SOFTWARE RELEASE DEPLOYMENT AND


ROLLBACK PLAN
Document Version 1.0

Prepared by:

Prepare Date:

Email Address:
Software Deployment and Rollback Plan

Table of Contents
1 PURPOSE ....................................................................................................................................................... 3

2 RELEASE SUMMARY ...................................................................................................................................... 3

3 TARGET DEPLOYMENT SUMMARY................................................................................................................. 5

4 BUILD HISTORY .............................................................................................................................................. 5

5 QA APPROVAL ............................................................................................................................................... 6

6 ROLLBACK PLAN ............................................................................................................................................ 7

7 DEPLOYMENT APPROVAL HISTORY ............................................................................................................... 8

Revision History
Date Version Description Author

I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 2 of 8
Software Deployment and Rollback Plan

1 PURPOSE
The Software deployment and rollback plan document to help build master to release latest build to
Production/UAT Server effectively without having any issues after the deployment. All the section to be
filled carefully by each team members or owner of this document without missing any build process. This
evidence document make sure the following process to be completed before signoff by the Stack holders.

 Release Summary

 Target Deployment Summary

 Build History

 QA Approval

 Rollback Plan

 Deployment Approval History

2 RELEASE SUMMARY
All the new features, modifications, change request and issues listed here. It helps the Stack holder what
are all the features going to be updated in the Production/UAT server based on the Build Unique
Identification Number. This release contains the following information.
New Features
SNO DESCRIPTION REF. TICKET ID

I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 3 of 8
Software Deployment and Rollback Plan

Change Request
SNO DESCRIPTION REF. TICKET ID

Issues
SNO DESCRIPTION REF. TICKET ID

I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 4 of 8
Software Deployment and Rollback Plan

3 TARGET DEPLOYMENT SUMMARY


This section helps to understand where and when the deployment going to targeted Production/UAT
server. This process will be applicable only approved by respective Product Stack Holder/Client or
Manager. This summary contains the following information.

BUILD VERSION NO
BUILD CREATED BY
BUILD CREATED DATE & TIME

QA REVIEWED BY
QA DATE & TIME
QA APPROVAL STATUS

TARGET PRODUCTION SERVER


SERVER LOCATION
IP ADDRESS
DEPLOYMENT BY
DEPLOYMENT DATE & TIME
HOURS REQUIRED

BUILD LOCATION
FTP TOOL

4 BUILD HISTORY
The following table represents about the build contained files which need to move target environment.
Listed files are available in the build location as described in the Section 3 of this document. If need any
other build instructions required will be updated in this section.

Application Related Files

SNO FILE NAME PACKAGE/FOLDER/FILE PATH FILE TYPE

I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 5 of 8
Software Deployment and Rollback Plan

Database Files

SNO SCRIPT NAME COMMENTS

5 QA APPROVAL
All the build has to be approved by tester.

Build Version:

Tested Date:

Tested By:

Approval Status:

Notes/Comments:

I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 6 of 8
Software Deployment and Rollback Plan

6 ROLLBACK PLAN
Rollback plan major and crucial part for any release to production environment. Build master should make
sure all the back has to be performed before transferring/copying files to application or database server.
All the necessary back has to be performed before entering into to release process. Here is the check list
for the pre and post deployment process.

 Database Backup
 Database Logs Backup
 Application Server Logs Backup
 Application Folders Backup
 Previous Build Backup from the Web or Application Server
 Email should be triggered to the respective stack holders/product owner/manager
 All the server should be stopped proper and order wise
 File location should verified by the build master
 Rollback file or folder location should be verified by the build master

ROLLBACK FILE/FOLDER LOCATION


SYSTERM/SERVER NAME
BACKUP DATE & TIME

Backup Files

SNO FILE DESCRIPTION COMMENTS

I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 7 of 8
Software Deployment and Rollback Plan

7 DEPLOYMENT APPROVAL HISTORY


All the server release should be approved by the stack holders/product owner and manager.

Date Build Version Approved By Comments