STR A STR Painting

The inspection test record documents the inspection of a structure painting project. It shows that surfaces were cleaned and dry, sharp edges removed, masking and safety measures taken, and visual controls performed during application. Spot painting and piping supports were completed, penetrations and joints correctly coated, and interfaces coated. Dry film thickness and any defects were checked and recorded, and paint application details like type, times and humidity levels were noted. Drawings were attached with highlighted checked areas. The record was completed, verified and accepted by signatures.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
114 views1 page

STR A STR Painting

The inspection test record documents the inspection of a structure painting project. It shows that surfaces were cleaned and dry, sharp edges removed, masking and safety measures taken, and visual controls performed during application. Spot painting and piping supports were completed, penetrations and joints correctly coated, and interfaces coated. Dry film thickness and any defects were checked and recorded, and paint application details like type, times and humidity levels were noted. Drawings were attached with highlighted checked areas. The record was completed, verified and accepted by signatures.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION TEST RECORD (ITR) - A

STRUCTURE PAINTING ST02-A


Project No.
Project Title
Facilities
INFORMATION
Area No Ref Drawing
System Inspection Date
Sub System Location

INSPECTION / TEST OK N/A P/L No.


1 All surfaces clean and dry prior to application
2 Sharp edges-removed prior to application
3 All masking completed and safety 3. measures taken
Visual control performed during application, record below ambient and humidity
4
during
5 Spot painting performed
6 Piping supports completed
7 Penetrations correctly coated
8 Bulkhead joints correctly coated
9 Structural interfaces correctly coated
10 Dry film thickness checked correct. Record details
11 Record any defective area(s) on punch list
Details of paint type as below:
Date of application :
Curing time : (Hrs)
12
Percentage of relative humidity: (%)
Start of application : (Hrs)
Completion of application : (Hrs)
13 Attach drawings, highlighted with areas checked
COMMENT(S) AND ADDITIONAL INFORMATION

COMPLETED BY VERIFIED BY ACCEPTED BY


Designation
Company
Name
Signature
Date