Detailed Estimate
Detailed Estimate
Department of Education
District Education Office,Palpa
DETAILS OF ESTIMATE
E/W in trenches,foundation etc in hard soil including timbering and shoring,pumping out water from trenches if necessary,dr
to 1.5mtr,stacking of excavated material at least 3 mtr,clear from edge of excavation,backfilling stacked soil in 150mm l
disposing all surplus excavated materials within the site all complete
Footing F1 4.0 2.00 2.00 1.75
Footing F2 2.0 2.30 2.30 1.75
Footing F3 8.0 2.65 2.65 1.75
Footing F4 2.0 3.20 3.20 1.75
Footing F5 2.0 3.65 3.65 1.75
Wall
1
Grid 1 1.0 16.60 0.23 0.72
Grid 2 1.0 12.85 0.23 0.73
m3
Grid 3 1.0 17.30 0.23 0.73
Grid A & F 2.0 5.35 0.23 0.73
Grid B & E 2.0 3.70 0.23 0.73
Grid C & D 2.0 4.33 0.23 0.73
Step 1.0 4.80 0.90 0.15
Ramp including Platform 1.0 6.50 1.30 0.15
1.0 3.25 1.30 0.15
Plinth Protection 1.0 73.30 0.50 0.15
Sub-Total
Stone Soling Work
Stone Soling in foundation & floor laid in line & level including filling in the joints with sand all complete
Footing F1 4.0 2.00 2.00 0.15
Footing F2 2.0 2.30 2.30 0.15
Footing F3 8.0 2.65 2.65 0.15
Footing F4 2.0 3.20 3.20 0.15
Footing F5 2.0 3.65 3.65 0.15
Wall
Grid 1 1.0 16.60 0.23 0.15
2 Grid 2 1.0 12.85 0.23 0.15
m3
Grid 3 1.0 17.30 0.23 0.15
Grid A & F 2.0 5.35 0.23 0.15
Grid B & E 2.0 3.70 0.23 0.15
Grid C & D 2.0 4.33 0.23 0.15
Step 1.0 4.80 0.90 0.15
Ramp including Platform 1.0 6.50 1.30 0.15
1.0 3.25 1.30 0.15
Plinth Protection 1.0 73.30 0.50 0.15
Sub-Total
P.C.C Work(1:3:6)For RCC Work
Plain Cement Concrete 1:1.5:3 blinding concrete under wall,floor & column foundn etc including protection of sides,laying c
all complete
Footing F1 4 2 2 0.25
Footing F2 2 2.3 2.3 0.25
Footing F3 8 2.65 2.65 0.25
Footing F4 2 3.2 3.2 0.25
Footing F5 2 3.65 3.65 0.4
Slope Protection on Footing
Footing F1 4 4 0.16 0.05
Footing F2 2 5.29 0.16 0.1
Footing F3 8 7.02 0.16 0.15
Footing F4 2 10.24 0.16 0.2
Footing F5 2 13.32 0.16 0.23
st
Column C(50cm up of 1 floor Lvl) 18 0.4 0.4 5.38
Tie Beam Long wall 3*2 27.2 0.23 0.3
4 Short wall 6*2 4.2 0.23 0.3
m3
Main Beam Long wall 3*2 27.2 0.3 0.5
Short wall 6*2 4.2 0.3 0.5
Secondry beam Long wall 3 27.2 0.23 0.3
Short wall 4 3.94 0.23 0.3
Staircase-waist slab Lower one 2*2 3.08 1.2 0.17
Landing Slab 1*2 2.77 1.8 0.17
Step 18*1/2 1.2 0.3 0.15
Slab 2*1 31.2 11.6 0.13
Total
Deduction Opening-Footing F1 4*4/2 1.4 0.4 0.15
Footing F2 4*4/2 1.7 0.4 0.2
Footing F3 2*4/2 1.8 0.4 0.25
Footing F4 2*4/2 2.1 0.4 0.3
Staircase wall 2 4.5 2.77 0.15
Total of Deduction
Sub-Total
Formwork
Formwork centering & shuttering with approved material such as shuttering plywood,local wood or plain sheet etc.for all R
shape,size & at any level with necessary propping,scafolding,staging,supporting,cutting holes for utilization works etc.inclu
sureface and oil & removal of forms all complete
56 Rm @ 2.45kg/Rm(E)
Bottom bar-20mm dai.throught 3 35.2
105.60Rm @ 2.45kg/Rm(F)
Bottom extra bar
Rm
At junction of grid C & D-16mm dai 2 6.46
12.92 Rm @ 1.57kg/Rm(G)
Grid 2-2 Same As Grid 1-1(I)
Grid 3-3 Rm Same As Grid 1-1(J)
Grid A-A
Top bar-20mm dai through out 3 13
39 Rm @ 2.45kg/Rm(K)
Top extra bar
At junction of grid 1&3-20mm dai 2*3 2.5
Rm
At junction of grid 2-20mm dai 3*2 3.4
Bottom bar-20mm dai.throught 3 13
74.4 Rm @ 2.45kg/Rm(L)
Grid B,C,D,E & F 5 Nos @ (95.55+182.28)kg(M)
6 Secondry Beam
Grid 1'-1'
From grid A to C & D to F-20mm dai 12 15
Rm
Grid 2'-2' 12 15
Slab
Long Span-8mm dai bar 93 31.2
250 11.6
Extra top bar 560 2
Hook bar 29 1.55
main bar for passage 29 4.55
Rm
Main bar for Short Span 32*2 5.25
32*2 5.93
Main bar for Passage 10 5.25
9 4.8
6
Extra top bar 73 1.875
Distribution Bar
Long Span-8mm @ 200 C/C 9*4 5.57
9*2 14.2
Short Span-Out Side Rm 10*2 10.2
Inside 8*2 10.2
Passage 4*2 4.8
8908.32Rm @ 0.39kg/Rm(X)
Total
Brick work in foundation
First Class Brickwork in sub-structure in(1:4) cement sand mortar with approved quality bricks in perfect line & level with
including wetting the bricks,properly packing the joints & curing the works with all complete
Grid B & D 2.0 27.2 0.23 0.65
Grid A, B, C, D, E & F 6.0 9.20 0.23 0.65
7 Step 1st 1.0 3.30 0.60 0.20
Ramp wall 1.0 3.65 0.23 0.58
m3
Platform wall 1.0 5.24 0.23 0.58
Appron 1.0 40.80 0.23 0.13
2nd Step 1.0 3.30 0.60 0.15
3rd Step 1.0 3.30 0.30 0.15
Sub-Total
Brickwork in Superstructure
Frist class Brickwork in super structure in (1:4) cement sand mortar with approved quality bricks in perfect line & level w
scaffolding including wetting the bricks,properly packing the joints & curing the works with all complete
Ground floor
8 Long wall 2.0 27.20 0.23 2.45
Short wall 6.0 7.65 0.23 2.45
m3
Deduction for openings
Door D -9.0 1.05 0.23 2.10
Window W -14.0 1.50 0.23 1.35
Sub-Total
Sal Wood for D/W frame
Sal wood for chaukats with fixing size of door & windowcwith necessary fittings all complete
9 Door D 9 5.25 0.075 0.1
m3
Window W 14 8.4 0.075 0.1
Sub-Total
Panneled shutter
Supplying & fixing of flush door shutter in counter in 38x75mm salwood frame with 4mm thck commercial plywood on both
10 morticelock,hings,towerbolt,handles etc.as per drawing,specification and instruction
Door D 9.00 0.93 2.05
m2
Window W 14*3 0.43 1.23
Sub-Total
Flooring work
a.Earth filling work with compaction
Earthwork in filling under floors with good quality earth in 150 mm thck layers with sprinking water,ramming & consolidatin
Rooms 4.0 7.65 6.05 0.45
Stair Hall 1.0 7.23 2.77 0.45
Passage m 3 1.0 13.07 1.54 0.45
Ramp 1.0 8.00 1.20 0.23
Platform 1.0 3.10 1.20 0.60
Sub-Total
b.Stone solling in floor laid in line & level including filling in the joints with sand all complete
Rooms 4.0 7.65 6.05 0.15
Stair Hall 1.0 7.23 2.77 0.15
Passage m 3 1.0 13.07 1.54 0.15
Ramp 1.0 8.00 1.20 0.15
Platform 1.0 3.10 1.20 0.15
Sub-Total
c.75mm thck PCC Work
Plain cement concrete 1:2:4 blinding concrete under wall,floor & column foundation etc.including protection of sides,laying
with all complete
Rooms 4.0 7.65 6.05 0.08
Stair Hall 1.0 7.23 2.77 0.08
11 3
Passage m 1.0 13.07 1.54 0.08
Ramp 1.0 8.0 1.2 0.08
Platform 1.0 3.1 1.2 0.08
Sub-Total
d.Plaster work
12.5mm thck cement sand plaster 1:4 on floor in perfect line & level with top quality finish including necessary wetting the
plastered surefaces with all complete
Rooms 4.0 7.65 6.05
Stair Hall 1.0 7.23 2.77
Passage m2 1.0 13.07 1.54
Ramp 1.0 8.00 1.20
Platform 1.0 3.10 1.20
Sub-Total
e.Cement Punning Work
3mm thck neat cement sand punning work over cement sand plaster in line & level with throwelling the top sureface to give
floor,wall & skirting etc in perfect line & level including cleaning,curing with all complete
Rooms 4.0 7.65 6.05
Stair Hall 1.0 7.23 2.77
Passage m 2 1.0 13.07 1.54
Ramp 1.0 8.00 1.20
Platform 1.0 3.10 1.20
Sub-Total
Plaster work
12.5mm thck cement sand plaster 1:4 on walls,ceilling etc.in perfect line & level with top quality finish including necessary
the joint,wetting the sureface & curing the plastered surefaces with all complete
Inside wall in rooms
Front and back side wall 4*2 6.05 2.85
Left and right side wall 4*2 7.65 2.85
Top Floor wall 1 16.5 2.85
Outside wall in room-1st & 2nd floor
12 Front and back side wall 2 29.6 9.6
Left and right side wall 2 8.45 9.6
m2
Top Floor wall 1 19.3 2.85
Step 18*2 1.2 0.3
Step 18*2 1.2 0.15
Deduction for openings
Door D -9.0 1.05 2.1
Window W -14.0 1.5 1.35
Sub-Total
Snowcem paint
13 Weathered coat(Apex)Paint,2 coat over one coat primer of approved colour and shade as per specification and instructio
Two coat ready made enamel paint of approved colour & shade over one coat of primer as per specification and instructio
Door D 9.0 0.9 2.1
14 2
Window W m 14.0 1.5 1.35
Ventilation 11.0 1.2 0.6
Total
Net-Total(53.28*2.25)
Fy :-2067/68
Quantity Remarks
es if necessary,dressing of sides,lift up
d soil in 150mm layers by ramming &
28.00
18.52
98.32
35.84
46.63
2.75
2.16
2.90
1.80
1.24
1.45
0.65
1.27
0.63
5.50
247.65
2.40
1.59
8.43
3.07
4.00
0.57
0.44
0.60
0.37
0.26
0.30
0.65
1.27
0.63
5.50
30.07
of sides,laying compacting,curing with
1.60
1.06
5.62
2.05
2.66
0.38
0.30
0.40
0.25
0.17
0.20
0.43
0.85
0.42
3.67
20.04
4.00
2.65
14.05
5.12
10.66
0.13
0.17
1.35
0.66
0.98
15.49
11.26
3.48
24.48
7.56
5.63
1.09
2.51
1.70
0.49
94.10
207.53
0.67
1.09
0.72
1.01
3.74
7.23
200.31
4.48
5.44
2.88
3.36
48.72
70.08
97.86
69.90
6.90
289.68
1.01
14.78
9.97
-24.93
600.14
224.00
294.40
190.80
268.80
365.00
1343.00 Rm
1195.27 kgs
122.40
130.40
521.60
163.00
195.60
i-122.40 1010.60
4170.48 kgs
1593.60
892.80
2486.40
3928.51 kgs
114.60 Rm
435.48 kgs
17.40
25.20
13.40
56.00 Rm
137.20 kgs
105.60
258.72 kgs
12.92 Rm
20.28 kgs
851.68 kgs
851.68 kgs
39.00 Rm
95.55 kgs
15.00
20.40
39.00
74.40 Rm
182.28 kgs
1389.15 kgs
180.00
180.00
360.00 Rm
565.20 kgs
145.70 kgs(O)
235.20 kgs(P)
180.49 kgs(Q)
56.16 kgs®
54.23 kgs(S)
15.66 kgs(T)
43.61 kgs(U)
49.06 kgs(V)
1612.80
1187.20
1432.64
130.68
4363.32 Rm
1701.69 kgs
2901.60
2900.00
1120.00
44.95
131.95
336.00
379.52
52.50
43.20
136.88
200.52
255.60
204.00
163.20
38.40
8908.32 Rm
3474.24 kgs
20037.54 kgs
8.13
8.25
0.40
0.49
0.70
1.22
0.30
0.15
19.63
30.65
25.86
-4.56
-6.52
45.43
0.35
0.88
1.24
17.16
22.21
39.37
27.77
3.00
3.02
1.44
0.56
35.79
on of sides,laying compacting,curing
14.81
1.60
1.61
0.77
0.30
19.09
185.13
20.03
20.13
9.60
3.72
238.60
sureface to give a smooth finish on
185.13
20.03
20.13
9.60
3.72
238.60
137.94
174.42
47.03
0.00
568.32
162.24
55.01
12.96
6.48
-19.85
-28.35
1116.20
1116.20
on and instruction
17.01
28.35
7.92
53.28
119.88
Government of Nepal
Department of Education
District Education Office,Palpa
Abstract of Cost
Wood work(Chaukhat)
564.55
4 R.C.C. Works:-
4.1 Plain Cement concrete (PCC) for RCC columns
beams, lintels and all kind of RCC works with
cement,sand and crushed aggregate in 1:2:4
ratio including mixing, laying, curing, and finis-
hing in perfect line and level all complete.
Unskilled m/days 2.50
Skilled m/days 1.00
cement bags 6.00
sand cu.m. 0.445
Agg. cu.m. 0.85
485.00 1212.50
660.00 660.00
795.00 4770.00
960.00 427.20
1760.00 1496.00
8565.68
485.00 48.50
660.00 33.00
50000.00 330.00
85.00 21.25
432.75
1 sq.m. 432.75
485.00 3.88
660.00 7.92
70.00 72.10
93.00 0.93
1 kg 84.83
m/days 485
m/days 660
bags 795
cu.m. 960
cu.m. 1760
cu.m. 1430
kg 85
nos. 13.75
liter 290
liter 520
kg 42
liter 142
cu.m. 150
kg 70.00
kg 93.00
kg 55.00
cu.m. 50000.00
complete.
Unskilled m/days 1.50
Skilled m/days 1.50
Cement bags 1.50
Sand cu.m. 0.28
Brick nos. 460.00
9 Flooring works:-
9.1 Earth Filling work for flooring with proper
compaction /1 cu.m.
Unskilled m/days 0.50
Soil for filling /2 km transportation cu.m. 1.00
485.00 1455.00
660.00 9900.00
50000.00 55000.00
50.00 4600.00
1.00 184.00
71139.00
485.00 242.50
660.00 66.00
795.00 62.01
960.00 13.44
383.95
485.00 242.50
660.00 66.00
795.00 71.55
960.00 13.44
393.44
485.00 242.50
150.00 150.00
392.50
485.00 48.50
660.00 66.00
795.00 90.63
960.00 23.04
228.17
485.00 48.50
660.00 66.00
960.00 2.21
795.00 51.04
Total 167.75
485.00 5.335
660.00 9.9
42 9.24
142 1.2496
Total 25.73
55.00 16.50
Total 37.41
Total per sqm. 37.41 14.d
1430.00 1,573.00
960.00 451.20
795.00 1,590.00
5,574.20 8.a
63855.00 13.h
50000.00 328.75
85.00 4.25
447.50
447.50 10.d
660.00 990.00
485.00 1455.00
795.00 1590.00
960.00 451.20
1430.00 1573.00
Total = 6059.20