SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 3 NG-SA Contract No. :
4400006264
AUX.RELAY (RXMB1) TEST
Page 1 of 2
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
1. GENERAL DATA AND INFORMATION:
Panel No. Designation
Make ABB Type 1MRK000 874-AN
Serial No. Aux. Voltage 110-125VD.C
Model No. RXMB1 No. of Contacts 5NO+2NC
ELECTRICAL TEST
TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 3 NG-SA Contract No. :
4400006264
AUX.RELAY (RXMB1) TEST
Page 2 of 2
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
1.1 PICKUP & drop off test:
Pick UP Drop off Contact
Voltage (V) Current (mA) Voltage (V) Current (mA) terminals
Limits : Pick-up voltage : <80%Ur Drop-off voltage: > 10% Ur
(Table 1of Buyer’s Guide 1MRK 508 006)
1.2 Operating and drop off time test:
Operating time (mS) Contact Terminals Reset time (mS) Contact Terminals
Limits: Operating time (mSec) = 8/6.5 mSec Resetting Time (mSec) =3,0/2,5 ms
(Table 1of Buyer’s Guide 1MRK 508 006)
1.3 Relay burden test:
RELAY BURDEN
VOLTAGE APPLIED MEASURE RELAY BURDEN
MEASURED
(VOLTS) CURRENT (mA) ACTUAL VALUE
VALUE
WATTS: 1.5-2 W (At 110V DC) (Table 1of Buyer’s Guide 1MRK 508 00
4. TEST EQUIPMENT USED:
No. Test Equipment Serial Number Calibration date Calibration due date
1
2
TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________