0% found this document useful (0 votes)
2K views44 pages

Lean

The document contains instructions for a Lean assessment test with 25 multiple choice questions covering various Lean concepts such as mistake proofing, customer value, go see yourself, takt time, 5 whys, pull systems, straightening in 5S, heijunka, kaizen, PDCA, value stream mapping, workload leveling, and when to implement Lean principles in a project. It provides the questions, answer options, and identified correct answers. The test is to be taken by clicking the options and involves getting a certificate upon scoring above 70%.

Uploaded by

naveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views44 pages

Lean

The document contains instructions for a Lean assessment test with 25 multiple choice questions covering various Lean concepts such as mistake proofing, customer value, go see yourself, takt time, 5 whys, pull systems, straightening in 5S, heijunka, kaizen, PDCA, value stream mapping, workload leveling, and when to implement Lean principles in a project. It provides the questions, answer options, and identified correct answers. The test is to be taken by clicking the options and involves getting a certificate upon scoring above 70%.

Uploaded by

naveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 44

<?xml version="1.0" standalone="yes"?

>

<NewDataSet>

<instxt>

<txt id="intro1"> Instructions</txt>

<txt id="intro2">You have to answer 10 multiple choice questions.</txt>

<txt id="intro3">You need to score a minimum of 70% to pass the test.</txt>

<txt id="intro4">Click Enter to begin the test.</txt>

<txt id="intro5">All the Best!</txt>

<txt id="intro6">Assessment - Result</txt>

<txt id="intro7">Your score</txt>

<txt id="intro8"> </txt>

<txt id="intro9">Lean Assessment</txt>

<txt id="intro10">Click the Correct Option.</txt>

<txt id="intro11">Click Get your certificate.</txt>

<txt id="intro12">Sorry! You have failed</txt>

<txt id="intro13">Congratulations!</txt>

</instxt>

<Main>

<QNo>1</QNo>

<QUESTION>Defect prevention is</QUESTION>

<OPTION1>Mistake proofing</OPTION1>

<OPTION2>Iterative testing</OPTION2>
<OPTION3>OA</OPTION3>

<OPTION4>Early testing</OPTION4>

<ANSWER>Mistake proofing</ANSWER>

</Main>

<Main>

<QNo>2</QNo>

<QUESTION> ______________ is the critical starting point of Lean thinking</QUESTION>

<OPTION1>Project Value</OPTION1>

<OPTION2>Customer Value</OPTION2>

<OPTION3>Value Addition</OPTION3>

<OPTION4>Program value </OPTION4>

<ANSWER>Customer Value</ANSWER>

</Main>

<Main>

<QNo>3</QNo>

<QUESTION>To get First Hand Information, we need to do</QUESTION>

<OPTION1>Visual Control</OPTION1>

<OPTION2>Go See Yourself</OPTION2>

<OPTION3>Brainstorm</OPTION3>

<OPTION4>Continuous Monitoring</OPTION4>

<ANSWER>Go See Yourself</ANSWER>

</Main>

<Main>

<QNo>4</QNo>

<QUESTION>Value is always defined from the perspective of the</QUESTION>


<OPTION1>Customer</OPTION1>

<OPTION2>Project</OPTION2>

<OPTION3>Product</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>Customer</ANSWER>

</Main>

<Main>

<QNo>5</QNo>

<QUESTION>______________ is a Visual Control device in the work area indicating a process or


quality problem</QUESTION>

<OPTION1>Andon Board</OPTION1>

<OPTION2>SMED</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Andon Board</ANSWER>

</Main>

<Main>

<QNo>6</QNo>

<QUESTION>______________ is the rate (time per unit of value) at which work should proceed
through a Value Stream</QUESTION>

<OPTION1>Cycle Time</OPTION1>

<OPTION2>Activity Time</OPTION2>

<OPTION3>Takt Time</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>Takt Time</ANSWER>

</Main>
<Main>

<QNo>7</QNo>

<QUESTION>This technique can be used to conduct root cause analysis</QUESTION>

<OPTION1>5 Why</OPTION1>

<OPTION2>Fishbone diagram</OPTION2>

<OPTION3>Cause and Effect diagram</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>All the above</ANSWER>

</Main>

<Main>

<QNo>8</QNo>

<QUESTION>Pull system helps in avoiding ______________</QUESTION>

<OPTION1>Over production</OPTION1>

<OPTION2>Slow production</OPTION2>

<OPTION3>Fast production</OPTION3>

<OPTION4>None of above</OPTION4>

<ANSWER>Over production</ANSWER>

</Main>

<Main>

<QNo>9</QNo>

<QUESTION>Placing everything in its place is part of _________________in 5S


framework</QUESTION>

<OPTION1>Sort</OPTION1>

<OPTION2>Straighten</OPTION2>

<OPTION3>Shine</OPTION3>

<OPTION4>Sustain</OPTION4>
<ANSWER>Straighten</ANSWER>

</Main>

<Main>

<QNo>10</QNo>

<QUESTION>Creation of a level schedule by sequencing orders in order to smoothen the demand is


known as ______________</QUESTION>

<OPTION1>Heijunka</OPTION1>

<OPTION2>Gemba</OPTION2>

<OPTION3>Kaizen</OPTION3>

<OPTION4>Hoshin Kanri</OPTION4>

<ANSWER>Heijunka</ANSWER>

</Main>

<Main>

<QNo>11</QNo>

<QUESTION>Kaizen as implemented in Lean helps in the following</QUESTION>

<OPTION1>Ongoing improvement</OPTION1>

<OPTION2>significant onetime improvement</OPTION2>

<OPTION3>Ongoing small changes suggested by external process consultant</OPTION3>

<OPTION4>One time significant change suggested by external process consultant</OPTION4>

<ANSWER>Ongoing improvement</ANSWER>

</Main>

<Main>

<QNo>12</QNo>

<QUESTION>Continuous organization learning and improvement is ensured through


______________</QUESTION>

<OPTION1>Standardization and Automation</OPTION1>


<OPTION2>Retrospection and Mistakeproofing</OPTION2>

<OPTION3>Pull and Flow</OPTION3>

<OPTION4>Retrospection and Kaizen</OPTION4>

<ANSWER>Retrospection and Kaizen</ANSWER>

</Main>

<Main>

<QNo>13</QNo>

<QUESTION>Main purpose of Visual control is to</QUESTION>

<OPTION1>Create dashboards and metrics for measurement</OPTION1>

<OPTION2>Ensure problems are not hidden</OPTION2>

<OPTION3>Help in baselining and measuring the trends</OPTION3>

<OPTION4>Showcase to the management on the success stories of the team</OPTION4>

<ANSWER>Ensure problems are not hidden</ANSWER>

</Main>

<Main>

<QNo>14</QNo>

<QUESTION>VSM helps in</QUESTION>

<OPTION1>Identifying areas where automation can be implemented</OPTION1>

<OPTION2>Identifying areas for putting mistake proofing process</OPTION2>

<OPTION3>Identifying value adding and non value adding activity in a process</OPTION3>

<OPTION4>Identifying areas where Visual control can be implemented</OPTION4>

<ANSWER>Identifying value adding and non value adding activity in a process</ANSWER>

</Main>

<Main>

<QNo>15</QNo>
<QUESTION>PDCA stands for</QUESTION>

<OPTION1>Plan-Do-Check-Act</OPTION1>

<OPTION2>Plan-Do-Control-Analyze</OPTION2>

<OPTION3>Plan-Do-Check-Analyze</OPTION3>

<OPTION4>Plan-Do-Control-Act</OPTION4>

<ANSWER>Plan-Do-Check-Act</ANSWER>

</Main>

<Main>

<QNo>16</QNo>

<QUESTION>Which of the following is not a root cause analysis technique</QUESTION>

<OPTION1>Pareto diagram</OPTION1>

<OPTION2>5 Why</OPTION2>

<OPTION3>Fish Bone Diagram</OPTION3>

<OPTION4>Mistake Proofing</OPTION4>

<ANSWER>Mistake Proofing</ANSWER>

</Main>

<Main>

<QNo>17</QNo>

<QUESTION>The culture of Lean gives a lot of importance to</QUESTION>

<OPTION1>Innovation</OPTION1>

<OPTION2>Capability building</OPTION2>

<OPTION3>Questioning status-quo</OPTION3>

<OPTION4>Showcasing best practices</OPTION4>

<ANSWER>Questioning status-quo</ANSWER>

</Main>
<Main>

<QNo>18</QNo>

<QUESTION>Identifying the necessary and removing unwanted one in any workplace is


called</QUESTION>

<OPTION1>Straighten</OPTION1>

<OPTION2>Automation</OPTION2>

<OPTION3>Mistake proofing</OPTION3>

<OPTION4>Sort</OPTION4>

<ANSWER>Sort</ANSWER>

</Main>

<Main>

<QNo>19</QNo>

<QUESTION>What is the typical first step towards identifying the area of waste elimination in a
project</QUESTION>

<OPTION1>Root Cause Analysis</OPTION1>

<OPTION2>5S</OPTION2>

<OPTION3>Mistake proofing </OPTION3>

<OPTION4>Value Stream Mapping</OPTION4>

<ANSWER>Value Stream Mapping</ANSWER>

</Main>

<Main>

<QNo>20</QNo>

<QUESTION>Kaizen applied with the right approach helps in achieving</QUESTION>

<OPTION1>Quantum improvement</OPTION1>

<OPTION2>Incremental improvement</OPTION2>

<OPTION3>Sustains the performance</OPTION3>


<OPTION4>Marginal improvement</OPTION4>

<ANSWER>Incremental improvement</ANSWER>

</Main>

<Main>

<QNo>21</QNo>

<QUESTION>&apos;Value&apos; in Lean terms is a deliverable to the client which is usable. Identify


which statements below qualify for this Value definition</QUESTION>

<OPTION1>Value for a recruitment group is each human resource made available to the project
teams</OPTION1>

<OPTION2>Value for a Maintenance project is the Bugs serviced per release</OPTION2>

<OPTION3>Value for a Conversion project is every web page converted</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>22</QNo>

<QUESTION>Identify Type 2 &quot;Waste&quot; in these scenarios</QUESTION>

<OPTION1>Waiting and searching for resources in the lab during reproduction and
testing</OPTION1>

<OPTION2>Capturing relevant information in defect tracker </OPTION2>

<OPTION3>Updating knowledge base </OPTION3>

<OPTION4>Frequent build cycles, frequent code reviews and early testing</OPTION4>

<ANSWER>Waiting and searching for resources in the lab during reproduction and testing</ANSWER>

</Main>

<Main>

<QNo>23</QNo>

<QUESTION>Workload leveling is</QUESTION>


<OPTION1>Assiging important tasks to key resources only</OPTION1>

<OPTION2>Allocating the tasks as and when they queue up </OPTION2>

<OPTION3>Allocating the right tasks to team members based on effort,complexity estimates, skill
level</OPTION3>

<OPTION4>Dividing and assigning the same tasks to multiple people </OPTION4>

<ANSWER>Allocating the right tasks to team members based on effort,complexity estimates, skill
level</ANSWER>

</Main>

<Main>

<QNo>24</QNo>

<QUESTION>What is Lean?</QUESTION>

<OPTION1>Creating value from the perspective of a customer</OPTION1>

<OPTION2>Improving processes and operation </OPTION2>

<OPTION3>A culture of continuous improvement </OPTION3>

<OPTION4>All of the above </OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>25</QNo>

<QUESTION>When should I start implementing Lean principles in a project?</QUESTION>

<OPTION1>When the organization mandates</OPTION1>

<OPTION2>When there is a problem in the project</OPTION2>

<OPTION3>When the project gets kicked off</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>When the project gets kicked off</ANSWER>

</Main>
<Main>

<QNo>26</QNo>

<QUESTION>During which phase of the project can Lean be implemented?</QUESTION>

<OPTION1>Requirement phase</OPTION1>

<OPTION2>Design phase</OPTION2>

<OPTION3>CUT &amp; ST phases</OPTION3>

<OPTION4>All of the above </OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>27</QNo>

<QUESTION>The delivery team uses white boards to monitor the status of the tickets, automates
routine jobs, maintains checklist and implements learning from previous releases. The team does not
have a knowledge of Lean and has never attended any Lean training sessions. Is Lean being practiced in
the project</QUESTION>

<OPTION1>Yes</OPTION1>

<OPTION2>No</OPTION2>

<OPTION3>Can&apos;t answer</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>Yes</ANSWER>

</Main>

<Main>

<QNo>28</QNo>

<QUESTION>The management decisions in a company practicing Lean philosophy is based


on</QUESTION>

<OPTION1>Waste elimination</OPTION1>

<OPTION2>Short term financial gains </OPTION2>


<OPTION3>Long term thinking even at short term financial expense</OPTION3>

<OPTION4>Medium term thinking but with high operating margins</OPTION4>

<ANSWER>Long term thinking even at short term financial expense</ANSWER>

</Main>

<Main>

<QNo>29</QNo>

<QUESTION>Which of the following are two key pillars of the Toyota Production
System?</QUESTION>

<OPTION1>Just-in-Time and Waste Elimination</OPTION1>

<OPTION2>Jidoka and Just in Time</OPTION2>

<OPTION3>Visual Management and Kaizen</OPTION3>

<OPTION4>Standardisation and Leveled Production</OPTION4>

<ANSWER>Jidoka and Just in Time</ANSWER>

</Main>

<Main>

<QNo>30</QNo>

<QUESTION>The culture of stopping when there is a quality problem is called</QUESTION>

<OPTION1>Waste elimination</OPTION1>

<OPTION2>Standardisation</OPTION2>

<OPTION3>Jidoka</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>Jidoka</ANSWER>

</Main>

<Main>

<QNo>31</QNo>
<QUESTION>Which of the following is a technique involving simple inexpensive automatic
mechanisms or manual inspection in a station, that makes the quality issues obvious at a
glance?</QUESTION>

<OPTION1>Visual Control</OPTION1>

<OPTION2>Value Steam Mapping</OPTION2>

<OPTION3>both 1 and 2</OPTION3>

<OPTION4>Poka Yoke</OPTION4>

<ANSWER>Poka Yoke</ANSWER>

</Main>

<Main>

<QNo>32</QNo>

<QUESTION>The roots of Lean thinking can be traced back to</QUESTION>

<OPTION1>Harvard</OPTION1>

<OPTION2>GE</OPTION2>

<OPTION3>Honda</OPTION3>

<OPTION4>Toyota</OPTION4>

<ANSWER>Toyota</ANSWER>

</Main>

<Main>

<QNo>33</QNo>

<QUESTION>Lean principle is based on management decisions adopting a _____________


philosophy"</QUESTION>

<OPTION1>Short Term</OPTION1>

<OPTION2>Medium Term</OPTION2>

<OPTION3>Long Term</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>Long Term</ANSWER>
</Main>

<Main>

<QNo>34</QNo>

<QUESTION>What is the main purpose of Visual Controls?</QUESTION>

<OPTION1>To show status to upper management</OPTION1>

<OPTION2>To show status to customer </OPTION2>

<OPTION3>To bring out operational problems affecting for early resolution </OPTION3>

<OPTION4>None of the above </OPTION4>

<ANSWER>To bring out operational problems affecting for early resolution</ANSWER>

</Main>

<Main>

<QNo>35</QNo>

<QUESTION>Which of the following is NOT part of 5 S?</QUESTION>

<OPTION1>SORT</OPTION1>

<OPTION2>Straighten</OPTION2>

<OPTION3>Soften</OPTION3>

<OPTION4>Standardize</OPTION4>

<ANSWER>Soften</ANSWER>

</Main>

<Main>

<QNo>36</QNo>

<QUESTION>Takt time is a ratio of the 'Net available time' to ________________</QUESTION>

<OPTION1>Total Supply</OPTION1>

<OPTION2>Customer demand</OPTION2>

<OPTION3>Both</OPTION3>
<OPTION4>None</OPTION4>

<ANSWER>Customer demand</ANSWER>

</Main>

<Main>

<QNo>37</QNo>

<QUESTION>Poka Yoke is ______________</QUESTION>

<OPTION1>Mistake Proofing</OPTION1>

<OPTION2>Visual Control</OPTION2>

<OPTION3>Standarization</OPTION3>

<OPTION4>None of above</OPTION4>

<ANSWER>Mistake Proofing</ANSWER>

</Main>

<Main>

<QNo>38</QNo>

<QUESTION>The "5 Why?" is a ______________ technique</QUESTION>

<OPTION1>5 S</OPTION1>

<OPTION2>RCA</OPTION2>

<OPTION3>DSM</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>RCA</ANSWER>

</Main>

<Main>

<QNo>39</QNo>

<QUESTION>Lean thinking advocates ______________</QUESTION>

<OPTION1>Push Systems</OPTION1>
<OPTION2>Pull Systems</OPTION2>

<OPTION3>both</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Pull Systems</ANSWER>

</Main>

<Main>

<QNo>40</QNo>

<QUESTION>Andon board is an example of ______________</QUESTION>

<OPTION1>Visual Control</OPTION1>

<OPTION2>Dashboard</OPTION2>

<OPTION3>Network diagram</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>Visual Control</ANSWER>

</Main>

<Main>

<QNo>41</QNo>

<QUESTION>To reduce test setup change-over time, you considered SMED technique. Which of the
following principles can help?</QUESTION>

<OPTION1>Displace</OPTION1>

<OPTION2>Eliminiate</OPTION2>

<OPTION3>Standardize</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>42</QNo>
<QUESTION>Customer expects the team to test 10 features in 20 working days. What is the takt
time?</QUESTION>

<OPTION1>10 features/month</OPTION1>

<OPTION2>2 days/feature</OPTION2>

<OPTION3>0.5 features/day</OPTION3>

<OPTION4>None of above</OPTION4>

<ANSWER>2 days/feature</ANSWER>

</Main>

<Main>

<QNo>43</QNo>

<QUESTION>Which of the following is a part of the Lean philosophy?</QUESTION>

<OPTION1>Management decisions based on a long term perspective</OPTION1>

<OPTION2>Stop when there is a quality problem</OPTION2>

<OPTION3>Leaders going to the actual workplace to see and understand throughly</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>44</QNo>

<QUESTION>Following are categories of waste</QUESTION>

<OPTION1>Overproduction</OPTION1>

<OPTION2>Transportation</OPTION2>

<OPTION3>Motion</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>
<Main>

<QNo>45</QNo>

<QUESTION>An effective way to make team memebrs aware of progress made and currents status is
through</QUESTION>

<OPTION1>Visual Boards</OPTION1>

<OPTION2>Poka - yoke</OPTION2>

<OPTION3>Mura</OPTION3>

<OPTION4>Muri</OPTION4>

<ANSWER>Visual Boards</ANSWER>

</Main>

<Main>

<QNo>46</QNo>

<QUESTION>Mistake proofing is</QUESTION>

<OPTION1>Andon</OPTION1>

<OPTION2>Poka - yoke</OPTION2>

<OPTION3>Mura</OPTION3>

<OPTION4>Muri</OPTION4>

<ANSWER>Poka - yoke</ANSWER>

</Main>

<Main>

<QNo>47</QNo>

<QUESTION>Over production is avoided by using ___________</QUESTION>

<OPTION1>Pull system</OPTION1>

<OPTION2>Poka - yoke</OPTION2>

<OPTION3>Mura</OPTION3>

<OPTION4>Push system</OPTION4>
<ANSWER>Pull system</ANSWER>

</Main>

<Main>

<QNo>48</QNo>

<QUESTION>How many Lean principles are there according to Jeffrey Liker as presented in "The
Toyoto Way"</QUESTION>

<OPTION1>5</OPTION1>

<OPTION2>10</OPTION2>

<OPTION3>14</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>14</ANSWER>

</Main>

<Main>

<QNo>49</QNo>

<QUESTION>How many categories of wastes can be identified as per the Toyota Production
System?</QUESTION>

<OPTION1>7</OPTION1>

<OPTION2>10</OPTION2>

<OPTION3>100</OPTION3>

<OPTION4>20</OPTION4>

<ANSWER>7</ANSWER>

</Main>

<Main>

<QNo>50</QNo>

<QUESTION>&quot;Upstream should not produce anything till downstream asks for it&quot; is a part
of which Lean principle</QUESTION>

<OPTION1>Poka- yoke</OPTION1>
<OPTION2>DSM</OPTION2>

<OPTION3>Push Mechanismans</OPTION3>

<OPTION4>Pull mechanism</OPTION4>

<ANSWER>Pull mechanism</ANSWER>

</Main>

<Main>

<QNo>51</QNo>

<QUESTION>The practice in 5S framework by which the work place efficiency is maintained is


________________</QUESTION>

<OPTION1>Sort</OPTION1>

<OPTION2>Shine</OPTION2>

<OPTION3>Sustain</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>Sustain</ANSWER>

</Main>

<Main>

<QNo>52</QNo>

<QUESTION>"Pace of production to meet customer demand" is related to


_______________</QUESTION>

<OPTION1>Takt Time</OPTION1>

<OPTION2>Talk Time</OPTION2>

<OPTION3>Delay time</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>Takt Time</ANSWER>

</Main>

<Main>
<QNo>53</QNo>

<QUESTION>Spending time to finding information can be mapped to _______________


waste</QUESTION>

<OPTION1>Overproduction</OPTION1>

<OPTION2>Inventory</OPTION2>

<OPTION3>Motion</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>Motion</ANSWER>

</Main>

<Main>

<QNo>54</QNo>

<QUESTION>A tool in the work area giving the current status of the work</QUESTION>

<OPTION1>Visual Control Board</OPTION1>

<OPTION2>SMED</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Visual Control Board</ANSWER>

</Main>

<Main>

<QNo>55</QNo>

<QUESTION>Employing tools to do work otherwise done by people results in reduction of


___________</QUESTION>

<OPTION1>Efforts</OPTION1>

<OPTION2>Schedule</OPTION2>

<OPTION3>Defects</OPTION3>

<OPTION4>1, 2 and 3</OPTION4>


<ANSWER>1, 2 and 3</ANSWER>

</Main>

<Main>

<QNo>56</QNo>

<QUESTION>Automated detection and stopping when a defect occurs is related to


___________</QUESTION>

<OPTION1>Automation</OPTION1>

<OPTION2>Jidoka (autonomation)</OPTION2>

<OPTION3>Genchi Genbutsu</OPTION3>

<OPTION4>Visual Controls</OPTION4>

<ANSWER>Jidoka (autonomation)</ANSWER>

</Main>

<Main>

<QNo>57</QNo>

<QUESTION>In TPS, high levels of quality is achieved by the principles of</QUESTION>

<OPTION1>Jidoka</OPTION1>

<OPTION2>Poka Yoke</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Both 1 and 2</ANSWER>

</Main>

<Main>

<QNo>58</QNo>

<QUESTION>According to Lean thinking, problems should be addressed at</QUESTION>

<OPTION1>Root Cause level</OPTION1>

<OPTION2>Manager level</OPTION2>
<OPTION3>Operator level</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>Root Cause level</ANSWER>

</Main>

<Main>

<QNo>59</QNo>

<QUESTION>Kaizen can result in an improvement in _______________</QUESTION>

<OPTION1>Quality</OPTION1>

<OPTION2>Throughput</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Both 1 and 2</ANSWER>

</Main>

<Main>

<QNo>60</QNo>

<QUESTION>Problems identified are displayed for everyone's attention rather than covering
up</QUESTION>

<OPTION1>Make the problem visibile</OPTION1>

<OPTION2>Make it fast</OPTION2>

<OPTION3>Make it beautiful</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Make the problem visibile</ANSWER>

</Main>

<Main>

<QNo>61</QNo>
<QUESTION>Any activity that consumes resources, but does not create value is
_______________</QUESTION>

<OPTION1>Muda</OPTION1>

<OPTION2>Mura</OPTION2>

<OPTION3>Muri</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>Muda</ANSWER>

</Main>

<Main>

<QNo>62</QNo>

<QUESTION>Tasks with clear specification on the input, process, time and output are
_______________</QUESTION>

<OPTION1>Fixed</OPTION1>

<OPTION2>standardized</OPTION2>

<OPTION3>Designed</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>standardized</ANSWER>

</Main>

<Main>

<QNo>63</QNo>

<QUESTION>Identification of all activities occuring along the life cycle of the product is
_________</QUESTION>

<OPTION1>Value Creation</OPTION1>

<OPTION2>Value Stream Mapping</OPTION2>

<OPTION3>Customer Value</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Value Stream Mapping</ANSWER>


</Main>

<Main>

<QNo>64</QNo>

<QUESTION>Making more parts than you can sell is _______________</QUESTION>

<OPTION1>Overprocessing</OPTION1>

<OPTION2>Overproduction</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Overproduction</ANSWER>

</Main>

<Main>

<QNo>65</QNo>

<QUESTION>Optimization of current state map gives the _______________</QUESTION>

<OPTION1>Optimized map</OPTION1>

<OPTION2>Value map</OPTION2>

<OPTION3>Future state map</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>Future state map</ANSWER>

</Main>

<Main>

<QNo>66</QNo>

<QUESTION>In the 5 Why analysis, if the root cause is not identified at the 5th Why, one should
_______________</QUESTION>

<OPTION1>Stop</OPTION1>

<OPTION2>Start afresh</OPTION2>

<OPTION3>Continue</OPTION3>
<OPTION4>None</OPTION4>

<ANSWER>Continue</ANSWER>

</Main>

<Main>

<QNo>67</QNo>

<QUESTION>The slowest operation in a process is _______________</QUESTION>

<OPTION1>Work stopper</OPTION1>

<OPTION2>Bottleneck</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Bottleneck</ANSWER>

</Main>

<Main>

<QNo>68</QNo>

<QUESTION>What is the ongoing process/philosophy of doing things better, faster and lower
cost?</QUESTION>

<OPTION1>Continuous Processs</OPTION1>

<OPTION2>Continuous Engineering</OPTION2>

<OPTION3>Continuous Improvement</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Continuous Improvement</ANSWER>

</Main>

<Main>

<QNo>69</QNo>

<QUESTION>Giving employees more responsibility, authority and accountability for effecting


improvements that are within their purview in the daily processes is Employee
_______________</QUESTION>
<OPTION1>Empowerment</OPTION1>

<OPTION2>Engagement</OPTION2>

<OPTION3>Endearment</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Empowerment</ANSWER>

</Main>

<Main>

<QNo>70</QNo>

<QUESTION>Lean practices optimizes the</QUESTION>

<OPTION1>Cost</OPTION1>

<OPTION2>Qualitty</OPTION2>

<OPTION3>Schedule</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>All the above</ANSWER>

</Main>

<Main>

<QNo>71</QNo>

<QUESTION>Achieving predictability of the outcome and making it repeatable is ensured through


_______________</QUESTION>

<OPTION1>Concurrent Engineering </OPTION1>

<OPTION2>Predictive Engineering</OPTION2>

<OPTION3>Standardization</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>Standardization</ANSWER>

</Main>

<Main>
<QNo>72</QNo>

<QUESTION>Genchi Genbatsu is part of _______________ category in Liker's 14 principle


model</QUESTION>

<OPTION1>Process</OPTION1>

<OPTION2>People and Partners</OPTION2>

<OPTION3>Problem Solving</OPTION3>

<OPTION4>Philosophy</OPTION4>

<ANSWER>Problem Solving</ANSWER>

</Main>

<Main>

<QNo>73</QNo>

<QUESTION>What is Hansei?</QUESTION>

<OPTION1>Reflection</OPTION1>

<OPTION2>Refraction</OPTION2>

<OPTION3>Retraction</OPTION3>

<OPTION4>Renovation</OPTION4>

<ANSWER> Reflection</ANSWER>

</Main>

<Main>

<QNo>74</QNo>

<QUESTION>Problems should not remain hidden. They should be _______________


early.</QUESTION>

<OPTION1>Standardized</OPTION1>

<OPTION2>Optimized </OPTION2>

<OPTION3>Surfaced </OPTION3>

<OPTION4>All the above </OPTION4>


<ANSWER>Surfaced</ANSWER>

</Main>

<Main>

<QNo>75</QNo>

<QUESTION>An engineer fixes a bug request from the customer. The customer value here is
_______________</QUESTION>

<OPTION1>Fixed Bug</OPTION1>

<OPTION2>No side effect</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Both 1 and 2</ANSWER>

</Main>

<Main>

<QNo>76</QNo>

<QUESTION>Attributes of value deliverables areTimelinessCost</QUESTION>

<OPTION1>Quality</OPTION1>

<OPTION2>Timeliness</OPTION2>

<OPTION3>Cost</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>All the above</ANSWER>

</Main>

<Main>

<QNo>77</QNo>

<QUESTION>According to Lean thinking, leaders should work with first hand information from
_______________ by direct observation.</QUESTION>

<OPTION1>Customers</OPTION1>
<OPTION2>Workplace</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Workplace</ANSWER>

</Main>

<Main>

<QNo>78</QNo>

<QUESTION>Which of the following are examples for Muda?</QUESTION>

<OPTION1>Hand off </OPTION1>

<OPTION2>Task Switching</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Both 1 and 2</ANSWER>

</Main>

<Main>

<QNo>79</QNo>

<QUESTION>In a maintenance project with a 3 month release cycle, the team idles during the first six
weeks due to lack of clarity. The customer expects team to work as per the planned efforts in the
remaining 6 weeks. This will lead to _______________</QUESTION>

<OPTION1>Task switching</OPTION1>

<OPTION2>Overload</OPTION2>

<OPTION3>Poor quality</OPTION3>

<OPTION4>Both 2 and 3</OPTION4>

<ANSWER>Both 2 and 3</ANSWER>

</Main>

<Main>
<QNo>80</QNo>

<QUESTION>The purpose of VSM is to ____________ and eliminate waste</QUESTION>

<OPTION1>Standardize</OPTION1>

<OPTION2>Empower</OPTION2>

<OPTION3>Identify</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Identify</ANSWER>

</Main>

<Main>

<QNo>81</QNo>

<QUESTION>_______________ is the time taken for those activities that actually transform the
product/service in a way that the customer is willing to pay for</QUESTION>

<OPTION1>Takt Time</OPTION1>

<OPTION2>Activity Time</OPTION2>

<OPTION3>Cycle Time</OPTION3>

<OPTION4>Value Added Time</OPTION4>

<ANSWER>Value Added Time</ANSWER>

</Main>

<Main>

<QNo>82</QNo>

<QUESTION>Those activities that are not mandatory to provide what customer wants are
_______________</QUESTION>

<OPTION1>Important</OPTION1>

<OPTION2>Non Value Add</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>
<ANSWER>Non Value Add</ANSWER>

</Main>

<Main>

<QNo>83</QNo>

<QUESTION>_______________ is an activity that transforms the input, thereby bringing it closer to


the form required by a customer</QUESTION>

<OPTION1>Value Add</OPTION1>

<OPTION2>Muda</OPTION2>

<OPTION3>Muri</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Value Add</ANSWER>

</Main>

<Main>

<QNo>84</QNo>

<QUESTION>Mechanisms (other than inspection at a work place) to achieve in-station quality by


prevention is an example of _______________</QUESTION>

<OPTION1>Jidoka</OPTION1>

<OPTION2>Heijunka</OPTION2>

<OPTION3>Poka Yoke</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>Poka Yoke</ANSWER>

</Main>

<Main>

<QNo>85</QNo>

<QUESTION>Principles of 5S aim at achieving</QUESTION>

<OPTION1>Efficient work place</OPTION1>


<OPTION2>Jidoka</OPTION2>

<OPTION3>Efficient task switching</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Efficient work place</ANSWER>

</Main>

<Main>

<QNo>86</QNo>

<QUESTION>Standardization helps to reduce variance in</QUESTION>

<OPTION1>Cycle time</OPTION1>

<OPTION2>Quality</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Both 1 and 2</ANSWER>

</Main>

<Main>

<QNo>87</QNo>

<QUESTION>Standardized work and environment are the basis for</QUESTION>

<OPTION1>Continuous improvement</OPTION1>

<OPTION2>Defect prevention</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Continous Improvement</ANSWER>

</Main>

<Main>

<QNo>88</QNo>
<QUESTION>An operating model with in-station quality is found in</QUESTION>

<OPTION1>Mass production approach</OPTION1>

<OPTION2>Toyota Production System</OPTION2>

<OPTION3>Both 1 and 2</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>Toyota Production System</ANSWER>

</Main>

<Main>

<QNo>89</QNo>

<QUESTION>Use of code analysis tools as the code is developed is an example of


_______________</QUESTION>

<OPTION1>Concurrent Engineering</OPTION1>

<OPTION2>In station quality</OPTION2>

<OPTION3>first things first</OPTION3>

<OPTION4>None</OPTION4>

<ANSWER>In station quality</ANSWER>

</Main>

<Main>

<QNo>90</QNo>

<QUESTION>Kaizen is _______________</QUESTION>

<OPTION1>An activity that causes an incidental problem</OPTION1>

<OPTION2>An activity that causes a recurrent problem</OPTION2>

<OPTION3>An activity that enables continuous improvement</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>An activity that enables continuous improvement</ANSWER>

</Main>
<Main>

<QNo>91</QNo>

<QUESTION>The 5 Ws of root cause analysis are</QUESTION>

<OPTION1>Who, what, where, when, why</OPTION1>

<OPTION2>What, where, when, who, why</OPTION2>

<OPTION3>Who, who, who, who, who</OPTION3>

<OPTION4>Why, why, why, why, why</OPTION4>

<ANSWER>Why, why, why, why, why</ANSWER>

</Main>

<Main>

<QNo>92</QNo>

<QUESTION>Automatically stopping the process when something is wrong and then fixing the
problems on the line itself as they occur is called _______________</QUESTION>

<OPTION1>Heijunka</OPTION1>

<OPTION2>Jidoka</OPTION2>

<OPTION3>Kaizen</OPTION3>

<OPTION4>Kanban</OPTION4>

<ANSWER>Jidoka</ANSWER>

</Main>

<Main>

<QNo>93</QNo>

<QUESTION>Which of the following are examples of Muda (waste) in the process which should be
eliminated?</QUESTION>

<OPTION1>Doing work manually when it can be automated</OPTION1>

<OPTION2>Equipment not working</OPTION2>

<OPTION3>Spending efforts in processing repetitive issues</OPTION3>


<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>94</QNo>

<QUESTION>Lean is _______________</QUESTION>

<OPTION1>Action Oriented</OPTION1>

<OPTION2>Continuous Improvement</OPTION2>

<OPTION3>Process toolkit</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>95</QNo>

<QUESTION>Lean is not _______________</QUESTION>

<OPTION1>Short term gain</OPTION1>

<OPTION2>Problem Solver</OPTION2>

<OPTION3>Action Oriented</OPTION3>

<OPTION4>Continous Improvement</OPTION4>

<ANSWER>Short term gain</ANSWER>

</Main>

<Main>

<QNo>96</QNo>

<QUESTION>The deciding factors for automation are _______________</QUESTION>

<OPTION1>Feasibility</OPTION1>
<OPTION2>Return of Investment</OPTION2>

<OPTION3>Frequency</OPTION3>

<OPTION4>All the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>97</QNo>

<QUESTION>Understanding the actual situation is known as _______________</QUESTION>

<OPTION1>Capacity Planning</OPTION1>

<OPTION2>Mistake Proofing</OPTION2>

<OPTION3>SS</OPTION3>

<OPTION4>Go and see Yourself</OPTION4>

<ANSWER>Go and see Yourself</ANSWER>

</Main>

<Main>

<QNo>98</QNo>

<QUESTION>Use _______________ to reduce setup/changeover time</QUESTION>

<OPTION1>SMED</OPTION1>

<OPTION2>5S</OPTION2>

<OPTION3>RCA</OPTION3>

<OPTION4>VSM</OPTION4>

<ANSWER>SMED</ANSWER>

</Main>

<Main>

<QNo>99</QNo>
<QUESTION>Issue log or KEDB helps in _______________</QUESTION>

<OPTION1> Mistake proofing</OPTION1>

<OPTION2>Automation</OPTION2>

<OPTION3>VSM</OPTION3>

<OPTION4>Competency management</OPTION4>

<ANSWER>Mistake proofing</ANSWER>

</Main>

<Main>

<QNo>100</QNo>

<QUESTION>The PM defines the coding standard for a new technology before the development
starts. Based on these guidelines, he also reconfigures the code review tool. Choose the Lean tenets PM
has applied</QUESTION>

<OPTION1>Standardization &amp; Mistake proofing</OPTION1>

<OPTION2>Standardization &amp; Statistical Analysis</OPTION2>

<OPTION3> Only Standardization</OPTION3>

<OPTION4>5S and Mistake proofing</OPTION4>

<ANSWER>Standardization &amp; Mistake proofing</ANSWER>

</Main>

<Main>

<QNo>101</QNo>

<QUESTION>What are the 5 STEPS of 5S?</QUESTION>

<OPTION1>Shine, Solve, Sustain, Sort, Standardize</OPTION1>

<OPTION2>Sustain, Sort, Standardize, Set, Shine</OPTION2>

<OPTION3>Sort, Straighten, Shine, Standardize, Sustain</OPTION3>

<OPTION4>Sort, Sustain, Sushi, Shine, Standardize</OPTION4>

<ANSWER>Sort, Straighten, Shine, Standardize, Sustain</ANSWER>


</Main>

<Main>

<QNo>102</QNo>

<QUESTION>Which statements defines "VALUE"?</QUESTION>

<OPTION1>The customer has to be willing to pay for the activity</OPTION1>

<OPTION2>The activity must "directly transform" the item or person flowing through the
process into what the customer is willing to pay for.</OPTION2>

<OPTION3>The activity must meet all expected requirements on the first attempt</OPTION3>

<OPTION4>All of the above</OPTION4>

<ANSWER>All of the above</ANSWER>

</Main>

<Main>

<QNo>103</QNo>

<QUESTION>A checklist is a simple example for _______________</QUESTION>

<OPTION1>Mistake proofing</OPTION1>

<OPTION2>Standardization</OPTION2>

<OPTION3>SMED</OPTION3>

<OPTION4>5S</OPTION4>

<ANSWER>Mistake Proofing</ANSWER>

</Main>

<Main>

<QNo>104</QNo>

<QUESTION>What is the first step in the VSM?</QUESTION>

<OPTION1>Draw the Value stream mapping(As-IS)</OPTION1>

<OPTION2>Identify the customer Value deliverable</OPTION2>

<OPTION3>Remove the wastes</OPTION3>


<OPTION4>Identify the Value added and Non value added activities</OPTION4>

<ANSWER>Identify the customer Value deliverable</ANSWER>

</Main>

<Main>

<QNo>105</QNo>

<QUESTION>In a project X, few resources are overburdened due to disparity of competency in teams.
This situation is a result of _______________</QUESTION>

<OPTION1>Muda</OPTION1>

<OPTION2>Muri</OPTION2>

<OPTION3>Mura</OPTION3>

<ANSWER>Muri</ANSWER>

</Main>

<Main>

<QNo>106</QNo>

<QUESTION>Which of the following tenets is used for work place management?</QUESTION>

<OPTION1>SMED</OPTION1>

<OPTION2>5S</OPTION2>

<OPTION3>VSM</OPTION3>

<OPTION4>DSM</OPTION4>

<ANSWER>5S</ANSWER>

</Main>

<Main>

<QNo>107</QNo>

<QUESTION>Which of the following Lean methodologies can be used to identify the waste in the
process?</QUESTION>

<OPTION1>DSM</OPTION1>
<OPTION2>5S</OPTION2>

<OPTION3>VSM</OPTION3>

<OPTION4>CMMI</OPTION4>

<ANSWER>VSM</ANSWER>

</Main>

<Main>

<QNo>108</QNo>

<QUESTION>Identify the applicable tenet used for identifying the root cause of the
problem</QUESTION>

<OPTION1>5S</OPTION1>

<OPTION2>Statistical Analysis</OPTION2>

<OPTION3>5WHY</OPTION3>

<OPTION4>PDCA</OPTION4>

<ANSWER>5 WHY</ANSWER>

</Main>

<Main>

<QNo>109</QNo>

<QUESTION>In an application maintenance project, the team was following the practice of placing a
Red flag in front of the engineer who was stuck up with a problem related to resolving the incident. This
is an example of _______________</QUESTION>

<OPTION1>Standardization</OPTION1>

<OPTION2>Kanban</OPTION2>

<OPTION3>Andon</OPTION3>

<OPTION4>None of the above</OPTION4>

<ANSWER>Andon</ANSWER>

</Main>

<Main>
<QNo>110</QNo>

<QUESTION>How many guiding principles does Lean have?</QUESTION>

<OPTION1>11</OPTION1>

<OPTION2>7</OPTION2>

<OPTION3>12</OPTION3>

<OPTION4>14</OPTION4>

<ANSWER>14</ANSWER>

</Main>

<Main>

<QNo>111</QNo>

<QUESTION>_____________ provides a complete visibility of all work items and status in the
team</QUESTION>

<OPTION1>Standardization</OPTION1>

<OPTION2>Mistake Proofing</OPTION2>

<OPTION3>Visual Control</OPTION3>

<OPTION4>ecube</OPTION4>

<ANSWER>Visual Control</ANSWER>

</Main>

<Main>

<QNo>112</QNo>

<QUESTION>TPS is an integrated socio-technical system, developed by ____________</QUESTION>

<OPTION1>Ford</OPTION1>

<OPTION2>Toyota</OPTION2>

<OPTION3>Wipro</OPTION3>

<OPTION4>IBM</OPTION4>

<ANSWER>Toyota</ANSWER>
</Main>

<Main>

<QNo>113</QNo>

<QUESTION>Which of the following is not part of 5S?</QUESTION>

<OPTION1>Sort</OPTION1>

<OPTION2>Sustain</OPTION2>

<OPTION3>Shine</OPTION3>

<OPTION4>Sequence</OPTION4>

<ANSWER>Sequence</ANSWER>

</Main>

<Main>

<QNo>114</QNo>

<QUESTION>According to Womack Lean thinking consists of __________ core principles</QUESTION>

<OPTION1>3</OPTION1>

<OPTION2>7</OPTION2>

<OPTION3>14</OPTION3>

<OPTION4>5</OPTION4>

<ANSWER>5</ANSWER>

</Main>

<Main>

<QNo>115</QNo>

<QUESTION>Which of these are not a core Lean principle according to Womack</QUESTION>

<OPTION1>Pull</OPTION1>

<OPTION2>Flow</OPTION2>

<OPTION3>Value</OPTION3>
<OPTION4>Push</OPTION4>

<ANSWER>Push</ANSWER>

</Main>

<Main>

<QNo>116</QNo>

<QUESTION>The principle of flow emphasizes on __________</QUESTION>

<OPTION1>reduction in batch size</OPTION1>

<OPTION2>Moving to next phase as quickly as possible</OPTION2>

<OPTION3>Individual productivity</OPTION3>

<OPTION4>Customer satisfaction</OPTION4>

<ANSWER>reduction in batch size</ANSWER>

</Main>

<Main>

<QNo>117</QNo>

<QUESTION>SMED stands for _____________</QUESTION>

<OPTION1>Single Minute Exchange of Dies</OPTION1>

<OPTION2>Simply More Energy Daily</OPTION2>

<OPTION3>Simplest Most Effective Design</OPTION3>

<OPTION4>Sampling Method for Effort Deviation</OPTION4>

<ANSWER>Single Minute Exchange of Dies</ANSWER>

</Main>

</NewDataSet>

You might also like