Electrical Check List
Electrical Check List
Electrical Check List
Note: All the electricians, shift relieving communication should be given proprely and inform clearly.
Ensure the availability of tools at each electrician
Follow the safety instructions strictly while working
Inform the work status to your immedate boss and follow his instructions
Write 'YES' for completion of work and 'NO' if any problem.Explain in the log book for 'NO'
KEY ELECTRICAL LOAD DETAILS SHIFT WISE DATE:
DESCRIPTION A- SHIFT B- SHIFT C- SHIFT
A- BLOCK REACTORS R Y B TIME R Y B TIME R Y B TIME
A/RE/022 ( 15 HP)
D/RE/006 (10 HP)
A/RE/004 (7.5 HP)
A/RE/019 (15 HP)
A/RE/009(PHARMA) (7.5 HP)
A/RE/003(PHARMA) (7.5 HP)
AHU'S
AHU-II
7.5 HP BLOWER (AHU-02)
AHU- 2 (11 TR)
DE- HUMIDIFIER
AHU-III
10 HP BLOWER (AHU-03)
AHU- 3 (11 TR)
AHU- 3 (5.5 TR)
TOP BLOWER (3 HP)
VACUUM PUMPS
VACUUM PUMP- 1 (20 HP)
VACUUM PUMP- 2 (15 HP)
VACUUM PUMP- 3 (10 HP)
VACUUM PUMP- 4 (10 HP)
VACUUM PUMP- 5 (15 HP)
VACUUM PUMP- 6 (10 HP)
UTILITIES
BLUESTAR 17 TR (100 HP)
VOLTAS 11 TR (50 HP)
VOLTAS 30 TR ( 40 HP)
BATLI BOI 28 TR (30 HP)
PUMPS
Chilling pumps (API)
1 7.5 HP
2 7.5 HP
C.T Fan (API)
1 15 HP
2 5 HP
CT water Pumps (API)
1 7.5 HP
2 10 HP
3 20 HP
CT plant circulation pump
1 20 HP
2 15 HP
Chilled water plant circulation
pump
1 10 HP
2 10 HP
Brine water plant circulation
1 10 HP
2 15 HP
Brine water chiller circulation
1 5 HP
2 10 HP
MAIN- BLOCK REACTORS
UTILITIES
BATLIBOI 28TR
Blue Star 23 TR
PUMPS
Chilling pumps (API)
1
2
C.T Fan (API)
1
2
CT water Pumps (API)
1
2
3
CT plant circulation pump
1
2
Chilled water plant circulation
pump
1
2
Brine water plant circulation
1
2
Brine water chiller circulation
1
2
STATUS OF CRITICAL A.C'S
Remarks
VFD, DANFOS 11 KW
VFD, ABB,7.5 KW
VFD, DANFOS 11 KW