This monthly HSE statistics report from a power plant construction project provides safety data and highlights. It includes:
- Over 68,000 safe man-hours worked with no lost time injuries or near misses.
- Three training sessions and 26 daily tool box talks conducted.
- Seven new employee and subcontractor HSE inductions.
- Ninety-seven HSE inspections/checklists performed including site, work at height, and accommodation inspections.
- Twenty-two HSE surveys and walks conducted by the unique HSE department.
- Two risk assessments and two method statements prepared for hot work and gate/shed jobs.
- Forty-six Take 5 sessions conducted by civil super
This monthly HSE statistics report from a power plant construction project provides safety data and highlights. It includes:
- Over 68,000 safe man-hours worked with no lost time injuries or near misses.
- Three training sessions and 26 daily tool box talks conducted.
- Seven new employee and subcontractor HSE inductions.
- Ninety-seven HSE inspections/checklists performed including site, work at height, and accommodation inspections.
- Twenty-two HSE surveys and walks conducted by the unique HSE department.
- Two risk assessments and two method statements prepared for hot work and gate/shed jobs.
- Forty-six Take 5 sessions conducted by civil super
This monthly HSE statistics report from a power plant construction project provides safety data and highlights. It includes:
- Over 68,000 safe man-hours worked with no lost time injuries or near misses.
- Three training sessions and 26 daily tool box talks conducted.
- Seven new employee and subcontractor HSE inductions.
- Ninety-seven HSE inspections/checklists performed including site, work at height, and accommodation inspections.
- Twenty-two HSE surveys and walks conducted by the unique HSE department.
- Two risk assessments and two method statements prepared for hot work and gate/shed jobs.
- Forty-six Take 5 sessions conducted by civil super
This monthly HSE statistics report from a power plant construction project provides safety data and highlights. It includes:
- Over 68,000 safe man-hours worked with no lost time injuries or near misses.
- Three training sessions and 26 daily tool box talks conducted.
- Seven new employee and subcontractor HSE inductions.
- Ninety-seven HSE inspections/checklists performed including site, work at height, and accommodation inspections.
- Twenty-two HSE surveys and walks conducted by the unique HSE department.
- Two risk assessments and two method statements prepared for hot work and gate/shed jobs.
- Forty-six Take 5 sessions conducted by civil super
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 2
NEW SECURITY BUIDLING UCH POWER PLANT
PROJECT
MONTHLY HSE STATISTICS
MONTHLY HSE STATISTICS
SN DESCRIPTION STATISTICS REMARKS 1 Safe Man-Hours 682132 Approximately 2 LTI 0 No Any LTI 3 Good Catch 0 4 Near Miss 0 No Any Near Miss Hot Work Safety Training. Kitchen Staff, Laundry Staff and Store Staff 5 Trainings 3 General HSE Training HSE Work at Height and Site Safety Rules Training to the new Scaffolder’s Daily Basis Conduct the HSE Tool Box Talk 6 Tool Box Talk 26 (Except 10 Moharram-Ul-Harram Holidays) From the 1st September to 26th September 7 HSE Induction 7 new employees as well new sub-contractors are inducted First Aid Box=4 Fire Extinguisher=1 Food Inspection=4 Audit of the Workers Camp Camp Inspection=4 Work at Height Inspection Checklists Site Inspection=25 First aid Box Inspection Checklists Work at Height=25 Workers Accommodation Checklists Power Tools Food Inspection Checklists 8 Inspections/Checklist Inspection=3 Fire Extinguishers Inspection Checklist Record Tool Box Talk=25 with tag Gas Cylinders Gas Cylinders Inspections Checklists with tag Inspection=4 Site Inspections/Observations Checklists Audit of the Workers Daily Tool Box Talk Checklists Camp=2 Power Tools Inspection Record with Tags Total= 97 Checklists with Inspection Daily and Weekly On Daily Basis Walk/visits of the Working Site Inspections as well Weekly Inspection through walk of the 9 HSE Survey/Walk Audits conducted by workers accommodation Unique HSE Weekly Inspection Through Walk of the Department=22 Supervisors/Workers Mess Prepared the New RA and MS for Power Risk Risk Assessment=2 Transformer 10 Assessment/Review Method Statement=2 Prepared the New RA and MS for Hot Job of Risk Assessment the Parking Shed and Main Gates NEW SECURITY BUIDLING UCH POWER PLANT PROJECT
MONTHLY HSE STATISTICS
11 Session on Take 5 46 On Daily Basis Civil Supervisor’s fill the Take-5
On daily basis On Daily Basis Conducted the Inspection of observations are being Working Sites observed the observation and closed and maintained closed at the working time Closeouts of HSE the record=25 12 Weekly Inspection of the working as well Observations Closeouts has been Workers Accommodation and shared the shared to the client as closeouts of the observations and maintained per client observation the record report=2