B. Rizal March 2017

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

BAS0 RIZAL

◊ CURRICULUM VITAE

A. PERSONAL PARTICULARS
Name : Ir. Baso Rizal
Date and Place of Birth : 27th July 1980, Sengkang, South Sulawesi, Indonesia.
Gender : Male
Classification : Pipeline/Piping Engineer
Mobile Phone : (+62) 811 868 8797
Language : English and Indonesian
Passport Number : P IDN B 2390597
Total Experience : 10 Years
Nationality : Indonesian
E-mail : [email protected]
Marital Status : Married
Permanent Address : JL. Tebet Dalam 2 d RT: OO9 RW: 01
No. 19 c, Tebet - Jakarta Selatan, Indonesia.

B. EDUCATION
 Bachelor of Mechanical Engineering, BRAWIJAYA UNIVERSITY, Malang, graduated in
2007
 Mechanical Engineering, UJUNG PANDANG STATE POLYTECHNIC, Ujung Pandang,
graduated in 2004

C. PROFESSIONAL MEMBERSHIP
 Institution of Engineers Indonesia (IEI), Reg. Number : 0905.09.025445
 Joint International Research Centre on Subsea Technology (JIRC-ST) - international
society of ocean, mechanical and aerospace scientists and engineering (ISOMAse)

D. PROFESSIONAL SKILLS
 Onshore Pipeline&Offshore Pipeline.
 Experienced in piping construction and insulation project at EPC Company.
 Experienced in Onshore& OffshorePipeline Engineering and Onshore Construction at
Project Management Consultancy (PMC) Company.
 Capable read isometric drawings with MTO & Supports and work accordingly.
 Solid knowledge of applicable Codes and Standards such as API, ASME and DNV.
 Good knowledge of Feasibility study, conceptual design, FEED, detail
design/Engineering, and familiar with Stress Analysis Using CAESAR II, Pipe lay analysis,
RFQ, Data Sheet, Make a calculation Pipeline report such us Analysis Thermal
Expansion, Stability/Buoyancy Analysis, Up heal Buckling Analysis, Wall Thickness
Calculation, Hydro test Calculation, Bending Analysis, Free Span Analysis, Pipe and Riser
Stress Analysis, inteligent pig.

E. ENGINEERING SOFTWARE SKILLS


 Comprehensive knowledge of piping/Pipeline system using Caesar II software to qualify
piping/Pipeline in accordance with ASME codes, project standard and project
specifications.
- Evaluate calculated stress result, displacements, and pipe support loads.
- Prepare analytical reports determining the reactions of piping / pipeline on
equipment and structures.

Page 1 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

- Review proposed piping / pipeline support systems, anchor flnage, identify


issues, and recommend appropriate, cost-effective solutions.
 Experienced to solve problem stress analysis, Riser, buried pipe, nozzle both vessel
displacement and flange leakage for suction pump.
 Orcaflex, prepare analytical reports static and dynamic of offshore marine systems for
Flexible Risers, mooring, and Pipe lay analysis.

F. TECHNICAL TRAINING
 Basic Sea Survival Training, held by PT. Safetindo Perkasa, Certificate, No.
BSS/SPOT/11738/2015, Valid from 28 January 2015 until 28 January 2018.
 The Engineering and Technology of Subsea System Oil and Gas : Case Studies and
Assessment on Shallow Ultra-Deep Water(ASME B31.4& DNV OS F101), held by Institution
of Engineers Indonesia ( IEI ), August 2015, certificate.
 Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids(ASME B31.4)
and Gas Transmission and Distribution Piping Systems(ASME B31.8) held by Institution of
Engineers Indonesia ( IEI ), September 2013, certificate.
 Pipe Stress Analysis training using CAESAR II.5 held by Ap-greid Oil & Gas Design Course,
Certificate, March 2013.

G. DESIGN TRAINING
 PIPING 3D MODELLING DESIGNER using PDMS, PT. SINERGY MITRA UTAMA, at
Mechanical Engineering Dept. Mercu Buana University, certificate, 2010.
 Piping Drafting Training (Semi Piping Designer) – held by ap-greid oil & gas
design course, 2013
 Drafter (AUTOCAD 2 & 3D),BLKI (Balai latihan kerja Indonesia), Makassar, certificate.

H. MANAGEMENT TRAINING
 Legal Contract on Engineering Procurement and construction (EPC) / Turnkey Projects,
FIDIC Contract Guide : General Condition Of contract, claims, Dsipute and Arbitration,
held by Institution of Engineers Indonesia ( IEI ), June2015, certificate.

I. ENGINEERING SEMINARS
 Post trenching study during pipelines and operation - The post trenching study
considering local analysis approach using ABAQUS finite element software - , Held by
PT. Energy Bangun, 11 Sep. 2015
 In-house Workshop Spec. Subsea Hose and Floating Hose, PHE ONWJ, December 2015.
 Potential of Co2 Utilization From Oil And Gas Field Production, Expert Association of Oil
and Gas Production Facilities Indonesia (IAFMI, Ikatan Ahli Fasilitas Produksi Minyak dan
Gas Bumi Indonesia), Friday 21 july 2017, Jakarta.

J. COMPUTER LITERATE
 Engineer &Design Software:
­ CAESAR II - Intermediate level
­ Orcaflex - Beginner level
­ Mooses - Beginner level
­ PDMS - Beginner level
­ Auto Cad 2D & 3D - Intermediate level
 Spread Sheet :
­ Microsoft Office Excel - Intermediate level
­ Microsoft Project- Intermediate level
­ MathCad - Intermediate level
 Word Processing and Presentation:
­ Microsoft Office Word - Intermediate level

Page 2 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

­ Microsoft Office Power Point - Intermediate level

K. EMPLOYMENT RECORD
1. EMPLOYER : PT. Titis Sampurna
Business Line : Engineering, Operation & Management oil and Gas (CNG,LNG,
LPG/Gas Extraction Plant), also Investment in Oil & Gas sector.
Period : December 2016 until Present.
Position Held : Pipeline Engineer/Piping Engineer.
Project Involved :
1. Bid Tender EPCI Pipeline Repair Manual, Lug and Bolt
Method/Mechanical Bolt-On Clamp (Sleeve) of KP 47 Grissik-
Singapore, TGI Onshore Jambi Pipeline, PT. Trasnportasi Gas Indonesia
2. In-Line Inspection/ILI (Inteligent Pig) 60 Km 8” Pipeline Air Serdang to
SP. Beringin & 10” Pipeline SP. Beringin to SKG. Limau Timur. Pertamina
EP Prabumulih.
3. Onshore Pipeline Gas Distribution from Pelabuhan Tanjung Perak -
Terminal Teluk Lamong 22 KM , 12” Seamless Pipe API 5L-X52, PT.
Indonesia power and PT.Pembangkitan Jawa Bali (PT. PJB)
4. Onshore Pipeline Oil Distribution 165 Km, from Blok Station Tampi to
PT.SRMD – Jene. 6” Seamless pipe API 5L-Gr. B
5. Design engineering Gas Pipeline 12 inch from PT. PJB Gresik to PT.
Indonesia Power Tanjung Perak 22 Km.
Main Duties :
 Site survey pre-design Pipeline Engineering.
 Preparation Pipeline Specifications.
 Estimation Engineering/BOQ for Bid Stage.
 Preparation for Master Derivable List (MDR).
 Review, analysis problem, calculation, and final design based on Design Master
Derivable List (MDL):
­ Wall Thickness Pipe Calculation.
­ Pipeline free span calculation.
­ Pipeline Crossing Analysis as API 1102.
­ Field Bend Analysis and calculation (natural, cold, and hot bending).
­ Pipeline Buoyancy Analysis and calculation.
­ Pipeline Lowering Analysis, etc.
 Review and arrange for pipe stress analysis.

2. EMPLOYER : PT. SINGGAR MULIA


Business Line : Engineering, Consultancy Company Oil and Gas Sectors.
Period : October 2016 until December 2016
Position Held : Pipeline Engineer
Project Involved :
1. Onshore Pipeline 130 Km, FEED Development of Non Associated Gas
from SABAR- NEB UTAF Field BCD-505-CA, PetroChina (PCI).
2. Offshore Pipeline, SUBSEA PIPELINE OF LESA-KLB (Pipe 10” 9.7 Km),
KKNA-KKA (2.7 Km) & BG-BC (Pipe 10” 2.6 Km), PERTAMINA HE ONWJ.
Main Duties:
 Site survey pre-design Pipeline Engineering.
 Preparation Pipeline Specifications.
 Estimation Engineering/BOQ.
 Preparation for Master Derivable List (MDR).
 Preparation Pipeline Datasheet :
­ Line Pipe Datasheet.
­ Corrosion Coating Datasheet.
­ Field Joint Coating Datasheet.

Page 3 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

­ Cathodic Protection Datasheet.


­ Hot Induction Bends Datasheet.
­ Monolithic Insulation Joint Datasheet.
­ Anchor Flange Datasheet.
­ Barred Tee Datasheet.
 Pipeline Installation Calculation and Design Analysis Report :
­ On-Bottom Analysis Report.
­ Design Calculation Wall Thickness.
­ Pipeline free span calculation.
­ Pipeline Crossing Analysis as API 1102.
­ Field Bend Analysis and calculation (natural, cold, and hot bending).
­ Pipeline Buoyancy Analysis and calculation.
­ Anchoring analysis.
­ Pipeline Lowering Analysis.
­ Pipeline Cathodic Protection Analysis and calculation.
 Pipeline stress analysis report.

3. EMPLOYER : PT. Mahakarya Andalan Nusantara


Business Line : OIL & GAS Engineering Consultancy Company.
Period : June 2016 until October 2016.
Position Held : Pipeline Engineer
Project Involved :
Company Client PT. PGN (PT. PERUSAHAAN GAS NEGARA).
Job Distribution Network Reliability SBU Region :
1. Pipeline onshore for Bekasi, Cilegon, Bogor and Palembang PIM 2 Area
Network Reliability, Carbon steel pipe API 5L-X52 and API 5L Gr. B :
­ Detail Engineering Desain Bekasi Area, start point at MR/S Rawa
Lumbu to MR/S Narogong, Pipe 8” 14 Km long.
­ Detail Engineering Desain Cilegon Area, start point at Bukit Al
Kadra Anyer, Pipe 16” 0.5 Km long.
­ Detail Engineering Desain Cilegon Area, start point Bukit Pelindo
II, Pipe 16” 1.3 Km long.
­ Detail Engineering Desain Bogor Area, Simpang Gas Alam – Ice
Woody (Jalan Raya Bogor), Pipe 10” 3.8 Km long.
­ Detail Engineering Desain Bogor Area, PT. Maxim – Cibinong
(Jalan Raya Bogor), Pipe 10” with 2.9 Km long.
­ Detail Engineering Desain Bogor Area, Warung Jambu – PT.
Good year, Pipe 8” with 2.15 Km Long.
­ Detail Engineering Desain Bogor Area, Taman PAM – PT. Unitex
(Jl. Raya Tajur), Pipe 10” with 2.91 Km Long.
­ Detail Engineering Desain Bogor Area, Tepung Tapioka –
Warung Jambu Area Bogor, Pipe 10” with 3.25 Km Long.
­ Detail Engineering Desain Bogor Area, Looping Pipa Citeureup
– Jalan Raya Bogor, Pipe 10” with 8.8 Km Long.
­ Detail Engineering Desain Palembang Area, PIM 2, Pipe 6” with
4.4 Km Long.
2. Pipeline onshore for Cirebon, and Bekasi Area Network Reliability,
Polyethilene (PE) Pipe:
­ Pipeline onshore Cirebon area, Looping DTR R/S Sector I to R/S
sector R. Pipe PE 125 mm, 0.8 KM long.
­ Pipeline onshore Cirebon area, Looping DTR R/S Sector I to R/S
sector SA. Pipe PE 125 mm, 0.55 KM long.
­ Pipeline onshore Cirebon area, Looping DTR R/S Sector MB to
R/S sector T. Pipe PE 125 mm, 0.012 KM long.
­ Pipeline onshore Looping Cirebon area, DTR DTM Kalijaga to R/S
sector Gardenia. Pipe PE 125 mm, 0.7 KM long.

Page 4 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

­ Pipeline onshore Looping Bekasi area, Looping R/S Sector Setia


Mekar. Pipe PE 63 mm, 0.1 KM long.
­ Pipeline onshore Looping Bekasi area, Looping R/S Sector Rawa
Tembaga. Pipe PE 63 mm, 0.1 KM long.
­ Pipeline onshore Looping Bekasi area, Looping R/S Sector
Margahayu. Pipe PE 63 mm, 0.1 KM long.
Main Duties:
 Site survey for Hot Tapping Point, HDD Entry and Exit Point, Sectional Valve
Point/Location.
 Prepare analysis problem, calculation, and final detail design based on Design
Submission Schedule(DSS):
­ Wall Thickness Pipe Calculation.
­ Pipeline free span calculation.
­ Pipeline Crossing Analysis as API 1102.
­ Field Bend Analysis and calculation (natural, cold, and hot bending).
­ Pipeline Buoyancy Analysis and calculation for swampy and river
crossing area.
­ Pipeline Lowering Analysis, etc.
 Analysis and calculation for loads of pipe support on bridges using pipe stress
analysis.
 Prepare document Analysis and calculation Road crossing for boring activity,
River crossing (boring and sinker), Cleaning, Pigging/Gauging, Hydro test, Drying-
N2 Purging, Pre commissioning/commissioning and Gas In.
 Arrange As build Allignment sheet as per actual site condition.

4. EMPLOYER : PT. SINGGAR MULIA


Business Line : Engineering, Consultancy Company Oil and Gas Sectors.
Period : August, 2014 until June, 2016.
Position Held : Pipeline/Piping Engineer
Project Involved :
3. EPCI FOR MDA & MBH Fields Development, Consortium of PT. Timas
Suplindo & PT Bakrie Construction, Husky Cnooc Madura Ltd.
4. Offshore Pipeline, Project Sejadi Gas Lift Pipeline, Sepinggan
Production platform to Sejadi platform, East Borneo, CHEVRON.
5. Offshore and onshore, FEED OO-OC-OX Field Development Project
consist of 15km-12in Pipeline from OOA Platform and 5km-6in Pipeline
from OCA Platform to Oscar ORFand OO-OC-OX Field Development
(Balongan), PERTAMINA PHE ONWJ.
6. Offshore and Onshore Pipeline 250 KM, Doris& GRT GAZ, Feasibility
study project East Java – Bali Pipeline project, , Gas Power Plant
(PLTG).
7. Onshore Pipeline, Project JTB-Exxon Mobile Pertamina EP Cepu,
Pipeline (Jimbaran Tiung Biru)
8. Onshore Pipeline, ConocoPhilips : Detail Engineering Design, Dayung
#3 Produced Water Flowline Project, Onshore Pipeline,Flexible
Pipe/RTP Pipe 3KM.
9. Onshore Pipeline,Front End Engineering Design (FEED) Construction
SP Tegal Pacing, PT. Pertamina EP, Onshore Pipeline 30 Km.
10. Project spec Complience with SNI, PHE ONWJ.
Main Duties:
 Site survey for feasibility studies /pre-design Pipeline Engineering.
 Prepare and report for ROW feasibility studies.
 Preparation Pipeline/Piping Specifications For onshore and offshore.
 Preparation Pipeline/Piping Request For Quatation(RFQ), Technical Bid
Evaluation(TBE).
 Estimation Engineering/BOQ.

Page 5 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

 Responsibilities for FEED and DED (Detail Engineering Design).


 Preparation for Master Derivable List (MDR).
 Preparation Pipeline/Piping Datasheet For onshore and offshore :
­ Line Pipe Datasheet.
­ Corrosion Coating Datasheet.
­ Field Joint Coating Datasheet.
­ Cathodic Protection Datasheet.
­ Hot Induction Bends Datasheet.
­ Monolithic Insulation Joint Datasheet.
­ Anchor Flange Datasheet.
­ Barred Tee Datasheet.
­ SP Item Bug Screen
­ SP Item Flame Arrestor
­ SP Item Flexible Hose
­ SP Item Insulation Gasket
­ SP Item Corrosion Probe & Coupon
­ SP Item Sample Connection
 Pipeline Installation Calculation and Design Analysis Report For onshore and
offshore :
­ External Corrosion Coating Design.
­ On-Bottom Analysis Report.
­ Design Calculation Wall Thickness.
­ Pipeline free span calculation.
­ Pipeline Crossing Analysis as API 1102.
­ Field Bend Analysis and calculation (natural, cold, and hot bending).
­ Pipeline Buoyancy Analysis and calculation.
­ Anchoring analysis.
­ Pipeline Lowering Analysis.
­ Pipeline Cathodic Protection Analysis and calculation.
 Pipeline Onshore Installation Procedure:
­ Installation Aboveground Piping Procedure.
­ Installation Underground Piping Procedure.
­ Pipe Coating and Wrapping Procedure.
­ Procedure of Cleaning, Flushing and Blowing.
­ Procedure of Trenching & Backfill.
­ Procedure of Pigging.
­ General Procedure of Road & River Crossing.
­ Pipeline pre-commissioning & Hydro testing.
 Pipeline stress analysis report.
 Riser Stress Analysis.

5. EMPLOYER : PT. Connusa Energindo


Business Line : Project Managemenet Construction (PMC), Consultancy Company
for Power Plant, Oil and Gas Sectors.
Period : Sept. 2013 until 22 August 2014.
Position Held : Pipeline Engineer
Project Involved :
Client PT. PGN (PT. PERUSAHAAN GAS NEGARA) :
1. SBU 2 Relocation Project, Kalisogo – Waru Gas Distribution Pipeline
Project (CP-20), 30 Km long.
2. SBU 2 Relocation Project, Ajinomoto – Cheil Jedang Gas Distribution
Pipeline Project (CP-18), 27 Km long.
3. SBU 2 Relocation Project, Otsuka - Purwosari Gas Distribution Pipeline
Project (CP-19), 15 Km long.
4. SBU 2 Relocation Project, Japanan Metering Station Project (CP-17)

Page 6 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

5. SBU 2 Relocation Project, Semarang Gas Distribution Pipeline Project


(CP-16),48 Km long.
Main Duties:
 Experience with Enquiry Requirements Base on Fidic Yellow Book.
 EWS, Evaluation works shop for bid document from contractor.
 Site survey for feasibility studies / pre-design Pipeline Engineering.
 Estimation Engineering/BOQ.
 Prepare Employer’s Requirements–Chapter Onshore Pipeline.
 Review Material Take Off (MTO).
 Review, analysis problem, calculation, and final design based on Design
Submission Schedule(DSS) / Master Derivable List (MDL):
­ Wall Thickness Pipe Calculation.
­ Pipeline free span calculation.
­ Pipeline Crossing Analysis as API 1102.
­ Field Bend Analysis and calculation (natural, cold, and hot bending).
­ Pipeline Buoyancy Analysis and calculation.
­ Pipeline Lowering Analysis, etc.
 Review and arrange for pipe stress analysis.
 Detail design/Engineering.

6. EMPLOYER : PT. SHAFTINDO ENERGI


Business Line : Coating, Pipeline & Piping Construction Oil and Gas.
Period : Marc 2013 until September 2013.
Position Held : Piping/Pipeline Engineer
Project Involved :
1. Piping Onshore pigging Facility Upgrade Bacth 1, ConocoPhilips.
2. Piping Suban 13, 14 dan 2 Shutdown Tie Ins Provision Project.
ConocoPhilips.
Main Duties:
 Prepare Material Take Off (MTO).
 Quality Assurance of Piping Engineering Works.
 Analysis problem, calculation, and final design.
 Line check and command for construction.
 Check & review the design drawing as per P&ID.
 Prepare shop drawing as per design approved client.
 Prepare test package as per test block diagram.
 Prepare as built drawing.
 Prepare BOQ.
 Prepare and arrange document for contract administration.
 Controlling document.
 Prepare and arrange a budget plan.
 Prepare and arrange a plan and work schedule.
 Prepare and arrange Master deliverable list.

7. EMPLOYER : PT. LINTAS TEKNOLOGI INDONESIA


Period : 2011 until 2013
Position Held : Project Engineer
Main Duties :
 Site survey in pre project installation to determine MTO for pre project
contract/tender.
 Supervisory installation equipment, test commissioning & handover to customer.
 Prepare and arrange BOQ for Project or installation requirements.
 Maintain the equipment in warranty period & keep good technical relationship
with customer.
 Prepare and arrange SOP installation, test commissioning, QC, maintenance,
troubleshooting for both internal company & customer.

Page 7 of 8
BAS0 RIZAL
◊ CURRICULUM VITAE

8. EMPLOYER : PT. PIACENTINI TURCHI INDONESIA


Business Line : Civil Construction
Period : 2010 until 2011.
Position Held : QC Engineer.
Project Involved : Saipem Karimun Yard Construction Project, Quay Wall Construction
Project, 927m long.
Main Duties:
 Material controls and progress reporting (QC/QA).
 Daily Progress preparation and Monitoring.
 Check the Fit up, Dimension & Orientation as per Eng. Standard.
 Preparing the Actual materials requirement as per Drawing & Design.
 To provide effective supervision and quality of work as per specification.
 Co-ordination with surveyor persons for dimensions, straightness, and the position
ready for installation (mooring point, king piles, sheet piles, tie rods, etc.).
 Record of all activities in the field, including recording all available data.
 Record and supervise Rock socket activities.

9. EMPLOYER : PT. BAYU BUANA MANDIRI


Business Line : Piping Construction Oil & Gas
Period : 2008 until 2009.
Position Held : Procurement
Main Duties:
 Organized for and oversaw the purchase of goods and services.
 Checked the received supplies to ensure they were in order Inspected supplies
before purchase (pipe and fitting).
 Supervised and re-check offloading and distribution of delivered supplies.

10. EMPLOYER : KAEFER KRAZU JOINT VENTURE


Business Line : Insulation in Oil &Gas
Period : 2007
Position Held : Project Engineer
Project Involved :McDermott Fabrication Yard at Batam – Indonesia Pre-Assembly
Modules of Woodside LNG Expansion Project
Main Duties :
 Progress reporting.
 Review material specification.
 Controlling document.
 Material controls.
 Prepare and arrange a plan and work schedule.

L. REFERENCES
Referees will be provided upon request

Yours truly,
Ir. Baso Rizal

Page 8 of 8

You might also like