0% found this document useful (0 votes)
88 views4 pages

Unit Testing Script QM - 02 Master Inspection Characteristics

This document provides test details, data, steps, and results for unit testing the creation, change, and display of master inspection characteristics in SAP. The test creates a new "ZLength" characteristic for plant 1102, then changes and displays the characteristic. All steps passed as the characteristic was correctly created, changed, and displayed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views4 pages

Unit Testing Script QM - 02 Master Inspection Characteristics

This document provides test details, data, steps, and results for unit testing the creation, change, and display of master inspection characteristics in SAP. The test creates a new "ZLength" characteristic for plant 1102, then changes and displays the characteristic. All steps passed as the characteristic was correctly created, changed, and displayed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

“UNIFY”

Unit testing Procedure Instructions & Test


Results

Unit Testing Document -1-


“UNIFY”
Unit testing Procedure Instructions & Test
Results

TEST DETAILS
TEST SCENARIO ID CYIENT_QM 02 _ Master Inspection characteristics.

SCENARIO Master Inspection characteristics creation/change/Display.


SAP CLIENT CYIENT
CREATOR PeddiReddy.G
TESTER PeddiReddy.G
EXECUTION DATE 17.08.2018

TEST DATA

DATA OBJECT VALUE / CODE DESCRIPTION COMMENTS AND NOTES


MIC. Zlength Length
Plant 1102 Cyient DLM - Unit-2 DTA

Unit Testing Document -2-


“UNIFY”
Unit testing Procedure Instructions & Test
Results

TRANSACTIONAL STEPS: -

OUTPUT
INPUT DATA / DATA / Pass
No. PROCESS STEPS T code Test Result
SPECIAL INFORMATION ACTUAL (Y/N)
RESULT

1 Master Inspection QS21 Data will be “ZLength” Y


characteristics  Select Plant.: 1102 saved. MIC is
creation  Create Master Inspection characteristic.: ZLength created.
 Valid from.
 Select quantitative char.: tick
 Status: Released
 Select Reference characteristic
 Lower specif Limit: 1 and Upper specif Limit :10
 Enter & Save.

2 Master Inspection QS23  Select Plant: 1102 Data should be “ZLength” Y


characteristics  Enter Master Inspection characteristic: ZLength change. MIC is
change  Execute Changed.
 Change the data and save

3 Master Inspection QS24  Select Plant. Data should be “ZLength” Y


Characteristics  Enter Master Inspection characteristic. Display. MIC is
Display  Execute Displayed.

COMMENTS: -
……………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………....

Sign-off: (Tester/Team Member Name and sign) ______________________________ Date: __/__/____

Unit Testing Document -3-


“UNIFY”
Unit testing Procedure Instructions & Test
Results

Unit Testing Document -4-

You might also like