0% found this document useful (0 votes)
392 views

Test Implementation and Test Execution

A test manager guide on Test Implementation and Test Execution as shown in A Test Manager's Guide from https://courses.cania-consulting.com

Uploaded by

Lucian C
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
392 views

Test Implementation and Test Execution

A test manager guide on Test Implementation and Test Execution as shown in A Test Manager's Guide from https://courses.cania-consulting.com

Uploaded by

Lucian C
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Test Implementation

Is the process of developing and prioritizing test

procedures, creating test data and, optionally, preparing

test harnesses and writing automated test scripts.

This is when tests are organized and prioritized and

when test designs are implemented as test cases, test

procedures and test data.

It is of great importance to pick the right tests and run

them in the right order. The importance of this even grows

exponentially in risk-based strategies when we prioritize

based on the likelihood of risk and problems.

At this stage, the Test Manager should ensure:

delivery of test environment

delivery of test data

constraints, risks and priorities are checked

test team is ready for execution

entry criteria is checked (explicit/implicit)

Some organizations may follow  the IEEE829 standard to

define inputs and their associated expected results during

testing. Other only have rigorous rules when they need to

provide evidence of compliance for regulatory projects or

for adherence to standards.

In the most common cases, the test inputs are usually

documented together with expected results, test steps and

stored test data.


Just like test conditions and test cases, even during test

implementation we will face the decision to go into an

extensive (detailed) stage or to have a light (generic)

approach. This decision should be taken by your

understanding of the development lifecycle and by the

predictability of software features under test.

For example, in agile or iterative

lifecycles where code changes

dramatically from iteration to iteration,

the implementation work changes

significantly between each stage.

Please do not count off the extensive implementation

preparation due to the above:

Concrete test cases provide working examples of how

the software behaves

When tests are archived for long term and re-use in

regression these details may become valuable

Domain experts are likely to verify versus a concrete

test rather than an abstract business rule

Further weakness in software specification is identified

Some defects can be found only in production-like test

environments. These are often expensive to procure and

difficult to configure and manage. Similar challenges are

also faced for the use of production data or production like

data which can even lead to data privacy or other

headaches.
Test implementation is not all about

manual testing, this is the stage where

automation scripting takes place, the

stage where automation versus manual

prioritization and execution order is

established.

And I am not talking only about automation, even tool

acquisition  is done here, especially for test data

generation required to prepare for load, volume or

performance testing.

Quick reminder before moving forward

Test Case
A set of preconditions, inputs, actions (where applicable),

expected results and post conditions, developed based on

test conditions.

Test Script
A sequence of instructions for

the execution of a test.

Test Suite
groups of test scripts, as well as a test

execution schedule.

Test Charter
An instruction of test goals and possible test ideas on how

to test. Documentation of test activities in session-based

exploratory testing.
Test Execution
Is the process of running a test on the component or

system under test, producing actual result.

Should finish before execution starts


Tests are designed or at least defined

Tools are in place for test management and defect

management and test automation (if applicable)

Standards  for test logging and defect reporting are

published

Execution begins once


The test object is delivered

The Entry criteria for test execution is met

During execution, a Test Managers role is to:

Monitor progress according to the plan

Initiate and carry out control actions to guide

testing

Ensure that test logs provide an adequate

record of relevant details for tests and events

During execution it is important to keep a traceability

between test conditions, the test basis and the test

objective and to have the appropriate level of test logging.

Time should be reserved for experienced-based and

defect-based test sessions driven by testers findings.