Table of Contents
1 PURPOSE ....................................................................................................................................................... 3
5 QA APPROVAL ............................................................................................................................................... 6
Revision History
Date Version Description Author
I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 2 of 8
Software Deployment and Rollback Plan
1 PURPOSE
The Software deployment and rollback plan document to help build master to release latest build to
Production/UAT Server effectively without having any issues after the deployment. All the section to be
filled carefully by each team members or owner of this document without missing any build process. This
evidence document make sure the following process to be completed before signoff by the Stack holders.
Release Summary
Build History
QA Approval
Rollback Plan
2 RELEASE SUMMARY
All the new features, modifications, change request and issues listed here. It helps the Stack holder what
are all the features going to be updated in the Production/UAT server based on the Build Unique
Identification Number. This release contains the following information.
New Features
SNO DESCRIPTION REF. TICKET ID
I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 3 of 8
Software Deployment and Rollback Plan
Change Request
SNO DESCRIPTION REF. TICKET ID
Issues
SNO DESCRIPTION REF. TICKET ID
I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 4 of 8
Software Deployment and Rollback Plan
BUILD VERSION NO
BUILD CREATED BY
BUILD CREATED DATE & TIME
QA REVIEWED BY
QA DATE & TIME
QA APPROVAL STATUS
BUILD LOCATION
FTP TOOL
4 BUILD HISTORY
The following table represents about the build contained files which need to move target environment.
Listed files are available in the build location as described in the Section 3 of this document. If need any
other build instructions required will be updated in this section.
I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 5 of 8
Software Deployment and Rollback Plan
Database Files
5 QA APPROVAL
All the build has to be approved by tester.
Build Version:
Tested Date:
Tested By:
Approval Status:
Notes/Comments:
I D B T E C H N O L O G I E S P R I V A T E L I M I T E D | Page 6 of 8
Software Deployment and Rollback Plan
6 ROLLBACK PLAN
Rollback plan major and crucial part for any release to production environment. Build master should make
sure all the back has to be performed before transferring/copying files to application or database server.
All the necessary back has to be performed before entering into to release process. Here is the check list
for the pre and post deployment process.
Database Backup
Database Logs Backup
Application Server Logs Backup
Application Folders Backup
Previous Build Backup from the Web or Application Server
Email should be triggered to the respective stack holders/product owner/manager
All the server should be stopped proper and order wise
File location should verified by the build master
Rollback file or folder location should be verified by the build master
Backup Files