CS-AD10

Sl
No. File No. File Name

MVIP-Constructing LBMC from ch.15741 m to 15847 m including


1 IDRB/DD/CD/CL/AD2/4028/89
CD works

2 IDRB/DD/CD/CL/AD2/292/90 MVIP-Constructing RBMC from ch.0m to 150 m Revised hydraulic


details

3 IDRB/DD/CD/CL/AD2/1771/90
Breaches in T.S Canals- rectification works-inspection

4 IDRB/DD/CD/CL/AD2/1365/91 Kayamkulam super thermal power project- remodelling of PIP


Canal at road crossing with a syphon.

5 IDRB/DD/CD/CL/AD2/508/90 MVIP-Constructing LBMC from ch.19420m to 21300m except


aqueduct from ch.19690 m to 19900 m including CD works

6 IDRB/DD/CD/CL/AD2/2311/91 KPIP-Lining work of LBMC from ch.0/610 to 1/1000km

7 IDRB/DD/CD/CL/AD2/2477/91 AVIP-Project Report revised design of canal-

Representation from Kuttanad Integral Development society


8 IDRB/DD/CD/CL/AD2/3549/91
dtd.14.09.91

9 IDRB/DD/CD/CL/AD2/1506/91 Kunnankattupathy Headworks Complaints

10 IDRB/DD/CD/CL/AD2/2425/92 MVIP-LBMC-Alignment of the canal from ch.27800m.

11 IDRB/DD/CD/CL/AD2/690/85 General file

MVIP-Constructing LBMC from ch.19420m to 21300m except


12 IDRB/DD/CD/CL/AD2/466/88
Pandapilly aqueduct stability analysis of embankment.

13 IDRB/DD/CD/CL/AD2/282/88 IIP-World bank Pipeline project- identification project report.

Leading channel to Thotapally spillway-Replies to comments of


14 IDRB/DD/CD/CL/AD2/583/88
Central Water Commission.

15 MVIP-PIDO/IV/10/114/79 MVIP-Canal lining.

16 IDRB/DD/CD/CL/AD2/2266/94 LA-Interpellation

Charge Handed Over Taken Charge


1
LEKHA B S NIDHI S
Sl
No. File No. File Name

17 IDRB/DD/CD/CL/AD2/3151/94 IIP-LLC Constructing CC channel of aqueduct from ch.92 to 703.

18 IDRB/DD/CD/CL/AD2/3170/94 Modification of chalakuzhy RBC system under IIP Design of canal

19 IDRB/DD/CD/CL/AD2/3339/94 IIP - Modification of LBC system of CRD scheme

Extension of effluent discharge pipeline of Hindustan Neswsprint


20 IDRB/DD/CD/CL/AD2/699/91
limited to Muvattupuzha .

21 IDRB/DD/CD/CL/AD2/3848/94 MVIP- Ettumanoor Branch canal constructing aqueduct at Ch.2140


m to 2275 m

22 IDRB/DD/CD/CL/AD2/3013/99 MVIP - Formation of Ettumanoor Branch canal from ch. 13204 to


13479m -Constructing cut & cover-Design particulars

23 PIDO/V/14/24/83 General File

24 IDRB/DD/CD/CL/AD2/134/98 KIP - RBC - Formation of of Kayamkulam Branch canal from ch.


4365 m to 5600 m including CD works

25 IDRB/DD/CD/CS/AD3/3065/04 Palakapandy Diversion scheme - construction of aqueduct between


Ch. 2120 to 2290m (part file )

26 IDRB/DD/CD/CL/AD2/1880/99 IIP - LLC Design of aqueduct from ch. 19050 to 19340 m

MVIP - LBC - Constructing Ezhuthonipadam aqueduct between ch .


27 IDRB/DD/CD/CS/AD3/3427/96
18065 to 18562m ( II volumes)

BSP - Padinjarathara Branch Canal Construction of aqueduct from


28 IDRB/DD/CD/CL/AD2/2033/04
ch. 2690 m to ch.3880 m

IIP - Constructing Main canal from ch.600m to 1000 m including


29 IDRB/DD/CD/CL/AD2/855/08
cut & cover from ch. 600 to 691m

IIP - LLC ch 0 to 70 m. Head Regulator, Drop, Link canal, Head


30 IDRB/DD/CD/CL/AD2/3004/96
Regulator Design - reg.

31 IDRB/DD/CD/Cl/AD2/1325/09 MVIP - Constructing Madakkathanam Minor distributory from ch. 0


- 3765 m

IDRB/DD/CD/CL/AD2/270/09
32 MVIP - Constructing Madakkathanam Minor distributory from ch. 0
(transferred to CS-AD9)
- 3765 m (Hydraulic Particulars)

Charge Handed Over Taken Charge


2
LEKHA B S NIDHI S
Sl
No. File No. File Name

IDRB/DD/CD/MFA/AD1/2967/95
33 IIP - LLC Constructing syphon well drop - II from ch. 3680 m to
(Part File)
3722.17 m

34 IDRB/DD/CD/CL/AD2/1121/09 General File

NABARD - RIDF XV - Constructing of VCB cum bridge across


35 IDRB/DD/CD/CL/AD2/3064/09
Kanjirapuzha at Nambooripotti Kalikkadavu in Chaliyar Panchayath

IIP - LLC Pressure syphon from ch.14783.5 m to 14862.9 (NH


36 IDRB/DD/CD/CL/AD2/904/2011
crossing)

37 IDRB/DD/CD/CL/AD2/1470/95 KARAPUZHA Irrigation Project

Chitturpuzha Project- Moolathara Regulator-Rectification work of


38 IDRB/DD/CD/CL/AD2/3699/92
the damaged portion.

Nabard RIDF XVII-Construction of checkdam across Kuthirapuzha


39 IDRB/DD/CD/CL/AD2/2199/12
at Ramankuth Valayankundu Kadavu in Nilambur Municipality

IDRB/DD/CD/CL/AD2/3300/12 Priority works under Minor Irrigation- Construction of checkdam


40
CS-AD10/7/2015-IDRB across Kabani River at Palvelicham in Mananthavady Panchayat.

Construction of a checkdam across Chandragiri River at Karichery


41 No.906/2013/IDRB/CL
Kizhakkukara in Pallikkara Panchayat.

Construction of Road bridge with footpath across Bhadakara Mahe


42 No.3480/2013/IDRB/CL
Canal at Parambil.

Construction of checkdam cum bridge across Kothamangalam river


43 No. 3769/2013/IDRB/PBD
at Kaniyankudy Eranakulam District.

CS-AD10/3/2015-IDRB Renovation of Modernization of Malampuzha garden -Phase 2


44
No.2053/2012/IDRB/DS1 (VOL I,II,III,IV,V)

CS-AD10/4/2015-IDRB
45 Tourism Development in Dams.
No.1100/2012/IDRB/DS1

CS-AD10/2/2015-IDRB
46 Reservoir based tourism-Chamravattom
No.558/2013/IDRB/CL

47 No.557/2013/IDRB/CL Reservoir based tourism- Malankara

Charge Handed Over Taken Charge


3
LEKHA B S NIDHI S
Sl
No. File No. File Name

48 CS-AD10/3/2016-IDRB Re-construction of Kallupalam Bridge across TS Canal at Kollam.

Pamba Irrigation Project-RBC-Extension of Kaviyoor canal beyond


Manimala river constructing an aqueduct between ch.3727 m to
49 CS-AD10/4/2016-IDRB
3914m and open canal at ch.4273 m to 4410m at the missed
portions and other allied works between ch.4000m to 4273m.

MIRPA-Construction of check dam across Bharathapuzha at


50 IDRB/DD/CD/CL/AD1/3868/10
Painkulam in Panjal Panchayath in Thrissur district

NABARB - RIDF XVI - Construction of Vented cross bar cum


51 No.4975/2014/IDRB/CL
dredge at Pady in Chengala Grama Panchayath

Koothumakkal - Chirakkal Cherupuzha Thodu Project


52 CS-AD10/1/2016-IDRB Augmentation scheme of painoor Kayal Lift Irrigation Project in
Edathiruthy Panchayath

Interlinking of Bharathapuzha and Biyyam lake in Ponnani taluk in


53 CS-AD10/1/2015-IDRB
Malappuram district.

Construction of checkdam at Aruvikuzhy in Chakkupallam


54 CS-AD10/5/2015-IDRB
panchayath.

WRD-IIP-Construction of bridge at ch.811 m to 851m including


55 CS-AD10/6/2015-IDRB
formation of canal and approach road.

56 CS-AD10/8/2015-IDRB Construction of checkdam at downstream of Peechi dam

State Horticulture Mission-Kerala-Implementation RKVY


57 CS-AD10/9/2015-IDRB Programme 2013-14-Construction of checkdam at Mechola in
Vattavada Panchayat,Idukki district.
Kasargod Development Package- Construction of checkdam across
58 CS-AD10/5/2016-IDRB Panathur river at Panamkode in Kodum-Belur Grama Panchayat in
Kasagod district.

Karappuzha Project- Padinjaraveedu Branch Canal ch.1110m to


59 CS-AD10/1/2017-IDRB
1210 m-Design of canal and protection wall.

CSIN-Construction of steel foot bridge across Badagara-Mahe canal


60 CS-AD10/2/2017-IDRB
at ch.461.550 KM AT Ottakandy Thazhe.

Providing drainage facilities by linking Vadai canal and Mammen


61 CS-AD10/3/2017-IDRB Edavazhithodu at ward near Alleppey Company in Alappuzha
Municipality in Alappuzha L.A.C

DRIP-Rehabilitation and Improvement of Basic Facilities of


62 CS-AD10/403/2017-IDRB
Chimony Irrigation Project-Design of flat type quarters building.

Charge Handed Over Taken Charge


4
LEKHA B S NIDHI S
Sl
No. File No. File Name

63 CS-AD10/1090/2017-IDRB

Neyyar Irrigation Project- Supreme Court of India-OS No.2/2012-


64 CS-AD10/1375/2017-IDRB
Cross Examination of TN-Documents furnishing.

65 CS-AD10/989/2018-IDRB PYIP-Rectification of breached portion of main canal at ch.1300m.

66 CS-AD10/1373/2018-IDRB

Flood 2018-Chalakudy River Diversion Scheme-Damage of LBMC


67 CS-AD10/1885/2018-IDRB
between ch.0/200 and 0/500 km.

CS-AD10/1879/2018-IDRB (File
68 MVIP-Urgent Rectification to the breached portion of kadappoor
transferred to CS-AD2 MFA)
distribution from ch.1410m to 1505m.

Proposed lift Irrigation scheme at Poovakkuzhy in Paradur


69 CS - AD10/85/2019 -IDRB
Panchayath, Palakkad

Construction of a vented weir cum bridge across Panathur river at


70 CS - AD9/645/2018 -IDRB
Chirankadavu at Panathady panchayath

71 CS - AD10/1795/2019 -IDRB Beautification of Dam Sites (NP)-sanction of FS & AS

KRBP-Construction of check dam at Idiyam Vayal across Anoth


72 CS - AD10/1925/2019 -IDRB
river in Pouzhuthana panchayath

Charge Handed Over Taken Charge


5
LEKHA B S NIDHI S
Sl
No. File No. File Name

MRVP - Construction of checkdam cum Bridge across Meenachil


83 CS/AD9/2/2017 IDRB river (Kalathukadavu) at Chillachibhagam in Thalappalam of
Moonnilavu Panchayath - Design approval

Peechi scheme - Re-alignment of Diversion canal from Kainoor


84 CS/AD9/1/2017 IDRB
Chira- proposal returned.

Chithupizha Project-Enhancement of storage Capacity- Digging of


85 CS/AD9/4/2017 IDRB Kambalathara Venkalakayam and Kunnampidari - file transfered to
investigation

Protecting erroded bank of Therlai island from Madhariveedu


86 CS/AD9/5/2017 IDRB kadavu to Valliyakunnu Kadavu & from Moideen Pallu Kadavu to
Therlayi Bridge

Reconstruction of box culvert at Ambanattuchira road near


87 CS/AD9/585/2018 IDRB
Chilavanoor in Ernakulam District- Design Approval

Charge Handed Over Taken Charge


6
LEKHA B S NIDHI S
Sl
No. File No. File Name

Construction of a weir across Thootha river at Kalikkadavu in


88 CS/AD10/2/2016 IDRB Aliparambu Panchayat in Malappuram District Transfered from
AD10 - Design Approval.

DRIP Rehabilitation and improvement of Barie facilities of


89 CS/AD9/1346/2018 IDRB
Moolathara Regulator - reg -Design approval

LLC aqueduct at ch: 3740m - installation of valve from Idamalayar


90 CS/AD9/675/2018 IDRB
Irrigation Project canal to Komarappadam branch canal

KIFBI-Construction of checkdam across Ithikkarayar at


mannayamkadavu for supplying water to Kalluvathukkal,Parippally
91 CS/AD9/584/2018 IDRB
and Velinalloor villages under samagrakudivellapadhathi reg. (File
transferred to MFA - AD3)

Construction of a weir across Kadalundi river near vattanikadavu


92 CS/AD9/1/2017 IDRB
(Irumbuzhi) in Kootilangadu Panchayath in Malappuram District

Construction of checkdam cum bridge across panathur river at


93 CS/AD9/3/2017 IDRB
Kaneeladukkam in Kallar Panchayath.

Construction of a vented weir cum bridge across Panathur river ar


94 CS/AD9/645/2018/ IDRB Chirakadavu at Panathady Panchayath - file tranfered to AD10
canals

95 No.1593/2015/AD1/CL/IDRB KIP- Construction of syphon at 165 m in Kollaka Distributory reg.

96 No.1536/2013/IDRB/CL/BSP BSP Note File

IIP - Construction of LLC from Ch 10490 - 12000 m including CD


97 No. CS-AD9/2/2015-IDRB
works

Construction of checkdam cum bridge at vallakadavu Pareekkanni


98 No. 2777/2014/ IDRB /CL connecting Kavalangad and pullarimangalam Panchayath in
Ernakulam District

Construction of check dam at Mannathikadavu across Thoothapuzha


99 CS-AD9/1897/2018/IDRB
at Cherpulassery Muncipalty in Palakkad District

IDRB/DD/CD/CL/AD1/730/2002 IIP - LLC Construction of cut & cover from ch 10490m to 10599m
100
Vol II including MC road crossing and allied works ( Through EPC)

Charge Handed Over Taken Charge


7
LEKHA B S NIDHI S
Sl
No. File No. File Name

IDRB/DD/CD/CL/AD1/1235/88
101 Hydraulic Particulars of Attappady Valley Irrigation Project
( Volume II)

Charge Handed Over Taken Charge


8
LEKHA B S NIDHI S
LIST OF FILES (AD1/CANALS)

Old Ref. Sl No. File No.

4 1 IDRB/DD/CD/CL/AD1/1830/89
5 2 IDRB/DD/CD/CL/AD1/1235/88

6 3 IDRB/DD/CD/CL/AD1/654/88
7 4 IDRB/DD/CD/CL/AD1/2657/89

8 5 IDRB/DD/CD/CL/AD1/2657/89
9 6 IDRB/DD/CD/CL/AD1/457/87
10 7 IDRB/DD/CD/CL/AD1/3807/89

16 8 IDRB/DD/CD/CL/AD1/1046/90

17 9 IDRB/DD/CD/CL/AD1/149/87

18 10 IDRB/DD/CD/CL/AD1/283/87

19 11 PIDO/IV/10/113/79

20 12 PDN V - 40577/76

21 13 PDN V - 40577/76

22 14 PIDO/IV/10/111/79

23 15 PIDO/IV/10/113/79
24 16 W5-12321/84
25 17 PIDO/IV/11/1110/85

26 18 PIDO/111/8/115/80

27 19 PIDO/IV/10/113/79

28 20 IDRB/DD/CD/CL/AD1/227/87

29 21 IDRB/DD/CD/CL/AD1/1417/92

29 a 22 IDRB/DD/CD/CL/AD1/1417/94

30 23 IDRB/DD/CD/CL/AD1/2516/92
30a 24 IDRB/DD/CD/CL/AD1/2516/92

30b 25 IDRB/DD/CD/CL/AD1/2516/94

31 26 IDRB/DD/CD/CL/AD1/2006/89

32 27 IDRB/DD/CD/CL/AD1/3003/96

IDRB/DD/CD/CL/AD1/3003/96 - Part
33 28 file No-1

34 29 IDRB/DD/CD/CL/AD1/110/88

35 30 IDRB/DD/CD/CL/AD1/135/98
IDRB/DD/CD/CL/AD1/2516/94 (part
36 31 file -II)

37 32 IDRB/DD/CD/CL/AD1/1278

38 33 IDRB/DD/CD/CL/AD1/1750

39 34 IDRB/DD/CD/CL/AD1/3503/96

40 35 IDRB/DD/CD/CL/AD1/1436

32 IDRB/DD/CD/CL/AD1/1436

41 33 IDRB/DD/CD/CL/AD1/2085/97

34

43 35 IDRB/DD/CD/CL/AD1/449/96

44 36 IDRB/DD/CD/CL/AD1/1778/95

45 37 IDRB/DD/CD/CL/AD1/49/98

46 38 IDRB/DD/CD/CL/AD1/49/98-part-I

47 39 IDRB/DD/CD/CL/AD1/730/2002
40 IDRB/DD/CD/CL/AD1/1778/95 VOI-II
41 IDRB/DD/CD/CL/AD1/1184/2004

42 IDRB/DD/CD/CL/AD1/1530/2004

51 43 IDRB/DD/CD/CL/AD1/2049/2004

52 44 IDRB/DD/CD/CL/AD1/2212/2004

45 IDRB/DD/CD/CL/AD1/2034/2004
54 46 IDRB/DD/CD/CL/AD1/3077/2004

55 47 IDRB/DD/CD/CL/AD1/1610/2006
48 IDRB/DD/CD/CL/AD1/1778/95 Part I

49 IDRB/DD/CD/CL/AD1/2665/2006
IDRB/DD/CD/CL/AD1/3003/96 Part
59 50 file No. II

60 51 IDRB/DD/CD/CL/AD1/1778/95 Vol II

61 52 IDRB/DD/CD/CL/AD1/260/95Vol - IV

62 53 IDRB/DD/CD/CL/AD1/1006/2007

54 IDRB/DD/CD/CL/AD1/2476/2008

64 55 IDRB/DD/CD/CL/AD1/360/2009

65 56 IDRB/DD/CD/CL/AD1/1289/2009

66 57 IDRB/DD/CD/CL/AD1/1339/2009

67 58 IDRB/DD/CD/CL/AD1/1561/2009

59 IDRB/DD/CD/CL/AD1/3868/2010

69 60 IDRB/DD/CD/CL/AD1/3170/2009
70 61 IDRB/DD/CD/CL/AD1/3065/2009

71 62 IDRB/DD/CD/CL/AD1/1146/2011

72 63 IDRB/DD/CD/CL/AD1/1146-1/2011

73 64 IDRB/DD/CD/CL/AD1/2085/97-Vol II

74 65 IDRB/DD/CD/CL/AD1/3838/2011

66 IDRB/DD/CD/CL/AD1/1146/2011

76 67 IDRB/DD/CD/CL/AD1/3494/2012

CS/AD9/1/2015-IDRB
77 68 (IDRB/DD/CD/CL/AD2/270/09)

78 69 CS/AD9/3/2015

70 CS/AD9/1/2016 IDRB

71 CS/AD9/2/2016 IDRB

80 72 CS/AD9/4/2016 IDRB

81 73 CS/AD9/2/2017 IDRB

82 74 CS/AD9/1/2017 IDRB

75 CS/AD9/585/2018 IDRB

84 76 CS/AD10/2/2016 IDRB

85 77 CS/AD9/1346/2018 IDRB

86 78 CS/AD9/675/2018 IDRB
87 79 CS/AD9/584/2018 IDRB

80 CS/AD9/1/2017 IDRB

81 CS/AD9/3/2017 IDRB

90 82 CS/AD9/645/2018/ IDRB

83 No.1593/2015/AD1/CL/IDRB

84 No.1536/2013/IDRB/CL/BSP

75 85 IDRB/DD/CD/CL/AD1/2821/2012

86 No. CS-AD9/2/2015-IDRB

78 87 No. 2777/2014/ IDRB /CL

88 CS-AD9/1897/2018/IDRB
LIST OF FILES (AD1/CANALS)

File Name

Water requirement calculation of Meenachil River valley Irrigation Project


Hydraulic Particulars of Attappady Valley Irrigation Project ( Vol I & Vol II)

MVIP Water requirement calculation Part file


Hydraulic Particulars of MVIP Left Bank Main Canal
Hydraulic Particulars of MVIP Left Bank Main Canal Part file-Aroor tunnel
from ch 21300 to 22200
MVIP Revised alignment of MVIP Left Bank Main Canal
Water requirement calculation of Karapuzha Irrigation Project

L A Interpolation

Vamanapuram Irrigation Project

Inland water transport 7th Five Year Centrally sponsored scheme

MVIP Revised alignment of Vol II

MVIP - Vol I

MVIP - Vol II

MVIP Revised alignment Vol I

MVIP LBMC Revised alignment and LS from ch 8000 to 20000m Vol-IV


Flood in Cochin City
IIP -Hydraulic particulars

Karapuzha Irrigation Project,RBMC-Hydraulic particulars

MVIP- Revised alignment and LS of LBC Vol IV

Flood in Cochin City

Hydraulic Particulars of MVIP Right Bank Main Canal Vol I & II


Construction of MVIP Right Bank Main Canal -Revised Hydraulic particulars
from ch 18000 to 22600m -part file-1
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from
ch-25665 (Orginal chainage) Vol - I
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from
ch-27800 m
MVIP Left Bank Main Canal and cut & cover from ch 36350 to ch 36800m
file-part II Vol - II
Modernisation of Malampuzha Irrigation Project-(Water requirement
calculation )
KIP-LBMC - Rectification of breach from ch 2100 to ch 2150m. Design of
reinforced earth retaining wall.

KIP-LBMC - Rectification of breached canal from ch 2100 to ch 2150m CC


retaining wall

Water requirement calculation of Banasurasagar Irrigation Project

KIP-RBC-Formation of Kayamkulam Branch canal from ch 2820m to ch 3875m

Design of cut & cover from ch 36350m to 36800m .

Construction of Syphon in Kottiyam branch canal

PIP-RBC Failure of Pipe culvert from ch 580m to 680 m Revision of HP


Karapuzha Irrigation Project, Revised Hydraulic particulars of LBMC & RBMC
and revision of HP from 0m to 368 1 m of LBMC
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016
and 25134m including transition
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016
and 25134m including transition

IIP Constructing LLC from ch 10490m to 19300 m Revision of HP

MVIP-LBMC Construction of flush escape -----file transferred

MVIP- Construction of Karumalloor distributary - aqueduct between ch 4260 m


& ch 4391 m

IIP Main canal revision of Hydraulic particulars from 0 m to 1366m & from ch
22914 m to ch 26098.

Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars from


12075m to 16125
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars of
Moolathara RBC from 0m to 12075 m
IIP - LLC Construction of cut & cover from ch 10502m to 10599m and covered
flume from ch 10866m to 11011m.
IIP - Revision of Hyraulic particulars of link canal
IIP Construction of Main canal aqueduct from ch 30200m to 30510m (file with
AD3 MFA

KKIP - Extension of MRBC up to Velanthavalam

IIP - Revision of Hyraulic particulars of Main canal from 24637m to ch 31978m

Draught relief work in Palakkad district. Diversion from Moolthara to Meenkara.

BSP- Venniyode Branch canal-aqueduct from ch 4340m


Diversion scheme from Palakapandy weir to Chulliyar dam.

MRVP-Approval of Hydraulic particulars ( ch. 0 m to ch .7000m)


IIP - Revision of Hyraulic particulars of link canal
MVIP Constructing kadapoor distributory from ch 0m to 1920m including CD
works Flood damage at Ch 1242 M

WRD-KIP-permanent rectification to the breached portion at ch2100m of LBMC

IIP Constructing main canal from ch 23398 to to 23676m including transition .

IIP Constructing LLC from ch 7300m to ch 8100m including CD works.


Balance work revised HP due to introduction of flume and extension of flume

KIP-LBMC permanent measures to the collapsed embankment portion between


ch 37600m to 37800m at ponmannoor near Kottarakkara.
MVIP Constructing Anicadu east minor distributory from ch 0m to 1855m
including CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works. Design of Open flume
between ch 3265m & 3320m.

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch 100m & 245m and open flume between ch
245m & 269m

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch1800m & 1930m and open flume between ch
1129m & 1186m
MIRPA -Constructing of check dam across Bharathapuzha at painkulam in Panjal
Panchayath in Trissur District

MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to


3650m. Design of syphon aqueduct with DI pipe between ch 1023m & 1164m.
MIRPA- Construction of a VCB cum Bridge across Pattukuthuthodu in Ward No
14 of Elamkulam panchayath

IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7311m to 7340m (4x1.7m)
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7644m to 7687m (5x1.7m)

IIPnConstructing Pressure syphon from ch 13832.50 to 13876.5m (Railway


crossing) Revision of HP from ch 13822.5m to 13879.5m
Construction of VCB cum Bridge across Mavullapoyil thodu at Mavullapoyil in
Eramam Kuttoor Panchayath in Kannur District

Construction of VCB across Shriya river at Kalyate in Enmakaje Panchayath of


Kasargod Taluk in Kasarkode District.

NABARD-Constructuin of VCB cum Bridge across Kanjirapuzha at


Nambooripotty Kalikadavu in Chaliyar Grama Panchayath

MVIP Costructing Madakkathanam Minor Distributory from ch 0m to 3765 m


including flume cut & cover and CD works except aqueduct and flume from
ch.690 to 1522m

Construction of Left Bank canal Shutter of Moolathara Design of Wheel gates-


Design approval

Hydraulicparticulars of proposed box structure of existing Vellayani Branch


canal for shifting to extreame edge of the row for four lane of existing TVPM
Bypass from Kayamkulam to Mukkola in NH 47
IIP - Construction of Flume & Deep fill culvert from Ch 2/000 KM to 3/000 KM
reg. --Orginal proposal returned
Construction of Regulator cum Bridge at kankakkadavu across Bharathapuzha in
Kuttipuram Panchayath- Design Approval
MRVP - Construction of checkdam cum Bridge across Meenachil river
(Kalathukadavu) at Chillachibhagam in Thalappalam of Moonnilavu Panchayath
- Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor Chira- proposal
returned.
Reconstruction of box culvert at Ambanattuchira road near Chilavanoor in
Ernakulam District- Design Approval

Construction of a weir across Thootha river at Kalikkadavu in Aliparambu


Panchayat in Malappuram District Transfered from AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of Moolathara
Regulator - reg -Design approval

LLC aqueduct at ch: 3740m - installation of valve from Idamalayar Irrigation


Project canal to Komarappadam branch canal
KIFBI-Construction of checkdam across Ithikkarayar at mannayamkadavu for
supplying water to Kalluvathukkal,Parippally and Velinalloor villages under
samagrakudivellapadhathi reg.

Construction of a weir across Kadalundi river near vattanikadavu (Irumbuzhi) in


Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at Kaneepadukkam
in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar Chirakadavu
at Panathady Panchayath

KIP- Construction of syphon at 165 m in Kollaka Distributory reg.

BSP Note File

Construction of VCB across Shiriya river at Kalyate in Enmakaye Panchayath

IIP - Construction of LLC from Ch 10490 - 12000 m including CD works

Construction of checkdam cum bridge at vallakadavu Pareekkanni connecting


Kavalangad and pullarimangalam Panchayath in Ernakulam District
Construction of check dam at Mannathikadavu across Thoothapuzha at
Cherpulassery Muncipalty in Palakkad Distrit
Status

finished 6/4/2000
approved on 25/6/2002

UO Note to JD Dam safety on 3/10/2015

approved on 29/11/2018
Letter to The Superintending Engineer, Project Circle, Piravom
file with AD3 MFA

approved on 7/8/2004

finished
Reminder II to The CE. Revised alignment plan to be
received

file closed on 11/8/2009


Letter to The Superintending Engineer, Project Circle,
Piravom

work with in the power of the SE ( 20/3/2013)

drawing forwarded on 19/7/2007

file retured on 19/3/2009

approved on 10/3/2011

letter to the CE, P II

approved on 15/5/2009

approved on 1/7/2009

approved on 1/7/2009

approved on 17/8/2009

design and drawing approved on 18/8/2010


proposal retured on 23/6/2012

approved on 26/9/2011

approved on 9/2/2012

design and drawing approved on 2/7/2012

approved on 8/10/2013

approved on 15/5/2009

approved on 22/2/2016

Orginal proposal returned

on going

approved on 22/5/2017

approved 7/2/2018

approved 30/4/2018

approved 13/12/2018

Finsihed
on going

on going

on going

on going

infromed to the CE , P2 on 14/10/2015

Letter to The CE, P1

file retured on 10/10/2012

hydraulic particluars to be recevied letter on 22/12/2018

approved on 2/12/2014

work progress

\
1 IDRB/DD/CD/CL/AD1/1830/89
2 IDRB/DD/CD/CL/AD1/1235/88

3 IDRB/DD/CD/CL/AD1/654/88
4 IDRB/DD/CD/CL/AD1/2657/89

5 IDRB/DD/CD/CL/AD1/2657/89
6 IDRB/DD/CD/CL/AD1/457/87
7 IDRB/DD/CD/CL/AD1/3807/89

8 IDRB/DD/CD/CL/AD1/1046/90

9 IDRB/DD/CD/CL/AD1/149/87

10 IDRB/DD/CD/CL/AD1/283/87

11 PIDO/IV/10/113/79

12 PDN V - 40577/76

13 PDN V - 40577/76

14 PIDO/IV/10/111/79

15 PIDO/IV/10/113/79
16 W5-12321/84
17 PIDO/IV/11/1110/85

18 PIDO/111/8/115/80

19 PIDO/IV/10/113/79

20 IDRB/DD/CD/CL/AD1/227/87

21 IDRB/DD/CD/CL/AD1/1417/92

22 IDRB/DD/CD/CL/AD1/1417/94

23 IDRB/DD/CD/CL/AD1/2516/92

24 IDRB/DD/CD/CL/AD1/2516/92
25 IDRB/DD/CD/CL/AD1/2516/94

26 IDRB/DD/CD/CL/AD1/2006/89

27 IDRB/DD/CD/CL/AD1/3003/96

28 IDRB/DD/CD/CL/AD1/3003/96 - Part file No-1

29 IDRB/DD/CD/CL/AD1/110/88

30 IDRB/DD/CD/CL/AD1/135/98

31 IDRB/DD/CD/CL/AD1/2516/94 (part file -II)

32 IDRB/DD/CD/CL/AD1/1278

33 IDRB/DD/CD/CL/AD1/1750

34 IDRB/DD/CD/CL/AD1/3503/96

35 IDRB/DD/CD/CL/AD1/1436

32 IDRB/DD/CD/CL/AD1/1436

33 IDRB/DD/CD/CL/AD1/2085/97

34

35 IDRB/DD/CD/CL/AD1/449/96

36 IDRB/DD/CD/CL/AD1/1778/95

37 IDRB/DD/CD/CL/AD1/49/98

38 IDRB/DD/CD/CL/AD1/49/98-part-I

39 IDRB/DD/CD/CL/AD1/730/2002
40 IDRB/DD/CD/CL/AD1/1778/95 VOI-II

41 IDRB/DD/CD/CL/AD1/1184/2004
42 IDRB/DD/CD/CL/AD1/1530/2004
43 IDRB/DD/CD/CL/AD1/2049/2004

44 IDRB/DD/CD/CL/AD1/2212/2004
45 IDRB/DD/CD/CL/AD1/2034/2004
46 IDRB/DD/CD/CL/AD1/3077/2004

47 IDRB/DD/CD/CL/AD1/1610/2006
48 IDRB/DD/CD/CL/AD1/1778/95 Part I

49 IDRB/DD/CD/CL/AD1/2665/2006

50 IDRB/DD/CD/CL/AD1/3003/96 Part file No. II

51 IDRB/DD/CD/CL/AD1/1778/95 Vol II

52 IDRB/DD/CD/CL/AD1/260/95Vol - IV

53 IDRB/DD/CD/CL/AD1/1006/2007

54 IDRB/DD/CD/CL/AD1/2476/2008

55 IDRB/DD/CD/CL/AD1/360/2009

56 IDRB/DD/CD/CL/AD1/1289/2009

57 IDRB/DD/CD/CL/AD1/1339/2009

58 IDRB/DD/CD/CL/AD1/1561/2009

59 IDRB/DD/CD/CL/AD1/3868/2010

60 IDRB/DD/CD/CL/AD1/3170/2009

61 IDRB/DD/CD/CL/AD1/3065/2009

62 IDRB/DD/CD/CL/AD1/1146/2011
63 IDRB/DD/CD/CL/AD1/1146-1/2011

64 IDRB/DD/CD/CL/AD1/2085/97-Vol II

65 IDRB/DD/CD/CL/AD1/3838/2011

66 IDRB/DD/CD/CL/AD1/1146/2011

67 IDRB/DD/CD/CL/AD1/3494/2012

CS/AD9/1/2015-IDRB
68 (IDRB/DD/CD/CL/AD2/270/09)

69 CS/AD9/3/2015

70 CS/AD9/1/2016 IDRB

71 CS/AD9/2/2016 IDRB

72 CS/AD9/4/2016 IDRB

73 CS/AD9/2/2017 IDRB

74 CS/AD9/1/2017 IDRB

75 CS/AD9/585/2018 IDRB

76 CS/AD10/2/2016 IDRB

77 CS/AD9/1346/2018 IDRB

78 CS/AD9/675/2018 IDRB

79 CS/AD9/584/2018 IDRB
80 CS/AD9/1/2017 IDRB

81 CS/AD9/3/2017 IDRB

82 CS/AD9/645/2018/ IDRB

83 No.1593/2015/AD1/CL/IDRB

84 No.1536/2013/IDRB/CL/BSP

85 IDRB/DD/CD/CL/AD1/2821/2012

86 No. CS-AD9/2/2015-IDRB

87 No. 2777/2014/ IDRB /CL


LIST OF FILES (AD1/CANALS)

Water requirement calculation of Meenachil River valley Irrigation Project


Hydraulic Particulars of Attappady Valley Irrigation Project

MVIP Water requirement calculation Part file


Hydraulic Particulars of MVIP Left Bank Main Canal

Hydraulic Particulars of MVIP Left Bank Main Canal Part file-Aroor tunnel from ch
21300 to 22200
MVIP Revised alignment of MVIP Left Bank Main Canal
Water requirement calculation of Karapuzha Irrigation Project

L A Interpolation

Vamanapuram Irrigation Project

Inland water transport 7th Five Year Centrally sponsored scheme

MVIP Revised alignment of Vol II

MVIP - Vol I

MVIP - Vol II

MVIP Revised alignment Vol I

MVIP LBMC Revised alignment and LS from ch 8000 to 20000m Vol-IV


Flood in Cochin City
IIP -Hydraulic particulars

Karapuzha Irrigation Project,RBMC-Hydraulic particulars

MVIP- Revised alignment and LS of LBC Vol IV

Flood in Cochin City

Hydraulic Particulars of MVIP Right Bank Main Canal Vol I & II


Construction of MVIP Right Bank Main Canal -Revised Hydraulic particulars from
ch 18000 to 22600m -part file-1
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from ch-
25665 (Orginal chainage) Vol - I

Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from ch-
27800 m
MVIP Left Bank Main Canal and cut & cover from ch 36350 to ch 36800m file-
part II Vol - II
Modernisation of Malampuzha Irrigation Project-(Water requirement
calculation )

KIP-LBMC - Rectification of breach from ch 2100 to ch 2150m. Design of


reinforced earth retaining wall.

KIP-LBMC - Rectification of breached canal from ch 2100 to ch 2150m CC


retaining wall

Water requirement calculation of Banasurasagar Irrigation Project

KIP-RBC-Formation of Kayamkulam Branch canal from ch 2820m to ch 3875m

Design of cut & cover from ch 36350m to 36800m .

Construction of Syphon in Kottiyam branch canal

PIP-RBC Failure of Pipe culvert from ch 580m to 680 m Revision of HP


Karapuzha Irrigation Project, Revised Hydraulic particulars of LBMC & RBMC and
revision of HP from 0m to 368 1 m of LBMC
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016 and
25134m including transition

MVIP Left Bank Main Canal Construction of cut & cover between ch 25016 and
25134m including transition

IIP Constructing LLC from ch 10490m to 19300 m Revision of HP

MVIP-LBMC Construction of flush escape -----file transferred

MVIP- Construction of Karumalloor distributary - aqueduct between ch 4260 m &


ch 4391 m

IIP Main canal revision of Hydraulic particulars from 0 m to 1366m & from ch
22914 m to ch 26098.

Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars from 12075m


to 16125
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars of Moolathara
RBC from 0m to 12075 m
IIP - LLC Construction of cut & cover from ch 10502m to 10599m and covered
flume from ch 10866m to 11011m.
IIP - Revision of Hyraulic particulars of link canal
IIP Construction of Main canal aqueduct from ch 30200m to 30510m (file with
AD3 MFA
KKIP - Extension of MRBC up to Velanthavalam
IIP - Revision of Hyraulic particulars of Main canal from 24637m to ch 31978m

Draught relief work in Palakkad district. Diversion from Moolthara to Meenkara.


BSP- Venniyode Branch canal-aqueduct from ch 4340m
Diversion scheme from Palakapandy weir to Chulliyar dam.

MRVP-Approval of Hydraulic particulars


IIP - Revision of Hyraulic particulars of link canal
MVIP Constructing kadapoor distributory from ch 0m to 1920m including CD
works Flood damage at Ch 1242 M

WRD-KIP-permanent rectification to the breached portion at ch2100m of LBMC

IIP Constructing main canal from ch 23398 to to 23676m including transition .

IIP Constructing LLC from ch 7300m to ch 8100m including CD works. Balance


work revised HP due to introduction of flume and extension of flume

KIP-LBMC permanent measures to the collapsed embankment portion between


ch 37600m to 37800m at ponmannoor near Kottarakkara.
MVIP Constructing Anicadu east minor distributory from ch 0m to 1855m
including CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works (HP)

MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to


2000m including regulator,cut & cover and CD works. Design of Open flume
between ch 3265m & 3320m.

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch 100m & 245m and open flume between ch
245m & 269m

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch1800m & 1930m and open flume between ch
1129m & 1186m

MIRPA -Constructing of check dam across Bharathapuzha at painkulam in Panjal


Panchayath in Trissur District

MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to


3650m. Design of syphon aqueduct with DI pipe between ch 1023m & 1164m.

MIRPA- Construction of a VCB cum Bridge across Pattukuthuthodu in Ward No 14


of Elamkulam panchayath

IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7311m to 7340m (4x1.7m)
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7644m to 7687m (5x1.7m)

IIPnConstructing Pressure syphon from ch 13832.50 to 13876.5m (Railway


crossing) Revision of HP from ch 13822.5m to 13879.5m

Construction of VCB cum Bridge across Mavullapoyil thodu at Mavullapoyil in


Eramam Kuttoor Panchayath in Kannur District

Construction of VCB across Shriya riverat Kalyate in Enmakaje Panchayath of


Kasargod Taluk in Kasarkode District.

NABARD-Constructuin of VCB cum Bridge across Kanjirapuzha at Nambooripotty


Kalikadavu in Chaliyar Grama Panchayath

MVIP Costructing Madakkathanam Minor Distributory from ch 0m to 3765 m


including flume cut & cover and CD works except aqueduct and flume from
ch.690 to 1522m

Construction of Left Bank canal Shutter of Moolathara Design of Wheel gates-


Design approval

Hydraulicparticulars of proposed box structure of existing Vellayani Branch canal


for shifting to extreame edge of the row for four lane of existing TVPM Bypass
from Kayamkulam to Mukkola in NH 47
IIP - Construction of Flume & Deep fill culvert from Ch 2/000 KM to 3/000 KM
reg. --Orginal proposal returned
Construction of Regulator cum Bridge at kankakkadavu across Bharathapuzha in
Kuttipuram Panchayath- Design Approval
MRVP - Construction of checkdam cum Bridge across Meenachil river
(Kalathukadavu) at Chillachibhagam in Thalappalam of Moonnilavu Panchayath -
Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor Chira- proposal
returned.
Reconstruction of box culvert at Ambanattuchira road near Chilavanoor in
Ernakulam District- Design Approval

Construction of a weir across Thootha river at Kalikkadavu in Aliparambu


Panchayat in Malappuram District Transfered from AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of Moolathara Regulator -
reg -Design approval

LLC aqueduct at ch: 3740m - installation of valve from Idamalayar Irrigation


Project canal to Komarappadam branch canal

KIFBI-Construction of checkdam across Ithikkarayar at mannayamkadavu for


supplying water to Kalluvathukkal,Parippally and Velinalloor villages under
samagrakudivellapadhathi reg.
Construction of a weir across Kadalundi river near vattanikadavu (Irumbuzhi) in
Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at Kaneepadukkam
in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar Chirakadavu at
Panathady Panchayath

KIP- Construction of syphon at 165 m in Kollaka Distributory reg.

Note File

Construction of VCB across Shiriya river at Kalyate in Enmakaye Panchayath

IIP - Construction of LLC from Ch 10490 - 12000 m including CD works

Construction of checkdam cum bridge at vallakadavu Pareekkanni connecting


Kavalangad and pullarimangalam Panchayath in Ernakulam District