Architectural Practice

The Minimum Basic Fee for an Inter-modal Port Complex with a Project Construction Cost of P5Billion would be 8% of P5Billion or P400Million since it is a complex design.

Uploaded by

Boc Victa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
156 views13 pages

Architectural Practice

The Minimum Basic Fee for an Inter-modal Port Complex with a Project Construction Cost of P5Billion would be 8% of P5Billion or P400Million since it is a complex design.

Uploaded by

Boc Victa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Archt. Maundelito S.

Florendo, UAP
the Brown Bauhaus
SPECTRUM OF THE ARCHITECT’S SERVICES

The spectrum of architect’s services extends over the entire range of activities
that proceed from the time the idea is conceived, perfected, transformed into sets of
space/design requirements, translated into structure through design, built, used, and
become a permanent feature of the man-made environment.
The architect’s services consist of the necessary conferences, deliberations,
discussions, evaluations, investigations, consultations, advise on matters affecting
the scientific, aesthetic, and orderly coordination of all the processes of safeguarding
life, health, and property which enter into the production of different levels and
sophistications of man-made structures and environment.
The architect, in the process of translating abstract ideas into meaningful
concrete terms, produces documents in the form of a data base report, an
architectural program, a feasibility study, an appraisal report, an impact analysis
report, a space-organizational set-up report, a site planning analysis and evaluation
report, an operational programming report, building programming and scheduling
report.
SPECTRUM OF THE ARCHITECT’S SERVICES

A complete and detailed documentation of construction or erection


drawings is prepared consisting of the architectural plans, the
plumbing/sanitary plans the mechanical/air conditioning plans, the civil work
plans, the technical specifications and other bid documents.
Aside from these, the Architect can prepare the post-construction
management document, the operating manual, the maintenance manual,
and other form of written and graphical documentations necessary for the
effective and efficient functioning of the man-made structures and
environment.
An appreciation of this scope of services of the Architect will bring into
focus the crucial role that the Architect assumes in the realization of abstract
ideas into tangible and meaningful terms.
Between abstract ideas and the physical world, stands the Architect.
STANDARDS OF PROFESSIONAL PRACTICE
UAP DOCUMENTS

201 - PRE-DESIGN SERVICES


202 - DESIGN SERVICES
203 - SPECIALIZED ALLIED SERVICES
204 - CONSTRUCTION SERVICES
205 - POST-CONSTRUCTION SERVICES
206 - COMPREHENSIVE ARCHITECTURAL SERVICES
207 - DESIGN-BUILD SERVICES
208 - SELECTION OF THE ARCHITECT AND
METHODS OF COMPENSATION
SERVICES OF THE ARCHITECT
1 2 3 4 5 6 7
PRE- DESIGN SPECIALIZE CONSTRUC POST- COMPRE- DESIGN-
DESIGN SERVICES D ALLIED -TION CONSTRUC HENSIVE BUILD
SERVICES SERVICES SERVICES TION SERVICES SERVICES
SERVICES (Doc. 207)
Project
Management Service
(Doc. 206)
Building &Grounds
Administration
(Doc. 205)
Full-time Supervision /
Construction Management
(Doc. 204)
Planning / Interior / Landscaping /
Acoustics, Communications, and Electronics Engineering
(Doc. 203)
Architect’s Regular Services

(Doc. 202)
Architectural Programing / Feasibility Study /
Site Study / Cost-effectiveness Study / Others
(Doc. 201)
PRE-DESIGN SERVICES
Economic and Feasibility Studies
Project Financing
Architectural Programming
Site Selection and Analysis
Site Utilization and Land-Use Studies
Space Management Studies
Promotional Services

METHOD OF COMPENSATION

Multiple of Direct Personal Expense.


DESIGN SERVICES
Schematic Design Phase
Design Development Phase
Contract Document Phase
Construction Phase
METHOD OF COMPENSATION (Payment Schedule)
Upon Signing of Agreement = 5%
Upon the Completion of Schematic Design Services = 15%
Upon the Completion of Design Development Services = 35%
Upon Completion of the Contract Document Phase = 50%
The remaining 15% Shall be (10%) for the Architect’s Liability Under the Civil Code and (5%) for the
Preparation of Contract Document Forms and Periodic Visit.
Upon Completion of the Construction Work, Necessary Adjustments to the Professional Fee Shall Take
Effect.
SPECIALIZED ALLIED SERVICES
Interior Design (ID)
Acoustics, Communications, and Electronics
Engineering (ACE)
Landscape Design (LD)
Physical Planning (PP)
Comprehensive Planning (CP)
METHOD OF COMPENSATION
Architect on ID = 15% (12%-20% varying on complexity) & 5% if Client pays the ID
On ACE/LD = 10%-15% varying on complexity & 5% if Client pays the ACE/LD
On PP/CP = 50ha (P5T/ha), +50-100ha (+4.500/ha), +100-200ha (+4T/ha), +200ha
(3T/ha)
SCHEDULE OF PAYMENT = 30% for Preliminary Design, 50% for Final Design, and 20% upon
the completion of the project.
SCHEDULE OF MINIMUM BASIC FEE FOR VARIOUS
BUILDING TYPES
*SIMPLE STRUCTURES 6% of the Project Construction Cost
*MODERATE COMPLEXITY 7% of the PCC
*COMPLEX DESIGNS 8% of the PCC
*RESIDENTIAL 10% of the PCC
*MONUMENTAL STRUCTURES 12% of the PCC
*STRUCTURES INVOLVING DETAILED & INTRICATE DESIGNS 15% of the PCC
*REPETITIVE DESIGN
(1st = Full MBF, 2nd = 80% of MBF, 3rd = 60% of MBF, 4th & on = 40% of MBF)
*HOUSING PROJECT (1st = Full, 2nd to 10th = 60% of MBF, 11th & on = 30% of MBF)
*ALTERATIONS / RENOVATIONS 150% of the original MBF
*ARBITRATION (Consultancy = P200 per hr / Expert Witness = P500 per Appearance)
NOTE: Fixed figures shall be adjusted based on value of money in the year 1979
COMPUTATION OF MBF FOR GROUPS 1 TO 3

GROUP 1 - SIMPLE STRUCTURES


Up to P50M - 6% of the Project Construction Cost

P50M+ to P100M - P3M + 5% of the amount exceeding P50M

P100M+ to P200M - P5.5M + 4% of the amount exceeding P100M

P200M+ to P500M - P9.5M + 3% of the amount exceeding P200M

P500M+ to P1B - P18.5M + 2% of the amount exceeding P500M

Above P1B - P28.5M + 1% of the amount exceeding P1B


GROUP 2 – STRUCTURES OF MODERATE COMPLEXITY
Up to P50M - ___% of the Project Construction Cost

P50M+ to P100M - P_____ + ___% of the amount exceeding P50M

P100M+ to P200M - P_____ + ___% of the amount exceeding P100M

P200M+ to P500M - P_____ + ___% of the amount exceeding P200M

P500M+ to P1B - P_____ + ___% of the amount exceeding P500M

Above P1B - P_____ + ___% of the amount exceeding P1B


GROUP 3 – COMPLEX STRUCTURES
Up to P50M - ___% of the Project Construction Cost

P50M+ to P100M - P_____ + ___% of the amount exceeding P50M

P100M+ to P200M - P_____ + ___% of the amount exceeding P100M

P200M+ to P500M - P_____ + ___% of the amount exceeding P200M

P500M+ to P1B - P_____ + ___% of the amount exceeding P500M

Above P1B - P_____ + ___% of the amount exceeding P1B


SIMPLIFIED COMPUTATION

Q: What is the Minimum Basic Architect’s Professional Fee for an Inter-


modal Port Complex with a Project Construction Cost of P5Billion?

COMPUTATION: MBF IS ____%


1ST P50M
P100M ______M
Excess of P50M from P100M
Excess of P100M from P200M P100M ______M
Excess of P200M from P500M P300M ______M
Excess of P500M from P1B P500M ______M
Excess of P1B from P5B P4000M ______M

MBF = P________M