Lesson Plan Road Header

This lesson plan outlines a 24-hour training on solo drill operation with the objectives of providing operators valuable experience and demonstrating safe operating standards. The plan covers introduction, two chapters on safety and product information, and a third chapter on operation. Chapter 1 addresses safety risks, dimensions, fire equipment, and emergency controls. Chapter 2 details the drill components and carrier module. Chapter 3 discusses the cabin/canopy models and carrier controls. The plan includes timing, topics, lesson details, and resources for slides and hands-on activities.

Uploaded by

Abdul Azis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views8 pages

Lesson Plan Road Header

This lesson plan outlines a 24-hour training on solo drill operation with the objectives of providing operators valuable experience and demonstrating safe operating standards. The plan covers introduction, two chapters on safety and product information, and a third chapter on operation. Chapter 1 addresses safety risks, dimensions, fire equipment, and emergency controls. Chapter 2 details the drill components and carrier module. Chapter 3 discusses the cabin/canopy models and carrier controls. The plan includes timing, topics, lesson details, and resources for slides and hands-on activities.

Uploaded by

Abdul Azis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Lesson Plan / Rencana Pembelajaran

Unit of Competency : T.B. A


Competency Name : Pengoperasian Solo Drill
Duration Time (Hours) : 24 Hours ( Theory & Practical )
At the end of the course operators gain valuable
experience.
Demonstrate a thorough knowledge and understanding of
the general safe operating standards and practices relating
to Solo Drill operation according to site procedures,
manufacturer recommendations and Mines Regulations.

TRAINING OBJECTIVE : Di akhir sesi pelatihan operator akan dapatkan pengalaman


berharga .
Menunjukkan pengetahuan dan pemahaman menyeluruh
tentang standar dan praktik operasi umum yang aman
terkait dengan operasi kendaraan Solo Drill sesuai dengan
prosedur lokasi, rekomendasi pabrikan dan Peraturan
Mines.

TIM
TOTAL
E RESOURCE
TIME MAIN TOPIC LESSON DETAIL
(MI /ACT
(MIN)
N)
DAY 1
30 Pendahuluan 10 Self-Introduction & expectation
(Introduction) Perkenalan & Harapan
5 Training Safety Procedure Slide
Prosedur Keselamatan Pelatihan Discussion
5 Expected Performance Criteria
Kriteria yang diharapkan
10 Exploring participant knowledge
Mengetahui pengetahuan peserta
70 Chapter 1 10 Greatest risks posed by the rig and its
Safety operation
Keselamatan Risiko terbesar yang ditimbulkan oleh rig
dan operasinya
10 Centre of gravity Slide
Pusat gravitasi Hand out
10 Maximum allowed inclination angles Discussion
Sudut kemiringan maksimum yang
diperbolehkan
5 Danger area during tramming and drilling
Area bahaya ketika tramming dan
pengeboran

HR Training 20 Maret 2019 Page 1 of 8


Lesson Plan / Rencana Pembelajaran

10 Rig dimensions and turning radius


Dimensi rig dan radius belok
10 Location and use of fire extinguishers
Lokasi dan penggunaan alat pemadam
kebakaran Slide
10 Operation of the fire suppression system Hand out
(AFFF) Discussion
Operasi sistem fire suppression (AFFF)
5 Location emergency stop buttons & main
switches
Lokasi tombol berhenti darurat dan
sakelar utama
305 Chapter 2 5 Drilling module
Product Information Modul pengeboran
Informasi produk 5 Rock drill HL 710 S
Bor batu HL 710 S
5 Feed LF 1500
Feed LF 1500
5 Boom ZRU 1408
Boom ZRU 1408
10 Rod changer RC1000
Pengganti rod RC1000
5 MSE Main switchgear
MSE Switchgear utama
5 1000 V Main switchgear (optional)
Slide
1000 V Switchgear utama (opsional)
Hand out
5 MSC/MSU Main switchgear (optional)
Discussion
MSC / MSU Switchgear utama (opsional)
5 Hydraulic oil filling pump (manual)
Pompa pengisian oli hidrolik (manual)
5 Hydraulic oil filling pump (electric)
(optional)
Pompa pengisian oli hidrolik (listrik)
(opsional)
5 Water hose reel (optional)
Gulungan selang air (opsional)
5 Cable reel
Kabel gulungan
5 Power pack
Power pack
5 Hydraulic receiver
Receiver hidrolik
10 Compressor
Kompresor
5 Water pump
Pompa air

HR Training 20 Maret 2019 Page 2 of 8


Lesson Plan / Rencana Pembelajaran

5 Pressure ‐ reducing valve


Katup penurun tekanan
10 Mud separator
Pemisah lumpur
10 Oil cooler
Pendingin oli
5 Greasing unit (optional)
Unit pelumasan (opsional)
5 Central lubrication (optional)
Pelumasan sentral (opsional)
10 Pressure cleaning system (15
bar)(optional)
Sistem pembersihan bertekanan (15 bar)
(opsional)
5 High pressure washing unit (optional)
Unit pencuci bertekanan tinggi (opsional)
5 Cabin / safety canopy
Kabin / kanopi keselamatan
10 Control panel
Slide
Panel kontrol
Hand out
10 Drilling components Discussion
Komponen pengeboran
5 Water separator (cabin model)
Pemisah air (model kabin)
5 Water separator (safety canopy model)
Pemisah air (model keselamatan kanopi)
10 Shank lubrication unit ‐ (cabin model)
Unit pelumasan shank ‐ (model kabin)
10 Shank lubrication unit ‐ (safety canopy
model)
Unit pelumasan shank ‐ (model kanopi
pengaman)
10 Drilling valves
Katup pengeboran
5 Boom valves
Boom valves
5 Flushing valves (cabin model)
Katup pembilasan (model kabin)
10 Flushing valves (safety canopy model)
Katup pembilasan (model kanopi
pengaman)
5 Pressure filter
Filter tekanan
10 Carrier module
Modul carrier

HR Training 20 Maret 2019 Page 3 of 8


Lesson Plan / Rencana Pembelajaran

10 Diesel engine (Mercedes‐‐Benz)


Diesel engine (Mercedes‐‐Benz)
10 Diesel engine (Deutz) (optional)
Diesel engine (Deutz) (opsional)
10 Transmission Slide
Transmisi Hand out
10 Axles Discussion
Axles
10 Carrier main switch
Sakelar utama
10 Fuel tank
Tangki fuel
5 Batteries
Baterei
795 Chapter 3 5 Cabin model
Operation Model kabin Slide
Operasi 10 Safety canopy model Hand out
Model kanopi keselamatan Discussion

DAY 2
10 Carrier panel (Mercedes Benz) Switches
Sakelar – sakelar panel carrier
10 Gauges
Pengukur
10 Warnings
Peringatan
10 Indicators
Indikator
10 Meter display and alarm / warning
symbols
Tampilan meter dan alarm /
Slide
simbol peringatan
Hand out
10 Controls for jacks and safety canopy
Discussion
Kontrol untuk Jack dan kanopi
keselamatan.
10 Tramming controls
Kontrol Tramming
10 Switch panel cabin model
Panel Sakelar model kabin
10 Switch panel ‐ cabin model
Panel Sakelar ‐ model kabin
10 Switch panel ‐ Safety canopy model
Panel Switch ‐ Model kanopi keselamatan
10 QN indicator panel
Panel indicator QN

HR Training 20 Maret 2019 Page 4 of 8


Lesson Plan / Rencana Pembelajaran

10 Windscreen wipers (cabin model only)


Wiper kaca depan (hanya model kabin)
5 JB43 box
Kotak JB43
10 Control devices for cooling &
heating(cabin model)
Perangkat kontrol untuk pendinginan dan
pemanasan (hanya model kabin)
10 Drilling and boom controls
Kontrol pengeboran dan boom
10 Pressure gauges ‐ Cabin model
Pengukur tekanan‐model kabin
10 Pressure gauges ‐ Safety canopy model
Pengukur tekanan‐model kanopi
keselamatan
10 Boom movements
Gerakan ‐ gerakan boom
10 Tube changer movements
Slide
Gerakan ‐ gerakan tube changer
Hand out
10 Tube changer movements in sequence
Discussion
Gerakan ‐ gerakan berurutan tube
changer
10 Drilling functions
Fungsi – fungsi pengeboran
10 Direction display / user interface
Tampilan arah/antarmuka pengguna
5 MSE main switch equipment and circuit
breakers
Peralatan switch utama MSE dan
pemutus sirkuit
10 1000 V main switch equipment & circuit
breakers
1000 V saklar peralatan utama dan
pemutussirkuit (pilihan)
10 MSC / MSU main switch & circuit
breakers
Switch utama peralatan MSC/MSU dan
pemutus sirkuit (opsional)
10 Starting diesel engine
Menghidupkan diesel engine
10 Checks while the engine is running
Cek saat engine sedang berjalan
10 Checks before tramming
Cek sebelum tramming
10 Connections to the drilling rig
Koneksi ke rig pengeboran

HR Training 20 Maret 2019 Page 5 of 8


Lesson Plan / Rencana Pembelajaran

10 Boom movement while trammin &


transportation
Pindah Boom ke posisi tramming &
transportasi
10 Brake testing
Pengetesan rem
10 Changing the speed range and drive
direction
Mengubah kecepatan dan arah
penggerak
10 Steering
Kemudi
10 Tramming
Tramming
10 Tramming on inclined surfaces
Tramming pada permukaan miring
10 Electrical system isolation Slide
Isolasi sistem kelistrikan Hand out
10 Discussion
Tramming between drilling site
Tramming antara lokasi pengeboran
10 Braking, stopping, and parking
Braking, stopping, and parking
10 Towing
Towing
10 Releasing the parking brakes
Merelease rem parker secara manual
10 After towing
Sesudah towing
10 Centring the rig and positioning it on the
fan
Memusatkan rig dan memposisikan di fan
10 Principles of percussion drilling
Prinsip pengeboran perkusi
DAY 3
10 Percussion
Perkusi
10 Feed
Memberi makan
10 Rotation
Rotasi Slide
10 Flushing Hand out
Pembilasan Discussion
5 Shank lubrication (SLU)
Pelumasan shank (SLU)
5 Shank lubrication (KVL 10) (optional)
Pelumasan shank (KVL 10) (opsional)

HR Training 20 Maret 2019 Page 6 of 8


Lesson Plan / Rencana Pembelajaran

10 Drill steel
Drill steel
10 Connections to the drilling rig
Koneksi ke rig pengeboran
10 Checks befor drilling
Pengecekan sebelum pengeboran
10 Before starting the power pack
Sebelum menghidupkan power pack
10 Starting the power pack
Menghidupkan power pack
10 Starting the water pump and compressor
Memulai pompa air dan kompresor
ketika Power Pack berjalan
10 Starting the water pump and compressor
Memulai pompa air dan kompresor
ketika Power Pack tidak berjalan
10 Lifting the rig onto jacks
Mengangkat rig ke Jack
10 Put tubes/rods into cassette
Menempatkan tubes/rods kedalam
cassette
Slide
10 Aligning with the drilling hole
Hand out
Meluruskan dengan lubang pengeboran
Discussion
10 Collaring, upward holes
Collaring, lubang‐lubang atas
10 Resetting the tube/rod counter
Setel ulang tube/rod counter
10 Resetting the depth counter
Setel ulang penghitung kedalaman
10 Drilling, upward holes
Pengeboran,lubang‐lubang atas
10 Adding tubes/rods in drilling
Menambah tubes/rods dalam
pengeboran
10 Engaging the threading sequence
Lakukan urutan threading
10 Adding tubes/rods using the extension
sequence
Menambah tubes/rods memakai urutan
extensi
10 Uncoupling and loosening the tubes/rods
Uncoupling dan melonggarkan
tabung/batang
10 Uncoupling and loosening the tubes/rods
Uncoupling dan melonggarkan
tabung/batang

HR Training 20 Maret 2019 Page 7 of 8


Lesson Plan / Rencana Pembelajaran

10 Manual uncoupling of tubes/rods


Manual uncoupling of tubes/rods
10 Engaging the uncoupling sequence
Lakukan urutan uncoupling
10 Installing a cuttings tube
Memasang cuttings tube
10 Drilling, removing jammed drill rods
Pengeboran, melepas drill rods yang
macet
10 Automatic drilling (drilling only)
Pengeboran otomatis (pengeboran saja) Slide
10 Automatic uncoupling Hand out
Uncoupling otomatis Discussion
10 Automatic drilling and uncoupling
Pengeboran otomatis dan uncoupling
10 During drilling
Selama pengeboran
10 Removing the drill bit
Melepaskan mata bor
10 Shank change procedure
Prosedur penggantian shank
10 Shank change safety pre‐actions
Pratindakan keselamatan penggantian
Shank
10 Tramming onto a transport platform or a
ship
Tramming ke platform transportasi atau
kapal
60 Written Assessment. 60 Written Assessment. WAC
Ujian Tertulis Ujian Tertulis sheets
DAY 4
420 Practical training and 420 Practical training and assessment Solo Drill
assessment Pelatihan praktek dan ujian Machine
Pelatihan praktek Hand out
dan ujian Discussion

HR Training 20 Maret 2019 Page 8 of 8