2 Maaden PDF
2 Maaden PDF
2 Maaden PDF
September 2013
Aluminium
Phosphate
Gold
Infrastructure
This document has been prepared for information purposes only and
Saudi Arabian Mining Company (‘Ma’aden”) makes no representation or
gives no warranties that the information contained herein is appropriate
or complete for each users intended purpose. This document does not
constitute an offer or invitation to purchase any shares or other
securities in Ma’aden and neither it nor any part of it shall form the basis
of, or be relied upon in connection with, any contract or commitment
whatsoever. Any decision to purchase shares or other securities in
Ma’aden is the sole responsibility of the investor who shall be
responsible for his own due diligence and evaluations.
Ma’aden (including its subsidiaries and affiliates, their directors,
officers, advisers or representatives) shall have any liability of
whatsoever nature or kind (whether in contract, tort, including
negligence) for any loss whatsoever arising out or in connection with
the use of any information contained in this document or otherwise
arising in connection with this document.
KSA- Macroeconomic Indicators
10
Population 2012 28 m
8
6 Population growth 2.0%
4
GDP growth (2012 est.) 6.8%
2
0 AA-
Sovereign Rating (Fitch)
2010 2011 2012 (POSITIVE)
Currency: SAR USD1=SAR 3.75
10%
Stable monetary policy
Well capitalised, liquid banking sector
0%
0-14 yrs 15-39 yrs 40 yrs + Economic stability supported by high levels
of capital spending
Our Mission
Champion the responsible development of the mining sector as the third
pillar of Saudi industry by maximizing the value of the mineral resources
for our stakeholders and adopting best in class practices.
4
Our Strategy
• Complete development , ramp-up and efficient operation of existing projects
• Make significant and targeted exploration investment
• Expansion in project opportunities with high returns and low risks
• Build best in class capabilities
Our Values
• Integrity
• Care
• Team Work
• Ownership and Accountability
5
Ma’aden Group
6
Ma’aden – Present Business Locations
Existing operations
GOLD MINES
4 operating gold mines
Over 16 m Oz Au resources
Ba’aitha
ALUMINIUM PRODUCTION
Bauxite mine – 4 mmt
Jeddah
Aluminium production – 740 Kmt
INDUSTRIAL MINERALS
Production of caustic calcined magnesia
Magnesite mine
7 7
Ma’aden Journey: Becoming A World Class
Minerals Enterprise
2009 - 2013
• Leading the mining value chain in Saudi Arabia
• Building the Third Pillar of Saudi Industry Expansion & Growth
2007 - 2008
Aluminium JV with
Capitalization ALCOA
2003 - 2006
First hot metal in KSA
Phosphate joint 12/12/12
Infrastructure venture with SABIC
Signing shareholder
2000 - 2002 agreement with JV
New mining law partners (Mosaic
IPO for 50% equity
and SABIC)
Gold Development
North-South Railway
1997 - 1999 Ma’aden Corporate
approved by Council
Al Hajar Gold Mine SAR 9 bn Revolver loan
of Ministers
Beginning commissioned Phosphate (DAP)
RAK Port approved commercial production
Bulgah Gold Mine
Established Opened Major new exploration
initiative using latest
technology
8
Ma’aden Growth Drivers
Access to domestic
mineral resources
Experienced Access to
management & competitively
growing priced energy, raw
institutional materials &
capability financing
Ma’aden’s
Competitive
Government Advantages World class
Support projects
Access to
Proximity to
excellent
high growth
infrastructure
markets
9
Exceptional Growth from a Diversified Strategy
55.14 5,576
Total Assets (SAR bn) Total Sales (SAR mn)
Average Annual Growth = 35% Average Annual Growth = 90%
43.58
34.72
29.23
21.36
460
634 705
458
2008 2009 2010 2011 2012 2008 2009 2010 2011 2012
10
Building Skilled Workforce
2012 Snapshot
5000
14000 Saudization
4500
Corporate 67%
Ma’aden Employees 4000
Other 65%
3500
Average Annual growth = 40%
Overall Saudization = 66% 3000
Phosphate 65%
2500
2000
4366 Aluminium 70%
≈
1500
3020
2241
1592 1000
1200
Gold 62%
500
11
Ma’aden Aligned To Kingdom’s Strategic Goals
Economic Diversification
Heavily contributing directly and indirectly to the Kingdom's GDP
Job Creation
Creating thousands of direct and indirect jobs for Saudi nationals
and become one of the largest employers in KSA
Capacity Building
Building significant capabilities for employees
12
Aluminium
13
Mine to Mill Aluminium
The largest and most efficient vertically integrated aluminum complex in the world
• Al Ba’itha mine • Located at Ras Al-Khair • Co-located with Refinery • Co-located with Smelter
at Ras Al-Khair at Ras Al-Khair
• 4 M Tonnes annually • 1.8M tonnes annually
initial capacity • 740K tonnes annually • 380K tonnes annually
• 30+ years of reserves
• First Alumina Refinery in • Designed for expansion • Designed for expansion
• North-South railway to GCC
transport bauxite • Ingots, Billets, T-bar and • Can, Auto, Foil and
• Designed for expansion slabs for Rolling Mill Construction Applications
Recyclable Urbanization
Population living in cities Asia
Other
• 2006: > 50% 3%
Durable • 2030: > 60% Europe
5%
Environment
Malleable
• Total energy consumption to 3%
N.
Highly America
increase by 54% until 2025 –
Non- Conductive >60% from developing M. East
2%
Corrosive countries
Rest of
• Person Transport Miles+40% 5%
World
by 2030
2010 2018
Integration
16
“Mine to Metal” Aluminium Complex
Power Station
2400 MW
Degree of Integration
Rolling Mill
380 KMT/Y
Smelter
740 KMT/Y
Refinery
GAS 1.8 MMT/Y
NaOH Plant
Mine Bauxite
4 MMT/Y
Number of Processes
17
“Getting From Here To There”
Ma’aden
18
Progress
Smelter Line 2 Jul-13
Mine Feb-14
Refinery Aug-14
19
Ma’aden Rolling Mill
Concrete : 155.000 m3
Steel : 25.000 tons
Cladding : 142.000 m3
Under roof: 0.3 km2
Construction : 93 % complete
Commissioning Started
20
Ma’aden Rolling Mill - Progress
21
Commissioning Started …
Scalper Commissioning
22
Capabilities
• Volume
• Max. 380 KMT
• Can stock
• Auto
• Others ( customer demand)
• Employees
• 2013 292
• 2021 477
110 (Auto)
23
Technical Capabilities & Services
Dimensions
• Coil width : max. 2050 mm
• Slitted coils for End & Tab: min. 20 mm
• Max. coil size : 25 tons
406 & 508 mm ID (on fiber cores) capability
Re oiling capabilities at Slitters
Coating
• No postlube
• Solvent based coating
• Water based coating
Services: Recycling:
• Technical Service Rep’s • UBC
• Dedicated trucks Transport • Class Scrap
arrangements
24
Project Opens Significant Downstream Opportunities
Ma’aden Investors
Billets
MINE Extrusion
4 MMT/Y Bauxite
Upstream
Ingots
Refinery Foundry Alloy, Wheel
1.8 MMT/Y SGA & Casting etc.
Downstream
Rods – Molten metal
Smelter Cables & Conductors
740 KMT/Y Bauxite
Intermediate
Slabs
FRP - Sheets
25
Major Value Added Product Opportunities
Rolling Tube and Drill Pipe 20
MENA Market Size
Welding Wire 25 ‘000 Tons
Alumminium Powder/Flakes 60
Foil 260
26
Opportunities with Ma’aden
27
Why should Japanese Companies Invest in KSA
Government Support
Human Capital Ease of doing
for Downstream
Availability business
Investments
Government support
Incentives and Competitive
for Non-Oil Based
Financial Support Operating Cost
Industries
28
THANK YOU