Unistar - Expansion Project 2013
Unistar - Expansion Project 2013
Unistar - Expansion Project 2013
SL.
NO. ITEMS Phase1
Total 1150.50
or say 1151.00
ANNEXURE - B
MEANS OF FINANCE
1. Promoters Contribution:
By way of Capital & Reserve* 196.00
-By way of unsecured loans 196.00
ANNEXURE - C
ANNEXURE - D
B COST OF OPERATION
ANNEXURE - E
2012-13
1st Qtr. 0.00 0.00 0.00 0.00
2nd Qtr. 0.00 0.00 759.00 759.00 379.50
3rd Qtr. 759.00 0.00 889.00 130.00 824.00
4th Qtr. 889.00 0.00 1019.00 130.00 954.00
2013-14
1st Qtr. 1019.00 0.00 1019.00 1019.00
2nd Qtr. 1019.00 0.00 1019.00 1019.00
3rd Qtr. 1019.00 31.63 31.63 987.38 1007.14
4th Qtr. 987.38 31.63 63.25 955.75 975.52
2014-15
1st Qtr. 955.75 42.46 105.71 913.29 939.83
2nd Qtr. 913.29 42.46 148.17 870.83 897.37
3rd Qtr. 870.83 42.46 190.63 828.38 854.91
4th Qtr. 828.38 42.46 233.08 785.92 812.45
2015-16
1st Qtr. 785.92 42.46 275.54 743.46 769.99
2nd Qtr. 743.46 42.46 318.00 701.00 727.54
3rd Qtr. 701.00 42.46 360.46 658.54 685.08
4th Qtr. 658.54 42.46 402.92 616.08 642.62
YEAR OPENING T.L. CUM. BALANCE ADDITION AVERAGE
BALANCE INSTL. PAYMENT O/S BALANCE
2016-17
1st Qtr. 616.08 42.46 445.38 573.63 600.16
2nd Qtr. 573.63 42.46 487.83 531.17 557.70
3rd Qtr. 531.17 42.46 530.29 488.71 515.24
4th Qtr. 488.71 42.46 572.75 446.25 472.79
2017-18
1st Qtr. 446.25 42.46 615.21 403.79 430.33
2nd Qtr. 403.79 42.46 657.67 361.33 387.87
3rd Qtr. 361.33 42.46 700.13 318.88 345.41
4th Qtr. 318.88 42.46 742.58 276.42 302.95
2018-19
1st Qtr. 276.42 42.46 785.04 233.96 260.49
2nd Qtr. 233.96 42.46 827.50 191.50 218.04
3rd Qtr. 191.50 42.46 869.96 149.04 175.58
4th Qtr. 149.04 42.46 912.42 106.58 133.12
2019-20
1st Qtr. 106.58 42.46 954.88 64.12 90.66
2nd Qtr. 64.12 42.46 997.33 21.67 48.20
3rd Qtr. 21.67 10.83 1008.17 10.83 17.60
4th Qtr. 10.83 10.83 1019.00 0.00 6.77
APPENDIX - E
ANNEXURE - F
A SOURCES OF FUNDS
Share capital 251.00
Unsecured loans 251.00
Long Term Loan 1019.00
B USES OF FUNDS :
ANNEXURE - G
A. SOURCES OF FUNDS
Share Capital 251.00 251.00 251.00
Reserve & Surplus 7.00 199.00 460.00
SECURED LOAN
Long term Loan 1019.00 956.00 786.00
Bank Borrowing for working
capital 171.00 448.00 536.00
Unsecured Loan 251.00 251.00 251.00
B. USES OF FUNDS:
Gross Fixed Assets 1455.00 1455.00 1455.00
Less : Depreciation 49.00 183.00 317.00
Net Fixed Assets 1406.00 1272.00 1138.00
CURRENT ASSETS
Stocks
Raw Materials 37.00 89.00 104.00
Consumable Stores 0.00 0.00 0.00
Finished Goods 75.00 178.00 208.00
Book Debts 153.00 418.00 506.00
Loans and advances 25.00 150.00 325.00
Cash & Bank Balances 31.00 64.00 80.00
ANNEXURE - H
B VARIABLE EXPENSES
Raw Materials ( with stock adjustment)
Consumable Stores
Excise duty
Power & Fuel
Employment cost
Interest on Bank Borrowings
for working capital
Selling expenses
C CONTRIBUTION (A-B)
367
Break even point =
--------------- X 2880.00
(in terms of capacity ) 843
ANNEXURE - J
Total: 407.74
APPENDIX - A2
Total 515.95
APPENDIX - A3
(Rs. in Lak
SL. No. ITEMS Qty Phase1
Imported
1 Injection Moulding m/c (EU)-Type B 1 42.00
2 Injection Moulding m/c (EU)-Type A 2 105.45
3 Injection Moulding Machine( Asian) 1
4 Cutting Machine 3
5 Pasting machine 2
6 Pressing machine 1
7 Skiving machine 1
8 Sole Attaching Press 1
9 Chiller 2 6.70
10 String Lasting Machine 4
11 Punching Machine 2
12 Eyeletting machine 2
13 Moulds 24
Indigenous
1 Injection moulding machine 1
2 Moulds 52
3 Stitching machine 80
4 Printing Machine 2
5 Shoe Repairing machine 1
6 Upper Heating Oven 2
7 Scrap Granulators 1.00
8 Air Compressor 1
9 PVC Mixer 3.00
10 Extruder Machine 1
11 Granule Palletising machine 1.00
12 Conveyors 5.00 3.31
13 Strapping machine 1.00
14 Automatic Tipping machine 1
15 Hi Frequency Machine 1.00
TOTAL 157.46
TOTAL B 12.02
TOTAL A + B 169.48
APPENDIX - A4
ELECTRICAL INSTALLATIONS & MISC FIXED ASSETS
APPENDIX - A5
APPENDIX - D1
Since the production varies for different quality, the intalled capcity has been indicated on
AVERAGE basis
APPENDIX - D2
2012-13
APPENDIX - D3
COST OF CONSUMABLES
APPENDIX - D4
SL CATE G O RY NO SALARY/
No MONTH
I. FIXED MANPOWER: (RS)
(A) ADMINISTRATIVE STAFF:
Existing Staff
TOTAL: 35
Add: other benefits 15% of above
TOTAL MONTHLY SALARY
Annual variable Salary Rs.
Total manpower Requirement 121
YEAR WISE MANPOWER COST
Year 2012-13 2013-14 2014-15
APPENDIX - D5
TOTAL
COST OF POWER
58.00
ADMINISTRATIVE EXPENSES
1. Insurance
2. Telephone charges
3. Office Maintenance
9. Others
APPENDIX - D7
SL I T E M S INSTALLED % OF EXPE-
NO COST -NDITURE
SL I T E M S APPORTIONED COST
NO ORIGINAL PREOPERATIVE CONTINGENCY
COST EXPENSES PROVISIONS
APPENDIX - D8
CALCULATION OF DEPRECIATION
APPENDIX - D9
(Rs. in Lakhs)
Phase2 Total
55.00 251.00
55.00 251.00
260.00 1019.00
370.00 1521.00
(Rs. in Lakhs)
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
(Rs. in Lakh)
2015-16 2016-17 2017-18 2018-19 2019-20
INTEREST THEREON
(Rs.in Lakh)
0.00 Construuction
11.86 11.86 Period
4.06 21.69
8.12 21.69
31.84
31.84
31.47
30.49
29.37
28.04
26.72
25.39
24.06
22.74
21.41
20.08
INTEREST
@ 12.5%
18.76
17.43
16.10
14.77
13.45
12.12
10.79
9.47
8.14
6.81
5.49
4.16
2.83
1.51
0.55
0.21
OAN
(Rs. in Lakh)
INTEREST
@ 12.50%
43.38
125.64
109.52
88.29
67.06
45.83
24.60
5.10
(Rs. in Lakh)
(Rs. in Lakh)
2015-16 2016-17 2017-18 2018-19 2019-20
(Rs. in Lakh)
2880.00
3136.00
2093.00
12.00
81.00
26.00
77.00
4.00
TOTAL: 2293.00
843.00
123.00
12.00
7.00
3.00
88.00
134.00
367.00
1254.00 MT
44%
796.00 MT
28%
(Rs. in Lakh)
TOTAL CASH CUMULATIVE Pay Back
INFLOW SURPLUS
56.00 56.00
326.00 382.00
395.00 777.00
470.00 1247.00
4 years
455.00 1702.00
459.00 2161.00
465.00 2626.00
470.00 3096.00
(Rs. in Lakh)
2015-16 2016-17 2017-18 2018-19 2019-20
380.00
27.74
0.00 407.74
(Rs. in Lakh)
Phase2 Total
288.93
227.02
231.15 231.15
231.15 747.10
ONS
(Rs. in Lakh)
Phase2 Total
42.00
105.45 210.90
16.40 16.40
27.25 27.25
4.50 4.50
2.00 2.00
4.47 4.47
3.70 3.70
6.70 13.40
3.60 3.60
2.60 2.60
2.87 2.87
49.97 49.97
0.00
10.17 10.17
47.33 47.33
21.53 21.53
3.06 3.06
0.73 0.73
3.04 3.04
2.29 2.29
5.35 5.35
4.32 4.32
5.19 5.19
0.35 0.35
15.45 18.76
0.43 0.43
2.68 2.68
2.09 2.09
353.52 510.98
1122.00
(Rs in lakhs)
Phase2 Total
2.10 2.10
11.94
23.54 23.54
7.14 7.14
3.87 3.87
2.14 2.14
0.17 0.25
11.03 11.03
2.76 2.76
6.62 6.62
3.86 3.86
19.30 19.30
11.03 11.03
0.00
0.00
93.56 105.58
447.08 616.56
SETS
(Rs. in Lakh)
Phase2 TOTAL
9.75
2.75
0.80
5.00 5.00
3.00 3.00
9.50 9.50
6.70 10.05
6.00 11.00
1.42 2.84
8.00 16.00
39.62 70.69
ES
(Rs. in Lakh)
AMOUNT
TOTAL 12.00
een indicated on
(Rs. in Lakhs)
Total
1207.50
2215.20
2015-16 2016-17
70.00 70.00
142.00 166.00
1092000 1092000
91000.00 91000.00
90.45 90.45
1001142 1001166
1421.62 1421.66
1421.62 1421.66
1421.62 1421.66
(Rs. in Lakhs )
RATE TOTAL
PER UNIT AMOUNT
( Rs.)
92040.00 663.00
92040.00 2651.00
2013-14 2014-15 2015-16
ONWARDS
60.00 70.00 80.00
2015-16
2304.00
12.00
TOTAL
SALARY
(RS)
30000.00
576000.00
112500.00
50000.00
768500.00
768500.00
115275.00
883775.00
106.00 Lakh
187500.00
50000.00
Manpower cost taken 25% for 1st yr
237500.00 as the plant will be in operation for
35625.00 6 months with half the capacity.( 30
273125.00 looms will be in operation for 6 months
33.00 Lakh out of 60 looms)
TOTAL UNITS
CONSUMED AT
FULL WORKING
3684000
3684000
TION
2013-14 2014-15 2015-16
ONWARDS
60.00 70.00 80.00
0.50
0.25
0.25
0.10
0.25
0.25
0.90
0.25
0.25
TOTAL 3.00
TURING EXPENSES
(Rs. in Lakh)
1ST TO 6TH
5TH YR. YEAR
4.60 5.06
61.25 67.38
0.00 0.00
65.85 72.44
66.00 72.00
GENCY PROVISIONS
(Rs. in Lakh)
CONTINGENCY TOTAL
PROVISIONS COST
0.00
230.00
1225.00
0.00
0.00
0.00
1455.00
(Rs. in Lakh)
MISC. FIXED TOTAL
ASSETS DEPRECIATION
(figures rounded off)
0.00
15.00
0.00 77.00
0.00 196.00
0.00 168.00
0.00 143.00
0.00 123.00
0.00 105.00
0.00 90.00
0.00 77.00
49.00
134.00
134.00
134.00
134.00
134.00
134.00
134.00
(Rs. in Lakh)
2015-16 2016-17 2017-18 2018-19 2019-20
EXTRUSION LINE
PLASTIC EXTRUSION PLANT AND MACHINERY
ACCESSORIES
A 100,500,000 10,161,146
PARTICULARS QUANTITY RATE AMOUNT EXCISE VAT
DUTY
80 MM LAMINATION MACHINE 1 6,400,000 6,400,000 791,040
B 138,990,000 12,558,976 -
2,500,000 2,500,000
16,250,000 16,250,000
2,000,000 2,000,000
1,500,000 1,500,000
1,800,000 1,800,000