(AMIN) Quo - CNM - OCM 1907-887 QQ+LHV
(AMIN) Quo - CNM - OCM 1907-887 QQ+LHV
(AMIN) Quo - CNM - OCM 1907-887 QQ+LHV
Parameter Certificate of
Ni MC SO3 Co CaO MnO Analysis
1. Fe2O3 MgO SiO2 Al2O3 15,000,000,- (CoA)
2,000
Na2O P2O5 K2O TiO2 Cr2O3 Draft Survey
Report
Draft Survey - Quantity LHV (Laporan
To determine the quantity of Hasil
Commodity by doing Initial Verifikasi)
and Final draft survey on
Vessel.
Remarks
Certificate of Analysis (CoA) shall be available within maximum 5 x 24 hours after the
job completed.
If loading time more than 5 (Five) working days, the additional charge Rp. 1,000,000
per day will be imposed
Accommodations, Transportation and meals during work in the field in half by Client
This quotation is valid for 30 (thirty) days from the quotation date.
DP 50% should be settled prior to the commencement of the job and the rest should
be settled before release of our final report.
Cancelation job will be charged 30% of total invoice, exclude lump sump and VAT.
Full payment shall be settled prior to submission of analysis, BCA KCP Cempaka
Putih, An. PT Carsurin, Acc 276 300 2926 and Mandiri Acc. 1220084003675, An. PT.
Carsurin
Surveyor must keep the samples from client maximum 3 (three) months from the
date of sample received from the clients.
We trust that we made you a competitive proposal, which matches your detailed
requirements and thank you for your interest in our services as always based on
quality and integrity.
PT CARSURIN
Mineral Dept.
MARKETING DIVISION
P. +62.21.2967.5868
F. +62.21.2967.5818/28 Mr. Djunaedi
E. [email protected] PT. ALAM MITRA INDAH NUGRAHA