Environmental Impact Assessment
Development projects in the past were undertaken without
any consideration to their environmental consequences. As a
result the whole environment got polluted and degraded.
In view of the colossal damage to the environment,
governments and public are now concerned about the
environmental impacts of developmental activities. So, to
assess the environmental impacts, the mechanism of EIA was
introduced.
EIA is a tool to anticipate the likely environmental impacts
that may arise out of the proposed developmental activities
and suggest mitigation measures and strategies.
EIA was introduced in India in 1978, with respect to river
valley projects. Later the EIA legislation was enhanced to
include other developmental sections since 1941.
EIA comes under Notification on Environmental Impact
Assessment (EIA) of developmental projects 1994under the
provisions of Environment (Protection) Act, 1986.
Besides EIA, the Government of India under Environment
(Protection) Act 1986 issued a number of other notifications,
which are related to environmental impact assessment.
EIA is now mandatory for 30 categories of projects, and
these projects get Environmental Clearance (EC) only after the
EIA requirements are fulfilled.
Environmental clearance or the ‘go ahead’ signal is granted
by the Impact Assessment Agency in the Ministry of
Environment and Forests, Government of India.
All projects that require clearance from central
government can be broadly categorized into the
following
1. Industries
2. Mining
3. Thermal power plants
4. River valley projects
5. Infrastructure and CRZ (Coastal Regulation Zone)
6. Nuclear power projects.
Individual projects that need require clearance from
central government
Nuclear power and related projects such as heavy water
plants, nuclear fuel complex, rare earths.
River valley projects including hydel power, major irrigation
and their combination including flood control.
Ports, harbours, airports (except minor ports and harbours).
Petroleum refineries including crude and product pipelines.
Chemical fertilizers (nitrogenous and phosphatic other than
single superphosphate).
Pesticides (technical).
Petrochemical complexes (both olefinic and aromatic) and
petrochemical intermediates such as DMT, Caprolactam, LAB
etc., and production of basic plastics such as LDPE, HDPE, PP,
PVC.
Bulk drugs and pharmaceuticals
Exploration for oil and gas and their production,
transportation and storage
Synthetic rubber
Asbestos and asbestos products
Hydrocyanic acid and its derivatives
Primary metallurgical industries (such as production of iron
and steel, aluminium, copper, zinc, lead, and ferro-alloys)
Chlor alkali industry
Integrated paint complex including manufacture of resins
and basic raw materials required in the manufacture of paints
Viscose staple fibre and filament yarn
Storage batteries integrated with manufacture of oxides of
lead and lead antimony alloy
All tourism projects between 200m-500 metres of High
Water Line and at locations with an elevation of more than
1000 metres with investment of more than Rs. 5 crore
Thermal power plants
Mining projects (with lease more than 5 hectares)
Highway projects except projects relating to improvement
work including widening and strengthening of roads with
marginal land acquisition along the existing alignments
provided it does not pass through ecologically sensitive
areas such as National Parks, Sanctuaries, Tiger Reserves,
Reserve Forests
Tarred roads in the Himalayas and forest areas
Distilleries
Raw skins and hide
Pulp, paper and newsprint
Dyes
Cement
Foundries (Individual)
Electroplating
Meta aminophenol
The important aspects of EIA are
1. risk assessment,
2. environmental management and
3. post product monitoring.
EIA is to
1. serve as a primary environmental tool with clear provisions.
2. apply consistently to all proposals with potential
environmental impacts.
3. use scientific practice and suggest strategies for mitigation.
4. address all possible factors such as short term, long term,
small scale and large scale effects.
5. consider sustainable aspects such as capacity for
assimilation, carrying capacity, biodiversity protection.
6. lay down a flexible approach for public involvement.
7. have in built mechanism of follow up and feedback.
8. include mechanisms for monitoring, auditing and evaluation.
In order to carry out an environmental impact
assessment, the following are essential:
1. assessment of existing environmental status.
2. assessment of various factors of ecosystem (air, water, land,
biological).
3. analysis of adverse environmental impacts of the proposed
project to be started.
4. impact on people in the neighborhood.
Benefits of EIA
EIA provides a cost effective method to eliminate or
minimize the adverse impact of developmental projects.
EIA enables the decision makers to analyses the effect of
developmental activities on the environment well before the
developmental project is implemented.
EIA encourages the adaptation of mitigation strategies in the
developmental plan.
EIA makes sure that the developmental plan is
environmentally sound and within limits of the capacity of
assimilation and regeneration of the ecosystem.
EIA links environment with development. The goal is to
ensure environmentally safe and sustainable development.
Environmental Components Of EIA
The EIA process looks into the following components of the
environment.
Air environment
Quality of ambient air present and predicted.
Meteorological data: Wind speed, direction, humidity etc.
Quantity of emission likely from project.
Impact of the emission on the area.
Pollution control desires/air quality standards.
Noise
Levels of noise present and predicted
Strategies for reducing noise pollution.
Water environment
Existing ground and surface water resources, their quality
and quantity within the zone.
Impact of proposed project on water resources.
Biological environment
Flora and fauna in impact zone.
Potential damage (likely) due to project, due to effluents,
emissions and landscaping.
Biological stress (prediction).
Land environment
Study of soil characteristics, land use, and drainage pattern,
and the likely adverse impact of the project.
Impact on historical monuments and heritage site.
Assessment of expected economic benefits arising out of the
project have to be compared to the all the above mentioned
factors. Thus we can say that environmental concerns have to
be made a part of the decision to set up a project.
EIA Process And Procedures
Steps in Preparation of EIA report
Collection of baseline data from primary and secondary
sources;
Prediction of impacts based on past experience and
mathematical modelling;
Evolution of impacts versus evaluation of net cost benefit;
Preparation of environmental management plans to reduce
the impacts to the minimum;
Quantitative estimation of financial cost of monitoring plan
and the mitigation measures.
Environment Management Plan
Delineation of mitigation measures including prevention and
control for each environmental component and rehabilitation
and resettlement plan.
Steps in EIA process
EIA involves the steps mentioned below. However, EIA process is
cyclical with interaction between the various steps.
Screening: The project plan is screened for scale of
investment, location and type of development and if the
project needs statutory clearance.
Scoping: The project’s potential impacts, zone of impacts,
mitigation possibilities and need for monitoring.
Collection of baseline data: Baseline data is the
environmental status of study area.
Impact prediction: Positive and negative, reversible and
irreversible and temporary and permanent impacts need to be
predicted which presupposes a good understanding of the
project by the assessment agency.
Mitigation measures and EIA report: The EIA report should
include the actions and steps for preventing, minimizing or by
passing the impacts or else the level of compensation for
probable environmental damage or loss.
Public hearing: On completion of the EIA report, public and
environmental groups living close to project site may be
informed and consulted.
Decision making: Impact Assessment (IA)Authority along
with the experts consult the project-in-charge along with
consultant to take the final decision, keeping mind EIA and
EMP (Environment Management Plan).
Monitoring and implementation of environmental
management plan: The various phases of implementation of
the project are monitored.
Assessment of Alternatives, Delineation of Mitigation
Measures and Environmental Impact Assessment Report: For
every project, possible alternatives should be identified and
environmental attributes compared. Alternatives should cover
both project location and process technologies.
Once alternatives have been reviewed, a mitigation plan
should be drawn up for the selected option and is
supplemented with an Environmental Management Plan (EMP)
to guide the proponent towards environmental improvements.
Risk assessment: Inventory analysis and hazard probability
and index also form part of EIA procedures.
Composition of the expert committees for EIA
The Committees will consist of experts in the following
disciplines:
Eco-system management
Air/water pollution control
Water resource management
Flora/fauna conservation and management
Land use planning
Social Sciences/Rehabilitation
Project appraisal
Ecology
Environmental Health
Subject Area Specialists
Representatives of NGOs/persons concerned with
environmental issues
The Chairman will be an outstanding and experienced
ecologist or environmentalist or technical professional with
wide managerial experience in the relevant development.
The representative of Impact Assessment Agency will act as
a Member-Secretary.
Chairman and members will serve in their individual
capacities except those specifically nominated as
representatives.
The membership of a committee shall not exceed 15
members.
Environmental Appraisal Procedure In India
An Appraisal Committee constituted by the Ministry of
Environment and Forests to first scrutinized a project based on
the data presented by the project authorities.
If necessary, the Ministry of Environment and Forests may
also hold consultations with the investors and experts on
specific issues as and when necessary.
After considering all the facets of a projects, environmental
clearance is accorded subject to implementation of the
stipulated environmental safeguards.
In case of projects where the project proponents have
submitted complete information, a decision is taken within 90
days.
The six regional offices of the Ministry functioning
at Shillong, Bhubaneshwar, Chandigarh, Bangalore,
Lucknow and Bhopal undertake monitoring of cleared projects.
The primary objectives of this procedure is to ensure
adequacy of the suggested safeguards and also to undertake
mid-course corrections if required.
Sometimes one or more natural resources becomes limiting
resource in a given region and that restrict the scopes of
development projects.
EIA of Coasts
Coastal Zone Management Plans (CZMPs) are prepared by
coastal states or Union Territories as per rules set by CRZ
notification 1991.
CZMPs are prepared based on identification and
categorization of coastal areas for different activities and then
submitted to the MoEF for approval.
The ministry then forms a task force for examining their
plans.
Environmental Clearance/Rejection Letter
Single window clearance
Environmental clearance + Forestry clearance.
When a project requires both environmental clearance as
well as approval under the Forest (Conservation) Act, 1980,
proposals for both are required to be given simultaneously to
the concerned divisions of the Ministry.
The processing is done simultaneously for clearance or
rejection. If the project does not involve diversion of
forestland, the case is processed only for environmental
clearance.
Time frame
Once all the requisite documents and data from the project
authorities are received and public hearings (where required)
have been held, assessment and evaluation of the project
from the environment angle is completed within 90 days and
the decision of the ministry shall be conveyed within 30 days
thereafter [120 days for final decision].
Post project monitoring
Whenever a project is given environment clearance, a set of
conditions are stipulated by the Appraisal Committee on a
case to case basis, which have to be complied with by the
project proponent.
The project authorities are required to submit a half-yearly
compliance report to the Ministry about the compliance of
conditions stipulated.
Cases of non-compliance of the recommendations and
conditions by cleared projects/ units are brought to the notice
of the Ministry, which may then initiate action against the
project authorities.
The Main Participants Of EIA
EIA applies to public and private sections. The six main players
are:
1. Those who propose the project
2. The environmental consultant who prepare EIA on behalf of
project proponent.
3. Pollution Control Board (State or National).
4. Public has the right to express their opinion.
5. The Impact Assessment Agency.
6. Regional center of the Ministry of Environment and Forest.
Salient Features of 2006 Amendment to EIA
Notification
Environment Impact Assessment Notification of 2006
has decentralized the environmental clearance projects by
categorizing the developmental projects in two categories,
i.e., Category A (national level appraisal) and Category B
(state level appraisal).
‘Category A’ projects are appraised at national level by
Impact Assessment Agency (IAA) and the Expert Appraisal
Committee (EAC) and Category B projects are apprised at
state level.
State Level Environment Impact Assessment Authority
(SEIAA) and State Level Expert Appraisal Committee (SEAC)
are constituted to provide clearance to Category B process.
After 2006 Amendment the EIA cycle comprises of four stages
1. Screening
2. Scoping
3. Public hearing
4. Appraisal
Category A projects require mandatory environmental
clearance and thus they do not undergo the screening
process.
Category B projects undergoes screening process and they
are classified into two types.
1. Category B, projects (Mandatory requires EIA).
2. Category B2 projects (Do not require EIA).
Thus Category A projects and Category B, projects undergo
the complete EIA process whereas Category B2 projects are
excluded from complete EIA process.
Procedure For Public Hearing
Notice of Public Hearing
Whoever applies for environmental clearance of projects,
should request the concerned State Pollution Control Board to
initiate a public hearing.
The State Pollution Control Board issues a notice for
environmental public hearing which will be published in at
least two newspapers widely circulated in the region around
the project, one of which will be in the vernacular language of
the locality concerned.
State Pollution Control Board mentions the date, time and
place of public hearing.
Suggestions, views, comments and objections of the public
will be invited within thirty days from the date of publication
of the notification.
All persons including the residents, environmental groups
and others located at the project site/sites of
displacement/sites likely to be affected can participate in the
public hearing. They can also make oral/written suggestions to
the State Pollution Control Board.
Composition of public hearing panel
The composition of Public Hearing Panel may consist of the
following, namely:
Representative of State Pollution Control Board;
District Collector or his nominee;
Representative of State Government dealing with the
subject;
Representative of Department of the State Government
dealing with Environment;
Not more than three representatives of the local bodies such
as Municipalities or panchayats;
Not more than three senior citizens of the area nominated by
the District Collector.
Shortcomings of Environmental Impact
Assessment
Applicability
There are several projects with significant environmental
impacts that are exempted from the notification either
because they are not listed in schedule I, or their investments
are less than what is provided for in the notification.
Composition of expert committees and standards
It is being found that the team formed for conducting EIA
studies is lacking the expertise in various fields such as
environmentalists, wild life experts, Anthropologists and Social
Scientists (to study the social impact of the project).
For example for the preparation of EIA report of the
proposed oil exploration in coast of Orissa by the reliance
group has been given to the life science Dept of Berhampur
university which has no expertise on the study of turtles and
its life cycle.
Public hearing
Public comments are not taken into account at the early
stage, which often leads to conflict at the later stage of
project clearance.
A number of projects with significant environmental and
social impacts have been excluded from the mandatory public
hearing process.
The documents which the public are entitled to are seldom
available on time.
The data collectors do not pay respect to the indigenous
knowledge of local people.
Quality of EIA
One of the biggest concerns with the environmental
clearance process is related to the quality of EIA report that
are being carried out.
The reports are generally incomplete and provided with false
data.
Many EIA report are based on single season data.
The EIA document in itself is so bulky and technical, which
makes it very difficult to decipher so as to aid in the decision
making process.
Lack of Credibility
It is the responsibility of the project proponent to
commission the preparation of the EIA for its project.
The EIA is actually funded by an agency or individual whose
primary interest is to procure clearance for the project
proposed.
There is little chance that the final assessment presented is
un biased, even if the consultant may provide an unbiased
assessment that is critical of the proposed project.
There are so many cases of fraudulent EIA studies where
erroneous data has been used, same facts used for two totally
different places etc.
There is no accreditation of EIA consultants, therefore any
such consultant with a track record of fraudulent cases cannot
be held liable for discrepancies.
It is hard to imagine any consultant after being paid lakh of
rupees, preparing a report for the project proponents,
indicating that the project is not viable.
Case Study
The MoEF constituted the Western Ghats Experts Ecology
Panel (WGEEP) in 2010 under the Chairmanship of Prof.
Madhav Gadgil.
The Panel submitted its report in 2011 but it was not made
public immediately due to its stringent assessment of the
condition of Western Ghats.
The report suggested many radical changes that needs to be
brought to conserve Western Ghats. The recommendation if
implemented would adversely affect mining mafia, sand mafia
and local encroachers.
Under pressure from various stakeholders, MoEF set up the
High Level Working Group (HLWG) under the Chairmanship of
Dr. K. Kasturirangan to study recommendations of WGEEP.
The very constitution of the HLWG raised suspicions that this
has been formed to dilute the recommendations of the
WGEEP.
The HLWG had indeed diluted many recommendations of
WGEEP to satisfy the interests of various mafia.
Monitoring, compliance and institutional
arrangements
Often, and more so for strategic industries such as nuclear
energy projected, the EMPs are kept confidential for political
and administrative reasons.
Details regarding the effectiveness and implementation of
mitigation measures are often not provided.
Emergency preparedness plans are not discussed in
sufficient details and the information not disseminated to the
communities.
Recommendations to improve EIA process
Independent EIA Authority.
Sector wide EIAs needed.
Creation of a centralized baseline data bank.
Dissemination of all information related to projects from
notification to clearance to local communities and general
public.
Applicability
All those projects where there is likely to be a significant
alternation of ecosystems need to go through the process of
environmental clearance, without exception.
No industrial developmental activity should be permitted in
ecologically sensitive areas.
Public hearing
Public hearings should be applicable to all hitherto exempt
categories of projects which have environmental impacts.
Quality
The focus of EIA needs to shift from utilization and
exploitation of natural resources to conservation of natural
resources.
At present EIA reports are extremely weak when it comes to
assessment of biological diversity of a project area and the
consequent impacts on it. This gap needs to be plugged.
All EIA reports should clearly state what are the adverse
impacts that a proposed projects will have. This should be a
separate chapter and not hidden within technical details.
The sub components or subsidiary reports of EIA reports
(e.g. Assessments of Biodiversity impacts done by a sub
consultant) should be made publicly accessible as standalone
reports with the EIA. This should be available on the websites
of the MOEF.
EIAs should be based on full studies carried out over at least
one year. Single season data on environmental parameters
like biodiversity, as is being done for several rapid
assessments is not adequate to gain understanding of the full
impact of the proposed project.
It is critical that the preparation of an EIA is completely
independent of the project proponent.
State and central governments should maintain a list of
credible, independent and competent agencies that can carry
out EIAs. similarly the EIA consultant those are making false
reports should be black listed.
A national level accreditation to environment consultancy
should be adopted
Grant of clearance
The notification needs to make it clear that the provision for
site clearance does not imply any commitment on the part of
the impact Assessment agency to grant full environmental
clearance.
The prior informed consent of local communities and urban
wards or residents association needs to be made mandatory
before the grant of environmental clearance. The consent
should be from the full general body.
The language used for specifying conditions of clearance
must be clear and specific.
Composition of expert committees
The present executive committees should be replaced by
expert’s people from various stakeholder groups, who are
reputed in environmental and other relevant fields.
The process of selection of those committees should be open
and transparent. The minutes, decisions and advice by these
committee should be open to public.
Monitoring, compliance and institutional
arrangements
The EIA notification needs to build within it an automatic
withdrawal of clearance if the conditions of clearance are
being violated, and introduce more stringent punishment for
noncompliance. At present the EIA notification limits itself to
the stage when environmental clearance is granted.
The MOEF should set up more regional offices with advisory
Expert committees, each with smaller areas of jurisdiction, to
effectively monitor the compliance of clearance conditions.
Redressal
The composition of the NGT needs to be changed to include
more judicials from the field of environment.
Citizen should be able to access the authority for redressal
of all violation of the EIA notification as well as issues relating
to non-compliance.
Capacity building
NGOs, civil society groups and local communities need to
build their capacities to use the EIA notification towards better
decision making on projects.