPER BASEMENT FLOOR Sqm 0.00 1.00
Page 7 of 115
F/QS/CIVIL/130-A-MEAS/00
GROUND FLOOR Sqm 3.60 1.00
FIRST FLOOR Sqm 3.60 1.00
Total Sqm
DOORS FRAMES
WOODEN SINGLE LEAF DOORS
FD1- 1200 X 2100
Location: Staircase
UPPER BASEMENT FLOOR Rmt 10.80 1.00
GROUND FLOOR Rmt 10.80 1.00
FIRST FLOOR Rmt 10.80 1.00
Total Rmt
Total Rmt
Total Rmt
Total Rmt
Total Rmt
Total Rmt
Page 8 of 115
F/QS/CIVIL/130-A-MEAS/00
GROUND FLOOR Rmt 10.38 1.00
FIRST FLOOR Rmt 10.38 1.00
Total Rmt
Total Rmt
ALUMINIUM WORK
W : 2630 X 1500
Location: ST-01
UPPER BASEMENT FLOOR Rmt 0.00 1.00
GROUND FLOOR Rmt 8.26 1.00
FIRST FLOOR Rmt 8.26 1.00
Total Rmt
W1 : 2400 X 1500
Location: ST-03
UPPER BASEMENT FLOOR Rmt 0.00 1.00
GROUND FLOOR Rmt 7.80 1.00
FIRST FLOOR Rmt 7.80 1.00
Total Rmt
Total Sqm
Total Sqm
PANEL FINISHED TO BE
WD-01
FINISHED WITH SMOKED EUCALYPTUS VENEER
Location: Shop Front
UPPER BASEMENT FLOOR Sqm 27.41 1.00
GROUND FLOOR Sqm 34.45 1.00
FIRST FLOOR Sqm 39.93 1.00
Total Sqm
MT-01
FINISHED WITH STAINLESS STEEL WITH MIRROR FINISH
Page 9 of 115
F/QS/CIVIL/130-A-MEAS/00
Location: Shop Front
UPPER BASEMENT FLOOR Sqm 37.72 1.00
GROUND FLOOR Sqm 47.41 1.00
FIRST FLOOR Sqm 54.96 1.00
Total Sqm
ST-03
FINISHED WITH BACKLIT ALABASTER
Location: Shop Front
UPPER BASEMENT FLOOR Sqm 43.31 1.00
GROUND FLOOR Sqm 54.45 1.00
FIRST FLOOR Sqm 63.11 1.00
Total Sqm
GLASS
SHOP FRONT
Location: Shop Front
UPPER BASEMENT FLOOR Sqm 314.20 1.00
GROUND FLOOR Sqm 355.30 1.00
FIRST FLOOR Sqm 391.06 1.00
Total Sqm
Total Sqm
Total Sqm
MT-02
Black ACP as approved.
Location: Shop Front
UPPER BASEMENT FLOOR Sqm 66.15 1.00
GROUND FLOOR Sqm 74.80 1.00
FIRST FLOOR Sqm 82.33 1.00
Total Sqm
Page 10 of 115
F/QS/CIVIL/130-A-MEAS/00
1. FLOORING
1.1 COMBINATION OF WHITE & GRAY GRANITE FLOORING
Location: Passage & Lift lobby
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 11 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
1.2 SKIRTING
1.1 100MM HIGH
Location: Passage & Lift lobby
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Page 12 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg No : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 13 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Page 14 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
RAMP FLOORING
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FALSE CEILING
FINISHED WITH PT-02 - CEILING AT 3450MM FROM F.F.L.
Location: Passage & Lift lobby
Page 15 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 16 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
FINISHED WITH PT-02 - CEILING IN SLOPE FROM HT. 3727MM TO 3450MM FROM FFL.
Location: Passage & Lift lobby
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
L.H.SIDE
Horizontal strip 2.0 21.83 0.37
2.0 21.12 0.29
2.0 20.16 0.20
Page 17 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
2.0 20.16
FINISHED WITH WD-01- CEILING IN SLOPE FROM HT. 3785MM TO 3727MM FROM FFL.
Location: Passage & Lift lobby
Page 18 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
L.H.S.
Horizontal strip 2.0 19.33 0.22
R.H.S.
Horizontal strip 2.0 15.88 0.22
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 19 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG Ht=
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG Ht=
PT-03 PAINT
Location : Staircase
Page 20 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG Ht=
Page 21 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG Ht=
1. FLOORING
1.1 Black Granite flooring
Location : Staircase
Drg Title : COMMERCIAL CIVIL LAYOUT LOWER FLOOR PLAN
Drg No :
Drg Date :
Rev :
Page 22 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Floor landing-02 1.0 5.10 parea
add FD-1 sill 1.0 1.20 0.23
mid landing-03 1.0 1.50 3.15
ded of col. -1.0 0.23 0.52
Open Stair
mid landing 2.0 3.05 1.50
ST-01
Floor landing-04 1.0 5.12 parea
add FD-1 sill 1.0 1.20 0.23
mid landing-05 1.0 5.02 parea
Page 23 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg Date :
Rev :
ST-01
Floor landing-06 1.0 1.50 3.15
add FD-1 sill 1.0 1.20 0.23
mid landing-07 1.0 5.02 parea
ST-03
floor landing 1.0 3.11 1.50
add opening sill 1.0 1.31 0.23
mid landing-01, 02, 03 3.0 1.50 1.50
ST-06
Floor landing 1.0 3.62 parea
Page 24 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Floor landing-06 1.0 1.50 3.15
add FD-1 sill 1.0 1.20 0.23
ST-03
floor landing 1.0 3.11 1.50
add opening sill 1.0 1.24 0.23
Page 25 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Floor landing-02 1.0 6.42
L=1.5+3.15+1.77
ded of FD1 -1.0 1.20
mid landing-03 1.0 6.15
L=2*1.5+3.15
ST-01
Floor landing-04 1.0 6.42
L=1.5+1.77+3.15
ded of FD1 -1.0 1.20
mid landing-05 1.0 6.42
L=1.5+3.15+1.77
Page 26 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Floor landing-06 1.0 6.15
L=2*1.5+3.15
ded of FD1 -1.0 1.20
mid landing-07 1.0 6.42
L=1.77+3.15+1.5
ST-03
Floor landing 1.0 6.22
L=3.11+1.5+1.61
ded of opening -1.0 1.31
ded of meter room door -1.0 1.20
mid landing 3.0 3.00
L=2*1.5
Page 27 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg Date :
Rev :
ST-06
Floor landing 1.0 6.54
L=3.05+2*(0.715+0.23+0.8)
ded of FD1 -1.0 1.25
ST-01
Floor landing-06 1.0 6.15
L=2*1.5+3.15
ded of FD1 -1.0 1.20
ST-03
Floor landing 1.0 5.61
L=2.5+1.5+1.61
ded of opening -1.0 1.24
Page 28 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Flight-1 & 2 2.0 4.00
L=SQRT(((12*0.27)^2)+((13*0.18)^2))
ST-01
Flight-1 & 2 2.0 3.64
L=SQRT(((11*0.27)^2)+((12*0.175)^2))
ST-01
Flight-1 & 2 2.0 3.64
L=SQRT(((11*0.27)^2)+((12*0.175)^2))
Page 29 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-03
Flight-1 & 3 2.0 0.73
L=SQRT(((0.27*2)^2)+((0.162*3)^2))
Flight-2 & 4
L=SQRT(((0.27*9)^2)+((0.162*10)^2)) 2.0 2.92
ST-06
Flight-1 1.0 4.28
L=SQRT(((13*0.27)^2+((14*0.175)^2)))
Flight-2 1.0 2.99
L=SQRT(((9*0.27)^2+((10*0.175)^2)))
ST-01
Flight-1 & 2 2.0 3.94
L=SQRT(((12*0.27)^2)+((13*0.173)^2))
ST-03
Flight-1 & 3 2.0 0.72
L=SQRT(((0.27*2)^2)+((0.161*3)^2))
Flight-2
L=SQRT(((0.27*9)^2)+((0.161*10)^2)) 1.0 2.91
Flight-4
L=SQRT(((0.27*11)^2)+((0.161*12)^2)) 1.0 3.54
Page 30 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Flight-1 & 2 24.0 1.50
ST-01
Flight-1 & 2 22.0 1.50
ST-01
Flight-1 & 2 22.0 1.50
Page 31 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-03
Flight-1 & 3 4.0 1.50
Flight-2 & 4 18.0 1.50
ST-06
Flight-1 13.0 1.50
Flight-2 9.0 1.50
ST-01
Flight-1 & 2 24.0 1.50
ST-03
Flight-1 & 3 4.0 1.50
Flight-2 9.0 1.50
Flight-4 11.0 1.50
Page 32 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg Date :
Rev :
ST-01
Flight-1 & 2 26.0 1.50
ST-01
Flight-1 & 2 24.0 1.50
Page 33 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg Date :
Rev :
ST-01
Flight-1 & 2 24.0 1.50
ST-06
Flight-1 14.0 1.50
Flight-2 10.0 1.50
ST-01
Flight-1 & 2 26.0 1.50
ST-03
Flight-1 & 3 6.0 1.50
Flight-2 & 4 20.0 1.50
Page 34 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-03
Flight-1 & 3 6.0 1.50
Flight-2 10.0 1.50
Flight-4 12.0 1.50
Page 35 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Gents Toilet
Elevation-1
wall at toilet entry 1.0 0.46
wall at D4 1.0 0.57
Elevation-2
wall at wash basin 1.0 1.47
wall at WC 1.0 1.90
ded of D4 -2.0 0.75
Page 36 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Elevation-4
wall at wash basin 1.0 1.02
Ladies Toilet
Elevation-1
wall at toilet entry 1.0 1.03
wall at D4 1.0 0.20
Elevation-2
wall at WC 1.0 2.25
ded of D4 -2.0 0.75
Elevation-4
wall at wash basin & toilet entry 1.0 2.25
ded of D7 -1.0 0.90
Gents Toilet
Elevation-3
wall at urinal 1.0 4.08
L=3+1.08
Elevation-4
wall at toilet entry 1.0 2.39
L=1.49+0.9
ded of D7 -1.0 0.90
Ladies Toilet
Elevation-3
wall 1.0 4.38
L=3.63+0.75
ded of D4 -1.0 0.75
Page 37 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Gents Toilet
WC 1.0 4.53
L=2*(1.35+0.915)
ded of D4 -1.0 0.75
WC 1.0 4.52
L=2*(1.35+0.91)
ded of D4 -1.0 0.75
Ladies Toilet
WC 1.0 4.30
L=2*(1.25+0.9)
ded of D4 -1.0 0.75
WC 1.0 4.57
L=2*(1.05+1.235)
ded of D4 -1.0 0.75
WC 1.0 4.50
L=2*(0.9+1.35)
ded of D4 -1.0 0.75
Page 38 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Page 39 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
3.00
Nos.
RHS
Quantity same as LHS 1.0 30.43
Page 40 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
3.1 Railing
Location : Staircase
Drg Title : COMMERCIAL CIVIL LAYOUT LOWER FLOOR PLAN
Drg No :
Drg Date :
Rev :
ST-01
Flight-1 & 2 2.0 4.00
L=SQRT(((12*0.27)^2)+((13*0.18)^2))
Page 41 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Flight-1 & 2 2.0 3.64
L=SQRT(((11*0.27)^2)+((12*0.175)^2))
ST-01
Flight-1 & 2 2.0 3.64
L=SQRT(((11*0.27)^2)+((12*0.175)^2))
ST-03
Flight-1 & 3 2.0 0.73
L=SQRT(((0.27*2)^2)+((0.162*3)^2))
Flight-2 & 4
L=SQRT(((0.27*9)^2)+((0.162*10)^2)) 2.0 2.92
ST-06
Flight-1 1.0 4.28
L=SQRT(((13*0.27)^2+((14*0.175)^2)))
Flight-2 1.0 2.99
L=SQRT(((9*0.27)^2+((10*0.175)^2)))
floor landing 1.0 1.50
Page 42 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-01
Flight-1 & 2 2.0 3.94
L=SQRT(((12*0.27)^2)+((13*0.173)^2))
floor landing 1.0 1.50
ST-03
Flight-1 & 3 2.0 0.72
L=SQRT(((0.27*2)^2)+((0.161*3)^2))
Flight-2
L=SQRT(((0.27*9)^2)+((0.161*10)^2)) 1.0 2.91
Flight-4
L=SQRT(((0.27*11)^2)+((0.161*12)^2)) 1.0 3.54
3.1.1 Railing
3.1.1 Location : Open Staircase
Page 43 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
DOORS
FD1- 1200 X 2100
Location: Staircase
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Page 44 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 45 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg No : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 46 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Page 47 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
ALUMINIUM WORK
W : 2630 X 1500
Location: ST-01
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
W1 : 2400 X 1500
Location: ST-03
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Page 48 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
SHOP FRONT
PLYWOOD PANELLING
Location: Shop Front
UPPER BASEMENT FLOOR
Drg Title : UPPER BASMENT FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
35.0 0.17
35.0 0.55
35.0 0.17
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
44.0 0.17
44.0 0.55
44.0 0.17
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Page 49 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Rev : NG
51.0 0.17
51.0 0.55
51.0 0.17
WD-01
FINISHED WITH SMOKED EUCALYPTUS VENEER
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
44.0 0.17
44.0 0.17
FIRST FLOOR
Page 50 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
51.0 0.17
51.0 0.17
MT-01
FINISHED WITH STAINLESS STEEL WITH MIRROR FINISH
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
88.0 0.17
88.0 0.55
88.0 0.17
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
102.0 0.17
102.0 0.55
102.0 0.17
Page 51 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
ST-03
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
44.0 0.55
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
51.0 0.55
GLASS
SHOP FRONT
Page 52 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
1.0 5.59
21.0 2.45
1.0 2.40
1.0 2.01
1.0 2.68
1.0 5.33
2.0 3.29
2.0 3.61
8.0 3.45
1.0 3.20
1.0 2.83
1.0 3.50
1.0 4.29
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
1.0 2.59
22.0 2.45
1.0 2.40
1.0 2.01
1.0 2.68
1.0 5.33
1.0 3.29
1.0 3.32
1.0 3.54
Page 53 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
4.0 3.29
10.0 3.45
1.0 3.20
1.0 2.83
1.0 4.49
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
Drg Date : NG
Rev : NG
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
MT-02
Page 55 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
GROUND FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
1.0 5.59
21.0 2.45
1.0 2.40
1.0 2.01
1.0 2.68
1.0 5.33
2.0 3.29
2.0 3.61
8.0 3.45
1.0 3.20
1.0 2.83
1.0 3.50
1.0 4.29
FIRST FLOOR
Drg Title : GROUND & FIRST FLOOR FLOORING LAYOUT PLAN
Drg No : NG
Drg Date : NG
Rev : NG
1.0 2.59
22.0 2.45
1.0 2.40
1.0 2.01
1.0 2.68
1.0 5.33
1.0 3.29
1.0 3.32
1.0 3.54
4.0 3.29
10.0 3.45
1.0 3.20
1.0 2.83
1.0 4.49
Page 56 of 115
F/QS/CIVIL/130-A-MEAS/00
PROJECT : MAHAGUN MYWOODS COMMERCIAL
VADODARA ARCHITECT : ARCHITECT HAFEEZ CONTRACTOR
DATE : 16.04.16 CLIENT :
PREPARED BY : HIRAL & SHIKHA CHECKED BY :
Page 57 of 115
F/QS/CIVIL/130-A-MEAS/00
SUMMARY
WOODS COMMERCIAL
AFEEZ CONTRACTOR
664.71
679.25
520.51
1864.47 1958.00
52.91
49.11
27.27
129.29 136.00
7.99
7.15
7.15
22.30 24.00
16.12
11.84
11.84
39.80 42.00
742.15
630.72
0.00
1372.87 1442.00
Page 58 of 115
F/QS/CIVIL/130-A-MEAS/00
24.42
19.14
62.56
25.50
9.95
141.57 149.00
23.73
14.37
63.51
29.37
9.32
140.30 148.00
7.99
16.13
21.84
15.80
61.77 65.00
36.00
33.00
99.00
72.00
240.00 252.00
79.30
79.30 84.00
39.00
39.00 41.00
36.00
72.00
108.00 114.00
Page 59 of 115
F/QS/CIVIL/130-A-MEAS/00
39.00
39.00 41.00
39.00
42.00
81.00 86.00
85.40
85.40 90.00
28.03
28.03
56.07 59.00
26.30
26.30
52.60 56.00
30.17
30.17
60.34 64.00
61.63
61.63
123.25 130.00
18.97
18.97
37.94 40.00
4.32
4.32
8.64 10.00
Page 60 of 115
F/QS/CIVIL/130-A-MEAS/00
5.22
5.22
10.43 11.00
3.00
3.00
6.00 6.00
158.61
194.64
353.24 371.00
214.03
213.66
180.47
608.16 639.00
0.00
0.00
52.73
52.73 56.00
190.39
230.50
0.00
420.89 442.00
24.97
28.97
21.12
75.06 79.00
210.25
Page 61 of 115
F/QS/CIVIL/130-A-MEAS/00
190.58
115.24
516.07 542.00
85.75
255.31
211.15
213.95
766.16 805.00
235.33
206.11
266.19
707.63 744.00
7.99
7.27
23.34
17.30
55.91 59.00
10.36
10.36 11.00
5.04
5.04
2.52
12.60 14.00
0.00
9.72
4.86
14.58 16.00
0.00
Page 62 of 115
F/QS/CIVIL/130-A-MEAS/00
7.88
7.88
15.75 17.00
0.00
4.16
4.16
8.32 9.00
6.48
0.00
0.00
6.48 7.00
2.52
2.52
2.52
7.56 8.00
4.83
4.83
4.83
14.49 16.00
0.00
0.00
5.40
5.40 6.00
0.00
3.95
3.95
7.89 9.00
0.00
Page 63 of 115
F/QS/CIVIL/130-A-MEAS/00
3.60
3.60
7.20 8.00
10.80
10.80
10.80
32.40 35.00
0.00
27.00
13.50
40.50 43.00
0.00
24.75
24.75
49.50 52.00
14.40
0.00
0.00
14.40 16.00
5.40
5.40
5.40
16.20 18.00
10.70
10.70
10.70
32.10 34.00
0.00
Page 64 of 115
F/QS/CIVIL/130-A-MEAS/00
10.38
10.38
20.76 22.00
0.00
0.00
12.60
12.60 14.00
0.00
8.26
8.26
16.52 18.00
0.00
7.80
7.80
15.60 17.00
108.43
136.32
158.00
402.75 423.00
208.25
0.00
0.00
208.25 219.00
27.41
34.45
39.93
101.79 107.00
Page 65 of 115
F/QS/CIVIL/130-A-MEAS/00
37.72
47.41
54.96
140.09 148.00
43.31
54.45
63.11
160.88 169.00
314.20
355.30
391.06
1060.56 1114.00
6.30
18.90
28.35
53.55 57.00
85.68
90.72
95.76
272.16 286.00
66.15
74.80
82.33
223.28 235.00
Page 66 of 115
F/QS/CIVIL/130-A-MEAS/00
MEASUREMENTS
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
534.67
91.37
-17.87
74.42
-17.87
664.71
Sq m
947.39
-268.14
679.25
Sq m
900.99
-206.25
-174.23
520.51
Sq m
Page 67 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
31.73
-1.20
-2.00
-2.30
-3.60
22.63
7.65
52.91
Rmt
25.37
-1.20
-2.00
-2.30
-3.60
7.34
25.37
-1.20
-1.50
-1.80
-2.70
7.34
49.11
Rmt
Page 68 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
21.79
-1.20
-2.00
-2.30
-3.60
21.79
-1.20
-1.50
-1.80
-2.70
27.27
Rmt
3.34
0.14
3.99
0.53
7.99
Sq m
2.50
0.14
3.99
0.53
7.15
Page 69 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
Sq m
2.50
0.14
3.99
0.53
7.15
Sq m
10.89
-1.20
8.73
-2.30
16.12
Rmt
6.61
-1.20
8.73
-2.30
11.84
Rmt
Page 70 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
6.61
-1.20
8.73
-2.30
11.84
Rmt
152.00
76.48
105.10
76.48
62.09
73.72
111.21
85.08
742.15
Sqm
630.72
630.72
Sq m
Page 71 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
133.73
80.30
214.03
Sq m
92.39
35.96
85.31
213.66
Sq m
180.47
180.47
Sq m
27.36
25.37
52.73
Sq m
Page 72 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
31.50
24.09
16.14
2.31
3.69
2.22
0.28 23.22
0.28 23.01
0.28 22.68
0.28 22.47
0.28 4.33
0.28 4.06
0.28 3.84
0.28 3.52
0.28 3.31
190.39
Sq m
16.28
12.25
8.02
3.26
5.42
3.41
0.28 11.92
0.28 11.70
0.28 11.38
Page 73 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
0.28 11.17
0.28 5.98
0.28 5.61
0.28 5.50
0.28 5.18
0.28 4.96
13.71
10.25
6.65
3.26
5.42
3.41
0.28 10.00
0.28 9.79
0.28 9.47
0.28 9.26
0.28 5.98
0.28 5.61
0.28 5.50
0.28 5.18
0.28 4.96
230.50
Sq m
17.24
2.42
0.06 4.66
0.06 0.65
24.97
Sq m
Page 74 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
8.39
3.72
0.06 2.34
0.06 0.99
6.89
3.72
0.06 1.94
0.06 0.99
28.97
Sq m
10.56
10.56
21.12
Sq m
3.45 m
Page 75 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
3.45 109.47
2.10 -2.52
2.20 -4.40
1.80 -4.14
1.80 -6.48
91.93
3.45 26.39
210.25
Sqm
3.45 m
3.45 87.51
2.10 -2.52
2.20 -4.40
1.80 -4.14
1.80 -6.48
3.45 25.32
95.29
190.58
Sqm
3.45 m
3.45 75.16
2.10 -2.52
2.20 -4.40
1.80 -4.14
1.80 -6.48
57.62
115.24
Sqm
Page 76 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
4.70 88.27
2.10 -2.52
85.75
Sqm
4.05 m
4.05 76.06
2.10 -2.52
4.05 70.11
2.10 -2.52
4.05 44.83
4.05 12.17
4.05 44.83
4.05 12.35
255.31
Sqm
4.00 m
4.00 75.12
2.10 -2.52
Page 77 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
1.50 -3.95
1.65
4.00 76.80
2.10 -2.52
4.00 71.76
2.10 -3.15
1.50 -3.60
1.56
211.15
Sqm
4.05 m
4.05 76.06
2.10 -2.52
1.50 -3.95
1.65
4.05 77.76
2.10 -2.52
4.05 72.66
2.10 -3.15
1.50 -3.60
1.56
213.95
Sqm
19.66
0.28
Page 78 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
-0.12
4.73
-0.12
24.42
Sq m
5.10
0.28
4.73
-0.12
9.15
19.14
Sq m
5.12
0.28
5.02
Page 79 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
21.59
0.30
6.75
18.65
0.29
4.58
62.56
Sq m
4.73
0.28
5.02
4.67
0.30
6.75
3.62
Page 80 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
0.14
25.50
Sq m
4.73
0.28
4.67
0.29
9.95
Sq m
18.78
-1.20
6.15
23.73
Rmt
Page 81 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
6.42
-1.20
6.15
3.00
14.37
Rmt
6.42
-1.20
6.42
Page 82 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
21.16
-1.31
-1.20
9.00
19.42
-1.25
6.05
63.51
Rmt
6.15
-1.20
6.42
6.22
-1.31
-1.20
9.00
Page 83 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
6.54
-1.25
29.37
Rmt
6.15
-1.20
5.61
-1.24
9.32
Rmt
Page 84 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
7.99
7.99
Rmt
7.27
8.86
16.13
Rmt
7.27
Page 85 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
1.45
5.84
4.28
2.99
21.84
Rmt
7.89
1.45
2.91
3.54
15.80
Rmt
Page 86 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
36.00
36.00
Rmt
33.00
33.00
Rmt
33.00
Page 87 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
6.00
27.00
19.50
13.50
99.00
Rmt
36.00
6.00
13.50
16.50
72.00
Rmt
Page 88 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
79.30
79.30
Rmt
39.00
39.00
Rmt
36.00
36.00
Rmt
Page 89 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
36.00
21.00
15.00
72.00
Rmt
39.00
39.00
Rmt
9.00
30.00
Page 90 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
39.00
Rmt
9.00
15.00
18.00
42.00
Rmt
85.40
85.40
Rmt
Page 91 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
10.90
0.10
1.24
0.09
1.23
0.09
10.40
0.10
1.13
0.09
1.30
0.09
1.22
0.09
28.03
Sq m
3.10 m
3.10 1.41
3.10 1.75
3.10 4.54
3.10 5.89
2.10 -3.15
Page 92 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
3.10 3.15
3.10 3.18
3.10 0.62
3.10 6.98
2.10 -3.15
3.10 6.98
2.10 -1.89
26.30
Sq m
3.10 m
3.10 12.65
3.10 7.41
2.10 -1.89
3.10 13.58
2.10 -1.58
30.17
Page 93 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
Sq m
3.10 m
3.10 14.04
2.10 -1.58
3.10 14.01
2.10 -1.58
3.10 13.33
2.10 -1.58
3.10 14.17
2.10 -1.58
3.10 13.95
2.10 -1.58
61.63
Sq m
Page 94 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
3.10 m
3.10 9.19
3.10 9.78
18.97
Sq m
1.20 2.16
1.20 2.16
4.32
Sq m
Page 95 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
2.97
2.25
5.22
Rmt
0.90 0.95
0.95
Sq m
5.19
4.44
4.80
12.54
6.64
-3.18
30.43
85.22
12.54
Page 96 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
158.61
Rmt
6.69
14.46
16.68
37.82
44.41
18.54
37.51
18.54
194.64
Rmt
7.99
7.99
Rmt
Page 97 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
7.27
7.27
Rmt
7.27
1.45
5.84
4.28
2.99
1.50
23.34
Page 98 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
Rmt
7.89
1.50
1.45
2.91
3.54
17.30
Rmt
8.86
1.50
10.36
Page 99 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
Rmt
2.52 5.40
2.52 5.40
5.04 10.80
Sqm Rmt
2.52 5.40
2.52 5.40
5.04 10.80
Sqm Rmt
2.52 5.40
2.52 5.40
2.52 10.80
Sqm Rmt
D QTY.
9.72 27.00
9.72 27.00
Sqm Rmt
4.86 13.50
4.86 13.50
Sqm Rmt
7.88 24.75
7.88 24.75
Sqm Rmt
7.88 24.75
7.88 24.75
Sqm Rmt
D QTY.
6.48 14.40
6.48 14.40
Sqm Rmt
2.52 5.40
2.52 5.40
Sqm Rmt
2.52 5.40
2.52 5.40
Sqm Rmt
2.52 5.40
2.52 5.40
Sqm Rmt
D QTY.
4.83 10.70
4.83 10.70
Sqm Rmt
4.83 10.70
4.83 10.70
Sqm Rmt
4.83 10.70
4.83 10.70
Sqm Rmt
4.16 10.38
4.16 10.38
Sqm Rmt
4.16 10.38
D QTY.
4.16 10.38
Sqm Rmt
5.40 12.60
5.40 12.60
Sqm Rmt
3.95 8.26
3.95 8.26
Sqm Rmt
3.95 8.26
3.95 8.26
Sqm Rmt
D QTY.
3.60 7.80
3.60 7.80
Sqm Rmt
3.60 7.80
3.60 7.80
Sqm Rmt
3.45 21.01
3.45 66.41
3.45 21.01
108.43
Sq m
3.45 26.41
3.45 83.49
3.45 26.41
136.32
Sq m
D QTY.
3.45 30.62
3.45 96.77
3.45 30.62
158.00
Sq m
208.25
208.25
Sq m
2.25 13.70
2.25 13.70
27.41
Sq m
2.25 17.23
2.25 17.23
34.45
Sq m
D QTY.
2.25 19.97
2.25 19.97
39.93
Sq m
0.60 7.31
0.60 23.10
0.60 7.31
37.72
Sq m
0.60 9.19
0.60 29.04
0.60 9.19
47.41
Sq m
0.60 10.65
0.60 33.66
0.60 10.65
54.96
D QTY.
Sq m
2.25 43.31
43.31
Sq m
2.25 54.45
54.45
Sq m
2.25 63.11
63.11
Sq m
2.85 32.92
D QTY.
2.85 7.44
2.85 6.53
2.85 7.13
2.85 104.74
2.85 17.19
2.85 5.87
2.85 18.75
2.85 98.33
2.85 15.32
314.20
Sq m
2.85 15.93
2.85 146.63
2.85 6.84
2.85 5.73
2.85 7.64
2.85 15.19
2.85 18.75
2.85 20.58
2.85 78.66
2.85 9.11
2.85 8.05
2.85 9.98
2.85 12.21
355.30
Sq m
2.85 7.38
2.85 153.62
2.85 6.84
2.85 5.73
2.85 7.64
2.85 15.19
2.85 9.38
2.85 9.45
2.85 10.07
D QTY.
2.85 37.51
2.85 98.33
2.85 9.11
2.85 8.05
2.85 12.78
391.06
Sq m
2.10 6.30
6.30
Sq m
2.10 18.90
18.90
Sq m
2.10 28.35
28.35
Sq m
D QTY.
2.10 85.68
85.68
Sq m
2.10 90.72
90.72
Sq m
2.10 95.76
95.76
Sq m
0.60 6.93
0.60 1.57
0.60 1.37
0.60 1.50
0.60 22.05
0.60 3.62
0.60 1.24
0.60 3.95
0.60 20.70
0.60 3.23
66.15
Page 111 of 115
F/QS/CIVIL/130-A-MEAS/00
WOODS COMMERCIAL
AFEEZ CONTRACTOR
D QTY.
Sq m
0.60 3.35
0.60 30.87
0.60 1.44
0.60 1.21
0.60 1.61
0.60 3.20
0.60 3.95
0.60 4.33
0.60 16.56
0.60 1.92
0.60 1.70
0.60 2.10
0.60 2.57
74.80
Sq m
0.60 1.55
0.60 32.34
0.60 1.44
0.60 1.21
0.60 1.61
0.60 3.20
0.60 1.97
0.60 1.99
0.60 2.12
0.60 7.90
0.60 20.70
0.60 1.92
0.60 1.70
0.60 2.69
82.33
Sq m
D QTY.
ASSUMPTIONS