Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
Test results:
Testing of Generator DG5, Breaker and
Potential Transformer
August 28-29, 2019
Prepared for:
SIPGC Plant
Calapan, Mindoro
Tested by: Verified by:
Kennah Sasamoto/Nelson Abas Julius A. Pangilinan
Test Engineer / Generator Testing Senior Test Engineer
and Repair Specialist
Approved by:
Eric D. Jabiniar
Plant Director
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
EQUIPMENT SPECIFICATION Model SERIAL NO. DESIGNATION
Generator 2100 kW, 720 rpm, 60 Hz TFW630-10-10 None DG 5
Main Stator: 13.8 kV, 110 amps
Main Field: 86 Volts, 6.3 amps
Vacuum Circuit 17.5 kV, 1250 amps VD4 1712-31M 301435/1003/02 DG 5
Breaker
Potential Transformer Nameplate cannot be read DG 5
EXECUTIVE SUMMARY:
As part of the acceptance testing, these generators and accessories are tested in accordance to standard testing
procedure in order to evaluate its present condition and to establish benchmark for future assessments.
Base on the series of test conducted, all results were found to be satisfactory aside from the significant ipf tip up
results on stator which requires thorough reconditioning on the next planned shutdown.
Comprehensive diagnostic testing is highly recommended to monitor overall condition of the generator and
accessories.
Work Done:
Visual inspection of Main stator, main field and exciters.
Took as found details.
Isolation of terminal leads before testing
Ohmic reading on heater
Diode check
Capacitance check on Main stator
Conduct the following testing on the following equipment.
a. Main stator
Winding resistance test
Insulation resistance test
Polarization Index test
b. Main field
Winding resistance test
Insulation resistance test
Polarization index test
Impedance test
c. Stator and Rotor Exciter
Winding resistance test
Insulation resistance
Dielectric Absorption ratio test
d. RTD
Insulation resistance test
Ohmic check
e. Vacuum circuit breaker
Insulation resistance test
Contact resistance test
f. Potential transformer
Insulation resistance test
Check continuity of potential transformer fuse.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
Test Results:
I. Stator Insulation Resistance and Polarization Index Test
Injected Voltage: 5000 VDC
Winding Temperature: 36 º C
PHASE A-G PHASE B-G PHASE C-G
MΩ MΩ MΩ
>5000 >5000 >5000
Test Equipment KYURITSU
Reference IEEE 43 – 2013, IEC 60034-27-4
Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.
If the Insulation resistance value is greater than 5000 Megohms, the
Polarization Index would not be meaningful and the PI test need not be
performed.
Results are satisfactory
Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
II. Stator Winding Resistance Test
Test Current: 10 Ampere
Winding Temperature: 36 º C
PHASE A PHASE B PHASE C
1.091 mΩ 1.048 mΩ 1.100 mΩ
Test Equipment Megger DLRO 10
Reference CSA C392 standard, IEC 60034-23
Remarks/Evaluation Measured winding resistance is within acceptable limits
Both reference standards recommends a limit of 1 % from the average
resistance value for form coil windings.
Results are satisfactory
Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints per phase and lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
III. Stator Insulation Power Factor and Tip-up Test
Test voltage: 8000 V
Test Specimen: CH and CL (Individual winding to ground)
PHASE TEST CAPACITANCE % POWER POWER LOSS LEAKAGE TIP -UP
VOLTAGE (nF) FACTOR (Watts) CURRENT
(kV) (mA)
2 42.32 1.532 0.977 31.9
4 42.5 1.883 3.696 55.39
A 5 42.72 2.227 8.961 80.52 1.512
7 42.95 2.591 17.31 105.2
8 43.25 3.044 31.73 130.4
2 41.80 1.449 0.912 31.51
4 41.98 1.811 3.509 55.39
B 5 42.18 2.181 8.661 79.47 1.676
7 42.43 2.612 17.64 104
8 43.77 3.125 32.22 129
2 41.51 1.442 0.902 31.3
4 41.69 1.797 3.459 55.02
C 5 41.88 2.151 8.487 78.94 1.841
7 42.18 2.649 17.79 103.4
8 42.58 3.283 33.69 128.4
Test Equipment Teldar CDF12 KV
Reference IEEE 286 – 2000, IEC 60034-27-3-2015
Remarks/Evaluation Acceptance criteria for industry practice vary, but epoxy mica insulation
system often have an acceptance criteria of 0.5% to 1.0% maximum tip-up.
However, if the unit is free from dust, dirt and other contaminants or
additional system curing can sometimes improve results when the values are
outside the acceptance criteria.
Results are satisfactory
Recommendation Trending of winding ipf and tip-up test is still recommended to monitor the
health of the winding insulation condition.
Unit requires thorough reconditioning on the next planned shutdown.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
IV. Main Rotor Field Insulation Resistance and Polarization Index Test
Injected Voltage: 500 VDC
Winding Temperature: 36 º C
Lead to Ground
(MΩ)
>5000
Test Equipment KYURITSU
Reference IEEE 43 – 2013, IEC 60034-27-4
Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.
If the Insulation resistance value is greater than 5000 Megohms, the
Polarization Index would not be meaningful and the PI test need not be
performed.
Results are satisfactory
Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition
V. Main Rotor Field Winding Resistance Test
Test Current: 10 Ampere
Winding Temperature: 36 º C
Lead 1 to Lead 2
(Ω)
3.63
Test Equipment Megger DLRO 10
Reference CSA C392 standard, IEC 60034-23
Remarks/Evaluation Compare value to OEM, This result also will be the benchmark for future
reference.
Results are satisfactory
Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
VI. Main Rotor Impedance Test
Injected Voltage: 120 V AC
Winding Temperature: 36 º C
TEST VOLTAGE ACTUAL VOLTAGE CURRENT IMPEDANCE
10 10.12 0.1 101.2
20 20.11 0.3 67.03
30 30.11 0.4 75.28
40 40.46 0.5 80.92
50 50.46 0.6 84.1
60 60.81 0.7 86.87
70 70.2 0.8 87.75
80 80.7 0.9 89.67
90 90.4 0.9 100.44
100 100.2 1.0 100.2
110 110.8 1.1 100.73
120 120.8 1.2 100.67
Test Equipment VARIABLE AC Source, Fluke DMM, Fluke Clamp Meter
Reference IEEE Std 62.2, EASA Std.
Remarks/Evaluation There was no presence of shorted turns appeared as the voltage is raised.
Very low impedance and high current indicates shorted turns is present
Results are satisfactory
Recommendation Trending of Impedance test is still recommended to monitor presence of
shorted turns in the field windings
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
VII. Rotor Exciter Insulation Resistance and Dielectric AbsorptionTest
Injected Voltage: 500 VDC
Winding Temperature: 36 º C
Particular Line to Ground Test
30 sec (MΩ) >1000 MΩ
1 minute (MΩ) >1000 MΩ
Dielectric Absorption >1
Test Equipment KYURITSU
Reference IEEE 43 – 2013, IEC 60034-27-4
Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.
If the Insulation resistance value is greater than 5000 Megohms, the
Polarization Index would not be meaningful and the PI test need not be
performed.
Results are satisfactory
Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition
VIII. Exciter Rotor Winding Resistance Test
Test Current: 10 milli-Ampere
Winding Temperature: 36 º C
PHASE A PHASE B PHASE C
11.958 mΩ 11.571 mΩ 11.907 mΩ
Test Equipment Megger DLRO 10
Reference CSA C392 standard, IEC 60034-23
Remarks/Evaluation Measured winding resistance is within acceptable limits
Both reference standards recommends a limit of 1 % from the average
resistance value for form coil windings.
Results are satisfactory
Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints per phase and lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
IX. Stator Exciter Insulation Resistance and Dielectric AbsorptionTest
Injected Voltage: 500 VDC
Winding Temperature: 36 º C
Particular Line to Ground Test
30 sec (MΩ) >1000 MΩ
1 minute (MΩ) >1000 MΩ
Dielectric Absorption >1
Test Equipment KYURITSU
Reference IEEE 43 – 2013, IEC 60034-27-4
Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.
If the Insulation resistance value is greater than 5000 Megohms, the
Polarization Index would not be meaningful and the PI test need not be
performed.
Results are satisfactory
Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition
X. Stator Exciter Winding Resistance Test
Test Current: 10 Ampere
Winding Temperature: 36 º C
Lead 1 to Lead 2
(Ω)
9.829
Test Equipment Megger DLRO 10
Reference CSA C392 standard, IEC 60034-23
Remarks/Evaluation Compare value to OEM, This result also will be the benchmark for future
reference.
Results are satisfactory
Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
XI. RTD Test
Particular Reading (Ω) Insulation Resistance (MΩ)
@ 500 VDC
RTD 1 113.9 > 100
RTD 2 114.2 > 100
RTD 3 113.8 > 100
RTD 4 114.0 > 100
RTD 5 113.5 > 100
RTD 6 113.2 > 100
Remarks/Evaluation Measured resistance and calculated equivalent temperatures are within
acceptable range.
All RTD’s are in Good Condition
Recommendation Trending of resistance test value is still recommended to monitor condition of
winding temperature detectors
XII. Diode Test
Particular Forward Bias Reverse Bias
(VDC) (VDC)
Diode 1 0.382
Diode 2 0.382
Diode 3 0.382
Diode 4 0.382
Diode 5 0.382
Diode 6 0.382
Diode 7 0.382
Diode 8 0.382
Diode 9 0.382
Diode 10 0.382
Diode 11 0.382
Diode 12 0.382
Remarks/Evaluation The forward voltage obtain on each diodes are within acceptable range.
All Diodes are in Good Condition
Recommendation Diodes shall be tested every time the unit is scheduled for shutdown
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
XIII. Vacuum Circuit Breaker Test
Contact Resistance Test
L1-L1’ L2-L2’ L3-L3’
(µΩ) (µΩ) (µΩ)
128.1 153.5 138.6
Test Equipment Megger DLRO 10
Reference ANSI/NETA-MTS
Remarks/Evaluation Does not exceed high level of normal range as indicated in the
manufacturer’s data or the values does not deviate 50% of the lowest values
Results are satisfactory
Recommendation Trending of resistance test and comprehensive test is still recommended to
monitor health condition of the breaker.
Insulation Resistance Test
Breaker Status Test Mode
L1-L2 L2-L3 L3-L1
Close >1 T Ω >1 T Ω >1 T Ω
L1-G L2-G L3-G
>1 T Ω >1 T Ω >1 T Ω
L1-L1’ L2-L2’ L3-L3’
Open >1 T Ω >1 T Ω >1 T Ω
Test Equipment KYURITSU
Reference ANSI/NETA-MTS
Remarks/Evaluation Table 100.1 from the reference standard shows that the results are within
acceptable tolerance
Results are satisfactory
Recommendation Trending of insulation resistance test and comprehensive test is still
recommended to monitor health condition of the breaker.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
XIV. Potential Transformer Insulation Resistance Test
Particular HV-LV HV-G LV-G
Core1/Core2 >100 MΩ
Core1 >100 MΩ >100 MΩ
Core2 >100 MΩ >100 MΩ
Test Equipment KYURITSU
Reference ANSI/NETA-MTS
Remarks/Evaluation Table 100.1 from the reference standard shows that the results are within
acceptable tolerance
Results are satisfactory
Recommendation Trending of insulation resistance test and comprehensive test is still
recommended to monitor health condition of the breaker.