MB Coiled Tubing Presentation

Download as pps, pdf, or txt
Download as pps, pdf, or txt
You are on page 1of 20

COILED TUBING, NITROGEN

& STIMULATION SERVICES


MB PETROLEUM SERVICES LLC
OVER VIEW
• PIPE / SIZE AND USES
• WORKING PRESSURES
• WELL SERVICING
• JOB MANAGEMENT
• CT CAPABILITIES
• NITROGEN CAPABILITIES
• PUMPING CAPABILITIES
MB PETROLEUM SERVICES
PRESSURE CAPABILITIES
• COILED TUBING AND WELLHEAD
EQUIPMENT
– NORMAL WORKING
• 5000 PSI
– HIGH PRESSURE APPLICATIONS
• 10,000 PSI
• 15,000 PSI

MB PETROLEUM SERVICES
WELL SERVICE
• BRINGING ON WELLS
– NITROGEN LIFT
– LIGHTER WEIGHT FLUIDS
• CLEANING WELL BORES
– CHEMICAL OR MUD SOLUTIONS
– MECHANICAL DEVICES
• NOZZLES, MOTORS OR JETTING TOOLS

MB PETROLEUM SERVICES
WELL SERVICE CONT.

• SELECTIVE ZONE STIMULATION


– ACID
– CHEMICALS
• SQUEEZING / ZONE ISOLATION
– WATER OR GAS SHUT OFF
– ENHANCE OIL OR GAS PRODUCTION

MB PETROLEUM SERVICES
WELL SERVICE CONT.

• MOTOR OPERATIONS
– DRILLING
– MILLING
– UNDER REAMING
– FISHING

MB PETROLEUM SERVICES
WELL SERVICE CONT.

• MEMORY TOOL DEPLOYMENT


– PRESSURE, TEMPERATURE, FLOW RATE,
ETC.
– HIGHLY DEVIATED WELLS
– HORIZONTAL WELLS
– WIRELINE CAN NOT GET THE TOOLS TO
DEPTH

MB PETROLEUM SERVICES
WELL SERVICE CONT.

• E-LINE COIL
– LOGGING
– PERFORATING
– SETTING DOWN HOLE TOOLS
• PRESSURE DEPLOYMENT TOOLS
– PERFORATING
– SETTING DOWN HOLE TOOLS

MB PETROLEUM SERVICES
WELL SERVICE CONT.

• KILLING WELLS
– WELL CONTROL SITUATIONS
– WELL HEAD PROBLEMS
• FISHING OPERATIONS
– JARS AND ACCELERATORS
– SPEARS, OVER SHOTS, ETC.

MB PETROLEUM SERVICES
WELL SERVICE CONT.

• CT VELOCITY STRINGS
– MARGINAL WELLS WITH DECREASING
BHP
– ORIGINAL TUBULARS TOO LARGE
• LOADING UP/ SLUG FLOW
• VELOCITY DECREASING OVER TIME
– INEXPENSIVE THROUGH TUBING GAS
LIFT

MB PETROLEUM SERVICES
JOB MANAGEMENT
CERBERUS
• CERBERUS / SOFTWARE BY CTES
• JOB DESIGN AND MODELING
– SINGLE OR MULTI PHASE FLOW
– VERTICAL TO HORIZONTAL WELLS
• WELL PROBLEMS ARE HIGHLIGHTED
BEFORE JOB IS STARTED
– MODEL RIH AND POOH
– MODEL ALL SIZES AND WEIGHT BHA’S
MB PETROLEUM SERVICES
CERBERUS
CONT.
• MODEL VELOCITY STRINGS
• UNLIMITED LICENSE IN COILED
TUBING
– USE AT ANY MB PETROLEUM LOCATION

MB PETROLEUM SERVICES
CERBERUS
CONT.
• COILED TUBING MANAGEMENT
– FATIGUE MONITORING
– REEL MANAGEMENT
– STRING MANAGEMENT
– OPTIMIZES SAFE PIPE UTILIZATION
– INCREASE THE PRODUCTIVE LIFE OF
COILED TUBING STRING

MB PETROLEUM SERVICES
DATA ACQUISITION
• ORION SYSTEM BY CTES
– REAL TIME SYSTEM
– MONITOR ALL RELEVANT DATA
– JOB REPORT PRODUCTION
– DATA RETRIEVAL FOR FATIGUE
MONITORING IN CERBERUS

MB PETROLEUM SERVICES
Trailer Mounted Coil Tubing Unit

MB PETROLEUM SERVICES
Coiled Tubing Capabilities
• COILED TUBING
– 2 S & S CTU’S
• 80K INJECTOR HEADS
• 10K BOP’S AND PACK OFF
• 2 PIECE LAND UNITS
– SEPARATE CRANE
– REELS ARE RECESSED INTO TRAILER

MB PETROLEUM SERVICES
Coiled Tubing Capabilities

• 1 inch to 2 3/8 inch REEL CAPIBILITY


• 6700 M OF 1 1/2” CT
• 1 Hydra Rig 1 ¼” Unit
– 5 K Unit
– Bob Tail Land Unit

MB PETROLEUM SERVICES
Trailer Mounted Nitrogen Unit

MB PETROLEUM SERVICES
N2 CAPABILITIES CONT.

• NITROGEN SERVICE
– 2 HEAT RECOVERY LN2 PUMPS
• SKIDDED FOR OFFSHORE OR LAND
• PUMP RATE
– 3000 SCFM
– 180,000 SCFH
– 5 NITROGEN TANKS
• SKIDDED FOR OFFSHORE OR LAND
• 1920 GALLON / 170,000 SCF

MB PETROLEUM SERVICES
THE END
THANK YOU

MB PETROLEUM SERVICES

You might also like