Salwa Road - 340

New Mirqab - 39
Souq Al-Rawda 3, 2nd Floor, Office 209
[email protected]

DOHA PORT RE-DEVELOPMENT PROJECT


COMBINED MINA DISTRICT
AND SEA WATER DIVING POOL WORKS

STRUCTURAL DESIGN REPORT


PILE REACTIONS FOR BUILDING 22

Project No. : 19193 Date Issued : 30 September 2019

Document No. : 19193-ST-CS-03-0001 Revision No. :0

Issue Status : IFA (Issued for Approval) Project Phase : For Construction

www.neosce.com / www.neosts.com
P.O. Box 1362 - Tel: (+974) 4029 9219 / 4037 0188- Fax: (+974) 4037 0188
Salwa Road - 340
New Mirqab - 39
Souq Al-Rawda 3, 2nd Floor, Office 209
[email protected]

STRUCTURAL DESIGN REPORT


RC STRUCTURE FOR BUILDING 50

Project No. : 19193 Date Issued : 30 September 2019

Document No. : 19193-ST-CS-03-0001 Revision No. :0

Issue Status : IFA (Issued for Approval) Project Phase : For Construction

Prepared by: Reviewed by: Approved by:

Name Franklyn P. Genove Alden P. Cayaga Tarek A. Gharib

Job Title Structural Engineer Technical Manager General Manager

Signature

Document HISTORY LOG:


Rev. Date Issued Purpose of Issue Revised Sections
No.

0 30/09/2019 Issued for Approval

This report has been prepared in accordance with the terms and conditions of appointment of Neo Spectrum
Engineering Consultancy (NEOSEC) for the aforementioned project. NEOSEC cannot accept any responsibility for
any use of or reliance on the contents of this report by any third party unless confirmed in writing by NEOSEC.

www.neosce.com / www.neosts.com
P.O. Box 1362 - Tel: (+974) 4029 9219 / 4037 0188- Fax: (+974) 4037 0188
TABLE OF CONTENTS
Section Description Page No.

STRUCTURAL DESIGN REPORT...........................................................................................................................1


1. INTRODUCTION..................................................................................................................................................... 1
2. CODES AND REFERENCE DOCUMENTS....................................................................................................... 1
2.1 CODES AND STANDARD...................................................................................................................................1
2.2 BUILDING CODE.................................................................................................................................................. 1
2.3 DESIGN CODES & STANDARDS..................................................................................................................... 1
2.4 REFERENCE DOCUMENTS.............................................................................................................................. 1

3. MATERIALS PARAMETERS & UNITS.............................................................................................................. 4


3.1 UNITS......................................................................................................................................................................4
3.2 MATERIALS PROPERTIES................................................................................................................................ 4

4. PERFORMANCE REQUIREMENTS................................................................................................................... 4
4.1 LOAD COMBINATION......................................................................................................................................... 4
4.1.1 ULTIMATE LIMIT STATE................................................................................................................................. 7
4.1.2 SERVICEABILITY LIMIT STATE.....................................................................................................................7

5. DESIGN TOOLS & SOFTWARE..........................................................................................................................8


6. STRUCTURAL MODEL......................................................................................................................................... 8
7. LOAD PARAMETERS............................................................................................................................................9
7.1 DEAD LOAD (DL)..................................................................................................................................................9
7.2 SUPERIMPOSED DEAD LOAD (SDL)..............................................................................................................9
7.3 LIVE LOAD (LL).....................................................................................................................................................9
7.4 WIND LOAD (WL)................................................................................................................................................. 9
7.5 SEISMIC LOAD..................................................................................................................................................... 9
7.6 TEMPERATURE LOAD (TL)............................................................................................................................... 9
7.7 LOAD COMBINATIONS.....................................................................................................................................10

8. PILE REACTION...................................................................................................................................................12

Pa
STRUCTURAL DESIGN REPORT
1. INTRODUCTION

The main objective of this structural calculation report is the consolidation of Pile reactions for
analysis of design of Pile foundation at Building 22 for Doha Port Re-development Project,
combined Mina District and Sea Water Diving Pool Works.

2. CODES AND REFERENCE DOCUMENTS

Included herein are the codes and standards, along with the list of reference documents to be
used in the structural calculation for Pile reactions at Building 22.

2.1 CODES AND STANDARD


This structural design and review manual shall be read in conjunction with the following
codes of practice and technical documents.

2.2 BUILDING CODE


 Governing Local Code : Qatar National Construction Standards

2.3 DESIGN CODES & STANDARDS

Structural design and verification were based on applicable Eurocode standards:

Structural design and verification were based on applicable Eurocode standards:


 BS EN 1991 - Actions on Structures - Part 1 - 4: General Actions - Wind Loads
 BS EN 1998 - Design of Structures for Earthquake resistance - Part 1: General rules,
seismic actions and rules for buildings
 BS EN 1992 - Design of Concrete Structures - Part 1 - 1: General Rules and rules for
Buildings
 BS EN 1997 - Geotechnical Design - Part 1: General rules
 BS EN 1998 - Design of Structures for Earthquake Resistance - Part 1: General rules,
seismic actions and rules for buildings

2.4 REFERENCE DOCUMENTS

Refer to Appendix A for the reference documents to be used in the structural calculation for
consolidation of Pile reactions. List of reference drawings as follows:

Architectural drawings:
DPP-DPQ-D-MDP-C-AR-00-22-1000
DPP-DPQ-D-MDP-C-AR-01-22-1001
DPP-DPQ-D-MDP-C-AR-02-22-1002
DPP-DPQ-D-MDP-C-AR-03-22-1003
DPP-DPQ-D-MDP-C-AR-AL-22-2001
DPP-DPQ-D-MDP-C-AR-AL-22-2002
DPP-DPQ-D-MDP-C-AR-AL-22-3001

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 1 of 18
Structural drawings:
DPP-DPQ-D-MDP-C-FN-FN-00-22-1000
DPP-DPQ-D-MDP-C-ST-00-22-1000
DPP-DPQ-D-MDP-C-ST-00-22-1100
DPP-DPQ-D-MDP-C-ST-00-22-1200
DPP-DPQ-D-MDP-C-ST-00-22-1300
DPP-DPQ-D-MDP-C-ST-01-22-1101
DPP-DPQ-D-MDP-C-ST-01-22-1201
DPP-DPQ-D-MDP-C-ST-01-22-1301
DPP-DPQ-D-MDP-C-ST-02-22-1102
DPP-DPQ-D-MDP-C-ST-02-22-1202
DPP-DPQ-D-MDP-C-ST-02-22-1302
DPP-DPQ-D-MDP-C-ST-03-22-1103
DPP-DPQ-D-MDP-C-ST-03-22-1203
DPP-DPQ-D-MDP-C-ST-03-22-1303
DPP-DPQ-D-MDP-C-ST-AL-22-5000
DPP-DPQ-D-MDP-C-ST-AL-22-5001
DPP-DPQ-D-MDP-C-ST-AL-22-5100
DPP-DPQ-D-MDP-C-ST-AL-22-5101
DPP-DPQ-D-MDP-C-ST-AL-22-6000
DPP-DPQ-D-MDP-C-ST-AL-22-6001

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 2 of 18
Structural Model - Building 22

Structural Model - Piles and Pile Caps

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 3 of 18
3. MATERIALS PARAMETERS & UNITS

Unless specified otherwise, the following materials’ characteristics and design specifications
shall be used in the design calculations and structural models as discussed below along with
the material design parameters to be used in the structural report for Pile reactions calculation
at Doha Port Re-development Project.

3.1 UNITS

Units to be used in the calculation shall be in accordance with SI Units, meter (m), centimeter
(cm), millimeter (mm), Newton (N) and Kilo Newton (kN) shall be used. If the loading values
given by mechanical or by others are in tons or kg, the given values shall be transferred to the
equivalent values in SI unit, such as 5kN (for 0.5tons), 294kN (for 30tons), 1kN/m2 (for 100
kg/m2), 4.9kN/m (for 500kg/m) 1 ton equals 9.8kN in general, alternatively it may be considered
as 10kN for small loads having less than 1 ton

The symbols to be used in calculation sheets shall be in accordance with Eurocode.

3.2 MATERIALS PROPERTIES


Structural concretel will be the principal construction materials to be used in this project.

The design will be governed by the relevant material specification.

Compressive strength of concrete fck : 40 MPa


Yield strength of reinforcement fyk : 500 MPa
Modulus of Elasticity Ec : 35 GPa
Pile stiffness:
Kx = 29 500 kN/m
Ky = 29 500 kN/m
Kz = 400 000 kN/m

4. PERFORMANCE REQUIREMENTS

Pile reactions to be used for Doha Port Redevelopment Project shall be calculated for
the load combinations shown below and shall be within the limits of Eurocode for
concrete for Ultimate Limit State (ULS) and Serviceability Limit State (SLS).

The provision for the load combination for the structural design and review of the project
shall be based on the construction stage, ultimate limit state and serviceability
requirements.

With an appropriate degree of safety, the steel structure should sustain all the loads and
deformations of normal construction and use.

4.1 LOAD COMBINATION

In checking the capacity of pile and formulating pile reactions, or of any part of it, the specified
loads shall be multiplied by the relevant partial factors as per Eurocode.

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 4 of 18
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 5 of 18
Table 1: Partial Safety Factors

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 6 of 18
Note that the factored loads shall be applied in the most unfavorable realistic combination for
the part of effect under consideration.

4.1.1 ULTIMATE LIMIT STATE

Ultimate limit states concern the safety of the whole or part of the structure to achieve an
acceptable probability that it will perform satisfactorily during their intended life.
Load combinations in accordance with Eurocode which are summarized in the table below.

4.1.2 SERVICEABILITY LIMIT STATE

The deformation or vibration of the structure or of any part of it under serviceability loads should
not adversely affect its strength, efficiency, appearance or its use.

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 7 of 18
5. DESIGN TOOLS & SOFTWARE

Structural modelling, analysis and design shall be done using Autodesk Robot Structural
Analysis Professional 2020.

6. STRUCTURAL MODEL
Shown below is the screen capture of the 3D model of the Steel Frame using Autodesk Robot
Structural Analysis Professional 2020.

Figure 1: Building 22 - 3D Model

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 8 of 18
7. LOAD PARAMETERS
7.1 Dead Load (DL)
Specific weight of the concrete: 23.54 kN/m³
7.2 Superimposed Dead Load (SDL)
Refer to appendices for Loading Plan as per Structural Plans
7.3 Live Load (LL)
Refer to appendices for Loading Plan as per Structural Plans
7.4 Wind Load (WL)

According to EN 1991-1-4: (Eurocode 1: Actions on structures — Part 1-4: General


actions — Wind Actions)
 Basic Wind velocity: 27 m / sec (≈ 60 mph) for 10 min. mean wind velocity with an
annual risk of being exceeded of 0.02.
 Terrain Category: 0
 Orography Factor, C0(z): 1
 Turbulence Factor, k1: 1
 Structural Factor, CsCd: 1
 Cp : Calculated for each building based on Section 7 of the code

7.5 Seismic Load


According to EN 1998-1: (Eurocode 8: Design of structures for earthquake
resistance — Part 1: General Rules, seismic action and rules for buildings)
 Peak ground acceleration, agR = 0.045 g
 Importance factor =1.0
 Design ground acceleration, ag = 0.045 g
 Ground type: Type C
 Spectrum type: 2
 Lower bound factor: 0.2
 Basic Value of behavior factor qo : 1.5
7.6 Temperature Load (TL)
As per QCS 2014, the considered design temperature was based on site temperature
condition:
Mean yearly temperature = 28.99 oC
Maximum ambient temperature = 50 oC
Minimum ambient temperature = 5 oC
Design ambient temperature = 50 oC
Maximum metal temperature under the sun = 85 oC
The temperature loads are applied to all concrete members of the structure. Therefore,
the following temperature loading conditions will be considered in design.

Positive Temperature Range: ΔT = +25 oC


Negative Temperature Range: ΔT = -25 oC

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 9 of 18
7.7 LOAD COMBINATIONS

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 10 of 18
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 11 of 18
8. PILE REACTION
For detailed reaction values, refer to the table on this report

Figure 2: Pile Nodes

Pile reaction summary (Load sets: G1, G2 and G3)

Note: For the Pile reaction with corresponding load combination, refer to (Appendix B).

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 12 of 18
APPENDIX A

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 13 of 18
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 14 of 18
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 15 of 18
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 16 of 18
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 17 of 18
APPENDIX B

DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
RC STRUCTURE FOR BUILDING 22 Rev.0 Page 18 of 18