DRT Report of 2-0700-CL-21 2019
DRT Report of 2-0700-CL-21 2019
DRT Report of 2-0700-CL-21 2019
Prepared by Reviewed by
This document is issued by the Company under its General Conditions of Service accessible at
http://www.sgs.com/terms_and_conditions.htm. Attention is drawn to the limitation of liability, indemnification and jurisdiction issues
defined therein.
Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its intervention
only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not
exonerate parties to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized
alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest
extent of the law.
Any holder of this document is advised that the information contained hereon is limited to visual examination of the safely and readily
accessible portions of the consignment only
Direct Radiography Test
Component Information
Component ID 2-0700-CL-21
Company Name SGS
Remarks N/A
Approver name SGS Representative
Approve Date 02-SEPT-2019
Modified Date 02-SEPT-2019
Modified by CZC0131V8P\GESIT Rhythm
Technique Information
SETUP DIAGRAM
Kv 0.00
Ma 0.00
Exposure (s) 25 s.
Source Distance 28 inches
Source Type IR-192
Curie Strength 18.0 Ci
Focal Spot (mm) 2 x 3mm
Geometric Enlargement 1.00
Pipe Thickness --
Technique Description Profile
Date Modified 02-SEPT-2019
Modified By CZC0131V8P\GESIT Rhythm
IQI Type: --
IQI Size: --
IQI Material: --
Filter Material: --
Filter Thickness: 0.00
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
DR-GTL-SGS-431
Direct Radiography Test
I-Tech Inspector
SGS QSGTL
Date: 02-SEPT-2019
Date: Date:
DR-GTL-SGS-431
Corrosion Loop Pack for 1/2-0700-CL21
PEARL GTL PROJECT Orig. Org.: Contractor Doc No: NA (QPG Job No. 51505)
QATAR CHC Project Doc No: T-4.091.106 Rev.: C
T-4.091.106 RevC - Corrosion Loop Pack for 1/2-0700-CL21
This document is confidential. Neither the whole nor any part of this document may be disclosed to any third party without the prior written consent of CHIYODA-HHI
CONSORTIUM (CHC). Title in respect of this document is vested in Qatar Shell GTL Limited. Neither the whole nor any part of this document may be reproduced, stored in
any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or otherwise) without the prior consent of CHC.
Revision List
The following summarizes revisions to Document Number: T-4.091.106, Rev.C from Rev.O.
3. For Piping 1-0700-CL21 (CS), 1 CML each is assigned for baseline thickness
measurement at site for Phase 1 and Phase 2 in accordance with the calculation using
IDMS loader reflecting the content of PI- 096- PMC-CHC-LE-04220 from QSGTL.
4. For Piping 1-0700-CL21 (PWHT CS), 2 CMLs each are assigned for baseline thickness
measurement at site for Phase 1 and Phase 2 in accordance with the calculation using
IDMS loader reflecting the content of PI- 096- PMC-CHC-LE-04220 from QSGTL.
5. For Piping 1-0700-CL21 (SS), 1 CML each is assigned for baseline thickness
measurement at site for Phase 1 and Phase 2 in accordance with the calculation using
IDMS loader reflecting the content of PI- 096- PMC-CHC-LE-04220 from QSGTL.
PEARL GTL PROJECT Orig. Org.: Contractor Doc No: NA (QPG Job No. 51505)
QATAR CHC Project Doc No: T-4.091.106 Rev.: C
T-4.091.106 RevC - Corrosion Loop Pack for 1/2-0700-CL21
This document is confidential. Neither the whole nor any part of this document may be disclosed to any third party without the prior written consent of CHIYODA-HHI
CONSORTIUM (CHC). Title in respect of this document is vested in Qatar Shell GTL Limited. Neither the whole nor any part of this document may be reproduced, stored in
any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or otherwise) without the prior consent of CHC.
1. Introduction
This document provides the information of corrosion monitoring location (CML) on corrosion
loop 1/2-0700-CL21 in Unit 1/2-0700. This corrosion loop consists of two Trains, i.e. Train 1
(Phase-1) and Train 2 (Phase-2).
There are three piping groups in this corrosion loop: Piping 1-0700-CL21 (CS), Piping 1-0700-
CL21 (PWHT CS) and Piping 1-0700-CL21 (SS).
The number of CML for Piping 1-0700-CL21 (CS) is 7 in accordance with the calculation using
IDMS loader reflecting the content of PI-096-PMC-CHC-LE-04220 and 1 CML is assigned as
the CML for baseline thickness measurement at site for Phase 1 based on PI-096-PMC-CHC-
LE-04220. 1 CML is assigned as the CML for baseline thickness measurement at site for Piping
2-0700-CL21 (CS), too.
The number of CML for Piping 1-0700-CL21 (PWHT CS) is 17 in accordance with the
calculation using IDMS loader reflecting the content of PI-096-PMC-CHC-LE-04220 and 2
CMLs are assigned as the CML for baseline thickness measurement at site for Phase 1 based
on PI-096-PMC-CHC-LE-04220. 2 CMLs are assigned as the CML for baseline thickness
measurement at site for Piping 2-0700-CL21 (PWHT CS), too.
The number of CML for Piping 1-0700-CL21 (SS) is 1 in accordance with the calculation using
IDMS loader reflecting the content of PI-096-PMC-CHC-LE-04220 and 1 CML is assigned as
the CML for baseline thickness measurement at site for Phase 1 based on PI-096-PMC-CHC-
LE-04220. 1 CML is assigned as the CML for baseline thickness measurement at site for Piping
2-0700-CL21 (SS), too.
Marked up PEFS (Attachment-2) is attached and snapshots (Attachment-3) are taken for
respective CMLs. CMLs for Train 2 are similar to Train 1, so snapshots for Train 1 shall be used
for Train 2 as a manner that line number and equipment number on snapshots (Train 1) are
read as that of Train 2.
Attachments
PEARL GTL PROJECT Orig. Org.: Contractor Doc No: NA (QPG Job No. 51505)
QATAR CHC Project Doc No: T-4.091.106 Rev.: C
T-4.091.106 RevC - Corrosion Loop Pack for 1/2-0700-CL21
This document is confidential. Neither the whole nor any part of this document may be disclosed to any third party without the prior written consent of CHIYODA-HHI
CONSORTIUM (CHC). Title in respect of this document is vested in Qatar Shell GTL Limited. Neither the whole nor any part of this document may be reproduced, stored in
any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or otherwise) without the prior consent of CHC.
Attachment 1
CML Details
Corrosion Loop 1/2-0700-CL21
Thickness Monitoring Points & Mark (Label)
Location
Piping Group CML ID (Circuit Name) Location Snapshot No Measurement (*2) Pipe Segment Number Remarks
(* 1) N or 12:00 E or 3:00 S or 6:00 W or 9:00 Guidance
Piping 1-0700-CL21 (CS) Piping 1-0700-CL21 ( CS) 01P-P-001 Reducer 10721012 ( No ) 12-001 3-001 6-001 9-001 P-5 50-1P070330-11042-S2-25MM Middle of reducer
( Phase 1) Piping 1-0700-CL21 ( CS) 01P-P-002 Elbow Center 10721013 ( No ) 12-002 3-002 6-002 9-002 P-4 50-1P070330-11042-S2-25MM
Piping 1-0700-CL21 ( CS) 01P-P-003 Piping (Drain) 10721014 Yes N-003 E-003 S-003 W-003 P-1 20-1P070330-11042-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 ( CS) 01P-P-004 Piping 10721018 ( No ) N-004 E-004 S-004 W-004 P-1 50-1P070330-11042-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 ( CS) 01P-P-005 Elbow Center 10721019 ( No ) 12-005 3-005 - 9-005 P-4 50-1P070330-11042-S2-25MM 6:00 is deleted due to pipe support.
Piping 1-0700-CL21 ( CS) 01P-P-006 Piping 10721025 ( No ) 12-006 3-006 6-006 9-006 P-1 50-1P070330-11042-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 ( CS) 01P-P-007 Reducer 10721002 ( No ) N-007 E-007 S-007 W-007 P-5 100-1P070328-11180Q1-S2-25MM Middle of reducer
Piping 1-0700-CL21 (PWHT CS) Piping 1-0700-CL21 (PWHT CS) 01P-P-001 Piping (Vent) 10721001 Yes 12-001 3-001 6-001 9-001 P-1 25-1P070328-11374-S2-25MM More than 25 mm from weld
( Phase 1) Piping 1-0700-CL21 (PWHT CS) 01P-P-002 Reducer 10721003 ( No ) N-002 E-002 S-002 W-002 P-5 80-1P070328-11374-S2-25MM Middle of reducer
Piping 1-0700-CL21 (PWHT CS) 01P-P-003 Piping (Vent) 10721004 ( No ) 12-003 3-003 6-003 9-003 P-1 20-1P070328-11374-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 (PWHT CS) 01P-P-004 Piping 10721005 ( No ) N-004 E-004 S-004 W-004 P-1 80-1P070328-11374-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 (PWHT CS) 01P-P-005 Reducer 10721006 ( No ) 12-005 3-005 6-005 9-005 P-5 25-1P070329-11374-S2-25MM Middle of reducer
Piping 1-0700-CL21 (PWHT CS) 01P-P-006 Elbow Center 10721007 ( No ) 12-006 3-006 6-006 9-006 P-4 25-1P070329-11374-S2-25MM
Piping 1-0700-CL21 (PWHT CS) 01P-P-007 Piping (Drain) 10721008 Yes N-007 E-007 S-007 W-007 P-1 20-1P070329-11374-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 (PWHT CS) 01P-P-008 Reducer 10721009 ( No ) 12-008 3-008 6-008 9-008 P-5 50-1P070328-11374-N-0MM Middle of reducer
Piping 1-0700-CL21 (PWHT CS) 01P-P-009 Piping 10721010 ( No ) N-009 E-009 S-009 W-009 P-1 150-1P070328-11374-N-0MM More than 25 mm from weld
Piping 1-0700-CL21 (PWHT CS) 01P-P-010 Elbow Center 10721011 ( No ) 12-010 3-010 6-010 9-010 P-4 25-1P070329-11374-S2-25MM
Piping 1-0700-CL21 (PWHT CS) 01P-P-011 Piping (Drain) 10721015 ( No ) N-011 E-011 S-011 W-011 P-1 20-1P070329-11374-S2-25MM More than 25 mm from weld
Piping 1-0700-CL21 (PWHT CS) 01P-P-012 Reducer 10721016 ( No ) 12-012 3-012 6-012 9-012 P-5 50-1P070329-11374-N-0MM Middle of reducer
Piping 1-0700-CL21 (PWHT CS) 01P-P-013 Elbow Center 10721017 ( No ) 12-013 3-013 6-013 9-013 P-4 50-1P070329-11374-N-0MM
Piping 1-0700-CL21 (PWHT CS) 01P-P-014 Elbow Center 10721020 ( No ) 12-014 3-014 6-014 9-014 P-4 40-1G070602-11374-N-0MM
Piping 1-0700-CL21 (PWHT CS) 01P-P-015 Joint 10721023 ( No ) - 3-015 6-015 9-015 P-1 150-1P070328-11374-N-0MM More than 25mm from weld
Piping 1-0700-CL21 (PWHT CS) 01P-P-016 Elbow Center 10721027 ( No ) 12-016 3-016 - 9-016 P-4 50-1P070329-11374-N-0MM 6:00 is deleted due to pipe support.
Piping 1-0700-CL21 (PWHT CS) 01P-P-017 Piping (Drain) 10221028 ( No ) N-017 E-017 S-017 W-017 P-1 20-1G070602-11374-N-0MM More than 25mm from weld.
Piping 1-0700-CL21 (SS) Piping 1-0700-CL21 (SS) 01P-P-001 Joint 10721026 Yes - 3-001 - 9-001 P-1 50-1P070718-13012Q1-S2-25MM More than 25mm from weld, 12:00 is deleted due to Joint & 6:00 is
Phase-1 deleted due to pipe support.
Piping 2-0700-CL21 (CS) Piping 2-0700-CL21 ( CS) 01P-P-001 Reducer (10721012) ( No ) 12-001 3-001 6-001 9-001 P-5 50-2P070330-11042-S2-25MM Middle of reducer
( Phase 2) Piping 2-0700-CL21 ( CS) 01P-P-002 Elbow Center (10721013) ( No ) 12-002 3-002 6-002 9-002 P-4 50-2P070330-11042-S2-25MM
*Snapshots of Phase-1 shall Piping 2-0700-CL21 ( CS) 01P-P-003 Piping (Drain) (10721014) Yes N-003 E-003 S-003 W-003 P-1 20-2P070330-11042-S2-25MM More than 25 mm from weld
be referred.
Piping 2-0700-CL21 ( CS) 01P-P-004 Piping (10721018) ( No ) N-004 E-004 S-004 W-004 P-1 50-2P070330-11042-S2-25MM More than 25 mm from weld
Piping 2-0700-CL21 ( CS) 01P-P-005 Elbow Center (10721019) ( No ) 12-005 3-005 - 9-005 P-4 50-2P070330-11042-S2-25MM 6:00 is deleted due to pipe support.
Piping 2-0700-CL21 ( CS) 01P-P-006 Piping (10721025) ( No ) 12-006 3-006 6-006 9-006 P-1 50-2P070330-11042-S2-25MM More than 25 mm from weld
Piping 2-0700-CL21 ( CS) 01P-P-007 Reducer (10721002) ( No ) N-007 E-007 S-007 W-007 P-5 100-2P070328-11180Q1-S2-25MM Middle of reducer
Piping 2-0700-CL21 (PWHT CS) Piping 2-0700-CL21 (PWHT CS) 01P-P-001 Piping (Vent) (10721001) Yes 12-001 3-001 6-001 9-001 P-1 25-2P070328-11374-S2-25MM More than 25 mm from weld
( Phase 2) Piping 2-0700-CL21 (PWHT CS) 01P-P-002 Reducer (10721003) ( No ) N-002 E-002 S-002 W-002 P-5 80-2P070328-11374-S2-25MM Middle of reducer
*Snapshots of Phase-1 shall Piping 2-0700-CL21 (PWHT CS) 01P-P-003 Piping (Vent) (10721004) ( No ) 12-003 3-003 6-003 9-003 P-1 20-2P070328-11374-S2-25MM More than 25 mm from weld
be referred.
Piping 2-0700-CL21 (PWHT CS) 01P-P-004 Piping (10721005) ( No ) N-004 E-004 S-004 W-004 P-1 80-2P070328-11374-S2-25MM More than 25 mm from weld
Piping 2-0700-CL21 (PWHT CS) 01P-P-005 Reducer (10721006) ( No ) 12-005 3-005 6-005 9-005 P-5 25-2P070329-11374-S2-25MM Middle of reducer
Piping 2-0700-CL21 (PWHT CS) 01P-P-006 Elbow Center (10721007) ( No ) 12-006 3-006 6-006 9-006 P-4 25-2P070329-11374-S2-25MM
Piping 2-0700-CL21 (PWHT CS) 01P-P-007 Piping (Drain) (10721008) Yes N-007 E-007 S-007 W-007 P-1 20-2P070329-11374-S2-25MM More than 25 mm from weld
Piping 2-0700-CL21 (PWHT CS) 01P-P-008 Reducer (10721009) ( No ) 12-008 3-008 6-008 9-008 P-5 50-2P070328-11374-N-0MM Middle of reducer
Piping 2-0700-CL21 (PWHT CS) 01P-P-009 Piping (10721010) ( No ) N-009 E-009 S-009 W-009 P-1 150-2P070328-11374-N-0MM More than 25 mm from weld
Piping 2-0700-CL21 (PWHT CS) 01P-P-010 Elbow Center (10721011) ( No ) 12-010 3-010 6-010 9-010 P-4 25-2P070329-11374-S2-25MM
Piping 2-0700-CL21 (PWHT CS) 01P-P-011 Piping (Drain) (10721015) ( No ) N-011 E-011 S-011 W-011 P-1 20-2P070329-11374-S2-25MM More than 25 mm from weld
Piping 2-0700-CL21 (PWHT CS) 01P-P-012 Reducer (10721016) ( No ) 12-012 3-012 6-012 9-012 P-5 50-2P070329-11374-N-0MM Middle of reducer
Piping 2-0700-CL21 (PWHT CS) 01P-P-013 Elbow Center (10721017) ( No ) 12-013 3-013 6-013 9-013 P-4 50-2P070329-11374-N-0MM
Piping 2-0700-CL21 (PWHT CS) 01P-P-014 Elbow Center (10721020) ( No ) 12-014 3-014 6-014 9-014 P-4 40-2G070602-11374-N-0MM
Piping 2-0700-CL21 (PWHT CS) 01P-P-015 Joint (10721023) ( No ) - 3-015 6-015 9-015 P-1 150-2P070328-11374-N-0MM More than 25mm from weld
Piping 2-0700-CL21 (PWHT CS) 01P-P-016 Elbow Center (10721027) ( No ) 12-016 3-016 6-016 9-016 P-4 50-2P070329-11374-N-0MM 6:00 is deleted due to pipe support.
Piping 2-0700-CL21 (PWHT CS) 01P-P-017 Piping (Drain) (10221028) ( No ) N-017 E-017 S-017 W-017 P-1 20-2G070602-11374-N-0MM More than 25mm from weld.
Attachment 1
Thickness Monitoring Points & Mark (Label)
Location
Piping Group CML ID (Circuit Name) Location Snapshot No Measurement (*2) Pipe Segment Number Remarks
(* 1) N or 12:00 E or 3:00 S or 6:00 W or 9:00 Guidance
Piping 2-0700-CL21 (SS) Piping 2-0700-CL21 (SS) 01P-P-001 Joint (10721026) Yes - 3-001 - 9-001 P-1 50-2P070718-13012Q1-S2-25MM More than 25mm from weld, 12:00 is deleted due to Joint & 6:00 is
Phase-2 deleted due to pipe support.
*Snapshots of Phase-1 shall
be referred.
(*1) - ' Yes ' : to be measured at site
(*1) - ' ( No ) ' : marking only on the 3D model
(*2) - Coloured column should be marked at site
Attachment-2
Attachment-3
4 Points Nozzle
E-1 E-5 Horizontal View
12 or N
45°
See P-4
9 or W 3 or E
6 or S
E-6
E-2 12 o’clock or North
12 or N
A
10:30 or NW 1:30 or NE
9 or W 3 or E
A Sec A-A
6 or S
7:30 or SW 4:30 or SE
E-7 Nozzle
Nozzle size is equal & larger than 12”
12 or N
E-3 Shell
12 o’clock A
12 or N
or north 9 or W 3 or E
3 or E Nozzle size is less than 12”
9 or W
6 or S
A 6 or S
Sec A-A
E-8 Nozzle
E-4 Shell Nozzle size is equal & larger than 12”
Sec A-A
(1/2)
Location Guidance of thickness measurement for Piping
9 3
or W or E
A
6 or S
Sec A-A
7:30 or SW 4:30 or SE
A
Sec A-A
P-3 Cap
A 12 or N
12 o’clock
or north
6
Horizontal Vertical Vertical
P-5 Reducer 12 or N
12 o’clock A
or north 9 3
or W or E
A 6 or S
Sec A-A
(2/2)