Projektni Zadatak: Univerzitet U Zenici Mašinski Fakultet U Zenici
Projektni Zadatak: Univerzitet U Zenici Mašinski Fakultet U Zenici
KATEDRA ZA ODRŽAVANJE
ODSJEK: ODRŽAVANJE
PREDMET: ODRŽAVANJE TEHNIČKIH SISTEMA
AKADEMSKA GODINA: 2017. / 2018.
PROJEKTNI ZADATAK
n=1000 cijevi
∆t=150 h otkazi u intervalima
interval 1 2 3 4 5 6 7 8 9 10 11 12 13
Broj 20 25 35 50 30 50 40 50 30 40 40 50 40
otkaza
interval 14 15 16 17 18 19 20 21 22 23 24 25 26
Broj 50 40 50 35 35 50 35 50 35 25 30 30 30
otkaza
Pouzdanost:
𝑁1
𝑃(𝑡1 ) = 1 − = 1 − 0,02 = 0,98
𝑛
𝑁1 + 𝑁2
𝑃(𝑡2 ) = 1 − = 1 − 0,045 = 0,955
𝑛
𝑁1 + 𝑁2 + 𝑁3
𝑃(𝑡3 ) = 1 − = 1 − 0,08 = 0,92
𝑛
𝑁1 + ⋯ + 𝑁4
𝑃(𝑡4 ) = 1 − = 1 − 0,13 = 0,87
𝑛
𝑁1 + ⋯ + 𝑁5
𝑃(𝑡5 ) = 1 − = 1 − 0,16 = 0,84
𝑛
𝑁1 + ⋯ + 𝑁6
𝑃(𝑡6 ) = 1 − = 1 − 0,21 = 0,79
𝑛
𝑁1 + ⋯ + 𝑁7
𝑃(𝑡7 ) = 1 − = 1 − 0,25 = 0,75
𝑛
𝑁1 + ⋯ + 𝑁8
𝑃(𝑡8 ) = 1 − = 1 − 0,29 = 0,71
𝑛
𝑁1 + ⋯ + 𝑁9
𝑃(𝑡9 ) = 1 − = 1 − 0,32 = 0,68
𝑛
𝑁1 + ⋯ + 𝑁10
𝑃(𝑡10 ) = 1 − = 1 − 0,36 = 0,64
𝑛
𝑁1 + ⋯ + 𝑁11
𝑃(𝑡11 ) = 1 − = 1 − 0,4 = 0,6
𝑛
𝑁1 + ⋯ + 𝑁12
𝑃(𝑡12 ) = 1 − = 1 − 0,45 = 0,55
𝑛
𝑁1 + ⋯ + 𝑁13
𝑃(𝑡13 ) = 1 − = 1 − 0,49 = 0,51
𝑛
𝑁1 + ⋯ + 𝑁14
𝑃(𝑡14 ) = 1 − = 1 − 0,54 = 0,46
𝑛
𝑁1 + ⋯ + 𝑁15
𝑃(𝑡15 ) = 1 − = 1 − 0,58 = 0,42
𝑛
𝑁1 + ⋯ + 𝑁16
𝑃(𝑡16 ) = 1 − = 1 − 0,63 = 0,37
𝑛
𝑁1 + ⋯ + 𝑁17
𝑃(𝑡17 ) = 1 − = 1 − 0,665 = 0,335
𝑛
𝑁1 + ⋯ + 𝑁18
𝑃(𝑡18 ) = 1 − = 1 − 0,7 = 0,3
𝑛
𝑁1 + ⋯ + 𝑁19
𝑃(𝑡19 ) = 1 − = 1 − 0,75 = 0,25
𝑛
𝑁1 + ⋯ + 𝑁20
𝑃(𝑡20 ) = 1 − = 1 − 0,785 = 0,215
𝑛
𝑁1 + ⋯ + 𝑁21
𝑃(𝑡21 ) = 1 − = 1 − 0,835 = 0,165
𝑛
𝑁1 + ⋯ + 𝑁22
𝑃(𝑡22 ) = 1 − = 1 − 0,87 = 0,13
𝑛
𝑁1 + ⋯ + 𝑁23
𝑃(𝑡23 ) = 1 − = 1 − 0,895 = 0,105
𝑛
𝑁1 + ⋯ + 𝑁24
𝑃(𝑡24 ) = 1 − = 1 − 0,925 = 0,075
𝑛
𝑁1 + ⋯ + 𝑁25
𝑃(𝑡25 ) = 1 − = 1 − 0,995 = 0,045
𝑛
𝑁1 + ⋯ + 𝑁26
𝑃(𝑡26 ) = 1 − = 1 − 0,985 = 0,015
𝑛
𝑁1 20
𝑓(𝑡1 ) = = = 0,133 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁2 25
𝑓(𝑡2 ) = = = 0,16 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁3 35
𝑓(𝑡3 ) = = = 0,23 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁4 50
𝑓(𝑡4 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁5 30
𝑓(𝑡5 ) = = = 0,2 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁6 50
𝑓(𝑡6 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁7 40
𝑓(𝑡7 ) = = = 0,266 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁8 50
𝑓(𝑡8 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁9 30
𝑓(𝑡9 ) = = = 0,2 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁10 40
𝑓(𝑡10 ) = = = 0,266 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁11 40
𝑓(𝑡11 ) = = = 0,266 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁12 50
𝑓(𝑡12 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁13 40
𝑓(𝑡13 ) = = = 0,266 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁14 50
𝑓(𝑡14 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁15 40
𝑓(𝑡15 ) = = = 0,266 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁16 50
𝑓(𝑡16 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁17 35
𝑓(𝑡17 ) = = = 0,233 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁18 35
𝑓(𝑡18 ) = = = 0,233 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁19 50
𝑓(𝑡19 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁20 35
𝑓(𝑡20 ) = = = 0,233 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁21 50
𝑓(𝑡21 ) = = = 0,33 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁22 35
𝑓(𝑡22 ) = = = 0,233 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁23 25
𝑓(𝑡23 ) = = = 0,166 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁24 30
𝑓(𝑡24 ) = = = 0,2 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁25 30
𝑓(𝑡25 ) = = = 0,2 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁26 30
𝑓(𝑡26 ) = = = 0,2 ∗ 10−3
𝑛 ∆𝑡 1000 ∗ 150
𝑁1 20
𝜆(𝑡1 ) = = = 1,3468 ∗ 10−4
(𝑛 − 𝑁)1 ∗ ∆𝑡 990 ∗ 150
𝑁2 25
𝜆(𝑡2 ) = = = 1,7271 ∗ 10−4
(𝑛 − 𝑁)2 ∗ ∆𝑡 967,5 ∗ 150
𝑁3 35
𝜆(𝑡3 ) = = = 2,488 ∗ 10−4
(𝑛 − 𝑁)3 ∗ ∆𝑡 937.5 ∗ 150
𝑁4 50
𝜆(𝑡4 ) = = = 3,724 ∗ 10−4
(𝑛 − 𝑁)4 ∗ ∆𝑡 895 ∗ 150
𝑁5 30
𝜆(𝑡5 ) = = = 2,339 ∗ 10−4
(𝑛 − 𝑁)5 ∗ ∆𝑡 855 ∗ 150
870 + (870 − 30) 870 + 840
(𝑛 − 𝑁)5 = = = 855
2 2
𝑁6 50
𝜆(𝑡6 ) = = = 1,227 ∗ 10−4
(𝑛 − 𝑁)6 ∗ ∆𝑡 815 ∗ 150
840 + (840 − 50) 840 + 790
(𝑛 − 𝑁)6 = = = 815
2 2
𝑁7 40
𝜆(𝑡7 ) = = = 3,463 ∗ 10−4
(𝑛 − 𝑁)7 ∗ ∆𝑡 770 ∗ 150
790 + (790 − 40) 790 + 750
(𝑛 − 𝑁)7 = = = 770
2 2
𝑁8 50
𝜆(𝑡8 ) = = = 4,5977 ∗ 10−4
(𝑛 − 𝑁)8 ∗ ∆𝑡 725 ∗ 150
750 + (750 − 50) 750 + 700
(𝑛 − 𝑁)8 = = = 725
2 2
𝑁9 30
𝜆(𝑡9 ) = = = 2,9197 ∗ 10−4
(𝑛 − 𝑁)9 ∗ ∆𝑡 685 ∗ 150
700 + (700 − 30) 700 + 670
(𝑛 − 𝑁)9 = = = 685
2 2
𝑁10 40
𝜆(𝑡10 ) = = = 4,1025 ∗ 10−4
(𝑛 − 𝑁)10 ∗ ∆𝑡 650 ∗ 150
670 + (670 − 40) 670 + 630
(𝑛 − 𝑁)10 = = = 650
2 2
𝑁11 40
𝜆(𝑡11 ) = = = 4,3715 ∗ 10−4
(𝑛 − 𝑁)11 ∗ ∆𝑡 610 ∗ 150
630 + (630 − 40) 630 + 590
(𝑛 − 𝑁)11 = = = 610
2 2
𝑁12 50
𝜆(𝑡12 ) = = = 5,8997 ∗ 10−4
(𝑛 − 𝑁)12 ∗ ∆𝑡 565 ∗ 150
590 + (590 − 50) 590 + 540
(𝑛 − 𝑁)12 = = = 565
2 2
𝑁13 40
𝜆(𝑡13 ) = = = 5,1282 ∗ 10−4
(𝑛 − 𝑁)13 ∗ ∆𝑡 520 ∗ 150
540 + (540 − 40) 540 + 500
(𝑛 − 𝑁)13 = = = 520
2 2
𝑁14 50
𝜆(𝑡14 ) = = = 7,0175 ∗ 10−4
(𝑛 − 𝑁)14 ∗ ∆𝑡 475 ∗ 150
500 + (500 − 50) 500 + 450
(𝑛 − 𝑁)14 = = = 475
2 2
𝑁15 40
𝜆(𝑡15 ) = = = 6,2015 ∗ 10−4
(𝑛 − 𝑁)15 ∗ ∆𝑡 430 ∗ 150
450 + (450 − 40) 450 + 410
(𝑛 − 𝑁)15 = = = 430
2 2
𝑁16 50
𝜆(𝑡16 ) = = = 8,658 ∗ 10−4
(𝑛 − 𝑁)16 ∗ ∆𝑡 385 ∗ 150
410 + (410 − 50) 410 + 360
(𝑛 − 𝑁)16 = = = 385
2 2
𝑁17 35
𝜆(𝑡17 ) = = = 6,8125 ∗ 10−4
(𝑛 − 𝑁)17 ∗ ∆𝑡 342,5 ∗ 150
360 + (360 − 35) 360 + 325
(𝑛 − 𝑁)17 = = = 342,5
2 2
𝑁18 35
𝜆(𝑡18 ) = = = 7,58807 ∗ 10−4
(𝑛 − 𝑁)18 ∗ ∆𝑡 307,5 ∗ 150
325 + (325 − 35) 325 + 290
(𝑛 − 𝑁)18 = = = 307,5
2 2
𝑁19 50
𝜆(𝑡19 ) = = = 1,2578 ∗ 10−3
(𝑛 − 𝑁)19 ∗ ∆𝑡 265 ∗ 150
290 + (290 − 50) 290 + 240
(𝑛 − 𝑁)19 = = = 265
2 2
𝑁20 35
𝜆(𝑡20 ) = = = 1,0489 ∗ 10−3
(𝑛 − 𝑁)20 ∗ ∆𝑡 222,5 ∗ 150
240 + (240 − 35) 240 + 205
(𝑛 − 𝑁)20 = = = 222,5
2 2
𝑁21 50
𝜆(𝑡21 ) = = = 1,8518 ∗ 10−3
(𝑛 − 𝑁)21 ∗ ∆𝑡 180 ∗ 150
205 + (205 − 50) 205 + 155
(𝑛 − 𝑁)21 = = = 180
2 2
𝑁22 35
𝜆(𝑡22 ) = = = 1,6969 ∗ 10−3
(𝑛 − 𝑁)22 ∗ ∆𝑡 137,5 ∗ 150
155 + (155 − 35) 155 + 120
(𝑛 − 𝑁)22 = = = 137,5
2 2
𝑁23 25
𝜆(𝑡23 ) = = = 1,5503 ∗ 10−3
(𝑛 − 𝑁)23 ∗ ∆𝑡 107,5 ∗ 150
120 + (120 − 25) 120 + 95
(𝑛 − 𝑁)23 = = = 107,5
2 2
𝑁24 30
𝜆(𝑡24 ) = = = 2,5 ∗ 10−3
(𝑛 − 𝑁)24 ∗ ∆𝑡 80 ∗ 150
95 + (95 − 30) 95 + 65
(𝑛 − 𝑁)24 = = = 80
2 2
𝑁25 30
𝜆(𝑡25 ) = = = 4 ∗ 10−3
(𝑛 − 𝑁)25 ∗ ∆𝑡 50 ∗ 150
65 + (65 − 30) 65 + 35
(𝑛 − 𝑁)25 = = = 50
2 2
𝑁26 30
𝜆(𝑡26 ) = = = 0,01
(𝑛 − 𝑁)26 ∗ ∆𝑡 20 ∗ 150
35 + (35 − 30) 35 + 5
(𝑛 − 𝑁)26 = = = 20
2 2
Interval i 1 2 3 4 5 6 7 8 9 10
Broj otkaza 20 25 35 50 30 50 40 50 30 40
N
Pouzdanost 0,98 0,955 0,92 0,87 0,84 0,79 0,75 0,71 0,68 0,64
P(t)
Učestalost 0,133 0,16 0,23 0,33 0,2 0,33 0,266 0,33 0,2 0,266
f(t)*10−3
Intenzitet 1,3468 1,727 2,488 3,724 2,339 1,227 3,463 4,59 2,91 4,1205
otkaza
λ(t)*10−4
Interval i 11 12 13 14 15 16 17 18 19 20
Broj otkaza 40 50 40 50 40 50 35 35 50 35
N
Pouzdanost 0,6 0,55 0,51 0,46 0,42 0,37 0,33 0,3 0,25 0,215
P(t)
Učestalost 0,23 0,33 0,26 0,33 0,266 0,33 0,233 0,233 0,33 0,23
f(t)*10−3
Intenzitet 4,371 5,899 5,128 7,017 6,201 8,658 6,821 7,588 12,57 10,49
otkaza
λ(t)* 10−4
Interval i 21 22 23 24 25 26
Broj otkaza 50 35 25 30 30 30
N
Pouzdanost 0,165 0,13 0,105 0,075 0,045 0,015
P(t)
Učestalost 0,33 0,233 0,166 0,2 0,2 0,2
f(t)*10−3
Intenzitet 18,518 16,969 15,503 25 40 100
otkaza
λ(t)* 10−4
2. Zadatak
𝑡𝑔𝑟 = 64 ℎ 𝑛𝑔𝑟 = 1
𝑡𝑠𝑟 = 32 ℎ 𝑛𝑠𝑟 = 3
𝑡𝑚𝑟 = 12 ℎ 𝑛𝑚𝑟 = 34
𝑡𝑝𝑝 = 2,5 ℎ 𝑛𝑔𝑟 = 37
𝑘∗𝑛 = 2∗4+6∗4+8∗8+1∗8+6∗2+4∗1+4∗4+3∗4+3∗4+3∗2+3∗2+5∗1
𝑘 ∗ 𝑛 = 177
ℎ
𝑇𝐶 ∗ (𝑘 ∗ 𝑛) = 177 ∗ 660,5 = 112 285
𝑐𝑖𝑘𝑙
12 000
= 3,53
3400
𝑇𝐶 96 907 ℎ
𝑇1 = = = 31 814
3,53 3,53 𝑔𝑜𝑑
Odnos bravarsko-mašinskih radova 2,5: 1
ℎ
𝑇𝑀 = 9090
𝑔
ℎ
𝑇𝐵 = 22724
𝑔
𝑇𝐵 22724
= = 13,36 ~13 𝑟𝑎𝑑𝑛𝑖𝑘𝑎
𝑇𝑠𝑔 3400
2 2
𝑇𝑀 9090
= = 5,34 ~5 𝑟𝑎𝑑𝑛𝑖𝑘𝑎
𝑇𝑠𝑔 3400
2 2