0% found this document useful (0 votes)
83 views2 pages

Application Form For Inter-Connection of Renewable Energy Facility To The MERALCO Distribution Grid

This 3 sentence summary provides the key details about an application form submitted to connect a 3KW solar renewable energy facility to the local power distribution grid: The applicant is seeking to interconnect a 3KW single phase synchronous inverter solar generating facility, located at the specified service point address, which plans to occasionally export up to PHP 2000 of power to the grid during its normal 120 second stand-by interconnected operation. Required attachments include a one-line diagram and layout sketch showing a lockable disconnect device.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views2 pages

Application Form For Inter-Connection of Renewable Energy Facility To The MERALCO Distribution Grid

This 3 sentence summary provides the key details about an application form submitted to connect a 3KW solar renewable energy facility to the local power distribution grid: The applicant is seeking to interconnect a 3KW single phase synchronous inverter solar generating facility, located at the specified service point address, which plans to occasionally export up to PHP 2000 of power to the grid during its normal 120 second stand-by interconnected operation. Required attachments include a one-line diagram and layout sketch showing a lockable disconnect device.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Application Form for Inter-connection of Renewable Energy Facility

to the MERALCO Distribution Grid

Name: Address:

Contact Person:

Telephone Number:

Service Point Address:

Information Prepared and Submitted by (Name and Address):

Signature:

All applicable items must be accurately completed in order that facilities may be effectively evaluated by
the Company for interconnection with the utility system.

GENERATING FACILITY
No. of Units:___1 UNIT____

Manufacturer:____CHINA_____

Type (Synchronous/Induction/Inverter):___SYNCHRONOUS INVERTER___

Fuel Source Type (Solar, Biogas, Wind, etc.): __SOLAR___

kW Rating (95F at location): ___3KW___

Kilovolt-Ampere Rating (95F at location):___3KVA____

Power factor:___0.8____

Voltage rating: __220/230/240 V__

Ampere Rating: ___14amps__

Number of Phases: Single Phase

Frequency: __60HZ__

Do you plan to export power: √ Yes No


If yes, maximum amount expected PHP 2000.00

Pre-Certification label or Type Number:_VDE 0126 / VDE4105 / G98 / G99 / AS4777/EN50438

Expected Energizing and Start-up Date:_______________________________

Normal Operation of Interconnection (examples: provide power to meet base load, demand
management, stand-by, back-up, others (please describe): 120 seconds stand-by normal operation
of interconnection to the grid.

One-line diagram attached ? √ Yes

Has the Manufacturer supplied its dynamic modelling values to the DU? √ Yes (Note that answer here
requires “Yes” for complete application. For Pre-certified Equipment, answer is Yes.)

Layout sketch showing lockable, “visible” disconnect device. Yes

Company ---------------------------------------------------------- Customer Name

By: By:

Title: Title:

Date: Date: