Standard Data Electrical Items For Buildings Preamble: Chapter 1: Conduit Laying
Standard Data Electrical Items For Buildings Preamble: Chapter 1: Conduit Laying
The Standard Data for Electrical Works are prepared based on the relevant BIS Specifications
in conjunction with National Electric Code. Similarly the method of execution shall be as per the
provisions contained in IE Rules and National Electric Code.
The following are the Chapters.
CHAPTER 1 : CONDUIT LAYING
This chapter contains conduit laying i.e. M.S. Conduit, PVC Pipe and PVC Casing and
Capping. The MS Conduit shall be finished with stone enameled surface. The MS Conduit
accessories shall be threaded type only. The conduit shall be joined by means of screwed couplers and
screwed accessories only.
The PVC Pipe should confirm with relevant IS Specifications. PVC casing and capping is
meant of emergency and additional points only.
For LAN / Telephone / Computer Separate Conduit should be laid.
CHAPTER 2 : WIRING
This unit comprises of copper wiring for light points and fan points. Further, electrical
accessories such as Plug Sockets, Batten Holders, Call Bells etc., are provided in this chapter.
The PVC insulated and flexible copper wires shall be Fire – Retardant and confirm to IS 694.
The colour code for wires shall be followed strictly for the entire installation as follows :
R – Red
Y – Yellow For Phases
B – Blue
B – Black --- For Neutral
G – Green --- For Earth
All Switch boards for neutral conduit wiring shall be fabricated with CRCA Sheet Steel from
1.6 mm (16 SWG) thick with 7 – tank process and powder coating or Hot dip galvanized boxes.
The mounting height of boards (Bottom of Box) shall be as follows :
a) All Switch Boards : 1.32 m from FFL (Finished Floor Level)
b) 16 A Power Plugs
and Metal Sockets : Sill Level of the Window
c) 16 A Power Plugs
and Metal Sockets in Kitchen: Above 30 cm on Platform
d) MCB Distribution Board : 2 m from FFL
The entire installation shall be tested for
(i) Installation Resistance
(ii) Earth Continuity
CHAPTER 3 : RUN OF MAINS
This chapter contains run of mains and circuit mains from Main Distribution Board to Sub-
distribution Boards and Sub-distribution Boards to Switch Boards. All the cables shall confirm to IS :
694 and if fire retardant.
/conversion/tmp/scratch/441756962.doc238
STANDARD DATA-ELECTRICAL ITEMS FOR BUILDINGS
/conversion/tmp/scratch/441756962.doc239
STANDARD DATA-ELECTRICAL ITEMS FOR BUILDINGS
/conversion/tmp/scratch/441756962.doc240
STANDARD DATA-ELECTRICAL ITEMS FOR BUILDINGS
/conversion/tmp/scratch/441756962.doc241