Rezumat: 1. Introducere
Rezumat: 1. Introducere
Petcu
REZUMAT ABSTRACT
Lucrarea This paper presents an analysis of a study carried
în cadrul proiectului european CA2, având ca out within the CA2 European project, the topic of
which is the estimation of the rate of the activities
carried out in view of the issuing of the new and
existing dwelling and public buildings energy
performance certificate. It results that the
simplification of the methods of calculation of the
Buildings Energy Performance is a real target of
the activity devoted to the buildings certification
activity, especially supported in the case of the
individual and collective dwelling buildings. The
colectiv statistical analysis of the existing building stock
and of the trend in building performance in the last
5 years in Romania leads to the conclusion that it
is necessary to equally approach the certification
of the collective and of the individual buildings.
The simplifications proposed in this paper are
based on the processing of the data provided by
the thermal bridges catalogues as well as on the
use of the data provided by the processing of the
calculation model corresponding to the conven-
tional block of flats, used in the case of some
representative localities in the climatic zones of
the country.
1. Introducere
emisiilor de CO2
serviciile energetice.
Având în vedere toate aceste aspecte,
lucrarea de fata trateaza:
-
Uniunii Europene;
-
26 – Nr. 2 / 2008
- câteva concluzii interesante cu privire la
mecanismele de generare a costurilor, concluzii
-
existente.
evaluare la nivel UE
1. Colectarea datelor:
R – 4; NR – 3,9;
2.
R – 3,5; NR – 3,45;
de utilizare a unor costuri nejustificat de reduse 3. Vizite/expertize:
R – 3,4; NR – 3,5;
4.
R – 3,2; NR – 3,3;
5. Metode de calcul/utilizare software:
R – 2,9; NR – 2,95;
6. Elaborarea certificatului:
R – 1,5; NR – 1,4.
– Nr. 2 / 2008 27
D. Constantinescu, C. Marin-Perianu, H. Petran, C. Petcu
•
a)
b)
d)
•
concluzii interesante:
a)
(R noi)
3,2 b)
3,1
3. Calificarea auditorului 3,1
2,8
5. Caracteristicile sistemului
2,7
6. Zonele de microclimat 2,6
1,5
energetice;
1. Calificarea auditorului: R – 3,4 NR – 3,5
R – 3,1 NR – 3,2 4. Din punctul de vedere al etapelor
R – 3,4 NR – 3,2
R – 3,1 NR – 3,2
5. Caracteristicile
R – 2,8 NR – 3,1
R – 2,2 NR – 2,3
R – 1,5 NR – 1,5 devansate de certificarea auditorilor.
28 – Nr. 2 / 2008
algoritm corect din punct de vedere al proceselor
geam termoizolant)
produc datele necesar a fi incluse în algoritmul
cu 5 cm polistiren expandat
cu 14 cm polistiren expandat
are ca scop reducerea punctajului acordat atât
de locuit existente.
2
3. Ana
A.1.
QA ∈ [128; 191] kWh/m2an
A.2 Modernizare 1
Q1 ∈ [90; 140] kWh/m2an
Ns = 15 ani;
NR1 ∈ [14,6 ; 11] ani – durata de
recuperare a investitiei
A.3 Modernizare 2
Q2 ∈ [56; 90] kWh/m2an
amplasate Ns = 15 ani;
virtual în zonele climatice din România. NR1 ∈ [15 ; 11] ani
În cele de mai jos sunt prezentate concluziile
rapoartelor de audit energetic elaborate: 2
B.1
QA ∈ [469; 694] kWh/m2an
1. B.2 Modernizare 1
Q1 ∈ [233; 355] kWh/m2an
geam termoizolant) Ns = 25 ani;
NR1 ∈ [9,4 ; 7,5] ani
10 cm polistiren expandat
B.3 Modernizare 2
Q2 ∈ [430; 638] kWh/m2an
extrudat
Ns = 15 ani;
NR2 ∈ [ 11,1 ; 14,8] ani
cu 5 cm polistiren expandat
B.4 Modernizare 3
Q3 ∈ [124; 190] kWh/m2an
Ns = 15 ani;
NR3 ∈ [ 10,9 ; 8,5] ani
cu 10 cm polistiren expandat
– Nr. 2 / 2008 29
D. Constantinescu, C. Marin-Perianu, H. Petran, C. Petcu
concluzii principale:
Ø
Ø locuit
zare rezultate din auditurile energetice,
în documentele statistice elaborate de Institutul
•
acestora:
Ø
Ø
bloc).
−
România, ponderea cea mai mare o au
(1,8%);
−
Figura 2.
30 – Nr. 2 / 2008
−
(6,8%).
Figura 3.2.
considerabile pentru
Figura 3.3.
din mediul urban
mare pondere (65,65%), comparativ cu
Figura 4.
– Nr. 2 / 2008 31
D. Constantinescu, C. Marin-Perianu, H. Petran, C. Petcu
valori Ψ
Tabelul 1.
Nr. tabel
C 107/3- Cazul Ψ1 Ψ2
2005
cu efect semnificativ asupra PEC. Ne referim la 1 -exteriori 0,00 0,07
2 0,00 0,00
3 0,09 0,09
intervalul de realizare. Prin urmare acest tip 3 0,17 0,17
5 0,07 0,07
6 b.a. 0,12 0,12
10 stâlpi b.a. 0,00 0,00
21 0,05 0,17
23 0,15 0,25
51 • 0,10
• b.c.a 0,07
−1
∑ L jΨj 61 • 0,20
1 j • b.c.a 0,18
Rc ≅ + (1) 31 Atic pod 0,30
R S
în care Rc R
32 – Nr. 2 / 2008
2.
αi = 8W/m K ; αi = 17W/m K
2 2 QPd =
S Pl
(ti o
− t Pd ) (8)
RPLc
λc
în care:
t Pd
Se poate utiliza un coeficient mediu de multi-
plicare de 1,08 astfel încât: RPLC = 0,90 ⋅ RPL ( RPL
λ c = 1,08 ⋅ λ catatog (5) în zona de câmp).
3.
b.c.a.).
QSOL =
SS
(ti 0
− te ) (9)
2
RSc
corectate din tabelul 2 [m K/W]:
Tabelul 2. în care valorile RSc se aleg din tabelul 2.
neizolat izolat 4.
pe sol 3.35 4.60
peste subsol 3.00 4.00 Qinf = B1 ⋅ na ⋅ V ⋅ ρ ⋅ c pa ⋅ ti0 − te ( ) (10)
în care:
6 − N Pi
B1 = 1 + 0,025 ⋅
R
în care:
N Pi -
SPL 3 SAC
⋅ tio + 1+ ⋅ + naPd ⋅VPd ⋅ ρ⋅ cpa ⋅ te R
RPLc te RAC zonei principale (include elementele
tPd =
SPL SAC
+ + naPd ⋅VPd ⋅ ρ⋅ cpa
RPLc RAC pod).
(6)
medie a valorilor N Pi
1. 2.
– Nr. 2 / 2008 33
D. Constantinescu, C. Marin-Perianu, H. Petran, C. Petcu
SE S PL
(
Qnec = + B1 ⋅ na ⋅ V ⋅ ρ ⋅ c pa tiR − teR [W] )
R [m2];
în care: SS 2
];
S E = S Pe + S F + S Pd + S S / Sb
RPe rezis lor exteriori
j
5 ⋅ S Loc 2
t iR = tio − cu orientarea car K/W];
SE
+ B1 ⋅ na ⋅ V ⋅ ρ ⋅ c pa te ,
R [°C].
SE
− β + B ⋅ n ⋅ V ⋅ ρ ⋅ c ⋅ te + βPd ⋅ t Pd
Pd 1 a pa Valoarea RPecj
t eR=
R
E
S în care valorile Ψk se preiau din tabelul 1 iar
+ B1 ⋅ na ⋅V ⋅ ρ ⋅ c pa
RPej
R
SE
R= RFj
S Pe SF SS
+ + β Pd +
RPe RF RS 2
K/W];
RAC
S Pe
RPe = ; S Pe = ∑ S Pe j
S Pe j
∑
j
δ
j RPe j R AC = 0.131 + ∑ ;
AC λ
SF RS
RF = ; SF = ∑ SF
SF j j
∑
j conform tabelului 2;
k RF j te
6 − N Pi [°C];
B1 = 1 + 0,025 ⋅ na , na Pd
R
S PL [s– 1];
β Pd =
RPLc V ,VPd volumul liber al zonei principale,
respectiv al podului [m3];
ti R °C];
S Pe j supr
te R °C].
2
];
SF
j este:
itraj) cu tiR = teR
”, [m2];
S AC
2.
2
];
34 – Nr. 2 / 2008
SE
Q& = 0,024⋅ + B1 ⋅ na ⋅V ⋅ ρcpa ⋅ NGZC⋅ η−1 [kWh]
R - utilizarea obligatorie a modelului
în care:
N GZC
ηR – randamentul de reglare;
ηS – randamentul sursei.
rente adiacente.
1.
Q&
q= [kWh/m2 ⋅ an]
SUTIL
2.
3.
procedura este cea din MC 001/2006.
În cazul condominiilor deciziile privind mobil / fix (fereastra, usa) inclus în panou.
simplificarea metodei de calcul a PEC sunt
de vitrare R v
cazul cladirilor individuale. Principalele
panoului mare;
– Nr. 2 / 2008 35
D. Constantinescu, C. Marin-Perianu, H. Petran, C. Petcu
Figura 5.
S PE ST SCS S SB
QNEC.ZPk = (tiR − t eRk ) ⋅⋅ β ⋅
R
+
SF
+ + + + na ⋅ V ⋅ ρ ⋅ c pa ⋅ B1
PE RF RT RCS RSB
în care:
a ⋅ S LOC
tiR = ti 0 −
S PE S F ST SCS S SB
β⋅ + + + + + na ⋅ V ⋅ ρ ⋅ c pa ⋅ B1
R R
PE RF RT CS RSB
S PE S F ST S S SB
β ⋅ + + + n ⋅ V ⋅ ρ ⋅ c ⋅ B ⋅ t + CS ⋅ t
CSk + ⋅ t SBk
RPE RF RT
a pa 1 ek
RCS RSB
teRk =
S PE S F ST SCS S SB
β⋅ + + + + + na ⋅ V ⋅ ρ ⋅ c pa ⋅ B1
R R
PE RF RT CS RSB
36 – Nr. 2 / 2008
Tabelul 3.
Nr. tabel
C 107/3- Cazul Ψ1 Ψ2
2005
1 -exteriori 0,04 0,040
2 0,02 0,020
3 0,145 0,145
13 intrand 0,35 -0,250
21 caramid 0,05 0,200
22 ziduri caramid (cu termoizolatie) 0,15 0,250
25 Grinda b.a si perete b.c.a. (consol sus) 0,07 0,270
27 Grinda b.a si perete b.c.a. (consol jos) 0,05 0,250
51 • 0,20
• b.c.a 0,15
61 • 0,23
• b.c.a 0,18
31 Atic teras 0,35 0,200
41 Soclu subsol perete caramid 0,22
44 Soclu subsol perete b.c.a si b.a 0,05
Perete interior pe placa peste subsol
46 • b.a 0,35
• caramid 0,22
• b.c.a. 0,10
Tabelul 4.
– Nr. 2 / 2008 37
D. Constantinescu, C. Marin-Perianu, H. Petran, C. Petcu
QLk = qLk ⋅ L
în care qLk se preia din Tabelul 4.
BIBLIOGRAFIE
5. Concluzii [1] Constantinescu D., Petran H., Petcu Cr.,
38 – Nr. 2 / 2008