0% found this document useful (0 votes)
94 views1 page

Flow Chart For The Process of Domestic Gas Connection

The flow chart outlines the process for obtaining a domestic gas connection which involves submitting an application with required documents, waiting for approval and issuance of an IT program, conducting a site survey to determine feasibility, issuing a demand notice for feasible applications to deposit security charges and service line fees into a bank account before a service agreement can be started in the computer system and waiting again for a turn to receive the gas connection.

Uploaded by

Waqar Dar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views1 page

Flow Chart For The Process of Domestic Gas Connection

The flow chart outlines the process for obtaining a domestic gas connection which involves submitting an application with required documents, waiting for approval and issuance of an IT program, conducting a site survey to determine feasibility, issuing a demand notice for feasible applications to deposit security charges and service line fees into a bank account before a service agreement can be started in the computer system and waiting again for a turn to receive the gas connection.

Uploaded by

Waqar Dar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FLOW CHART FOR THE PROCESS OF DOMESTIC GAS CONNECTION

Submission of Application
Documents Required: Filled Application Form, Copy of CNIC, Property Title Document, Neighbours’ gas bill
(preferable), NOC from Development Authority (if applicable)

Waiting for turn merit (issuance of IT program)

Site Survey

Issuance of regret/ intimation on


Issuance of Demand Notice on feasible Application
non- feasible Application

Signing of contract by the Applicant

Issuance of bill of security & service line


charges

Deposit of security & service line charges into Bank

Start of Service Agreement (SA) in computerized system

Waiting for turn (issuance of IT program) for gas connection