Lesson Plan Road Header
Lesson Plan Road Header
TIM
TOTAL
E RESOURCE
TIME MAIN TOPIC LESSON DETAIL
(MI /ACT
(MIN)
N)
DAY 1
30 Pendahuluan 10 Self-Introduction & expectation
(Introduction) Perkenalan & Harapan
5 Training Safety Procedure Slide
Prosedur Keselamatan Pelatihan Discussion
5 Expected Performance Criteria
Kriteria yang diharapkan
10 Exploring participant knowledge
Mengetahui pengetahuan peserta
70 Chapter 1 10 Greatest risks posed by the rig and its
Safety operation
Keselamatan Risiko terbesar yang ditimbulkan oleh rig
dan operasinya
10 Centre of gravity Slide
Pusat gravitasi Hand out
10 Maximum allowed inclination angles Discussion
Sudut kemiringan maksimum yang
diperbolehkan
5 Danger area during tramming and drilling
Area bahaya ketika tramming dan
pengeboran
DAY 2
10 Carrier panel (Mercedes Benz) Switches
Sakelar – sakelar panel carrier
10 Gauges
Pengukur
10 Warnings
Peringatan
10 Indicators
Indikator
10 Meter display and alarm / warning
symbols
Tampilan meter dan alarm /
Slide
simbol peringatan
Hand out
10 Controls for jacks and safety canopy
Discussion
Kontrol untuk Jack dan kanopi
keselamatan.
10 Tramming controls
Kontrol Tramming
10 Switch panel cabin model
Panel Sakelar model kabin
10 Switch panel ‐ cabin model
Panel Sakelar ‐ model kabin
10 Switch panel ‐ Safety canopy model
Panel Switch ‐ Model kanopi keselamatan
10 QN indicator panel
Panel indicator QN
10 Drill steel
Drill steel
10 Connections to the drilling rig
Koneksi ke rig pengeboran
10 Checks befor drilling
Pengecekan sebelum pengeboran
10 Before starting the power pack
Sebelum menghidupkan power pack
10 Starting the power pack
Menghidupkan power pack
10 Starting the water pump and compressor
Memulai pompa air dan kompresor
ketika Power Pack berjalan
10 Starting the water pump and compressor
Memulai pompa air dan kompresor
ketika Power Pack tidak berjalan
10 Lifting the rig onto jacks
Mengangkat rig ke Jack
10 Put tubes/rods into cassette
Menempatkan tubes/rods kedalam
cassette
Slide
10 Aligning with the drilling hole
Hand out
Meluruskan dengan lubang pengeboran
Discussion
10 Collaring, upward holes
Collaring, lubang‐lubang atas
10 Resetting the tube/rod counter
Setel ulang tube/rod counter
10 Resetting the depth counter
Setel ulang penghitung kedalaman
10 Drilling, upward holes
Pengeboran,lubang‐lubang atas
10 Adding tubes/rods in drilling
Menambah tubes/rods dalam
pengeboran
10 Engaging the threading sequence
Lakukan urutan threading
10 Adding tubes/rods using the extension
sequence
Menambah tubes/rods memakai urutan
extensi
10 Uncoupling and loosening the tubes/rods
Uncoupling dan melonggarkan
tabung/batang
10 Uncoupling and loosening the tubes/rods
Uncoupling dan melonggarkan
tabung/batang