Project Schedule

The document is a Gantt chart showing the schedule for construction of a causeway over 5 weeks from May 31 to July 4. It details 3 main activities: obtaining permits by June 3, procuring and delivering 556 square meters of sheet piles from June 3 to August 21, and dredging 72,553 cubic meters from April 30 to June 22.

Uploaded by

saber2s22ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
489 views3 pages

Project Schedule

The document is a Gantt chart showing the schedule for construction of a causeway over 5 weeks from May 31 to July 4. It details 3 main activities: obtaining permits by June 3, procuring and delivering 556 square meters of sheet piles from June 3 to August 21, and dredging 72,553 cubic meters from April 30 to June 22.

Uploaded by

saber2s22ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Construction of Causeway 1st Week 2nd Week 3rd Week 4th Week 5th Week

31-May-19

10-Jun-19
11-Jun-19
12-Jun-19
13-Jun-19
14-Jun-19
15-Jun-19
16-Jun-19
17-Jun-19
18-Jun-19
19-Jun-19
20-Jun-19
21-Jun-19
22-Jun-19
23-Jun-19
24-Jun-19
25-Jun-19
26-Jun-19
27-Jun-19
28-Jun-19
29-Jun-19
30-Jun-19
Productivity

1-Jun-19
2-Jun-19
3-Jun-19
4-Jun-19
5-Jun-19
6-Jun-19
7-Jun-19
8-Jun-19
9-Jun-19

1-Jul-19
2-Jul-19
3-Jul-19
4-Jul-19
# Activity Name Unit QTY (Unit/day) Assigned Duration Start Finish
backward

Construction of Causeway
1 Al SARH SOW
1.1 Obtaining all of Permits required to commence
1.1.1 Permits 0 3-Jun-19 3-Jun-19 gg
1.2 Procuremet & Delivery of Sheet/king piles m2 556 78 3-Jun-19 21-Aug-19 gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
Dredging From -1.00 CD to the round head of
1.3 m3 72,553
the causeway
1.3.1 LOA for Subcontractor 0 30-Apr-19 30-Apr-19
1.3.2 Mobilization & Preparation Works 45 9-May-19 22-Jun-19 gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
1.3.3 Dredging & Disposal Works 60 23-Jun-19 22-Aug-19 gg
gggg
gggg
gggg
gggg
gggg
gg
1.3.5 Demobilization 6 23-Aug-19 29-Aug-19
1.4 Supply and Delivery of Causeway Material
1.4.1 Core Materials 1 - 500 kg. Ton 325,225 3011.34 108 2-Jul-19 18-Oct-19 gg
gggg
1.4.2 Underlay Stones 300 - 1000 kg Ton 42,221 394.59 107 5-Jul-19 20-Oct-19
1.4.3 Armour Rock 1000 - 3000 kg Ton 13,054 543.93 24 19-Jul-19 12-Aug-19
1.4.4 Armour Rock 3000 - 6000 kg Ton 16,368 409.19 40 13-Aug-19 22-Sep-19
1.4.5 Armour Rock 4000 - 7500 kg Ton 21,778 750.98 29 23-Sep-19 22-Oct-19
1.5 Supply causeway material to close the gaps between the piles and causeway
2 SCC SOW
1.1.3 Mobilization LS 1 14 9-Jun-19 23-Jun-19 gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
2.2 Installation of sheet / king piles m2 556 19.87 28 22-Aug-19 20-Sep-19
2.3 Stretch # 1 (Sec A1 to Sec 0+190) Installation of Causeway Material

2.3.1 Dredging "on-shore" (Excluding Hauling) m3 8,388 14 23-Jun-19 8-Jul-19 gg


gggg
gggg
gggg
gggg
gggg
gg
599.14
2.3.2 Core Materials 1 - 500 kg. Ton 31,532 3153.16 10 2-Jul-19 13-Jul-19 gg
gggg
2.3.3 Underlay Stones 300 - 1000 kg Ton 6,401 711.24 9 5-Jul-19 15-Jul-19
2.4 Stretch # 2 (Sec 0+190 to Sec 06) Installation of Causeway Material
2.4.1 Core Materials 1 - 500 kg. Ton 77,377 3224.02 24 14-Jul-19 8-Aug-19
2.4.2 Underlay Stones 300 - 1000 kg Ton 11,506 479.40 24 16-Jul-19 10-Aug-19
2.4.3 Armour Rock 1000 - 3000 kg Ton 12,460 541.75 23 19-Jul-19 12-Aug-19
2.5 Stretch # 3 (Sec 06 to Sec-P-02) Installation of Causeway Material
2.5.1 Core Materials 1 - 500 kg. Ton 109,115 2797.83 39 9-Aug-19 18-Sep-19
2.5.2 Underlay Stones 300 - 1000 kg Ton 12,069 309.46 39 11-Aug-19 20-Sep-19
2.5.3 Armour Rock 3000 - 6000 kg Ton 16,368 419.68 39 13-Aug-19 22-Sep-19
2.6 Stretch # 4 (Sec-P-02 to Sec 02) Installation of Causeway Material
2.6.1 Core Materials 1 - 500 kg. Ton 103,029 3679.61 28 19-Sep-19 18-Oct-19
2.6.2 Underlay Stones 300 - 1000 kg Ton 12,245 437.33 28 21-Sep-19 20-Oct-19
2.6.3 Armour Rock 4000 - 7500 kg Ton 21,778 777.80 28 23-Sep-19 22-Oct-19
Finalizing the rocks placing around the sheet
2.7 LS 1 1 10 21-Sep-19 2-Oct-19
piles
6th Week 7th Week 8th Week 9th Week 10th Week 11th Week 12th Week 13th Week 14th Week 15th Week 16th Week 17th Week

10-Aug-19
11-Aug-19
12-Aug-19
13-Aug-19
14-Aug-19
15-Aug-19
16-Aug-19
17-Aug-19
18-Aug-19
19-Aug-19
20-Aug-19
21-Aug-19
22-Aug-19
23-Aug-19
24-Aug-19
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19

10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
24-Sep-19
25-Sep-19
10-Jul-19
11-Jul-19
12-Jul-19
13-Jul-19
14-Jul-19
15-Jul-19
16-Jul-19
17-Jul-19
18-Jul-19
19-Jul-19
20-Jul-19
21-Jul-19
22-Jul-19
23-Jul-19
24-Jul-19
25-Jul-19
26-Jul-19
27-Jul-19
28-Jul-19
29-Jul-19
30-Jul-19
31-Jul-19
1-Aug-19
2-Aug-19
3-Aug-19
4-Aug-19
5-Aug-19
6-Aug-19
7-Aug-19
8-Aug-19
9-Aug-19

1-Sep-19
2-Sep-19
3-Sep-19
4-Sep-19
5-Sep-19
6-Sep-19
7-Sep-19
8-Sep-19
9-Sep-19
5-Jul-19
6-Jul-19
7-Jul-19
8-Jul-19
9-Jul-19

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg

gg
gggg
gg

gg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg

gg
gggg
gggg
gggg
gg
gggg
gggg
gg
gggg

gg
gggg
gggg
18th Week 19th Week 20th Week 21st Week
26-Sep-19
27-Sep-19
28-Sep-19
29-Sep-19
30-Sep-19

10-Oct-19
11-Oct-19
12-Oct-19
13-Oct-19
14-Oct-19
15-Oct-19
16-Oct-19
17-Oct-19
18-Oct-19
19-Oct-19
20-Oct-19
21-Oct-19
22-Oct-19
23-Oct-19
24-Oct-19
1-Oct-19
2-Oct-19
3-Oct-19
4-Oct-19
5-Oct-19
6-Oct-19
7-Oct-19
8-Oct-19
9-Oct-19
ASJV SOW- Delivery of Pile CUC SOW

ASJV SOW-Delivery of Rocks SCC SOW

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg

gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg
gggg

gg
gggg
gggg
gggg

You might also like