Seminar For Reserves Estimators
Seminar For Reserves Estimators
Seminar For Reserves Estimators
Petroleum Consultants
Houston Denver Calgary
Bogotá, Colombia
March, 2012
1
PRESENTATION OUTLINE
McKELVEY DIAGRAM
FRAMEWORK
PRINCIPLES
CRITERIA FOR RESOURCE CLASSIFICATION
PROJECT MATURITY (SUBCLASSES)
PROSPECTIVE RESOURCES
CONTINGENT RESOURCES
RESERVES
© Ryder Scott Company, L.P. 2 2
McKELVEY DIAGRAM
(adapted)
SEC - -
SPE/WPC SPE/WPC SPE/WPC
1P SEC Voluntary Disclosure of Probable and Possible Reserves
2P
3P
© Ryder Scott Company, L.P. 4 4
Basic Principles and Definitions
Ref.: Section 1.0 PRMS
Commerciality
Discovery
RESERVES
discovered quantities of
TOTAL PETROLEUM INITIALLY-IN-PLACE (PIIP)
petroleum anticipated to be
1P 2P 3P
DISCOVERED PIIP
Classify by Chance of
from known accumulations
Commerciality
SUB-COMMERCIAL
CONTINGENT
RESOURCES
1C 2C 3C
from a given date forward
under defined conditions.
UNRECOVERABLE
PROSPECTIVE
quantities of petroleum
Low Best High
Estimate Estimate Estimate
Source: SPE-PRMS
COMMERCIAL
RESERVES
DISCOVERED PIIP
SUB-COMMERCIAL
recovered from undiscovered
CONTINGENT
RESOURCES
accumulations.
1C 2C 3C
UNRECOVERABLE
Evaluated according to
UNDISCOVERED PIIP
PROSPECTIVE
RESOURCES
and,
UNRECOVERABLE
Range of Uncertainty
Not to scale
PRODUCTION
COMMERCIAL
RESERVES
DISCOVERED PIIP
SUB-COMMERCIAL
CONTINGENT
UNRECOVERABLE
UNDISCOVERED PIIP
PROSPECTIVE
commercially recoverable.
Estimate Estimate Estimate
UNRECOVERABLE
▬
Not to scale
COMMERCIAL
RESERVES
of petroleum anticipated to be
DISCOVERED PIIP
commercially recoverable by
application of development
SUB-COMMERCIAL
CONTINGENT
RESOURCES
UNDISCOVERED PIIP
PROSPECTIVE
Range of Uncertainty
project(s) applied :
discovered,
recoverable,
commercial, and
PRODUCTION
On Production
COMMERCIAL
Commerciality
TOTAL PETROLEUM INITIALLY-IN-PLACE (PIIP)
Approved for
Justified for
Development
SUB-COMMERCIAL
Development Pending
CONTINGENT Development Unclarified
RESOURCES or On Hold
Development
not Viable
UNRECOVERABLE
UNDISCOVERED PIIP
Prospect
PROSPECTIVE Discovery
RESOURCES Lead
Play
UNRECOVERABLE
Range of Uncertainty
a t
h
o tt
isn a ll!
sk a e r
a t
Al d a f
ba
Reserve Classification
(Proved, Probable, or Possible)
Developed Undeveloped
Producing Non-Producing
Shut-in Behind-Pipe
Deterministic methodology
Discrete estimate(s) is made based on known geoscience, engineering and
economic data
Probabilistic methodology
Known geoscience, engineering and economic data are used to generate a
continuous range of estimates and their associated probabilities
Probabilistic Deterministic
P10
3P Proved + Probable
Less likely than probable
+ Possible
P10
Probability
P50
2P Less likely than proved,
Proved + Probable
P50 more likely than possible
P90
1P Proved Reasonable certainty
P90
Reserve Volume