Risk Assessment Form
Risk Assessment Form
Risk Assessment Form
Purpose of Work :
Date & Time :
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Note :- Here "OK" means, that GDC engineer has no issue to verified above points at the time of
Risks involved
Access /egress to the work area
Slip & trip hazards or falling objects
Improper access ladder or Unprotected stairway
Unprotected edges
Structural damages to foundations or tower
Unavailability of proper work platforms /tower members
Presence of bees hives, bird nests, etc
Overhead High Tension lines in close proximity to work area
Extreme weather conditions
Lighting / visibility
Is the Lifting Plan & Method Statement present and referred at site. Capture a photo.
Are there insufficient/inadequate lifting equipment (rope, pulley & other lifting equipment )
Loosely coupled or unshackled material or tool
Untrained material handling team
Note :- Here "OK" means, that GDC engineer has no issue to verified above points at the time of Activity.
Location:
Engineer Name :
TI Partner Name :
L OK
L OK
L OK
L OK
L OK
L what would I have to do, to get this point??
L OK
L OK
Site ID :
Purpose of Work :
Date & Time :
No.
1
2
3
4
5
6
9
10
11
12
13
14
15
16
Note :- (i). Here "OK" means, that GDC engineer has no issue to verified above points at the time of Activ
Consideration
Is the person authorized/trained and competent to work at height?
Is the scope of work properly communicated to the permit receiver?
Is the person not wearing an implanted medical device (pacemakers and defibrillators)?
Is the Supervisor aware of sector shutdown / power down procedures if temporary access is required in front lobe of
antenna?
Is the height worker told to discontinue work and return to base, if he feels or perceives any work condition as
unsafe?
Team Supervisor present at site(take a team selfie by supervisor so that team photo is captured)
). Here "OK" means, that GDC engineer has no issue to verified above points at the time of Activity.
Location:
Engineer Name :
TI Partner Name :
Pass ok
Comments during meeting
Note :- (i). Here "OK" means, that GDC engineer has no issue to verified above points at the time of Activ
ality Check List
Remarks Category
All
All
All
Antenna
Antenna
Antenna
Site engineer to test & show `
Antenna
Antenna
Antenna / RF module
applicable for 2G Sites RF feeder
applicable for 2G Sites RF feeder
RF module
RF module
RF module
RF module
RF module
RF module
applicable for 2G Sites RF Module
applicable for 2G Sites RF Module
RF module
RF Module
RF Module / System Module
RF Module / System Module
RF Module / System Module
Tower top
Tower top
Tower top
Logical/ LED status System module
System module
System module
System module
System module
System module
System module
System module
System module
System module
System module
System module
DCDB
Indoor only for SRAN sites
Indoor only for SRAN sites
Indoor only for SRAN sites