Specification No.: Heep/test-Bed/800/cws, Rev.01
Specification No.: Heep/test-Bed/800/cws, Rev.01
Specification No.: Heep/test-Bed/800/cws, Rev.01
SPECIFICATION
for
CONTENTS
SLNO DESCRIPTION
01 INTRODUCTION
02 SCOPE OF WORK
03 SCOPE OF SUPPLIES & SERVICES
04 TECHNICAL SPECIFICATION
05 DRAWINGS/DATA SHEET/ DOCUMENTS
06 GUARANTTEE
07 PROJECT SCHEDULE
08 GENERAL TERMS & CONDITIONS
09 REFERENCE DRAWINGS / SKETCHES
1
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
1.0 INTRODUCTION
1.1 PURPOSE
A new Cooling Water Service System has been envisaged to test Turbo-
generator up to 800 MW / 1000 MW. It is proposed to provide Vertical
Turbine Pumps for pumping cold water from cold water sump up to the
various cooler inlets and return water from the coolers to the cooling tower
along with necessary control & Instrumentation, Measurement & protection
and Mimic panels to test 800/1000 MW Turbo-generator.
2
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
2.1 General
The scope of work under this Bid Enquiry would include setting up of new
cooling water service system on Turnkey basis as per battery limits shown
in the Drawings/and detailed in the Specifications herewith.
3
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Along with above, all the Hydro-Mech-Elect equipments required for the
Job shall be provided. Any item not specifically written in the
specifications but required for completing the works shall be deemed to be
included in the scope of supply by the Contractor.
4
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
2.7 Scope of Motor- Pump sets, Piping Work & their accessories
5
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
(ii) Proposed location of New Pump House and piping routing upto
basement for Auxiliaries TGE-2466
(iii) MCC Single Line Diagram for Pumps& Electrics for 800 MW Test
Bed in Block-1 TGE-2467
6
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
7
9.4 Electronic Tempt. measurement system for Cold Water 1 Set
Sump with High/Low Alarms
9.5 Signal & Control Cables with accessories from field 1 Lot
instruments to control panel including Cable Trays and
conduits as required
10 Control Panel for Remote Control/Operation with 1 Set
Indications including for Level, Flow, Tempt, Pressure
complete with accessories
11 EOT Crane 5.0 T capacity with gantry rails and 1 Set
accessories/controls as per Technical Specifications
12 1.5T Air Conditioner in Control Room with Wiring/ 1 Set
Controls
13 450 mm dia. Exhaust Fans with Accessories 900 RPM 6 Nos.
14 Portable Dewatering Pump set Submersible type capacity 4 Sets
10 m3/hr each Total Head 15 mts with flexible pipe and
submersible cable
15 11 KV/415V 1000 KVA ONAN Dyn.11 Indoor Dry type 1 No.
Transformers as per Technical Specifications
16 Power cum Motor Control Centre (Main LV 1 Set
Switchboard) comprising of Incomer feeders Bus coupler
& Outgoing feeders with protections relays, metering &
indications as per Technical Specifications and Single
Line Diagram
17 Sub Distribution Board comprising of Incomer & 1 Set
Outgoing Feeders with metering & indications for
Lighting & Small power requirements as per Technical
Specifications and Single Line Diagram
18 Capacitor Bank with APFC Panel for improvement of 1 Set
System Power factor to 0.98 with protections, metering
& indications
19 11 KV grade 3C x 70 sq. mm Aluminium Conductor 1200 mts
XLPE insulated Armoured Cables
20 1.1 KV grade 6 (3½C x 300 sq.mm) Aluminium 1500 m
Conductor PVC insulated Armoured Cables
21 Bus duct with Copper Bus bars for Inter-connections 1 Lot
between LV of 1000 KVA Transformer & Incomer from
LT Power Distribution
22 1.1 KV Grade PVC insulated armoured Cables for:
8
22.2 Inter-connection between PMCC & Cooling Tower 1 Lot
Motors Size 3C x 10 Sq. mm (Copper Conductor)
9
31 Spare-parts for 2 years normal maintenance (List to be 1 Lot
furnished)
For underground/buried cables; sand & bricks shall be provided for protection.
For Cables to be carried in the Trenches ladder type Cable Trays and supports
shall be provided.
The trenches shall be provided with chequered plate covers.
10
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Cooling Tower to be designed with dry bulb and wet bulb temperature
of Haridwar in consideration
Contactor shall take care of environmental regulation as per guidelines
by State Pollution Control Board and Central Pollution Control Board.
Contractor shall take care of safety requirements also
4.1.4 Site location & space requirement for new cooling water service plant
Contactor shall examine & decide in consultation with BHEL the exact
location of site for its optimum use in testing of 800/1000 MW TG as per
11
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
space requirements for new cooling water service plant keeping in view of
the following:
The water head & flow requirements are met for testing of 1000 MW
TG at new location situated approximately at 150 meters away from
New Pump House.
12
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
4.2.1 PUMPS
4.2.2 MOTORS
Make Crompton/ABB/Kirloskar/Alstom
Type Squirrel Cage Induction Solid Shaft
Type of Mounting Vertical Flange mounted
Motor Output 200 KW
Quantity 4 Nos.
Supply Voltage 415V (±) 10%
Supply Frequency 50 Hz (±) 5%
13
Combined Voltage & Frequency (±) 10%
Variation
Duty Continuous S1
Type of Enclosure TEFC
Degree of Protection IP-55
Syn. Speed 1500 RPM
Full load Current (Nom.) 325 A
Insulation Class/Temp. rise allowed Class F/Class B with reference Tempt
as 50ºC
4.2.3 VALVES
Cold well Pump Delivery line Butterfly 450 mm, PN-1.0 rated,
Valve C I Body & disc with
SS trims, Motor operated
as per BS:5155/IS:13095
Cold well Pump Non return valve single 450 mm, PN-1.0 rated,
door swing check type on C I Body & disc with
pump delivery line SS trims, Motor operated
as per IS:5312 Part-1
Valve Chambers Butterfly valves 600 mm PN-1.0 rated,
C I Body & disc with
SS trims, Motor operated
as per BS:5155/IS:13095
Cooling tower inlet to Gate valve/Sluice valve 200 mm PN-1.0 rated,
cells C I Body & disc with
SS trims, Manually
operated as per IS:14846
14
Dia of Fan 2440
Fan RPM 470
No. of Blades/Fan 6
Material of Blades FRP
Material of Hud Cast Aluminium
Fan Shaft SS 304
Type of Balancing Dynamic
2. Motor
No of Motor 6
Motor HP 15
Seed (Nom.) 1440 RPM
Drive Reduction Gear Box
Make (Motor) Hindustan or other reputed
Make (Gear Box) MM Gears/Deekay or other reputed
3. Distribution Piping
Type Fixed Nozzle
Material PVC, Non-clog
4. Design Performance
Spray Loss Max. % 0.1
Evaporation Loss Max. % 0.59
5. Inlet Pipe “10” NB
Outlet Pipe “10” NB
6. Hardware
Material of Bolt, Nut and Washer SS
Weight of Tower without Water-KG 2000/Tower)
Weight of Tower with Water-KG 3600/Tower) App. Reference Values
7. Contact Surface Area 30000/Tower)
4.2.5 TRANSFORMER
Impedance 5%
ONAN Cooling
15
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Full capacity Off-load type Tap Changer on HV Side for Dry type Tr.
with Pad locking facility for (+) 5% to (-) 10% range; Tap Set 2½%
Totally enclosed, dust & vermin proof enclosure with IP-52 degree of
protection.
16
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
The Sheet Steel thickness shall be min. 2.0 mm for front/base/side and
3.16 mm for load bearing pads.
This Panel shall have two 415V, 1600A, 50 KA (1 sec) TPN bus
sections coupled by a 415V, 1600A, 50 KA (1 sec) bus coupler, with
Manual transfer interlock.
The Incomer shall have 1600 Amp ACB (motorized and fully withdraw
able) and have Voltmeter, Ammeter with CTs, Selector Switches and
Indicating lamps etc.
17
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Porcelain insulators, Rubber pads & Set of inter-cell, inter tier and inter-
bank connectors provided as required for complete installation.
- DC Voltmeter : (One)
- Hydrometer : (One)
18
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Battery Charger shall be suitable for float charging. The battery under
normal conditions and boost charging the battery when it has discharged
during service conditions. The changeover from float to boost mode
and vice-versa shall be automatic.
19
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
4.2.9 INSTRUMENTATION:
20
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
4.2.11 CAPACITORS:
Capacitors shall be provided for improvement of Power factor at all
working loads to min. 0.98 lagging. LV Capacitors with APFC Relay and a
Panel shall be provided for connection to PMCC bus as shown in SLD.
Capacitors shall comply with IEC 60871, IS 13585, IS 13925. The rating
of the Capacitors shall be suitable to achieve the above referred
improvement. Estimated Rating 300 KVAr. However the rating as per
actual requirement depending upon uncorrected PF of Motors to be
provided.
Type of Insulation : APP/MD
Rated Voltage : 415V
Supply System : 50 Hz 3 Ph AC
Capacitor Bank Connection : Delta
Mounting & Location : Floor mounted Indoor
Design/Reference Tempt : 50ºC
Arrangement : Automatic power factor connection
Type of Switching : Automatic
Degree of Protection of Enclosure: IP-52
Type of APFC Relay : Microprocessor based automatic
Power factor corrections
relay (max setting 0.99)
21
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
The cubicle shall be fabricated out of 2 mm thick cold rolled sheets. The
Panel shall consist of the following:
- Isolating MCCB
- Contactors with overload element
- Relays responsive to current/voltage/KVAR/PF for automatic Switching
- Sequencing devices, timers & auxiliary relays for automatic Sequential
Switching of Capacitor units/banks
- Auto/Manual Selector Switch
- APFC Relay
- Indicating lamps
Capacity : 5 MT (SWL)
Class : II/IS:3177
Lift : 6 mts
Electrically operated bridge type with down shop conductor, rails and
other accessories.
Pendant type push button station sheet steel enclosed consisting of Push
Buttons & Indicating Lamps for Start/Stop, Long Travel (Right/Left),
Cross Travel (To/Fro) Hook (Hoist/Lower) and Supply ‘ON’ indication.
22
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
23
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
PUMP
Material of Construction
1. Casing-CI IS 210 GR FG 200
2. Impeller - Bronze IS 318
3. Shaft- C-40 IS 157
4. Shaft Sleeve- CI IS 210 GR FG 200
5. Casing Wear ring- Bronze IS 318
6. Stuffing Box Bush- CI IS 210 GR 200
MOTOR
1. Make- Alstom/ Crompton
2. Specification – 110 KW TEFC, Squirrel Cage Induction Motor
3. Supply- 3 phase, 415 volts, 50 Hz
4. Insulation- Class F
5. Enclosure- Conforming to protection IP-55
6. Operating altitude- upto 1000mts.
24
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Piping upto & including 150 NB shall be carbon steel (ERW IS:1239)
Piping 200 NB and above shall be carbon steel (IS:2062) rolled and
welded conforming to IS:3589.
NB OD Thickness NB OD Thickness
15 21.8 3.2 150 166.5 5.4
25 34.2 4.0 200 219.1 6.0
40 48.8 4.0 250 273.0 6.0
50 60.8 4.5 300 323.9 6.0
65 76.6 4.5 350 355.6 6.0
80 89.5 4.8 400 406.4 6.0
100 115.0 5.4 450 457.0 6.0
125 140.8 5.4
500 508 7.0
600 610.0 7.0
25
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
- Apply one layer of Tape comprising Coal tar. Application of Tape shall
conform to AWWA C-203/IS 10221 (Appendix – B) with minimum
thickness of tape as 4 mm ± 10%.
26
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
Cooling Tower
Cold Well Sump
Pump House
Electrical Building for 11 KV/433 Volts Transformer, MCC Panel etc
5.2 Detailed Layout drawing and certified dimensioned drawing with civil
assignment for
27
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
5.5 List of vendors with details addresses (postal addresses, e-mail, fax number
& telephone number etc) for approval for all bought out items & spares.
5.6 Operation & Maintenance manual with catalog and test certificates of
equipments
5.7 Approved Scheme of cooling water system for 800/1000 MW TG for our
approval
5.9 All catalogues & technical details given by Vendor shall be furnished.
28
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
6.0 GUARANTEE
b) Supplier shall furnish test and guarantee certificates of all bought out
items to HEEP, BHEL.
29
BHARAT HEAVY ELECTRICALS LIMITED – HARIDWAR
TURNKEY PROJECT ON AUXILIARY COOLING WATER
SYSTEM FOR 800 / 1000 MW TG
________SPECIFICATION NO. : HEEP/TEST-BED/800/CWS,REV.01_____
8.1 Before quote, Supplier along with other Tenderer is requested to visit the
site, understand the technical requirements in detail, site conditions, space
availability and other requirements. Contractor is required to ensure
complete understanding of technical requirements and site conditions.
8.2 Contractor shall complete the entire job for the cooling water system of
Test-bed, Block-I, as per this specification on turnkey basis.
8.3 Contractor shall obtain approval for scheme for complete cooling water
system to test 800/1000 MW TG.
8.4 Supplier shall obtain final approval for each item before issue of
Purchase order/awarding of works contract by them.
8.5 Any material/or component not foreseen till the stage (completion &
approval of Technical Specifications by BHEL for Cooling Water System
800/1000 MW TG), but which are necessary for the implementation,
satisfactory & trouble free operation of the system and its accessories
shall be responsibility of the Contractor to fulfill them as per Project
schedule without any extra cost.
8.6 Contractor shall train Testing staff at site during commissioning of the
Project. Contractor shall arrange training of testing staff at Contractor
works for operation & maintenance aspects of water pump, cooling tower
and accessories.
8.7 Contractor shall carry out inspection of all bought out items at
manufacturers’ works as well as on receipt at HEEP, HARIDWAR.
30
31