Electrical Check List

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

UNIT-I, REGADICHELIKA

Shift Electrician Check List Date:


Status
Sl. No Work description Remarks
A B C
1 Note down the HT meter readings in log book
2 Check the 33KV Yard VCB charger condition
3 Check the 11KV Yard VCB charger condition
Ensure the voltage,Amps& PF of PCC I&II panels
4
are in correct
Record the 'A' Block critical equipments Load
5
details in log book those are running.
Record the 'A' Block AHU Load details in log book
6
those are running.
Record the 'A' Block utilities Load details in log
7
book those are running.
Record the Main Block critical equipments Load
8
details in log book those are running.
Record the Main Block utilities Load details in log
9
book those are running.
Check the condition of DG set & diesel stock of
10
600KVA
Check the condition of DG set & diesel stock of
11
200KVA
Monitor the lighting conditon in all areas and rectify
12 if any problem. (Details shall be record in the log
book)
Check the Air conditioners working status and
13 record load details those are critical (Write about
problem clearly in log book)
Attend the breakdowns immediately after receipt
14
information/Work order from the production.
Check the terminations at electrical connections of
15
panels/DB's etc.
16

Name& Signature of the Electrician

Note: All the electricians, shift relieving communication should be given proprely and inform clearly.
Ensure the availability of tools at each electrician
Follow the safety instructions strictly while working
Inform the work status to your immedate boss and follow his instructions
Write 'YES' for completion of work and 'NO' if any problem.Explain in the log book for 'NO'
KEY ELECTRICAL LOAD DETAILS SHIFT WISE DATE:
DESCRIPTION A- SHIFT B- SHIFT C- SHIFT
A- BLOCK REACTORS R Y B TIME R Y B TIME R Y B TIME
A/RE/022 ( 15 HP)
D/RE/006 (10 HP)
A/RE/004 (7.5 HP)
A/RE/019 (15 HP)
A/RE/009(PHARMA) (7.5 HP)
A/RE/003(PHARMA) (7.5 HP)

AHU'S
AHU-II
7.5 HP BLOWER (AHU-02)
AHU- 2 (11 TR)
DE- HUMIDIFIER
AHU-III
10 HP BLOWER (AHU-03)
AHU- 3 (11 TR)
AHU- 3 (5.5 TR)
TOP BLOWER (3 HP)
VACUUM PUMPS
VACUUM PUMP- 1 (20 HP)
VACUUM PUMP- 2 (15 HP)
VACUUM PUMP- 3 (10 HP)
VACUUM PUMP- 4 (10 HP)
VACUUM PUMP- 5 (15 HP)
VACUUM PUMP- 6 (10 HP)
UTILITIES
BLUESTAR 17 TR (100 HP)
VOLTAS 11 TR (50 HP)
VOLTAS 30 TR ( 40 HP)
BATLI BOI 28 TR (30 HP)
PUMPS
Chilling pumps (API)
1 7.5 HP
2 7.5 HP
C.T Fan (API)
1 15 HP
2 5 HP
CT water Pumps (API)
1 7.5 HP
2 10 HP
3 20 HP
CT plant circulation pump
1 20 HP
2 15 HP
Chilled water plant circulation
pump
1 10 HP
2 10 HP
Brine water plant circulation
1 10 HP
2 15 HP
Brine water chiller circulation
1 5 HP
2 10 HP
MAIN- BLOCK REACTORS

UTILITIES
BATLIBOI 28TR
Blue Star 23 TR
PUMPS
Chilling pumps (API)
1
2
C.T Fan (API)
1
2
CT water Pumps (API)
1
2
3
CT plant circulation pump
1
2
Chilled water plant circulation
pump
1
2
Brine water plant circulation
1
2
Brine water chiller circulation
1
2
STATUS OF CRITICAL A.C'S

Shift person name /Sign Verified by


A
B Manager
C
ATE:

Remarks
VFD, DANFOS 11 KW
VFD, ABB,7.5 KW
VFD, DANFOS 11 KW

VFD, DANFOS 5.5 KW


KREBS BIOCHEMICALS & INDUSTRIES LIMITED KREBS BIOCHEMICALS & INDUSTRIES LIMITED
REGADICHELIKA IB REGADICHELIKA IA
Date: Date:

UTILITY DAILY REPORT UTILITY DAILY REPORT

Motor Running Motor Running


S.No Section HP Hours
S.No Section HP Hours
1 BATLIBOI 28TR 1 BATLIBOI 28TR
2 VOLTAS 150TR 2 VOLTAS 30 TR
3 Blue Star 23 TR 3 VOLTAS 11 TR
4 Chilling pumps (Steroids) 4 BLUE STAR 17 TR
1 5 Chilling pumps (API)
2 1
3 2
5 C.T Fan (Steroids) 3
1 6 C.T Fan (API)
2 1
6 CT water Pumps (Steroids) 2
1 7 CT water Pumps (API)
2 1
3 2
7 Air compressor (Steroids) 3
1 8 CT plant circulation pump
2 1
3 2
8 CT plant circulation pump 3
Chilled water plant
1 9 circulation pump
2 1
3 2
Chilled water plant circulation
9 pump
3

1 10 Brine water plant circulation


2 1
3 2
10 Brine water plant circulation 11 AHU A-blocks
AHU-02
AHU-03
11 RO Plant 12 AHU cooling coils
12 2.0 Ton Boilers AHU-02
13 OTHERS AHU-03
13 De humidifier
15 1.0 Ton Boilers
16 DM PLANT
NOTE : Running hrs From 6 AM to next day 6 AM (24 Hrs) 17 OTHERS
Supervisior name: NOTE : Running hrs From 6 AM to next day 6 AM (24 Hrs)
Signature:
Date: Supervisior name:
Signature:
Date: