STANDAR HARGA SATUAN DASAR UPAH

NO MATERIAL SATUAN KODE

A. UPAH
1 Pekerja Org/hari L. 01
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listr Org/hari L. 02
3 Kepala Tukang Org/hari L. 03
4 Mandor Org/hari L. 04
5 Ahli alat berat (mekanik) Org/hari L. 07
6 Operator Alat Berat Org/hari L. 08
7 Pembantu Operator Org/hari L. 09
8 Supir Truk Org/hari L. 10
9 Kenek truk Org/hari L. 11

STANDAR HARGA SATUAN DASAR BAHAN

NO MATERIAL SATUAN

B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 3-5 cm M³
6 Batu pecah 2-3 cm M³
7 Batu pecah 1-2 cm M³
8 Batu pecah 0,5-1 cm M³
9 Stone Dust M³
10 Aspal Kg
11 Aspal Emulsi (Teak Coat) Kg
12 Aspal Emulsi (Prime Coat) Kg
13 Aspal Sealent Kg
14 Pasir Kasar M³
15 Pasir Halus M³
16 Semen PC Zak
17 Semen PC Kg
NO MATERIAL SATUAN

18 Tanah Ex. Peniraman M³


19 Tanah Pilihan (Paladis/Tanah Bukit Tokok) M³
20 Paving Block Bh
21 Paving Stone Bh
22 Batu Bata 5 x 11 x 22cm Bh
23 Bataco 15 x 30 x 7 cm Bh
24 Bataco 20 x 40 x 9 cm ( press ) Bh
25 Bataco 20 x 40 x 7 cm ( press ) Bh
26 Kerawang ( roster ) 18 x 18 cm Bh
27 Kerawang press ( roster ) 30 x 30 cm Bh
28 Keramik 20 x 20 cm Polished ex Roman Kotak
29 Keramik 20 x 20 cm Unpolished ex Roman Kotak
30 Keramik 30 x 30 cm Polished ex Roman Kotak
31 Keramik 30 x 30 cm Unpolished ex Roman Kotak
32 Keramik 40 x 40 cm Polished ex Roman Kotak
33 Keramik 40 x 40 cm Unpolished ex Roman Kotak
34 Keramik 30 x 60 cm Polished (setaraf Indogress) Kotak
35 Keramik 30 x 60 cm Unpolished (setaraf Indogress) Kotak
36 Keramik 40 x 40 cm Polished (setaraf Indogress) Kotak
37 Keramik 40 x 40 cm Unpolished (setaraf Indogress) Kotak
38 Keramik 60 x 60 cm Polished (setaraf Indogress) Kotak
39 Keramik 60 x 60 cm Unpolished (setaraf Indogress) Kotak
40 Keramik dinding 20 x 20 cm ex Roman Kotak
41 Keramik dinding 20 x 25 cm ex Roman Kotak
42 Marmer M²
43 Wood Flooring M²
44 List Keramik WC. 8 x 20 cm Bh
45 Plint Kayu uk. 2 x 10 cm Bh
46 Floor Hardener Kg
47 Beton Ready Mix B 0 M³
48 Beton Ready Mix 125 M³
49 Beton Ready Mix 175 M³
50 Beton Ready Mix 225 M³
51 Beton Ready Mix 250 M³
52 Beton Ready Mix 300 M³
53 Beton Ready Mix 350 M³
54 Beton Ready Mix 400 M³
55 Beton Ready Mix 450 M³
56 Additive Ready Mix Liter
57 Karung Goni Curing Beton ( 0.7m² ) Lembar
58 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, 4 D 16, ø 6 K 300 - 6m Btg
59 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, 8 D 13, ø 6 K 350 - 6m Btg
60 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 4 D 16, ø 6 K 300 - 6m Btg
61 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D 13, ø 6 K 350 -6 m Btg
62 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 30 x 30, 4 D 16, ø 6 K 450 - 6m Btg
63 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, 8 D 13, ø 6 K 350 - 8m Btg
64 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D 16, ø 6 K 350 - 9m Btg
65 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 350 - 6m Btg
66 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 450 - 6m Btg
67 Sheetpile 0,6 x 0,15 x 4 meter K.350 (Besi Ulir D 13 Polos D 6) Btg
NO MATERIAL SATUAN

68 Sheetpile 0,6 x 0,15 x 5 meter K.350 (Besi Ulir D 13 Polos D 6) Btg


69 Sheetpile 0,6 x 0,15 x 6 meter K.350 (Besi Ulir D 13 Polos D 6) Btg
70 Sewa Pompa Ready Mix (Min. 100 M³) M³
71 Bahan Plastik Cor Beton M²
72 Kansteen / kerb beton 20x30x60 bh
73 Kansteen / kerb beton 16x28x45 bh

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³
10 Ky. Belian ketam Uk. 6/6 - 4 M M³
11 Ky. Belian ketam Uk. 7/7 - 4 M M³
12 Ky. Belian ketam Uk. 8/8 - 4 M M³
13 Ky. Belian ketam Uk. 5/10 - 4 M M³
14 Ky. Belian ketam Uk. 4/8 - 4 M M³
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
16 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam ) M³
20 Kusen Ky Belian uk. 5/10 Meter
21 Kusen Ky Kelas I Bangkirai uk. 5/10 Meter
22 Kusen Ky Kelas II uk. 5/10 Meter
23 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
33 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
34 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
35 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
36 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
37 Papan belian ketam (4m) M³
38 Papan belian tdk ketam (4m) M³
39 Papan kayu klas II (mabang) tdk ketam M³
40 Papan kayu klas II (mabang) ketam M³
41 Papan kayu klas I tdk ketam M³
42 Papan kayu klas I ketam M³
NO MATERIAL SATUAN

43 Papan mal klas III M³


44 Renglat kayu klas I uk 1/8 cm Btg
45 Kayu profil 10cm Btg
46 Kayu cerucuk /dolken ø 6 - 8 - Pj. 3,8 M Btg
47 Kayu cerucuk /dolken ø 8 - 10 - Pj. 3,8 M Btg
48 Kayu cerucuk /dolken ø 10 - 12 - Pj. 6 M Btg
49 Kayu cerucuk /dolken ø 12 - 15 - Pj. 11 M Btg
50 Alas laci Btg
51 Wood Plank M'
52 Bambu Pj. 10 m Btg

D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat setara Dulux Kg
4 Cat kilat setara Avian Kg
5 Plamur Kg
6 Cat Dasar Alkali Kg
7 Cat Akhir Interior setara Dulux Kg
8 Cat Akhir Eksterior (weather shield) setara Dulux Kg
9 Cat Dasar setara Mowilex Kg
10 Cat Akhir Interior setara Mowilex Kg
11 Cat Akhir Eksterior (weather shield) setara Mowilex Kg
12 Cat Dasar setara Vinilex Kg
13 Cat Akhir Interior setara Vinilex Kg
14 Cat seng (Zinc Chromate) Kg
15 Plitur Kg
16 Thiner Ltr
17 Melamic Ltr
18 Vernis Ltr
19 Meni Kg
20 Oker / Semen Warna Kg
21 Lem Kayu Kg
22 Sealent Kg
23 Soda Api Kg
24 Sabun / cream pembersih kotoran Kg
25 Teak Oil Ltr
26 Ter / Residu Ltr
27 Kuas 4" Bh
28 Cat Marka (non Thermoplas) Kg
29 Cat Marka (Thermoplastic) Kg
30 Cat Kansteen (ex. Matex) Kg
31 Cat Trotoar (ex. Tenokote) Kg
32 Glass Bead Kg
33 Weatherbond Emulsion ( cat kerb ) Kg
34 Cat Water Proofing Kg

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton U 24 Kg
2 Besi Tulangan Beton U 32 Kg
NO MATERIAL SATUAN

3 Besi wire mesh ø 5 Kg


4 Besi wire mesh ø 6 Kg
5 Besi wire mesh ø 8 Kg
6 Kawat baja/bendrat Kg
9 Baut dia 4/8 " pj = 20 cm Btg
10 Besi Penahan bh
11 Beugel plat L. 3 cm bh
12 Plat 1,2 x 2,4 x 12 Bh
13 Besi Profil Kg
14 Kawat Las Btg
15 Kawat Las Kg
16 Kawat harmonika M²
17 Kawat kasa M²
18 Pipa galvanis dia 3/4" Btg
19 Pipa galvanis dia 1/2" Btg
20 Pipa galvanis dia 1" Btg
21 Pipa galvanis dia 1 1/4" Btg
22 Pipa galvanis dia 1 1/2" Btg
23 Pipa galvanis dia 2" Btg
24 Pipa galvanis dia 2,5" Btg
25 Pipa galvanis dia 3" Btg
26 Pipa galvanis dia 4" Btg
27 Pipa galvanis dia 5" Btg
28 Pipa galvanis dia 6,5" Btg
29 Folding gate M²
30 Rangka Aluminium 1 1/2" x 3" Meter
31 Rangka Aluminium 1 3/4" x 4" Meter
32 Pintu Aluminium std IKP, lengkap 4" Unit
33 Kusen Aluminium 3" Putih Meter
34 Kusen Aluminium 3" Hitam Meter
35 Kusen Aluminium 3" Silver Meter
36 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) M²
37 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m M²
38 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) M²
39 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 M²
40 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) M²
41 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m M²
42 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) M²
43 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 M²
44 Reng Rangka Baja Ringan (Polos) uk. 0.40 - 0.45 Pjg 6 m btg
45 Rangka baja truss (0,75-6m) btg
46 Rangka baja truss (0,65-6m) btg
47 Dinabolt bh
48 L. Braket bh
49 Baut truss bh
50 Baut reng bh
51 Baut atap 5 cm bh
52 Alumunium Komposit + Rangka Besi M²
53 Alumunium Komposit 1,24 x 2,44 m (setara alumatec) Lbr
54 Rangka Plafond Metal Furing + Pemasangan M²
NO MATERIAL SATUAN

55 Besi stainles 1" btg


56 Besi tempa btg

F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku triplek Kg
20 Paku GRC Kg
21 Paku Zincalum Kg
22 Paku Onduline Bh
23 Sekrup Onduline Bh
24 Sekrup Gibsum Kg
25 Sekrup Fixer Bh
26 Sekrup Steel Sheet uk. 5 x 15 mm Bh
27 Sekrup Steel Sheet uk. 5 x 25 mm Bh
28 Sekrup Steel Sheet uk. 5 x 35 mm Bh
29 Sekrup Steel Sheet uk. 5 x 45 mm Bh
30 Sekrup Steel Sheet uk. 5 x 50 mm Bh
31 Sekrup Steel Sheet uk. 5 x 55 mm Bh
32 Sekrup Steel Sheet uk. 5 x 65 mm Bh
33 Sekrup Ulir Kayu Bh
34 Paku asbes Bh
35 Sekrup Zincalume Bh
36 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit
37 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit
38 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit
39 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit

G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Permata 0.30 Lbr
5 Genteng Metal Type Prima 0.30 Lbr
NO MATERIAL SATUAN

6 Genteng Metal Type Royal 0.30 Lbr


7 Genteng Metal Type Classic 0.30 Lbr
8 Genteng Metal Type Permata 0.25 Lbr
9 Genteng Metal Type Classic 0.25 Lbr
10 Genteng Metal Type Royal 0.25 Lbr
11 Atap Genteng Onduline Transparan 2 x 0,95 m Lbr
12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam) Lbr
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium) Lbr
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam) Lbr
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino) Lbr
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam) Lbr
17 Perabung Onduline Warna 90 x 50 cm (biru/premium) Lbr
18 Perabung Onduline Warna 90 x 50 cm (florentino) Lbr
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam) Lbr
20 Apron Piece Onduvilla 102 x 14 cm Lbr
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm Lbr
22 Onduband M
23 Atap Seng Metal Soka Abadi Lbr
24 Atap Seng Metal Soka Jempol Lbr
25 Atap Seng Metal Soka Tiara Lbr
26 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
27 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
28 Atap Metal Supersheet 0.35 (polos) M²
29 Atap Metal Supersheet 0.35 (colour) M²
30 Atap Metal Supersheet 0.25 (polos) M²
31 Atap Metal Supersheet 0.25 (colour) M²
32 Atap Trim Deck 0.3 (polos) M²
33 Atap Trim Deck 0.35 (color) M²
34 Atap polycarbonat M²
35 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
36 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
37 Nok bubungan genteng metal kotak 0.35 M'
38 Nok bubungan genteng metal stone kotak 0.35 M'
39 Nok bubungan Trim Deck (polos) M'
40 Nok bubungan Trim Deck (color) M'
41 Seng Gelombang Bjls 30 Lbr
42 Seng Gelombang Bjls 20 Lbr
43 Seng Plat Bjls 20 Lbr
44 Seng Plat Bjls 30 Lbr
45 Seng Plat Bjls 30 (lebar 45 cm) M'
46 Plat Datar Color 0.35 Lbr
47 Zincalume Gelombang Persegi 0.40 (polos) M²
48 Zincalume Gelombang Persegi 0.35 (polos) M²
49 Zincalume Gelombang Persegi 0.30 (polos) M²
50 Zincalume Gelombang Persegi 0.40(color) M²
51 Zincalume Gelombang Persegi 0.35 (color) M²
52 Zincalume Gelombang Persegi 0.30 (color) M²
53 Zincalume Plat 0.2 Lbr
54 Aluminium Foil M²
55 Papan Belian utk Atap uk. 1/15 pj. 50 cm Lbr
NO MATERIAL SATUAN

56 Atap Steel Sheet 0.30 lurus (silver) M


57 Atap Steel Sheet 0.35 lurus (silver) M
58 Atap Steel Sheet 0.4 lurus (silver) M
59 Atap Steel Sheet 0.25 lurus (biru, merah, hijau tua) M
60 Atap Steel Sheet 0.30 lurus (biru, merah, coklat, hijau tua, biru tua) M
61 Atap Steel Sheet 0.35 lurus (coklat, biru, merah, hijau muda) M
62 Atap Steel Sheet 0.40 lurus (biru) M
63 Atap Steel Sheet 0.45 lurus (biru, merah, hijau muda) M
64 Atap Steel Sheet 0.30 lengkung (silver) M
65 Atap Steel Sheet 0.35 lengkung (silver) M
66 Atap Steel Sheet 0.4 lengkung (silver) M
67 Atap Steel Sheet 0.30 lengkung (biru, merah, coklat, hijau tua, biru tua) M
68 Atap Steel Sheet 0.35 lengkung (coklat, biru, merah, hijau muda) M
69 Atap Steel Sheet 0.40 lengkung (biru) M
70 Atap Steel Sheet 0.45 lengkung (biru, merah, hijau muda) M
71 Nok/Prabung Steel Sheet 0.30 lebar 333 mm (silver) M
72 Nok/Prabung Steel Sheet 0.35 lebar 333 mm (silver) M
73 Nok/Prabung Steel Sheet 0.40 lebar 333 mm (silver) M
74 Nok/Prabung Steel Sheet 0.25 lebar 333 mm (biru, merah, hijau tua) M
75 Nok/Prabung Steel Sheet 0.30 lebar 333 mm (biru, merah, coklat, hijau tua, biru tua) M
76 Nok/Prabung Steel Sheet 0.35 lebar 333 mm (coklat, biru, merah, hijau muda) M
77 Nok/Prabung Steel Sheet 0.40 lebar 333 mm (biru) M
78 Nok/Prabung Steel Sheet 0.45 lebar 333 mm (biru, merah, hijau muda) M
79 Nok/Prabung Steel Sheet 0.30 lebar 500 mm (silver) M
80 Nok/Prabung Steel Sheet 0.35 lebar 500 mm (silver) M
81 Nok/Prabung Steel Sheet 0.40 lebar 500 mm (silver) M
82 Nok/Prabung Steel Sheet 0.25 lebar 500 mm (biru, merah, hijau tua) M
83 Nok/Prabung Steel Sheet 0.30 lebar 500 mm (biru, merah, coklat, hijau tua, biru tua) M
84 Nok/Prabung Steel Sheet 0.35 lebar 500 mm (coklat, biru, merah, hijau muda) M
85 Nok/Prabung Steel Sheet 0.40 lebar 500 mm (biru) M
86 Nok/Prabung Steel Sheet 0.45 lebar 500 mm (biru, merah, hijau muda) M

H. BAHAN KACA
1 Kaca Polos, t = 3 mm M²
2 Kaca Polos, t = 5 mm M²
3 Kaca Polos, t = 8 mm M²
4 Kaca Polos, t = 12 mm M²
5 Kaca Rayben, t = 3 mm M²
6 Kaca Rayben, t = 5 mm M²
7 Kaca Rayben, t = 8 mm M²
8 Kaca Rayben, t = 12 mm M²
9 Kaca Cermin t = 3 mm M²
10 Kaca Cermin t = 5 mm M²
11 Kaca Repsol, t = 5 mm M²
12 Sealent Kg
13 Nako + Bingkai (80 x 15) x 10 daun polos Bh
14 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
15 Kaca Es, t = 3 mm M²
16 Kaca Es, t = 5 mm M²
17 Kaca Raindown, t = 5 mm M²
NO MATERIAL SATUAN

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
5 Teakwood t = 3 mm Lbr
6 Formika t = 0,03 mm Lbr
7 Multiplex t = 6 mm Lbr
8 Multiplex t = 9 mm Lbr
9 Multiplex t = 10 mm Lbr
10 Multiplek t = 12 mm Lbr
11 Plywood 4' x 8' x 4mm Lbr
12 Panel GRC 120 x 240 x 40 Lbr
13 GypsumBoard t = 9 mm Lbr
14 Super Plank 10 x 240 x 9 cm Lbr
15 Super Plank 20 x 240 x 9 cm Lbr
16 Super Plank 30 x 240 x 9 cm Lbr

J. BAHAN SANITASI
1 Wastafel setara Toto Bh
2 Kloset duduk monoblok Bh
3 Kloset duduk putih (setaraf TOTO) Bh
4 Kloset duduk warna (setaraf TOTO) Bh
5 Kloset jongkok (setaraf TOTO) Bh
6 Kloset jongkok (setaraf INA) Bh
7 Urinoir setaraf Toto Unit
8 Bak air fibreglass uk. 55x55x60 cm Bh
9 Shower Spray setara Toto Unit
10 Sliding rail setara Toto Unit
11 Floordrain stainless steel setara Toto Bh
12 Floordrain PVC Bh
13 Tempat Sabun Setara Toto Bh
14 Kran zink setara Toto Bh
15 Kitchenzink stainless steel 1 lubang Unit
16 Kran dinding setara Toto Bh
17 Kran air uk 1/2" Bh
25 Pipa PVC dia 1/2" AW ex Wavin Btg
26 Pipa PVC dia 3/4" AW ex Wavin Btg
27 Pipa PVC dia 1" AW ex Wavin Btg
28 Pipa PVC dia 2" AW ex Wavin Btg
29 Pipa PVC dia 3" AW ex Wavin Btg
30 Pipa PVC dia 4" AW ex Wavin Btg
Pipa PVC dia 8" AW ex Wavin Btg
31 Pipa PVC dia 3/4" D ex Wavin Btg
32 Pipa PVC dia 1" D ex Wavin Btg
33 Pipa PVC dia 2" D ex Wavin Btg
34 Pipa PVC dia 3" D ex Wavin Btg
35 Pipa PVC dia 4" D ex Wavin Btg
36 Stop kran dia 1/2" ex onda Bh
37 Stop kran dia 3/4" ex onda Bh
38 Stop kran dia 1" ex onda Bh
39 Tangki air 1000 liter Bh
NO MATERIAL SATUAN

40 Tangki air 500 liter Bh


41 Pelampung otomatis Bh
42 Roof Drain Metal Bh
43 Septicktank Biosel kap. 6,00 m3 Unit
44 Mesin Jet Pump kap.250 watt Unit
45 Mesin Pompa tekan kap. 150 watt Unit

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar industri Ltr
2 Bensin industri Ltr
3 Minyak pelumas/Oli Ltr
4 Minyak tanah Ltr
5 Gas Elpiji Refill 12 kg Kg
6 Sewa Molen Set
7 Sewa Alat Perakitan Set
8 Sewa Peralatan Las Set
9 Alat-alat bantu Set

L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm M²
2 Batu Andesit Ukuran 15 x 30 cm M²
3 Batu Andesit Ukuran 20 x 40 cm M²
4 Batu Andesit Ukuran 30 x 60 cm M²
5 Batu Candi Ukuran 10 x 20 cm M²
6 Batu Candi Ukuran 15 x 30 cm M²
7 Batu Candi Ukuran 20 x 40 cm M²
8 Batu Pacitoroso Ukuran 10 x 20 cm M²
9 Batu Pacitoroso Ukuran 15 x 30 cm M²
10 Batu Pacitoroso Ukuran 20 x 40 cm M²
11 Batu Bali Green Ukuran 10 x 20 cm M²
12 Batu Bali Green Ukuran 15 x 30 cm M²
13 Batu Bali Green Ukuran 20 x 40 cm M²
14 Batu Prasasti Peresmian (batu hitam) ukuran 40 x 60 buah
15 Batu Prasasti Peresmian (batu hitam) ukuran 60 x 80 buah
16 Batu Koral (batu taman) kg
17 Batu Granit Ukuran Lebar 60 cm M²

M. BAHAN ALAT-ALAT LISTRIK


1 Traffo HPL 400 Watt Buah
2 Traffo HPL 250 Watt Buah
3 Traffo HPL 125 Watt Buah
4 Traffo SON T 1000 Watt Buah
5 Traffo SON T 400 Watt Buah
6 Traffo SON T 250 Watt Buah
7 Traffo SON T 150 Watt Buah
8 Traffo SON T 125 Watt Buah
9 Traffo SON T 70 Watt Buah
10 Traffo Neon 40 Watt Buah
11 Traffo Neon 20 Watt Buah
12 HPL 250 Watt Buah
NO MATERIAL SATUAN

13 HPL 125 Watt Buah


19 Bola Lampu HPIT 400 Watt Buah
31 Lampu Sorot 300 Watt (LENGKAP) Buah
50 Bola Lampu Sorot 300 Watt Buah
51 Hologen 500 Watt Buah
52 Hologen 1.000 Watt Buah
90 Box MCB 1 Group Buah
91 Box Time Swich ( Lengkap pipa optic 1,5 +Klem + Kunci ) Set
92 Box KWH Meter Uk. L 35 cm x T 50 cm x LS 25 cm Buah
94 Fitting Duduk Buah
95 Fitting Atom Buah
96 Fitting Gantung E 27 Buah
97 Fitting Duduk E 27 Buah
98 Full Breket Buah
100 Icnitor SN 58 Buah
101 Inector Buah
102 Ignator Buah
103 Kap Hijau E 27 Buah
104 Kap Hijau E 40 Buah
105 Kop Skring Buah
106 k. Skum 10-8 Buah
107 MCB 1.A Buah
108 MCB 2.A Buah
109 MCB 25 A Buah
110 MCB 63 A Buah
111 MCB 40 A Buah
112 MCB 50 A Buah
113 MCB 10 A Buah
114 MCB 16 A Buah
115 MCB 6 A Buah
116 MCB 32 A Buah
117 MCB Box Buah
118 Multi Tester Buah
119 Macon Mec gmg-50 aC Buah
120 Magnetic Contactor 100 A Buah
121 NH Fuse 80 A Buah
122 Ornamen Pijar Buah
125 Solar Seal / Photo Seal Buah
126 Rangka Ring 32 Watt Buah
127 Rel MCB Buah
135 Solder Pistol Buah
136 Solar Seal / Photo Seal Buah
138 Steker T Buah
139 Sadel No. 6 Bungkus
140 Sadel No. 8 Bungkus
141 Sadel No. 9 Bungkus
142 Sadel No. 10 Bungkus
143 Sadel No. 12 Bungkus
144 Sadel No. 14 Bungkus
145 Sadel No. 19 Bungkus
146 Sadel No. 22 Bungkus
147 Stater Buah
NO MATERIAL SATUAN

150 Tang Kombinasi Buah


151 Time Swicht Theben Buah
152 Taping Conector 1 baut Buah
153 Taping Conector 2 baut Buah
154 Tespen Buah
155 Amatur Lampu Son T 250 Watt (lengkap) Set
156 Amatur Lampu Son T 150 Watt (lengkap) Set
162 Wide Klem Buah
163 Pole Breacket Buah
164 Kapasitor Buah
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

105,000.00
125,000.00
145,000.00
155,000.00
125,000.00
170,000.00
100,000.00
115,000.00
80,000.00

HARGA SATUAN DASAR


(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

275,000.00
320,000.00
335,000.00
350,000.00
405,000.00
435,000.00
475,000.00
500,000.00
350,000.00
13,500.00
13,500.00
13,500.00
35,000.00
120,000.00
120,000.00
75,000.00
1,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

300,000.00
350,000.00
3,750.00
4,000.00
2,000.00
1,800.00
2,500.00
2,300.00
20,000.00
60,500.00
81,600.00
98,000.00
95,000.00
95,000.00
100,000.00
111,000.00
243,000.00
243,000.00
154,000.00
155,000.00
320,000.00
323,000.00
98,750.00
102,000.00
1,400,000.00
420,000.00
11,600.00
61,000.00
16,600.00
1,072,500.00
1,108,250.00
1,194,050.00
1,329,800.00
1,372,800.00
1,430,000.00
1,530,100.00
1,601,600.00
1,673,100.00
38,300.00
11,300.00
1,260,000.00
1,440,000.00
1,650,000.00
1,770,000.00
2,340,000.00
2,240,000.00
3,825,000.00
1,122,000.00
1,158,300.00
1,380,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

1,725,000.00
2,070,000.00
33,000.00
3,000.00
60,000.00
50,000.00

11,805,000.00
11,700,000.00
8,950,000.00
8,750,000.00
9,567,900.00
10,000,000.00
13,020,900.00
10,416,700.00
11,500,000.00
12,800,000.00
12,500,000.00
11,015,700.00
11,000,000.00
11,718,750.00
7,421,875.00
7,500,000.00
7,800,000.00
7,840,000.00
9,050,000.00
120,000.00
80,000.00
65,000.00
4,440,000.00
4,716,717.69
5,070,000.00
4,755,000.00
3,355,000.00
3,576,000.00
4,224,000.00
5,468,750.00
4,589,000.00
4,634,000.00
4,531,000.00
5,600,000.00
2,500,000.00
2,083,000.00
14,814,000.00
13,880,000.00
7,060,000.00
8,300,000.00
10,819,800.00
11,188,300.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

2,558,000.00
18,000.00
35,000.00
9,000.00
12,000.00
85,000.00
150,000.00
11,000.00
77,500.00
12,000.00

3,500.00
36,000.00
70,000.00
70,000.00
31,500.00
140,000.00
104,000.00
107,000.00
70,000.00
84,000.00
104,000.00
27,000.00
28,000.00
44,000.00
64,000.00
25,000.00
67,000.00
45,000.00
52,000.00
14,000.00
18,500.00
35,900.00
24,500.00
15,700.00
60,000.00
58,400.00
24,000.00
65,000.00
95,000.00
53,750.00
41,250.00
30,000.00
39,000.00
78,500.00

12,000.00
13,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

13,000.00
13,000.00
13,000.00
23,000.00
5,000.00
16,000.00
15,000.00
310,000.00
13,500.00
5,300.00
28,500.00
35,000.00
16,000.00
140,000.00
110,000.00
169,000.00
227,000.00
287,000.00
375,000.00
450,000.00
582,500.00
925,000.00
1,071,300.00
1,721,700.00
715,000.00
85,000.00
95,000.00
1,500,000.00
120,000.00
85,000.00
75,000.00
235,200.00
272,500.00
250,000.00
304,100.00
175,000.00
225,400.00
193,900.00
257,000.00
52,500.00
82,000.00
75,000.00
5,700.00
6,000.00
800.00
800.00
800.00
908,700.00
1,339,100.00
130,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

145,000.00
69,600.00

266,000.00
14,400.00
15,400.00
135,000.00
18,800.00
29,000.00
18,900.00
8,800.00
179,100.00
162,500.00
47,500.00
57,500.00
78,800.00
190,000.00
88,750.00
20,900.00
20,500.00
31,400.00
20,500.00
21,300.00
10,700.00
1,300.00
1,500.00
53,000.00
2,500.00
300.00
300.00
400.00
500.00
500.00
500.00
700.00
700.00
600.00
500.00
5,500,000.00
2,500,000.00
1,750,000.00
850,000.00

5,300.00
57,200.00
68,400.00
63,000.00
66,600.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

66,600.00
66,600.00
51,800.00
51,800.00
51,800.00
275,000.00
173,000.00
200,000.00
59,000.00
54,000.00
100,000.00
110,000.00
110,000.00
93,000.00
89,500.00
89,500.00
57,000.00
92,000.00
65,000.00
59,000.00
80,000.00
80,000.00
81,300.00
111,900.00
47,000.00
64,000.00
100,000.00
112,300.00
78,300.00
46,000.00
75,000.00
50,000.00
96,900.00
109,500.00
123,100.00
72,000.00
47,400.00
55,000.00
68,000.00
20,000.00
55,000.00
75,900.00
73,000.00
70,000.00
83,800.00
80,000.00
55,000.00
46,500.00
55,000.00
15,200.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

55,000.00
60,000.00
65,000.00
50,000.00
57,000.00
67,000.00
72,000.00
55,000.00
60,500.00
66,000.00
71,500.00
62,700.00
73,700.00
79,200.00
84,700.00
22,000.00
24,000.00
26,000.00
20,000.00
22,800.00
26,800.00
28,800.00
30,800.00
33,000.00
36,000.00
39,000.00
30,000.00
34,200.00
40,200.00
43,200.00
46,200.00

150,000.00
200,000.00
398,000.00
640,000.00
200,000.00
200,000.00
550,000.00
900,000.00
275,000.00
418,000.00
550,000.00
35,000.00
400,000.00
469,000.00
275,000.00
267,500.00
550,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

70,000.00
140,000.00
115,000.00
111,000.00
220,000.00
278,000.00
282,000.00
120,000.00
79,700.00
74,600.00
65,000.00
70,000.00
78,000.00

1,000,000.00
2,962,700.00
2,246,800.00
2,500,000.00
330,000.00
191,000.00
2,000,000.00
280,000.00
230,000.00
500,000.00
319,100.00
18,500.00
65,200.00
307,000.00
650,000.00
150,000.00
32,500.00
1,115,000.00
22,000.00
30,000.00
45,000.00
82,000.00
164,000.00
254,000.00
23,500.00
30,000.00
48,000.00
86,000.00
130,000.00
43,000.00
51,200.00
115,500.00
2,500,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

2,000,000.00
75,000.00
75,000.00
115,000.00
1,440,000.00
550,000.00

8,100.00
7,400.00
28,800.00
9,600.00
28,800.00
170,000.00
70,000.00
70,000.00
66,400.00

180,000.00
210,000.00
230,000.00
260,000.00
180,000.00
210,000.00
230,000.00
180,000.00
210,000.00
230,000.00
180,000.00
200,000.00
220,000.00
2,500,000.00
4,000,000.00
15,000.00
2,000,000.00

298,500.00
228,000.00
155,350.00
1,687,000.00
462,000.00
311,930.00
179,000.00
180,000.00
120,000.00
40,000.00
40,000.00
170,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

117,750.00
240,000.00
250,000.00
32,000.00
35,500.00
51,250.00
3,500.00
2,695,650.00
781,700.00
13,300.00
3,500.00
11,000.00
41,000.00
17,500.00
51,500.00
73,500.00
35,000.00
12,000.00
16,000.00
7,000.00
1,000.00
35,000.00
31,600.00
33,000.00
62,000.00
29,000.00
62,000.00
37,500.00
44,800.00
33,000.00
33,000.00
2,500.00
110,000.00
484,500.00
672,000.00
495,000.00
89,000.00
50,000.00
45,000.00
15,000.00
45,000.00
56,000.00
20,000.00
6,500.00
7,000.00
7,350.00
8,000.00
9,500.00
12,600.00
18,100.00
19,100.00
5,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

35,000.00
334,250.00
16,266.00
24,233.00
17,500.00
3,856,500.00
3,304,300.00
5,800.00
21,600.00
181,200.00
A.2.2.1 Harga Satuan Pekerjaan Persiapan

A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.02 OH 0.400 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.020 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.250 12,000.00
Semen Portland Kg 2.500
Seng gelombang Lbr 1.200 47,400.00
Pasir Beton m3 0.005
Koral Beton m3 0.009
Kayu 5/7 m3 0.072 4,755,000.00
Paku Biasa 2"-5" Kg 0.060 20,500.00
Mini besi Liter 0.450 52,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.3 (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.02 OH 0.300 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.020 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.000 12,000.00
Semen Portland Kg 2.000 1,500.00
Kawat duri m 25.000 4,000.00
Pasir Beton m3 0.005 1,500.00
Koral Beton m3 0.009 120,000.00
Paku Biasa 2"-5" Kg 0.060 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.4 Pengukuran dan pemasangan 1m Bouwplank


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang Kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012 4,755,000.00
Paku 2"-3" Kg 0.020 20,500.00
Kayu papan 3/20 m3 0.007 2,558,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.5 (K3) Pembuatan 1m2 kantor sementara lantai plasteran


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.000 105,000.00
Tukang Kayu L.02 OH 2.000 125,000.00
Tukang Batu L.02 OH 1.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.250 12,000.00
Kayu m3 0.180 4,716,717.69
Paku biasa Kg 0.080 20,500.00
Besi strip Kg 1.100 13,500.00
Semen Portland Kg 35.000 1,500.00
Pasir pasang m3 0.150 120,000.00
Pasir beton m3 0.100 120,000.00
Koral beton m3 0.150 500,000.00
Bata merah Bh 30.000 2,000.00
Seng pelat Lbr 0.250 55,000.00
Jendela naco Bh 0.200 400,000.00
Kaca polos m2 0.080 150,000.00
Kunci tanam Bh 0.150 57,500.00
Plywood 4 mm Lbr 0.060 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.9 (K3) Pembersihan 1 m2 lapangan atau perataan


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.12 Pembuatan 1 m2 jalan sementara


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.150 350,000.00
Batu pecah m3 0.090 335,000.00
Pasir pasang m3 0.010 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.13 Pembongkaran 1 m3 beton bertulang


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 13.334 105,000.00
Mandor L.04 OH 0.666 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.667 105,000.00
Mandor L.04 OH 0.333 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

21,000.00
50,000.00
2,900.00
3,100.00
77,000.00

15,000.00
-
56,880.00
-
-
342,360.00
1,230.00
23,400.00
438,870.00

515,870.00
77,380.50
593,250.50

Jumlah Harga
(Rp.)

21,000.00
37,500.00
2,900.00
3,100.00
64,500.00

12,000.00
3,000.00
100,000.00
7.50
1,080.00
1,230.00
117,317.50

181,817.50
27,272.63
209,090.13

Jumlah Harga
(Rp.)

10,500.00
12,500.00
1,450.00
775.00
25,225.00

57,060.00
410.00
17,906.00
75,376.00

100,601.00
15,090.15
115,691.15

Jumlah Harga
(Rp.)

210,000.00
250,000.00
125,000.00
43,500.00
7,750.00
636,250.00

15,000.00
849,009.18
1,640.00
14,850.00
52,500.00
18,000.00
12,000.00
75,000.00
60,000.00
13,750.00
80,000.00
12,000.00
8,625.00
7,200.00
1,219,574.18

1,855,824.18
278,373.63
2,134,197.81

Jumlah Harga
(Rp.)

10,500.00
7,750.00
10,500.00

10,500.00
1,575.00
12,075.00

Jumlah Harga
(Rp.)

105,000.00
775.00
105,775.00

52,500.00
30,150.00
1,200.00
83,850.00

189,625.00
28,443.75
218,068.75

Jumlah Harga
(Rp.)

1,400,070.00
103,230.00
1,503,300.00

1,436,630.00
215,494.50
1,652,124.50

Jumlah Harga
(Rp.)

700,035.00
51,615.00
751,650.00
718,315.00
107,747.25
826,062.25
A.2.3.1 Harga Satuan Pekerjaan Tanah

A.2.3.1.1 Penggalian 1m3 tanah biasa sedalam 1m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.750 105,000.00
Mandor L.04 OH 0.025 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.2 Penggalian 1m3 tanah biasa sedalam 2 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 105,000.00
Mandor L.04 OH 0.045 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.3 Menggali 1m3 tanah biasa sedalam 3 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.050 105,000.00
Mandor L.04 OH 0.067 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.4 Menggali 1m3 tanah keras sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Mandor L.04 OH 0.032 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.5 Menggali 1m3 tanah cadas sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.500 105,000.00
Mandor L.04 OH 0.060 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.6 Menggali 1m3 tanah lumpur sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 105,000.00
Mandor L.04 OH 0.045 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.8 (K3) Pembuangan 1 m3 tanah sejauh 30 meter


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.330 105,000.00
Mandor L.04 OH 0.010 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 105,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.10 (K3) Pemadatan tanah 1 m3 tanah (per 20 cm)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 105,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Mandor L.04 OH 0.010 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug 1.200 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

78,750.00
3,875.00
82,625.00

82,625.00
12,393.75
95,018.75

Jumlah Harga
(Rp.)

94,500.00
6,975.00
101,475.00

101,475.00
15,221.25
116,696.25

Jumlah Harga
(Rp.)

110,250.00
10,385.00
120,635.00

120,635.00
18,095.25
138,730.25

Jumlah Harga
(Rp.)

105,000.00
4,960.00
109,960.00

109,960.00
16,494.00
126,454.00

Jumlah Harga
(Rp.)

157,500.00
9,300.00
166,800.00

166,800.00
25,020.00
191,820.00

Jumlah Harga
(Rp.)

126,000.00
6,975.00
132,975.00

132,975.00
19,946.25
152,921.25

Jumlah Harga
(Rp.)

34,650.00
1,550.00
36,200.00

36,200.00
5,430.00
41,630.00

Jumlah Harga
(Rp.)

52,500.00
7,750.00
60,250.00

60,250.00
9,037.50
69,287.50

Jumlah Harga
(Rp.)

52,500.00
7,750.00
60,250.00

60,250.00
9,037.50
69,287.50

Jumlah Harga
(Rp.)

31,500.00
1,550.00
33,050.00

144,000.00
144,000.00
177,050.00
26,557.50
203,607.50
A.3.2.1 Harga Satuan Pekerjaan Pondasi

A.3.2.1.1 Pemasangan 1m3 pondasi batu belah campuran 1SP : 3PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.500 105,000.00
Tukang batu L.02 OH 0.750 125,000.00
Kepala tukang L.03 OH 0.075 145,000.00
Mandor L.04 OH 0.075 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah (10-15 cm) m3 1.200 350,000.00
Semen Portland Kg 202.000 1,500.00
Pasir pasang m3 0.485 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.3.2.1.2 Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.500 105,000.00
Tukang batu L.02 OH 0.750 125,000.00
Kepala tukang L.03 OH 0.075 145,000.00
Mandor L.04 OH 0.075 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah (10-15 cm) m3 1.200 350,000.00
Semen Portland Kg 163.000 1,500.00
Pasir pasang m3 0.520 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.3.2.1.9 (K3) Pemasangan 1m3 pondasi batu kosong (anstamping)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.780 105,000.00
Tukang batu L.02 OH 0.390 125,000.00
Kepala tukang L.03 OH 0.039 145,000.00
Mandor L.04 OH 0.039 155,000.00

B BAHAN
Batu belah (10-15 cm) m3 1.200 350,000.00
Pasir urug m3 0.432 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1 SP : 2PB : 3 Kr dan 40% batu belah
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.400 105,000.00
Tukang batu L.02 OH 0.850 125,000.00
Kepala tukang L.03 OH 0.085 145,000.00
Mandor L.04 OH 0.170 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah (10-15 cm) m3 0.480 350,000.00
Semen Portland Kg 194.000 1,500.00
Pasir beton m3 0.312 120,000.00
Kerikil (1-2 cm) m3 0.468 475,000.00
Besi beton Kg 126.000 12,000.00
Kawat beton Kg 1.800 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.3.2.1.11 Pemasangan 1m3 pondasi sumuran, diameter 100 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.400 105,000.00
Tukang batu L.02 OH 0.800 125,000.00
Kepala tukang L.03 OH 0.080 145,000.00
Mandor L.04 OH 0.119 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah (10-15 cm) m3 0.450 350,000.00
Semen Portland Kg 194.000 1,500.00
Pasir beton m3 0.312 120,000.00
Kerikil (1-2 cm) m3 0.468 475,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

157,500.00
93,750.00
10,875.00
11,625.00
273,750.00

420,000.00
303,000.00
58,200.00
781,200.00

1,054,950.00
158,242.50
1,213,192.50

Jumlah Harga
(Rp.)

157,500.00
93,750.00
10,875.00
11,625.00
273,750.00

420,000.00
244,500.00
62,400.00
726,900.00
1,000,650.00
150,097.50
1,150,747.50

Jumlah Harga
(Rp.)

81,900.00
48,750.00
5,655.00
6,045.00
142,350.00

420,000.00
51,840.00
471,840.00

614,190.00
92,128.50
706,318.50

Jumlah Harga
(Rp.)

357,000.00
106,250.00
12,325.00
26,350.00
501,925.00

168,000.00
291,000.00
37,440.00
222,300.00
1,512,000.00
41,400.00
2,272,140.00

2,774,065.00
416,109.75
3,190,174.75

Jumlah Harga
(Rp.)

252,000.00
100,000.00
11,600.00
18,445.00
382,045.00

157,500.00
291,000.00
37,440.00
222,300.00
708,240.00

1,090,285.00
163,542.75
1,253,827.75
A.4.1.1 Harga Satuan Pekerjaan Beton

A.4.1.1.1 Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 1,500.00
Pasir beton Kg 869.000 85.71
Kerikil (maks 30 mm) Kg 999.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.1.a Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 1,500.00
Pasir beton Kg 869.000 85.71
Kerikil (maks 30 mm) Kg 999.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.2 Membuat 1m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm ,w/c =0,78
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1500.00
Pasir beton Kg 828.000 85.71
Kerikil (maks 30 mm) Kg 1012.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.2.a Membuat 1m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm ,w/c =0,78 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1500.00
Pasir beton Kg 828.000 85.71
Kerikil (maks 30 mm) Kg 1012.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.3 Membuat 1m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm ,w/c =0,72
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 299.000 1,500.00
Pasir beton Kg 799.000 85.71
Kerikil (maks 30 mm) Kg 1017.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Catatan
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, buckling factor pasir = 20%

A.4.1.1.3.a Membuat 1m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm ,w/c =0,72 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 299.000 1,500.00
Pasir beton Kg 799.000 85.71
Kerikil (maks 30 mm) Kg 1017.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.4 Membuat 1m3 lantai kerja beton mutu f'c = 7,4 MPa slump (3-6) cm, w/c =0,87
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 105,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.060 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 230.000 1,500.00
Pasir beton Kg 893.000 85.71
Kerikil (maks 30 mm) Kg 1027.000 351.85
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.5 Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000 1,500.00
Pasir beton Kg 760.000 85.71
Kerikil (maks 30 mm) Kg 1029.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.5.a Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000 1,500.00
Pasir beton Kg 760.000 85.71
Kerikil (maks 30 mm) Kg 1029.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.6 Membuat 1m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm ,w/c = 0,61
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 352.000 1,500.00
Pasir beton Kg 731.000 85.71
Kerikil (maks 30 mm) Kg 1031.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.6.a Membuat 1m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm ,w/c = 0,61 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 352.000 1,500.00
Pasir beton Kg 731.000 85.71
Kerikil (maks 30 mm) Kg 1031.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.7 Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000 1,500.00
Pasir beton Kg 698.000 85.71
Kerikil (maks 30 mm) Kg 1047.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.7.a Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000 1,500.00
Pasir beton Kg 698.000 85.71
Kerikil (maks 30 mm) Kg 1047.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.8 Membuat 1m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm ,w/c = 0,56
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 384.000 1,500.00
Pasir beton Kg 692.000 85.71
Kerikil (maks 30 mm) Kg 1039.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.8.a Membuat 1m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm ,w/c = 0,56 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 384.000 1,500.00
Pasir beton Kg 692.000 85.71
Kerikil (maks 30 mm) Kg 1039.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.9 Membuat 1m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm ,w/c = 0,53
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 406.000 1,500.00
Pasir beton Kg 684.000 85.71
Kerikil (maks 30 mm) Kg 1026.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.9.a Membuat 1m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm ,w/c = 0,53 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 406.000 1,500.00
Pasir beton Kg 684.000 85.71
Kerikil (maks 30 mm) Kg 1026.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.10 Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 413.000 1,500.00
Pasir beton Kg 681.000 85.71
Kerikil (maks 30 mm) Kg 1021.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.10.a Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 413.000 1,500.00
Pasir beton Kg 681.000 85.71
Kerikil (maks 30 mm) Kg 1021.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.11 Membuat 1m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm ,w/c = 0,49
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.105 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 439.000 1,500.00
Pasir beton Kg 670.000 85.71
Kerikil (maks 30 mm) Kg 1006.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.12 Membuat 1m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm ,w/c = 0,48
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.105 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 448.000 1,500.00
Pasir beton Kg 667.000 85.71
Kerikil (maks 30 mm) Kg 1000.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.13 Membuat 1m3 beton kedap air dengan strorox - 100


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.105 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 400.000 1,500.00
Pasir beton m3 0.480 85.71
Kerikil (maks 30 mm) m3 0.800 351.85
Air Kg 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.16 Membuat 1m PVC Waterstop lebar 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.080 105,000.00
Tukang batu L.02 OH 0.040 125,000.00
Kepala tukang L.03 OH 0.004 145,000.00
Mandor L.04 OH 0.004 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar 300 mm m 1.050 75,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.17 Pembesian 10 Kg dengan besi polos atau besi ulir (U24)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 105,000.00
Tukang besi L.02 OH 0.070 125,000.00
Kepala tukang L.03 OH 0.007 145,000.00
Mandor L.04 OH 0.004 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (Polos/ulir) (U24) Kg 10.500 12,000.00
Kawat beton Kg 0.150 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
G Harga Satuan Pekerjaan per 1Kg besi

A.4.1.1.17.a Pembesian 1 Kg dengan besi polos atau besi ulir (U32)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 105,000.00
Tukang besi L.02 OH 0.070 125,000.00
Kepala tukang L.03 OH 0.007 145,000.00
Mandor L.04 OH 0.004 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (Polos/ulir) (U32) Kg 10.500 13,500.00
Kawat beton Kg 0.150 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
G Harga Satuan Pekerjaan per 1Kg besi
A.4.1.1.19 Pemasangan 10 Kg jaring kawat baja (wiremesh)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 105,000.00
Tukang besi L.02 OH 0.025 125,000.00
Kepala tukang L.03 OH 0.025 145,000.00
Mandor L.04 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat baja dilas Kg 10.200 13000
Kawat beton Kg 0.050 23000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.20 (K3) Pemasangan 1m2 bekisting untuk pondasi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 105,000.00
Tukang kayu L.02 OH 0.260 125,000.00
Kepala tukang L.03 OH 0.026 145,000.00
Mandor L.04 OH 0.026 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 10 cm Kg 0.300 20,500.00
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.20.a Pemasangan 1m2 bekisting untuk pondasi (papan mal)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 105,000.00
Tukang kayu L.02 OH 0.260 125,000.00
Kepala tukang L.03 OH 0.026 145,000.00
Mandor L.04 OH 0.026 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Mal kelas III m³ 0.013 2,558,000.00
Paku 5 - 10 cm Kg 0.300 20,500.00
Cerucuk ф 6-8 cm - panj 4 m Btg 0.125 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.21 (K3) Pemasangan 1m2 bekisting untuk sloof


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 105,000.00
Tukang kayu L.02 OH 0.260 125,000.00
Kepala tukang L.03 OH 0.026 145,000.00
Mandor L.04 OH 0.026 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.045 2,083,000.00
Paku 5 - 10 cm Kg 0.300 20,500.00
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.21.a Pemasangan 1m2 bekisting untuk sloof (papan mal)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 105,000.00
Tukang kayu L.02 OH 0.260 125,000.00
Kepala tukang L.03 OH 0.026 145,000.00
Mandor L.04 OH 0.026 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Mal kelas III m³ 0.013 2,558,000.00
Paku 5 - 10 cm Kg 0.300 20,500.00
Cerucuk ф 6-8 cm - panj 4 m Btg 0.125 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.22 (K3) Pemasangan 1m2 bekisting untuk kolom


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015 3,355,000.00
Plywood tebal 9 mm Lbr 0.350 220,000.00
Dolken kayu ɸ8-10cm - panj 4 m Batang 2.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.22.a Pemasangan 1m2 bekisting untuk kolom (papan mal)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015 3,355,000.00
Papan Mal kelas III m3 0.013 2,558,000.00
Dolken kayu ɸ8-10cm - panj 4 m Batang 2.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.23 (K3) Pemasangan 1m2 bekisting untuk balok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.018 3,355,000.00
Plywood tebal 9 mm Lbr 0.350 220,000.00
Dolken kayu ɸ(8-10)cm - panj 4 m Batang 2.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.23.a Pemasangan 1m2 bekisting untuk balok (papan mal)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.018 3,355,000.00
Papan Mal kelas III m3 0.013 2,558,000.00
Dolken kayu ɸ(8-10)cm - panj 4 m Batang 2.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.24 (K3) Pemasangan 1m2 bekisting untuk lantai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015 3,355,000.00
Plywood tebal 9 mm Lbr 0.350 220,000.00
Dolken kayu galam, ɸ(8-10)cm 4 m Batang 6.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.24.a Pemasangan 1m2 bekisting untuk lantai (papan mal)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015 3,355,000.00
Papan Mal kelas III m3 0.013 2,558,000.00
Dolken kayu galam, ɸ(8-10)cm 4 m Batang 6.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.25 (K3) Pemasangan 1m2 bekisting untuk dinding


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.020 3,355,000.00
Plywood tebal 9 mm Lbr 0.350 220,000.00
Dolken kayu, ɸ(8-10)cm panjang 4 m Batang 3.000 12,000.00
Penjaga jarak bekisting/spacer Buah 4.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.25.a Pemasangan 1m2 bekisting untuk dinding (papan mal)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.020 3,355,000.00
Plywood tebal 9 mm m3 0.013 2,558,000.00
Dolken kayu, ɸ(8-10)cm panjang 4 m Batang 3.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.26 (K3) Pemasangan 1m2 bekisting untuk tangga


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.150
Balok kayu kelas II m3 0.015 3,355,000.00
Plywood tebal 9 mm Lbr 0.350 220,000.00
Dolken kayu ɸ(8-10)cm panjang 4 m Batang 2.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.26.a Pemasangan 1m2 bekisting untuk tangga (papan mal)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 105,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala tukang L.03 OH 0.033 145,000.00
Mandor L.04 OH 0.033 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030 2,083,000.00
Paku 5 - 12 cm Kg 0.400 20,500.00
Minyak bekisting Liter 0.150
Balok kayu kelas II m3 0.015 3,355,000.00
Papan Mal kelas III m3 0.013 2,558,000.00
Dolken kayu ɸ(8-10)cm panjang 4 m Batang 2.000 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.27 Pemasangan 1m2 jembatan untuk pengecoran beton


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang kayu L.02 OH 0.050 125,000.00
Kepala tukang L.03 OH 0.005 145,000.00
Mandor L.04 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III (papan) m3 0.026 2,558,000.00
Paku 5 - 12 cm Kg 0.600 20,500.00
Dolken kayu ɸ(8-10)cm panjang 4 m Batang 0.500 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.35 Membuat 1m' kolom praktis beton bertulang (11 x 11) cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.180 105,000.00
Tukang batu L.02 OH 0.020 125,000.00
Tukang kayu L.02 OH 0.020 125,000.00
Tukang besi L.02 OH 0.020 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.009 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.002 2,083,000.00
Paku 5 - 12 cm Kg 0.010 20,500.00
Minyak bekisting Liter
Besi beton polos Kg 3.000 12,000.00
Kawat beton Kg 0.450 23,000.00
Semen portland Kg 4.000 1,500.00
Pasir beton m3 0.006 85.71
Kerikil m3 0.009 351.85
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.36 Membuat 1m' ring balok beton bertulang (10 x 15) cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.297 105,000.00
Tukang batu L.02 OH 0.033 125,000.00
Tukang kayu L.02 OH 0.033 125,000.00
Tukang besi L.02 OH 0.033 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.003 2,083,000.00
Paku 5 - 12 cm Kg 0.020 20,500.00
Minyak bekisting Liter
Besi beton polos Kg 3.600 12,000.00
Kawat beton Kg 0.050 23,000.00
Semen portland Kg 5.500 1,500.00
Pasir beton m3 0.009 85.71
Kerikil m3 0.015 351.85
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
B. 13.a.1 Membuat 1 m³ beton ready mix K 100 menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 100 m³ 1.020 1,072,500.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.a.2 Membuat 1 m³ beton ready mix K 100 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 100 m³ 1.020 1,072,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
B. 13.b.1 Membuat 1 m³ beton ready mix K 125 menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 125 m³ 1.020 1,108,250.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.b.2 Membuat 1 m³ beton ready mix K 125 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 125 m³ 1.020 1,108,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.c.1 Membuat 1 m³ beton ready mix K 175 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 175 m³ 1.020 1,194,050.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.c.2 Membuat 1 m³ beton ready mix K 175 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 175 m³ 1.020 1,194,050.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.d.1 Membuat 1 m³ beton ready mix K 225 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 225 m³ 1.020 1,329,800.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.d.2 Membuat 1 m³ beton ready mix K 225 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 225 m³ 1.020 1,329,800.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.e.1 Membuat 1 m³ beton ready mix K 250 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 250 m³ 1.020 1,372,800.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.e.2 Membuat 1 m³ beton ready mix K 250 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 250 m³ 1.020 1,372,800.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.f.1 Membuat 1 m³ beton ready mix K 300 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 300 m³ 1.020 1,430,000.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.f.2 Membuat 1 m³ beton ready mix K 300 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 300 m³ 1.020 1,430,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.g.1 Membuat 1 m³ beton ready mix K 350 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 350 m³ 1.020 1,530,100.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.g.2 Membuat 1 m³ beton ready mix K 350 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 350 m³ 1.020 1,530,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.h.1 Membuat 1 m³ beton ready mix K 400 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 400 m³ 1.020 1,601,600.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.h.2 Membuat 1 m³ beton ready mix K 400 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 400 m³ 1.020 1,601,600.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.i.1 Membuat 1 m³ beton ready mix K 450 menggunakan pompa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 450 m³ 1.020 1,673,100.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.i.2 Membuat 1 m³ beton ready mix K 400 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 450 m³ 1.020 1,673,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

370,500.00
74,485.71
351,500.00

796,485.71

1,021,035.71
153,155.36
1,174,191.07

enggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

370,500.00
74,485.71
351,500.00

796,485.71

972,010.71
145,801.61
1,117,812.32

Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

414,000.00
70,971.43
356,074.07

841,045.50

1,065,595.50
159,839.33
1,225,434.83

nggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

414,000.00
70,971.43
356,074.07

841,045.50
1,016,570.50
152,485.58
1,169,056.08

Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

448,500.00
68,485.71
357,833.33

874,819.05

1,099,369.05
164,905.36
1,264,274.40

enggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

448,500.00
68,485.71
357,833.33
874,819.05

1,050,344.05
157,551.61
1,207,895.65

Jumlah Harga
(Rp.)

126,000.00
25,000.00
2,900.00
9,300.00
163,200.00

345,000.00
76,542.86
361,351.85

782,894.71

946,094.71
141,914.21
1,088,008.92

Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

489,000.00
65,142.86
362,055.56

916,198.41

1,140,748.41
171,112.26
1,311,860.67

menggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

489,000.00
65,142.86
362,055.56

916,198.41

1,091,723.41
163,758.51
1,255,481.92

Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
528,000.00
62,657.14
362,759.26

953,416.40

1,177,966.40
176,694.96
1,354,661.36

menggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

528,000.00
62,657.14
362,759.26

953,416.40

1,128,941.40
169,341.21
1,298,282.61

Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

556,500.00
59,828.57
368,388.89

984,717.46

1,209,267.46
181,390.12
1,390,657.58

menggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

556,500.00
59,828.57
368,388.89

984,717.46

1,160,242.46
174,036.37
1,334,278.83

Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

576,000.00
59,314.29
365,574.07

1,000,888.36

1,225,438.36
183,815.75
1,409,254.11

menggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

576,000.00
59,314.29
365,574.07

1,000,888.36

1,176,413.36
176,462.00
1,352,875.36

Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

609,000.00
58,628.57
361,000.00
-
1,028,628.57

1,253,178.57
187,976.79
1,441,155.36

menggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

609,000.00
58,628.57
361,000.00
-
1,028,628.57

1,204,153.57
180,623.04
1,384,776.61
Jumlah Harga
(Rp.)

173,250.00
34,375.00
4,060.00
12,865.00
224,550.00

619,500.00
58,371.43
359,240.74

1,037,112.17

1,261,662.17
189,249.33
1,450,911.49

menggunakan molen)
Jumlah Harga
(Rp.)

138,915.00
23,625.00
2,755.00
10,230.00
175,525.00

619,500.00
58,371.43
359,240.74

1,037,112.17

1,212,637.17
181,895.58
1,394,532.74
Jumlah Harga
(Rp.)

220,500.00
43,750.00
5,075.00
16,275.00
285,600.00

658,500.00
57,428.57
353,962.96

1,069,891.53

1,355,491.53
203,323.73
1,558,815.26

Jumlah Harga
(Rp.)

220,500.00
43,750.00
5,075.00
16,275.00
285,600.00

672,000.00
57,171.43
351,851.85

1,081,023.28

1,366,623.28
204,993.49
1,571,616.77

Jumlah Harga
(Rp.)

220,500.00
43,750.00
5,075.00
16,275.00
285,600.00

600,000.00
41.14
281.48

600,322.62

885,922.62
132,888.39
1,018,811.02

Jumlah Harga
(Rp.)

8,400.00
5,000.00
580.00
620.00
14,600.00

78,750.00
-

-
-
14,000.00
2,100.00
16,100.00
Jumlah Harga
(Rp.)

7,350.00
8,750.00
1,015.00
620.00
17,735.00

126,000.00
3,450.00
129,450.00

-
-
147,185.00
22,077.75
169,262.75
16,926.28

Jumlah Harga
(Rp.)

7,350.00
8,750.00
1,015.00
620.00
17,735.00

141,750.00
3,450.00
145,200.00

-
-
162,935.00
24,440.25
187,375.25
18,737.53
Jumlah Harga
(Rp.)

2,625.00
3,125.00
3,625.00
155.00
9,530.00

132,600.00
1,150.00
133,750.00

-
-
143,280.00
21,492.00
164,772.00

Jumlah Harga
(Rp.)

54,600.00
32,500.00
3,770.00
4,030.00
94,900.00

83,320.00
6,150.00
-
89,470.00

184,370.00
27,655.50
212,025.50
Jumlah Harga
(Rp.)

54,600.00
32,500.00
3,770.00
4,030.00
94,900.00

33,254.00
6,150.00
1,125.00
40,529.00

135,429.00
20,314.35
155,743.35

Jumlah Harga
(Rp.)

54,600.00
32,500.00
3,770.00
4,030.00
94,900.00

93,735.00
6,150.00
-
99,885.00

-
-
194,785.00
29,217.75
224,002.75
Jumlah Harga
(Rp.)

54,600.00
32,500.00
3,770.00
4,030.00
94,900.00

33,254.00
6,150.00
1,125.00
40,529.00

-
-
135,429.00
20,314.35
155,743.35

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

83,320.00
8,200.00
-
50,325.00
77,000.00
24,000.00
242,845.00

363,295.00
54,494.25
417,789.25

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

83,320.00
8,200.00
-
50,325.00
33,254.00
24,000.00
199,099.00

319,549.00
47,932.35
367,481.35

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

83,320.00
8,200.00
-
60,390.00
77,000.00
24,000.00
252,910.00

-
-
373,360.00
56,004.00
429,364.00

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

83,320.00
8,200.00
-
60,390.00
33,254.00
24,000.00
209,164.00

-
-
329,614.00
49,442.10
379,056.10

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
50,325.00
77,000.00
72,000.00
290,845.00

-
-
411,295.00
61,694.25
472,989.25

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

83,320.00
8,200.00
-
50,325.00
33,254.00
72,000.00
247,099.00

-
-
367,549.00
55,132.35
422,681.35

Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

62,490.00
8,200.00
-
67,100.00
77,000.00
36,000.00
-
250,790.00

-
-
371,240.00
55,686.00
426,926.00

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

62,490.00
8,200.00
-
67,100.00
33,254.00
36,000.00
207,044.00

-
-
327,494.00
49,124.10
376,618.10

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

62,490.00
8,200.00
-
50,325.00
77,000.00
24,000.00
222,015.00

-
-
342,465.00
51,369.75
393,834.75

Jumlah Harga
(Rp.)

69,300.00
41,250.00
4,785.00
5,115.00
120,450.00

62,490.00
8,200.00
-
50,325.00
33,254.00
24,000.00
178,269.00

-
-
298,719.00
44,807.85
343,526.85

Jumlah Harga
(Rp.)

15,750.00
6,250.00
725.00
1,240.00
23,965.00

67,531.20
12,300.00
6,000.00
85,831.20

-
-
109,796.20
16,469.43
126,265.63

Jumlah Harga
(Rp.)

18,900.00
2,500.00
2,500.00
2,500.00
870.00
1,395.00
28,665.00
4,166.00
205.00
-
36,000.00
10,350.00
6,000.00
0.51
3.17
56,724.68

-
-
85,389.68
12,808.45
98,198.13

Jumlah Harga
(Rp.)

31,185.00
4,125.00
4,125.00
4,125.00
1,450.00
2,325.00
47,335.00

6,249.00
410.00
-
43,200.00
1,150.00
8,250.00
0.77
5.28
59,265.05

-
-
106,600.05
15,990.01
122,590.06
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,093,950.00
1,093,950.00

396,000.00
396,000.00
1,645,325.00
246,798.75
1,892,123.75

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,093,950.00
1,093,950.00

1,249,325.00
187,398.75
1,436,723.75
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,130,415.00
1,130,415.00

396,000.00
396,000.00
1,681,790.00
252,268.50
1,934,058.50

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,130,415.00
1,130,415.00

1,285,790.00
192,868.50
1,478,658.50
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,217,931.00
1,217,931.00

396,000.00
396,000.00
1,769,306.00
265,395.90
2,034,701.90

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,217,931.00
1,217,931.00

1,373,306.00
205,995.90
1,579,301.90
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,356,396.00
1,356,396.00

396,000.00
396,000.00
1,907,771.00
286,165.65
2,193,936.65

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,356,396.00
1,356,396.00

1,511,771.00
226,765.65
1,738,536.65
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,400,256.00
1,400,256.00

396,000.00
396,000.00
1,951,631.00
292,744.65
2,244,375.65

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,400,256.00
1,400,256.00

1,555,631.00
233,344.65
1,788,975.65
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,458,600.00
1,458,600.00

396,000.00
396,000.00
2,009,975.00
301,496.25
2,311,471.25

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,458,600.00
1,458,600.00

1,613,975.00
242,096.25
1,856,071.25
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,560,702.00
1,560,702.00

396,000.00
396,000.00
2,112,077.00
316,811.55
2,428,888.55

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,560,702.00
1,560,702.00

1,716,077.00
257,411.55
1,973,488.55
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,633,632.00
1,633,632.00

396,000.00
396,000.00
2,185,007.00
327,751.05
2,512,758.05

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,633,632.00
1,633,632.00

1,789,007.00
268,351.05
2,057,358.05
Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,706,562.00
1,706,562.00

396,000.00
396,000.00
2,257,937.00
338,690.55
2,596,627.55

Jumlah Harga (Rp)

105,000.00
31,250.00
3,625.00
15,500.00
155,375.00

1,706,562.00
1,706,562.00

1,861,937.00
279,290.55
2,141,227.55
A.4.2.1 Harga Satuan Pekerjaan Besi dan Alumunium

A.4.2.1.1 Pemasangan 1 kg besi profil


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 105,000.00
Tukang las konstruksi L.03 OH 0.060 145,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi profil Kg 1.150 13,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 105,000.00
Tukang las konstruksi L.03 OH 0.060 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi baja IWF Kg 1.150 13,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.3 Pengerjaan 100 Kg pekerjaan perakitan


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang besi konstruksi L.03 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.001 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000 8,100.00
Minyak pelumas Liter 0.100 28,800.00
JUMLAH HARGA BAHAN
C PERALATAN
1. Sewa alat Jam 0.800 70,000.00
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.040 105,000.00
Tukang besi konstruksi L.03 OH 0.020 145,000.00
Kepala tukang L.03 OH 0.002 145,000.00
Mandor L.04 OH 0.002 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik Kg 0.400 28,500.00
Solar Liter 0.300 8,100.00
Minyak pelumas Liter 0.040 28,800.00
JUMLAH HARGA BAHAN
C PERALATAN
Sewa alat Jam 0.170 70,000.00
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.11 Pemasangan 1 m kusen pintu allumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.043 105,000.00
Tukang khusus alumunium L.03 OH 0.043 125,000.00
Kepala tukang L.03 OH 0.0043 145,000.00
Mandor L.04 OH 0.0021 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alumunium m 1.100 75,000.00
skrup fixer buah 2.000 2,500.00
Sealant Tube 0.060 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.13 Pemasangan 1 m2 pintu kaca rangka allumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.085 105,000.00
Tukang alumunium / kaca L.03 OH 0.085 145,000.00
Kepala tukang L.03 OH 0.009 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alumunium m 4.400 75,000.00
Profil kaca m 4.500 200,000.00
Sealant Tube 0.270 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.15 Pemasangan 1 m2 terali besi strip (2x3) mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.670 105,000.00
Tukang las L.03 OH 1.670 145,000.00
Kepala tukang L.03 OH 0.167 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi strip Kg 6.177
Pengelasan cm 27.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.16 Pemasangan 1 m2 kawat nyamuk


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang L.03 OH 0.100 145,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1.100
Pengelasan cm 11.110
Baja strip (0,2x2)cm Kg 1.716
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.17 Pemasangan 1 m2 jendela nako & tralis


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang L.03 OH 0.200 145,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako (rangka + kaca 5 m2 1.100
mm)
Paku skrup 1cm - 2,5 cm buah 10.000
Besi strip m 7.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.18 Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang L.03 OH 0.200 145,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.050 20,000.00
Paku 1cm - 2,5 cm Kg 0.015 20,500.00
Papan kayu kelas II atau III m3 0.019 7,060,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.19 Pemasangan 1 m' talang 1/2 lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang L.03 OH 0.300 145,000.00
Kepala tukang L.03 OH 0.030 145,000.00
Mandor L.04 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.050 20,000.00
Paku 1cm - 2,5 cm Kg 0.010 20,500.00
Besi strip m3 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60x120 cm, untuk partisi
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 105,000.00
Tukang besi L.02 OH 0.250 125,000.00
Kepala tukang L.03 OH 0.025 145,000.00
Mandor L.04 OH 0.013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN

M1 3.500
Rangka metal hollow 40.40.2 mm
Assesoris ( perkuatan, las, dll) Ls 100%xrangka
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60cm, untuk plafon
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.350
Tukang besi L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN

M1 4.000
Rangka metal hollow 40.40.2mm
Assesoris ( perkuatan,las,dll) Ls 100%xrangka
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

6,300.00
8,700.00
870.00
465.00
16,335.00

15,525.00
15,525.00

-
-
31,860.00
4,779.00
36,639.00

Jumlah Harga
(Rp.)

6,300.00
7,500.00
870.00
465.00
15,135.00

15,525.00
15,525.00

-
-
30,660.00
4,599.00
35,259.00
Jumlah Harga
(Rp.)

10,500.00
12,500.00
145.00
775.00
23,920.00

8,100.00
2,880.00
10,980.00

56,000.00
56,000.00
90,900.00
13,635.00
104,535.00

Jumlah Harga
(Rp.)

4,200.00
2,900.00
290.00
310.00
7,700.00

11,400.00
2,430.00
1,152.00
14,982.00

11,900.00
11,900.00
34,582.00
5,187.30
39,769.30
Jumlah Harga
(Rp.)

4,515.00
5,375.00
623.50
325.50
10,839.00

82,500.00
5,000.00
2,100.00
89,600.00

-
-
100,439.00
15,065.85
115,504.85

Jumlah Harga
(Rp.)

8,925.00
12,325.00
1,305.00
775.00
23,330.00

330,000.00
900,000.00
9,450.00
1,239,450.00

-
-
1,262,780.00
189,417.00
1,452,197.00
Jumlah Harga
(Rp.)

175,350.00
242,150.00
24,215.00
12,865.00
454,580.00

-
-
-

-
-
454,580.00
68,187.00
522,767.00

Jumlah Harga
(Rp.)

10,500.00
14,500.00
1,450.00
775.00
27,225.00

-
-
-
-

-
-
27,225.00
4,083.75
31,308.75
Jumlah Harga
(Rp.)

21,000.00
29,000.00
2,900.00
155.00
53,055.00

-
-
-
-

-
-
53,055.00
7,958.25
61,013.25

Jumlah Harga
(Rp.)

21,000.00
29,000.00
2,900.00
155.00
53,055.00

21,000.00
307.50
134,140.00
155,447.50

-
-
208,502.50
31,275.38
239,777.88
Jumlah Harga
(Rp.)

15,750.00
43,500.00
4,350.00
1,240.00
64,840.00

21,000.00
205.00
-
21,205.00

-
-
86,045.00
12,906.75
98,951.75

Jumlah Harga
(Rp.)

26,250.00
31,250.00
3,625.00
2,015.00
63,140.00

-
#VALUE!
#VALUE!
Jumlah Harga
(Rp.)
A.4.4.1 Harga Satuan Pekerjaan Pasangan Dinding

A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 105,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.030 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Buah 140.000 2,000.00
Semen portland Kg 26.550 1,500.00
Pasir pasang m3 0.093 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.1.17.a Pemasangan 1 m² dinding batako uk. 20/40/9


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.350 105,000.00
Tukang batu L.02 OH 0.150 125,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.018 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batako 20/40/9 (cetak mesin) Bh 12.500 2,500.00
Semen Portland Kg 7.500 1,500.00
Pasir pasang m³ 0.027 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.1.17.b Pemasangan 1 m² dinding batako uk. 20/40/7


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.350 105,000.00
Tukang batu L.02 OH 0.150 125,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.018 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batako 20/40/7 (cetak mesin) Bh 12.500 2,300.00
Semen Portland Kg 7.500 1,500.00
Pasir pasang m³ 0.027 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.1.19.a Pemasangan 1 m² dinding batako 15/30/7


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.320 105,000.00
Tukang batu L.02 OH 0.120 125,000.00
Kepala tukang L.03 OH 0.012 145,000.00
Mandor L.04 OH 0.016 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
HB-15 m3 22.200 1,800.00
Semen portland Kg 18.200 1,500.00
Pasir pasang m3 0.582 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.1.23.a Pemasangan 1 m² dinding terawang (rooster) 18x18 campuran 1SP:4PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kerawang ( roster ) 18 x 18 cm m3 30.000 20,000.00
Semen portland Kg 11.000 1,500.00
Pasir pasang m3 0.035 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.1.23.b Pemasangan 1 cm2 dinding terawang (rooster) 30 x 30 campuran 1 SP : 4 PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Beton Ready Mix B 0 m3 11.870 60,500.00
Semen portland Kg 11.000 1,500.00
Pasir pasang m3 0.035 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

63,000.00
25,000.00
2,900.00
4,650.00
95,550.00

280,000.00
39,825.00
11,160.00
330,985.00

-
-
426,535.00
63,980.25
490,515.25

Jumlah Harga
(Rp.)

36,750.00
18,750.00
2,175.00
2,790.00
60,465.00

31,250.00
11,250.00
3,240.00
45,740.00

-
-
106,205.00
15,930.75
122,135.75

Jumlah Harga
(Rp.)

36,750.00
18,750.00
2,175.00
2,790.00
60,465.00

28,750.00
11,250.00
3,240.00
43,240.00

-
-
103,705.00
15,555.75
119,260.75

Jumlah Harga
(Rp.)

33,600.00
15,000.00
1,740.00
2,480.00
52,820.00

39,960.00
27,300.00
69,840.00
137,100.00
-
-
189,920.00
28,488.00
218,408.00

Jumlah Harga
(Rp.)

31,500.00
12,500.00
1,450.00
2,325.00
47,775.00

600,000.00
16,500.00
4,200.00
620,700.00

-
-
668,475.00
100,271.25
768,746.25

Jumlah Harga
(Rp.)

31,500.00
12,500.00
1,450.00
2,325.00
47,775.00

718,135.00
16,500.00
4,200.00
738,835.00

-
-
786,610.00
117,991.50
904,601.50
A.4.4.2 Harga Satuan Pekerjaan Plesteran

A.4.4.2.2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Tukang batu L.03 OH 0.150 125,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 10.224 1,500.00
PP m3 0.020 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Tukang batu L.03 OH 0.150 125,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 6.240 1,500.00
PP m3 0.024 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.2.14 Pemasangan 1 m2 plesteran 1SP : 3 PP tebal 20 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.260 105,000.00
Tukang batu L.03 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 10.368 1,500.00
PP m3 0.031 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.2.15 Pemasangan 1 m2 plesteran 1SP : 4 PP tebal 20 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.400 105,000.00
Tukang batu L.03 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.022 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 8.320 1,500.00
PP m3 0.032 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.2.21 Pemasangan 1 m2 plesteran granit 1 SP : 2 granit tebal 1 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.450 105,000.00
Tukang batu L.03 OH 0.225 125,000.00
Kepala tukang L.03 OH 0.023 145,000.00
Mandor L.04 OH 0.023 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.000 1500
Batu granit Kg 15.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1 SP : 2 PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Tukang batu L.03 OH 0.150 125,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 6.340 1,500.00
Pasir pasang m3 0.012 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.2.27 Pemasangan 1 m2 acian


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang batu L.03 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.010 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

31,500.00
18,750.00
2,175.00
2,325.00
54,750.00

15,336.00
2,400.00
17,736.00

72,486.00
10,872.90
83,358.90

Jumlah Harga
(Rp.)

31,500.00
18,750.00
2,175.00
2,325.00
54,750.00

9,360.00
2,880.00
12,240.00

66,990.00
10,048.50
77,038.50

Jumlah Harga
(Rp.)

27,300.00
25,000.00
2,900.00
2,015.00
57,215.00

15,552.00
3,720.00
19,272.00

76,487.00
11,473.05
87,960.05

Jumlah Harga
(Rp.)

42,000.00
25,000.00
2,900.00
3,410.00
73,310.00

12,480.00
3,840.00
16,320.00

89,630.00
13,444.50
103,074.50

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

31,500.00
18,750.00
2,175.00
2,325.00
54,750.00

9,510.00
1,440.00
10,950.00
65,700.00
9,855.00
75,555.00

Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
1,550.00
36,500.00

4,875.00
4,875.00

41,375.00
6,206.25
47,581.25
A.4.4.3 Harga Satuan Pekerjaan Penutup Lantai dan Penutup Dinding

A.4.4.3.34.a Pemasangan 1 m2 lantai keramik ukuran 60 x 60 cm Polish (setara indogres)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Polished (ex Indogres) Bh 1.050 320,000.00
Semen portland Kg 8.190 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.34.b Pemasangan 1 m2 lantai keramik ukuran 60 x 60 cm Unpolish (setara indogres)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Unpolished (ex Indogres) Bh 1.050 323,000.00
Semen portland Kg 8.190 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.34.c Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm Polish (setara indogres)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 cm Polished (ex Indogres) Bh 1.050 154,000.00
Semen portland Kg 8.190 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.34.d Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm Unpolish (setara indogres)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 cm Unpolished (ex Indogres) Bh 1.050 155,000.00
Semen portland Kg 8.190 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.35 Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm Polish (setara Roman)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm Polish (ex Roman) m2 1.050 95,000.00
Semen portland Kg 10.000 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.35.a Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm Unpolish (setara Roman)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm Unpolish (ex Roman) m2 1.050 95,000.00
Semen portland Kg 10.000 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.35.b Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm Polish (setara Roman)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 cm Polish (ex Roman) m2 1.050 100,000.00
Semen portland Kg 10.000 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.35.c Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm Unpolish (setara Roman)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 cm Unpolish (ex Roman) m2 1.050 111,000.00
Semen portland Kg 10.000 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.36 Pemasangan 1 m2 lantai keramik ukuran 20 x 20 cm Polish (setara Roman)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 20x20 cm Polish (ex Roman) Bh 1.050 81,600.00
Semen portland Kg 10.400 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.36.a Pemasangan 1 m2 lantai keramik ukuran 20 x 20 cm Unpolish (setara Roman)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 20x20 cm Unpolish (ex Roman) Bh 1.050 98,000.00
Semen portland Kg 10.400 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.43 Pemasangan 1 m2 lantai marmer ukuran 100cm x 100 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.060 1,400,000.00
Semen portland Kg 8.190 1,500.00
Pasir pasang m3 0.045 120,000.00
Semen warna Kg 0.134 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.46 Pemasangan 1 m2 lantai parquet kayu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang kayu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.050 420,000.00
Lem Kg 0.600 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.54 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 105,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala tukang L.03 OH 0.045 145,000.00
Mandor L.04 OH 0.045 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Dinding 20 x 20 cm Buah 26.500 3,950.00
Semen portland Kg 9.300 1,500.00
pasir pasang m3 0.018 120,000.00
semen warna Kg 1.940 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.54.a Pemasangan 1 m2 dinding keramik 20 cm x 25 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 105,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala tukang L.03 OH 0.045 145,000.00
Mandor L.04 OH 0.045 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Dinding 20 x 25 cm Buah 20.000 5,100.00
Semen portland Kg 9.300 1,500.00
pasir pasang m3 0.018 120,000.00
semen warna Kg 1.940 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.55 Pemasangan 1 m2 dinding marmer 100 cm x 100 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.300 105,000.00
Tukang batu L.02 OH 0.650 125,000.00
Kepala tukang L.03 OH 0.065 145,000.00
Mandor L.04 OH 0.065 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer Buah 1.060 1,400,000.00
Semen portland Kg 12.440 1,500.00
pasir pasang m3 0.025 120,000.00
semen warna Kg 0.650 14,000.00
Paku 12 cm Buah 3.030 2,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu tempel hitam (batu candi uk. 10x20 cm) Buah 1.100 180,000.00
Semen portland Kg 11.750 1,500.00
pasir pasang m3 0.035 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.61 Pemasangan 1 m2 floor harderner


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.120 105,000.00
Tukang batu L.02 OH 0.120 125,000.00
Kepala tukang L.03 OH 0.012 145,000.00
Mandor L.04 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner Kg 5.000 16,600.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.65.a Pemasangan 1 m2 paving block natural tebal 8 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 105,000.00
Tukang batu L.02 OH 0.500 125,000.00
Kepala tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.0013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving block 8 cm natural m2 1.010 110,000.00
Stone Dust m3 0.008 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10 66,400.00
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.65.b Pemasangan 1 m2 paving block natural tebal 10 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 105,000.00
Tukang batu L.02 OH 0.500 125,000.00
Kepala tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.0013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving block 10 cm natural m2 1.010 165,000.00
Stone Dust m3 0.008 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10 66,400.00
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.65.c Pemasangan 1 m2 paving block segi 6 natural tebal 7 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 105,000.00
Tukang batu L.02 OH 0.500 125,000.00
Kepala tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.0013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving block segi 6 tebal 7 cm m2 1.010 105,400.00
Stone Dust m3 0.008 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10 66,400.00
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.67.a Pemasangan 1 m2 paving stone


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 105,000.00
Tukang batu L.02 OH 0.500 125,000.00
Kepala tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.0013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving stone m2 1.010 200,000.00
Stone Dust m3 0.008 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10 66,400.00
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

336,000.00
12,285.00
5,400.00
7,000.00
360,685.00

488,435.00
73,265.25
561,700.25

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

339,150.00
12,285.00
5,400.00
7,000.00
363,835.00

491,585.00
73,737.75
565,322.75

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

161,700.00
12,285.00
5,400.00
7,000.00
186,385.00

314,135.00
47,120.25
361,255.25

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

162,750.00
12,285.00
5,400.00
7,000.00
187,435.00
315,185.00
47,277.75
362,462.75

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

99,750.00
15,000.00
5,400.00
7,000.00
127,150.00

254,900.00
38,235.00
293,135.00

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

99,750.00
15,000.00
5,400.00
7,000.00
127,150.00
254,900.00
38,235.00
293,135.00

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

105,000.00
15,000.00
5,400.00
7,000.00
132,400.00

260,150.00
39,022.50
299,172.50

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

116,550.00
15,000.00
5,400.00
7,000.00
143,950.00

271,700.00
40,755.00
312,455.00

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

85,680.00
15,600.00
5,400.00
7,000.00
113,680.00

241,430.00
36,214.50
277,644.50

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

102,900.00
15,600.00
5,400.00
7,000.00
130,900.00

258,650.00
38,797.50
297,447.50

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

1,484,000.00
12,285.00
5,400.00
1,876.00
1,503,561.00

1,631,311.00
244,696.65
1,876,007.65

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
441,000.00
11,100.00
452,100.00

579,850.00
86,977.50
666,827.50

Jumlah Harga
(Rp.)

94,500.00
56,250.00
6,525.00
6,975.00
164,250.00

104,675.00
13,950.00
2,160.00
27,160.00
147,945.00

312,195.00
46,829.25
359,024.25

Jumlah Harga
(Rp.)

94,500.00
56,250.00
6,525.00
6,975.00
164,250.00
102,000.00
13,950.00
2,160.00
44,620.00
162,730.00

326,980.00
49,047.00
376,027.00

Jumlah Harga
(Rp.)

136,500.00
81,250.00
9,425.00
10,075.00
237,250.00

1,484,000.00
18,660.00
3,000.00
9,100.00
7,575.00
1,522,335.00

1,759,585.00
263,937.75
2,023,522.75

Jumlah Harga
(Rp.)

73,500.00
43,750.00
5,075.00
5,425.00
127,750.00

198,000.00
17,625.00
4,200.00
219,825.00

347,575.00
52,136.25
399,711.25

Jumlah Harga
(Rp.)

12,600.00
15,000.00
1,740.00
930.00
30,270.00

83,000.00
83,000.00

113,270.00
16,990.50
130,260.50

Jumlah Harga
(Rp.)

52,500.00
62,500.00
7,250.00
201.50
122,451.50

111,100.00
2,625.00
113,725.00

6,640.00
6,640.00
242,816.50
36,422.48
279,238.98

Jumlah Harga
(Rp.)

52,500.00
62,500.00
7,250.00
201.50
122,451.50

166,650.00
2,625.00
169,275.00

6,640.00
6,640.00
298,366.50
44,754.98
343,121.48

Jumlah Harga
(Rp.)

52,500.00
62,500.00
7,250.00
201.50
122,451.50
106,454.00
2,625.00
109,079.00

6,640.00
6,640.00
238,170.50
35,725.58
273,896.08

Jumlah Harga
(Rp.)

52,500.00
62,500.00
7,250.00
201.50
122,451.50

202,000.00
2,625.00
204,625.00

6,640.00
6,640.00
333,716.50
50,057.48
383,773.98
A.4.5.1 Satuan Pekerjaan Langit-Langit (plafond)

A.4.5.1.5 Pemasangan 1 m2 langit-langit tripleks ukuran (120x240) cm, tebal 6 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tripleks (6 mm) Lembar 0.375 111,000.00
Paku tripleks Kg 0.030 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)mm, tebal 9 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang kayu L.03 OH 0.050 125,000.00
Kepala tukang L.03 OH 0.005 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364 74,600.00
Paku skrup Kg 0.110 53,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.1.7.a Pemasangan 1 m2 langit-langit GRC ukuran 120 x 240 mm tebal 4 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang kayu L.03 OH 0.050 125,000.00
Kepala tukang L.03 OH 0.005 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
GRC tebal 4 mm Lembar 0.364 79,700.00
Paku GRC Kg 0.110 21,300.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.1.9 Pemasangan 1 m' list langit-langit kayu profil


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 105,000.00
Tukang kayu L.03 OH 0.050 125,000.00
Kepala tukang L.03 OH 0.005 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.050 35,000.00
Paku Kg 0.010 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

10,500.00
12,500.00
1,450.00
775.00
25,225.00

41,625.00
615.00
42,240.00

67,465.00
10,119.75
77,584.75

Jumlah Harga
(Rp.)

10,500.00
6,250.00
725.00
775.00
18,250.00

27,154.40
5,830.00
32,984.40

51,234.40
7,685.16
58,919.56

Jumlah Harga
(Rp.)

10,500.00
6,250.00
725.00
775.00
18,250.00

29,010.80
2,343.00
31,353.80

49,603.80
7,440.57
57,044.37

Jumlah Harga
(Rp.)

5,250.00
6,250.00
725.00
465.00
12,690.00

36,750.00
205.00
36,955.00

49,645.00
7,446.75
57,091.75
A.4.5.2 Harga Satuan Pekerjaan Penutup Atap

A.4.5.2.32.a Pemasangan 1 m2 genteng metal Type Classic atap pelana


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.11 OH 0.010 145,000.00
Mandor L.15 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Type Classic 0.30 m2 1.300 107,892.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.32.b Pemasangan 1 m2 genteng metal Type Royal atap pelana


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.11 OH 0.010 145,000.00
Mandor L.15 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Type Royal 0.30 m2 1.300 113,886.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.32.c Pemasangan 1 m2 genteng metal Type Metal Stone atap pelana


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.11 OH 0.010 145,000.00
Mandor L.15 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Stone ( Type Classic 0.35 ) m2 1.300 129,600.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.33.a Pemasangan 1 m2 genteng metal Type Classic atap jurai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.11 OH 0.010 145,000.00
Mandor L.15 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Type Classic 0.30 m2 2.000 107,892.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.33.b Pemasangan 1 m2 genteng metal Type Royal atap jurai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.11 OH 0.010 145,000.00
Mandor L.15 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Type Royal 0.30 m2 2.000 113,886.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.33.c Pemasangan 1 m2 genteng metal Type metal Stone atap jurai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang kayu L.03 OH 0.100 125,000.00
Kepala tukang L.11 OH 0.010 145,000.00
Mandor L.15 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Stone ( Type Classic 0.35 ) m2 2.000 129,600.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.34 Pemasangan 1 m2 atap sirap kayu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.166 105,000.00
Tukang kayu L.03 OH 0.250 125,000.00
Kepala tukang L.11 OH 0.025 145,000.00
Mandor L.15 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu Buah 30.000 5,300.00
Paku biasa 1/2"-1" Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.37 Pemasangan 1 m' nok genteng metal


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 105,000.00
Tukang kayu L.03 OH 0.150 125,000.00
Kepala tukang L.11 OH 0.015 145,000.00
Mandor L.15 OH 0.013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal Buah 1.100 50,000.00
Paku biasa 1/2"-1" Kg 0.050 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.38 Pemasangan 1 m' nok sirap


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.125 105,000.00
Tukang kayu L.03 OH 0.250 125,000.00
Kepala tukang L.11 OH 0.025 145,000.00
Mandor L.15 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat 3"x 6" Lbr 0.400 68,000.00
Paku biasa 1/2"-1" Kg 0.050 20,500.00
Paku biasa 2"-5" Kg 0.050 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.39 Pemasangan 1 m2 atap seng gelombang


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.120 105,000.00
Tukang kayu L.03 OH 0.060 125,000.00
Kepala tukang L.11 OH 0.006 145,000.00
Mandor L.15 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng gel 3"x 6" Lbr 0.700 72,000.00
Paku biasa 1/2"-1" Kg 0.020 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.40 Pemasangan 1 m' nok atap seng


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang kayu L.03 OH 0.070 125,000.00
Kepala tukang L.11 OH 0.007 145,000.00
Mandor L.15 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat 3"x 6" bjls 28 Lbr 0.300 68,000.00
Paku biasa 1/2"-1" Kg 0.040 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.41.a Pemasangan 1 m2 atap Zincalum Polos 0.40


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang kayu L.03 OH 0.750 125,000.00
Kepala tukang L.11 OH 0.080 145,000.00
Mandor L.15 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalume Gelombang Persegi 0.40 (polos) Lbr 1.050 75,900.00
Paku hak panjang 15 cm Kg 0.020 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.41.b Pemasangan 1 m2 atap Zincalum Warna 0.40


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang kayu L.03 OH 0.750 125,000.00
Kepala tukang L.11 OH 0.080 145,000.00
Mandor L.15 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalume Gelombang Persegi 0.40(color) Lbr 1.050 83,800.00
Paku hak panjang 15 cm Kg 0.020 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.42 Pemasangan 1 m' nok alumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang kayu L.03 OH 1.000 125,000.00
Kepala tukang L.11 OH 0.100 145,000.00
Mandor L.15 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok bubungan genteng metal kotak 0.35 Buah 1.200 50,000.00
Paku hak panjang 15 cm Kg 0.040 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.43 Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang kayu L.03 OH 0.050 125,000.00
Kepala tukang L.11 OH 0.005 145,000.00
Mandor L.15 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Alumunium foil Kg 1.050 55,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
155.00
35,105.00

140,259.60
4,100.00
144,359.60

179,464.60
26,919.69
206,384.29

Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
155.00
35,105.00

148,051.80
4,100.00
152,151.80

187,256.80
28,088.52
215,345.32

Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
155.00
35,105.00

168,480.00
4,100.00
172,580.00

207,685.00
31,152.75
238,837.75

Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
155.00
35,105.00

215,784.00
4,100.00
219,884.00

254,989.00
38,248.35
293,237.35

Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
155.00
35,105.00

227,772.00
4,100.00
231,872.00

266,977.00
40,046.55
307,023.55

Jumlah Harga
(Rp.)

21,000.00
12,500.00
1,450.00
155.00
35,105.00

259,200.00
4,100.00
263,300.00
298,405.00
44,760.75
343,165.75

Jumlah Harga
(Rp.)

17,430.00
31,250.00
3,625.00
1,240.00
53,545.00

159,000.00
4,100.00
163,100.00

216,645.00
32,496.75
249,141.75

Jumlah Harga
(Rp.)

26,250.00
18,750.00
2,175.00
2,015.00
49,190.00

55,000.00
1,025.00
56,025.00
105,215.00
15,782.25
120,997.25

Jumlah Harga
(Rp.)

13,125.00
31,250.00
3,625.00
930.00
48,930.00

27,200.00
1,025.00
1,025.00
29,250.00

78,180.00
11,727.00
89,907.00

Jumlah Harga
(Rp.)

12,600.00
7,500.00
870.00
930.00
21,900.00

50,400.00
410.00
50,810.00
51,740.00
7,761.00
59,501.00

Jumlah Harga
(Rp.)

15,750.00
8,750.00
1,015.00
930.00
26,445.00

20,400.00
820.00
21,220.00

22,150.00
3,322.50
25,472.50

Jumlah Harga
(Rp.)

15,750.00
93,750.00
11,600.00
930.00
122,030.00

79,695.00
410.00
80,105.00

202,135.00
30,320.25
232,455.25

Jumlah Harga
(Rp.)

15,750.00
93,750.00
11,600.00
930.00
122,030.00

87,990.00
410.00
88,400.00

210,430.00
31,564.50
241,994.50

Jumlah Harga
(Rp.)

10,500.00
125,000.00
14,500.00
7,750.00
157,750.00

60,000.00
820.00
60,820.00

218,570.00
32,785.50
251,355.50

Jumlah Harga
(Rp.)

15,750.00
6,250.00
725.00
1,240.00
23,965.00

57,750.00
8,662.50

32,627.50
4,894.13
37,521.63
A.4.6.1 Harga Satuan Pekerjaan Kayu

A.4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.000 105,000.00
Tukang Kayu L.03 OH 21.000 125,000.00
Kepala Tukang L.03 OH 2.100 145,000.00
Mandor L.04 OH 0.350 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Kayu Kelas 1 (bengkirai) m3 1.100 16,000,000.00
Paku 10cm kg 1.250 20,500.00
Lem kayu kg 1.000 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.1.a Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu belian
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.000 105,000.00
Tukang Kayu L.03 OH 21.000 125,000.00
Kepala Tukang L.03 OH 2.100 145,000.00
Mandor L.04 OH 0.350 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Kayu Belian m3 1.100 24,000,000.00
Paku 10cm kg 1.250 20,500.00
Lem kayu kg 1.000 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.000 105,000.00
Tukang Kayu L.03 OH 18.000 125,000.00
Kepala Tukang L.03 OH 1.800 145,000.00
Mandor L.04 OH 0.300 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Kayu Kelas II m3 1.200 13,000,000.00
Paku 10cm kg 1.250 20,500.00
Lem kayu kg 1.000 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar,kayu kelas II


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.350 105,000.00
Tukang Kayu L.03 OH 1.050 125,000.00
Kepala Tukang L.03 OH 0.105 145,000.00
Mandor L.04 OH 0.018 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II m3 0.040 8,300,000.00
Paku 5-7 cm kg 0.050 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas 1 (bengkirai) m3 0.040 11,188,300.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.5.a Pembuatan dan pemasangan 1m2 daun pintu panel, kayu belian
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Belian m3 0.040 14,814,000.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.5.b Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II (mabang) m3 0.040 8,300,000.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00
Tukang Kayu L.03 OH 2.400 125,000.00
Kepala Tukang L.03 OH 0.240 145,000.00
Mandor L.04 OH 0.040 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas 1 (bengkirai) m3 0.024 11,188,300.00
Lem kayu kg 0.300 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.6.a Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00
Tukang Kayu L.03 OH 2.400 125,000.00
Kepala Tukang L.03 OH 0.240 145,000.00
Mandor L.04 OH 0.040 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II (mabang) m3 0.024 8,300,000.00
Lem kayu kg 0.300 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.064 11,188,300.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.8 Pembuatan dan pemasangan 1m2 pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang Kayu L.03 OH 2.100 125,000.00
Kepala Tukang L.03 OH 0.210 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kelas II m3 0.025 8,300,000.00
Paku 1cm-2,5 cm kg 0.030 20,500.00
Lem kayu kg 0.500 18,500.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.9 Pembuatan 1m2 pintu plywood rangkap, rangka expose kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00
Tukang Kayu L.03 OH 2.100 125,000.00
Kepala Tukang L.03 OH 0.240 145,000.00
Mandor L.04 OH 0.040 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.0256 11,188,300.00
Paku 1cm-2,5 cm kg 0.030 20,500.00
Lem kayu kg 0.500 18,500.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.10 Pemasangan 1m2 jalusi kusen, kayu kelas I


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.670 105,000.00
Tukang Kayu L.03 OH 2.000 125,000.00
Kepala Tukang L.03 OH 0.200 145,000.00
Mandor L.04 OH 0.335 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.060 11,188,300.00
Paku 1cm-2,5 cm kg 0.150 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.13.a Pemasangan 1m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.000 105,000.00
Tukang Kayu L.03 OH 12.000 125,000.00
Kepala Tukang L.03 OH 1.200 145,000.00
Mandor L.04 OH 0.200 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II uk. 6/12 m3 1.100 11,000.00
Paku 12 cm kg 5.600 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.14 Pemasangan 1m3 konstruksi kuda-kuda expose, kayu kelas I


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.700 105,000.00
Tukang Kayu L.03 OH 20.100 125,000.00
Kepala Tukang L.03 OH 2.010 145,000.00
Mandor L.04 OH 0.335 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas I uk. 5/10 m3 1.200 9,050,000.00
Besi strip tebal 5 mm kg 15.000 -
Paku 12 cm kg 5.600 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.15 Pemasangan 1m3 konstruksi gordeng, kayu kelas II


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.700 105,000.00
Tukang Kayu L.03 OH 20.100 125,000.00
Kepala Tukang L.03 OH 2.010 145,000.00
Mandor L.04 OH 0.335 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Kelas II Uk. 5/10 m3 1.100 3,355,000.00
Besi strip tebal 5 mm kg 15.000 -
Paku 12 cm kg 3.000 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.18 Pemasangan 1m2 rangka atap sirap, kayu kelas II


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.120 105,000.00
Tukang Kayu L.03 OH 0.120 125,000.00
Kepala Tukang L.03 OH 0.012 145,000.00
Mandor L.04 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II uk. 4/6 m3 0.014 5,070,000.00
Paku 5 - 10 cm m3 0.057 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.19 Pemasangan 1m2 rangka langit-langit (50x100) cm, kayu kelas II


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang Kayu L.03 OH 0.300 125,000.00
Kepala Tukang L.03 OH 0.030 145,000.00
Mandor L.04 OH 0.075 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
kaso-kaso 5 x7 cm m3 0.0154 4,755,000.00
Paku 7 cm - 10 cm Kg 0.200 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.20 Pemasangan 1m2 rangka langit-langit (60x60) cm, kayu kelas II


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.03 OH 0.300 125,000.00
Kepala Tukang L.03 OH 0.030 145,000.00
Mandor L.04 OH 0.010 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
kaso-kaso 5 x7 cm m3 0.0163 4,755,000.00
Paku 7 cm - 10 cm Kg 0.250 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.21 Pemasangan 1m' lisplank ukuran (3x20) cm, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang Kayu L.03 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.0108 11,188,300.00
Paku 5 dan 7 cm Kg 0.100 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.22 Pemasangan 1m' lisplank ukuran (3x30) cm, kayu kelas I


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Tukang Kayu L.03 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.011 11,188,300.00
Paku 5 dan 7 cm Kg 0.050 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.23 Pemasangan 1m2 rangka dinding pemisah (60x120) cm, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Tukang Kayu L.03 OH 0.450 125,000.00
Kepala Tukang L.03 OH 0.045 145,000.00
Mandor L.04 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II uk. 7/7 m3 0.028 4,716,717.69
Paku 5 dan 7 cm Kg 0.150 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.25 Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.03 OH 0.600 125,000.00
Kepala Tukang L.03 OH 0.060 145,000.00
Mandor L.04 OH 0.010 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
balok kayukelas II uk. 6/12 m3 0.028 4,224,000.00
Paku 5 dan 10 Kg 0.150 20,500.00
Plywood 4 mm,120 x 240 Lembar 0.860 120,000.00
Lem kayu Kg 0.560 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.26 Pemasangan 1m2 dinding lambrisering, dari papan kayu kelas I


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 105,000.00
Tukang Kayu L.03 OH 1.800 125,000.00
Kepala Tukang L.03 OH 0.180 145,000.00
Mandor L.04 OH 0.030 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.007 11,188,300.00
Paku 5 dan 10 Kg 0.100 20,500.00
Paku skrup 10 cm Kg 0.150 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.1.27 Pemasangan 1m2 dinding lambrisering, dari plywood ukuran (120x240)cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 105,000.00
Tukang Kayu L.03 OH 0.075 125,000.00
Kepala Tukang L.03 OH 0.008 145,000.00
Mandor L.04 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywood 4 mm m3 0.400 120,000.00
Paku 1 dan 2,5 Kg 0.050 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

735,000.00
2,625,000.00
304,500.00
54,250.00
3,718,750.00

17,600,000.00
25,625.00
18,500.00
17,644,125.00

21,362,875.00
3,204,431.25
24,567,306.25

Jumlah Harga
(Rp.)

735,000.00
2,625,000.00
304,500.00
54,250.00
3,718,750.00

26,400,000.00
25,625.00
18,500.00
26,444,125.00
30,162,875.00
4,524,431.25
34,687,306.25

Jumlah Harga
(Rp.)

630,000.00
2,250,000.00
261,000.00
46,500.00
3,187,500.00

15,600,000.00
25,625.00
18,500.00
15,644,125.00

18,831,625.00
2,824,743.75
21,656,368.75

Jumlah Harga
(Rp.)

36,750.00
131,250.00
15,225.00
2,790.00
186,015.00

332,000.00
1,025.00
333,025.00
519,040.00
77,856.00
596,896.00

Jumlah Harga
(Rp.)

105,000.00
375,000.00
43,500.00
7,750.00
531,250.00

447,532.00
9,250.00
456,782.00

988,032.00
148,204.80
1,136,236.80

Jumlah Harga
(Rp.)

105,000.00
375,000.00
43,500.00
7,750.00
531,250.00

592,560.00
9,250.00
601,810.00
1,133,060.00
169,959.00
1,303,019.00

Jumlah Harga
(Rp.)

105,000.00
375,000.00
43,500.00
7,750.00
531,250.00

332,000.00
9,250.00
341,250.00

872,500.00
130,875.00
1,003,375.00

Jumlah Harga
(Rp.)

84,000.00
300,000.00
34,800.00
6,200.00
425,000.00

268,519.20
5,550.00
274,069.20

699,069.20
104,860.38
803,929.58

Jumlah Harga
(Rp.)

84,000.00
300,000.00
34,800.00
6,200.00
425,000.00

199,200.00
5,550.00
204,750.00

629,750.00
94,462.50
724,212.50

Jumlah Harga
(Rp.)

105,000.00
375,000.00
43,500.00
7,750.00
531,250.00

716,051.20
9,250.00
725,301.20

1,256,551.20
188,482.68
1,445,033.88

utup (lebar sampai 90cm)


Jumlah Harga
(Rp.)

73,500.00
262,500.00
30,450.00
5,425.00
371,875.00

207,500.00
615.00
9,250.00
120,000.00
337,365.00

709,240.00
106,386.00
815,626.00

Jumlah Harga
(Rp.)

84,000.00
262,500.00
34,800.00
6,200.00
387,500.00

286,420.48
615.00
9,250.00
120,000.00
416,285.48

803,785.48
120,567.82
924,353.30

Jumlah Harga
(Rp.)

70,350.00
250,000.00
29,000.00
51,925.00
401,275.00

671,298.00
3,075.00
1,075,648.00

1,104,648.00
165,697.20
1,270,345.20

Jumlah Harga
(Rp.)

420,000.00
1,500,000.00
174,000.00
31,000.00
2,125,000.00

12,100.00
114,800.00
126,900.00

2,251,900.00
337,785.00
2,589,685.00

Jumlah Harga
(Rp.)

703,500.00
2,512,500.00
291,450.00
51,925.00
3,559,375.00

10,860,000.00
-
114,800.00
10,974,800.00

14,534,175.00
2,180,126.25
16,714,301.25

Jumlah Harga
(Rp.)
703,500.00
2,512,500.00
291,450.00
51,925.00
3,559,375.00

3,690,500.00
-
61,500.00
3,752,000.00

7,311,375.00
1,096,706.25
8,408,081.25

Jumlah Harga
(Rp.)

12,600.00
15,000.00
1,740.00
930.00
30,270.00

70,980.00
1,168.50
72,148.50

73,078.50
10,961.78
84,040.28
Jumlah Harga
(Rp.)

15,750.00
37,500.00
4,350.00
11,625.00
69,225.00

73,227.00
4,100.00
77,327.00

88,952.00
13,342.80
102,294.80

Jumlah Harga
(Rp.)

21,000.00
37,500.00
4,350.00
1,550.00
64,400.00

77,506.50
5,125.00
82,631.50

84,181.50
12,627.23
96,808.73
Jumlah Harga
(Rp.)

10,500.00
25,000.00
2,900.00
775.00
39,175.00

120,833.64
2,050.00
122,883.64

123,658.64
18,548.80
142,207.44

Jumlah Harga
(Rp.)

10,500.00
25,000.00
2,900.00
775.00
39,175.00

123,071.30
1,025.00
124,096.30

124,871.30
18,730.70
143,602.00
Jumlah Harga
(Rp.)

15,750.00
56,250.00
6,525.00
1,240.00
79,765.00

132,068.10
3,075.00
135,143.10

136,383.10
20,457.46
156,840.56

Jumlah Harga
(Rp.)

21,000.00
75,000.00
8,700.00
1,550.00
106,250.00

118,272.00
3,075.00
103,200.00
10,360.00
234,907.00

341,157.00
51,173.55
392,330.55

Jumlah Harga
(Rp.)

63,000.00
225,000.00
26,100.00
4,650.00
318,750.00

78,318.10
2,050.00
3,075.00
83,443.10

88,093.10
13,213.97
101,307.07

Jumlah Harga
(Rp.)

2,625.00
9,375.00
1,160.00
155.00
13,315.00

48,000.00
1,025.00
62,340.00
63,500.00
9,525.00
73,025.00
A.4.6.2 Harga Satuan Pekerjaan Kunci dan Kaca

A.4.6.2.1 Pemasangan 1 buah kunci tanam antik


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 105,000.00
Tukang Kayu L.02 OH 0.600 125,000.00
Kepala Tukang L.03 OH 0.060 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1.000 47,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 105,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam biasa buah 1.000 57,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.4 Pemasangan 1 buah kunci silinder
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.005 105,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder buah 1.000 78,800.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.5 Pemasangan 1 buah engsel pintu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 105,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.0008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu buah 1.000 29,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 105,000.00
Tukang Kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.0005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu buah 1.000 18,800.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.9 Pemasangan 1 buah kait angin


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 105,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin buah 1.000 14,400.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.10 Pemasangan 1 buah door closer


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 105,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.000 190,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.11 Pemasangan 1 buah kunci slot


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang Kayu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.001 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot buah 1.000 18,900.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.13 Pemasangan 1 buah door stop


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 105,000.00
Tukang Kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop buah 1.000 88,750.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.17 Pemasangan 1m2 kaca tebal 5 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 105,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.0008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100 200,000.00
Sealant kg 0.050 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.18 Pemasangan 1m2 kaca tebal 8 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.017 105,000.00
Tukang Kayu L.02 OH 0.170 125,000.00
Kepala Tukang L.03 OH 0.017 145,000.00
Mandor L.04 OH 0.0009 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.100 398,000.00
Sealant kg 0.07 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.19 Pemasangan 1m2 kaca buram tebal 12 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 105,000.00
Tukang Kayu L.02 OH 0.250 125,000.00
Kepala Tukang L.03 OH 0.025 145,000.00
Mandor L.04 OH 0.0013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram tebal 12 mm m2 1.100 640,000.00
Sealant kg 0.070 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.20 Pemasangan 1m2 kaca cermin tebal 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 105,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.100 418,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

6,300.00
75,000.00
8,700.00
465.00
90,465.00

47,500.00
47,500.00

-
137,965.00
20,694.75
158,659.75

Jumlah Harga
(Rp.)

1,050.00
62,500.00
7,250.00
775.00
71,575.00

57,500.00
57,500.00

-
129,075.00
19,361.25
148,436.25
Jumlah Harga
(Rp.)

525.00
62,500.00
7,250.00
465.00
70,740.00

78,800.00
78,800.00

-
149,540.00
22,431.00
171,971.00

Jumlah Harga
(Rp.)

1,575.00
18,750.00
2,175.00
124.00
22,624.00

29,000.00
29,000.00

-
51,624.00
7,743.60
59,367.60
Jumlah Harga
(Rp.)

1,050.00
12,500.00
1,450.00
77.50
15,077.50

18,800.00
18,800.00

-
33,877.50
5,081.63
38,959.13

Jumlah Harga
(Rp.)

1,575.00
18,750.00
2,175.00
1,240.00
23,740.00

14,400.00
14,400.00

38,140.00
5,721.00
43,861.00
Jumlah Harga
(Rp.)

5,250.00
62,500.00
7,250.00
465.00
75,465.00

190,000.00
190,000.00

265,465.00
39,819.75
305,284.75

Jumlah Harga
(Rp.)

2,100.00
25,000.00
2,900.00
155.00
30,155.00

18,900.00
18,900.00

29,055.00
4,358.25
33,413.25
Jumlah Harga
(Rp.)

1,050.00
12,500.00
1,450.00
775.00
15,775.00

88,750.00
88,750.00

-
104,525.00
15,678.75
120,203.75

Jumlah Harga
(Rp.)

1,575.00
18,750.00
2,175.00
124.00
22,624.00

220,000.00
1,750.00
221,750.00

-
244,374.00
36,656.10
281,030.10
Jumlah Harga
(Rp.)

1,785.00
21,250.00
2,465.00
139.50
25,639.50

437,800.00
2,450.00
440,250.00

-
465,889.50
69,883.43
535,772.93

Jumlah Harga
(Rp.)

2,625.00
31,250.00
3,625.00
201.50
37,701.50

704,000.00
2,450.00
706,450.00

-
744,151.50
111,622.73
855,774.23
Jumlah Harga
(Rp.)

1,575.00
18,750.00
2,175.00
1,240.00
23,740.00

459,800.00
459,800.00

-
483,540.00
72,531.00
556,071.00
A.4.7.1 Harga Satuan Pekerjaan Pengecatan

A.4.7.1.1. 1m2 Pengikisan/ pengerokan permukaan cat lama


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.050 24,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.2. 1m2 Pencucian bidang permukaan tembok yang pernah di cat


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050 15,700.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.3. 1m2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 105,000.00
Mandor L.04 OH 0.008 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050 15,700.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.4. 1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 105,000.00
Tukang cat L.02 OH 0.009 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200 52,000.00
Plamuur Kg 0.150 31,500.00
Cat dasar Kg 0.170 70,000.00
Cat penutup Kg 0.260 84,000.00
Kuas buah 0.010 24,000.00
Pengencer Kg 0.030 25,000.00
Ampelas Lbr 0.200 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.5. 1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 105,000.00
Tukang cat L.02 OH 0.105 125,000.00
Kepala tukang L.03 OH 0.004 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200 52,000.00
Plamuur Kg 0.150 31,500.00
Cat dasar Kg 0.170 70,000.00
Cat penutup Kg 0.350 84,000.00
Kuas buah 0.010 24,000.00
Pengencer Kg 0.030 25,000.00
Ampelas Lbr 0.200 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.6. Pelaburan 1m2 bidang kayu dengan teak oil


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.040 105,000.00
Tukang cat L.02 OH 0.630 125,000.00
Kepala tukang L.03 OH 0.063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Teak oil L 0.360 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.7. Pelaburan 1m2 bidang kayu dengan polintur


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.040 105,000.00
Tukang cat L.02 OH 0.060 125,000.00
Kepala tukang L.03 OH 0.160 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Polintur L 0.150 64,000.00
Polintur jadi L 0.372 64,000.00
Ampelas Lbr 2.000 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.8. Pelaburan 1m2 bidang kayu cat residu dan ter


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00
Mandor L.04 OH 0.006 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Residu atau ter L 0.350 58,400.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.9. Pelaburan 1m2 bidang kayu dengan vernis


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.160 105,000.00
Tukang cat L.02 OH 0.160 125,000.00
Kepala tukang L.03 OH 0.016 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vernis L 0.150 45,000.00
Dempul Kg 0.050 31,500.00
Ampelas Lbr 0.100 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10. 1m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior setara Vinilex
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 31,500.00
Cat dasar Kg 0.100 27,000.00
Cat penutup Kg 0.260 28,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10.a 1m2 Pengecatan tembok baru Interior (setara Mowilex)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 31,500.00
Cat dasar Kg 0.100 27,000.00
Cat penutup (setara mowilex) Kg 0.260 84,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10.b 1m2 Pengecatan tembok baru Exterior (setara Mowilex)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 31,500.00
Cat dasar (setara mowilex) Kg 0.100 27,000.00
Cat penutup (setara mowilex) Kg 0.260 104,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10.c 1m2 Pengecatan tembok baru Interior (setara Dulux)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 31,500.00
Cat dasar Kg 0.100 27,000.00
Cat penutup (setara dulux) Kg 0.260 104,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10.d 1m2 Pengecatan tembok baru Exterior (setara Dulux)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 31,500.00
Cat dasar Kg 0.100 27,000.00
Cat penutup (setara dulux) Kg 0.260 107,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10.e 1m2 Pengecatan tembok baru Acian Exterior (setara Dulux)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Alkali Kg 0.100 140,000.00
Cat penutup (setara dulux) Kg 0.260 107,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.11 1m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Interior setara Vinilex
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.280 105,000.00
Tukang cat L.02 OH 0.042 125,000.00
Kepala tukang L.03 OH 0.0042 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.120 27,000.00
Cat penutup Kg 0.180 28,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.11.a 1m2 Pengecatan tembok lama Interior setara Mowilex


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.280 105,000.00
Tukang cat L.02 OH 0.042 125,000.00
Kepala tukang L.03 OH 0.0042 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat penutup (setara mowilex) Kg 0.180 84,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.11.b 1m2 Pengecatan tembok lama Exterior setara Mowilex


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.280 105,000.00
Tukang cat L.02 OH 0.042 125,000.00
Kepala tukang L.03 OH 0.0042 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat penutup (setara mowilex) Kg 0.180 104,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.11.c 1m2 Pengecatan tembok lama Interior setara Dulux


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.280 105,000.00
Tukang cat L.02 OH 0.042 125,000.00
Kepala tukang L.03 OH 0.0042 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat penutup (setara dulux) Kg 0.180 104,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.11.d 1m2 Pengecatan tembok lama Exterior setara Dulux


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.280 105,000.00
Tukang cat L.02 OH 0.042 125,000.00
Kepala tukang L.03 OH 0.0042 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat penutup (setara dulux) Kg 0.180 107,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.16. Pengecatan 1m2 permukaan baja dengan menie besi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.0025 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 52,000.00
Kwas Lbr 0.010 24,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.17. Pengecatan 1m2 permukaan baja dengan menie besi dengan perancah
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 105,000.00
Tukang cat L.02 OH 0.225 125,000.00
Kepala tukang L.03 OH 0.0225 145,000.00
Mandor L.04 OH 0.0075 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 52,000.00
Pengencer L 0.010 25,000.00
Kwas Lbr 0.010 24,000.00
Perancah kayu m2 0.002 467,762.50
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

15,750.00
465.00
16,215.00

1,225.00
1,225.00

-
17,440.00
2,616.00
20,056.00

Jumlah Harga
(Rp.)

15,750.00
465.00
16,215.00

785.00
785.00

-
17,000.00
2,550.00
19,550.00

Jumlah Harga
(Rp.)
15,750.00
1,240.00
16,990.00

785.00
785.00

-
17,775.00
2,666.25
20,441.25

Jumlah Harga
(Rp.)

7,350.00
1,125.00
870.00
465.00
9,810.00

10,400.00
4,725.00
11,900.00
21,840.00
240.00
750.00
700.00
50,555.00

-
60,365.00
9,054.75
69,419.75
Jumlah Harga
(Rp.)

7,350.00
13,125.00
580.00
465.00
21,520.00

10,400.00
4,725.00
11,900.00
29,400.00
240.00
750.00
700.00
58,115.00

-
79,635.00
11,945.25
91,580.25

Jumlah Harga
(Rp.)

4,200.00
78,750.00
9,135.00
465.00
92,550.00

21,600.00
21,600.00

-
114,150.00
17,122.50
131,272.50

Jumlah Harga
(Rp.)

4,200.00
7,500.00
23,200.00
465.00
35,365.00

9,600.00
23,808.00
7,000.00
40,408.00

-
75,773.00
11,365.95
87,138.95

Jumlah Harga
(Rp.)

10,500.00
930.00
11,430.00

20,440.00
20,440.00

-
31,870.00
4,780.50
36,650.50

Jumlah Harga
(Rp.)

16,800.00
20,000.00
2,320.00
465.00
39,585.00

6,750.00
1,575.00
350.00
8,675.00

-
48,260.00
7,239.00
55,499.00

p) Interior setara Vinilex


Jumlah Harga
(Rp.)

2,100.00
7,875.00
913.50
465.00
11,353.50

3,150.00
2,700.00
7,280.00
13,130.00
-
24,483.50
3,672.53
28,156.03

Jumlah Harga
(Rp.)

2,100.00
7,875.00
913.50
465.00
11,353.50

3,150.00
2,700.00
21,840.00
27,690.00

-
39,043.50
5,856.53
44,900.03

Jumlah Harga
(Rp.)

2,100.00
7,875.00
913.50
465.00
11,353.50

3,150.00
2,700.00
27,040.00
32,890.00

-
44,243.50
6,636.53
50,880.03

Jumlah Harga
(Rp.)

2,100.00
7,875.00
913.50
465.00
11,353.50

3,150.00
2,700.00
27,040.00
32,890.00

-
44,243.50
6,636.53
50,880.03

Jumlah Harga
(Rp.)

2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
2,700.00
27,820.00
33,670.00

-
45,023.50
6,753.53
51,777.03

Jumlah Harga
(Rp.)

2,100.00
7,875.00
913.50
465.00
11,353.50

14,000.00
27,820.00
41,820.00

-
53,173.50
7,976.03
61,149.53

Jumlah Harga
(Rp.)

29,400.00
5,250.00
609.00
465.00
35,724.00

3,240.00
5,040.00
8,280.00

-
44,004.00
6,600.60
50,604.60

Jumlah Harga
(Rp.)

29,400.00
5,250.00
609.00
465.00
35,724.00

15,120.00
15,120.00

-
50,844.00
7,626.60
58,470.60

Jumlah Harga
(Rp.)

29,400.00
5,250.00
609.00
465.00
35,724.00

18,720.00
18,720.00

-
54,444.00
8,166.60
62,610.60

Jumlah Harga
(Rp.)

29,400.00
5,250.00
609.00
465.00
35,724.00

18,720.00
18,720.00

-
54,444.00
8,166.60
62,610.60

Jumlah Harga
(Rp.)

29,400.00
5,250.00
609.00
465.00
35,724.00

19,260.00
19,260.00

-
54,984.00
8,247.60
63,231.60

Jumlah Harga
(Rp.)

2,100.00
25,000.00
2,900.00
387.50
30,387.50

5,200.00
240.00
5,440.00

-
35,827.50
5,374.13
41,201.63

Jumlah Harga
(Rp.)

26,250.00
28,125.00
3,262.50
1,162.50
58,800.00

5,200.00
250.00
240.00
935.53
6,625.53

-
65,425.53
9,813.83
75,239.35
A.5.1.1 Harga Satuan Pekerjaan Sanitasi Dalam Gedung

A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/ monoblock


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.300 105,000.00
Tukang batu L.02 OH 1.100 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.160 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.000 2,962,700.00
Perlengkapan Ls 6% x closet 2,962,700.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang batu L.02 OH 1.500 125,000.00
Kepala tukang L.03 OH 0.150 145,000.00
Mandor L.04 OH 0.160 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.000 191,000.00
Semen Portland Kg 6.000 1,500.00
Pasir pasang M2 0.010 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.4. (K3) Pemasangan 1 buah urinoir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang batu L.02 OH 1.000 125,000.00
Kepala tukang L.03 OH 0.100 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.000 2,000,000.00
Semen Portland Kg 6.000 1,500.00
Pasir pasang M3 0.010 120,000.00
Perlengkapan % 30.000 2,000,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.5. (K3) Pemasangan 1 buah westafel


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 105,000.00
Tukang batu L.02 OH 1.450 125,000.00
Kepala tukang L.03 OH 0.150 145,000.00
Mandor L.04 OH 0.060 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Westafel Unit 1.200 1,000,000.00
Semen Portland Kg 6.000 1,500.00
Pasir pasang M3 0.010 120,000.00
Perlengkapan % 12.000 1,000,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.000 105,000.00
Tukang batu L.02 OH 4.500 125,000.00
Kepala tukang L.03 OH 0.050 145,000.00
Mandor L.04 OH 0.900 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak fiberglass Unit 1.000 280,000.00
Perlengkapan Ls 12% x bak 280,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.10. Pemasangan 1 buah bak fiberglass vol 1m3


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 105,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala tukang L.03 OH 0.450 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak air fiberglass Unit 1.000 280,000.00
Perlengkapan % 12.000 280,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.030 105,000.00
Tukang batu L.02 OH 0.300 125,000.00
Kepala tukang L.03 OH 0.030 145,000.00
Mandor L.04 OH 0.015 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.000 650,000.00
Waterdrain buah 1.000 319,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.14. Pemasangan 1 buah floor drain


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 105,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor drain Unit 1.000 319,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.540 105,000.00
Tukang batu L.02 OH 0.090 125,000.00
Kepala tukang L.03 OH 0.009 145,000.00
Mandor L.04 OH 0.0027 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1/2" M 1.200 18,333.33
Perlengkapan Ls 35% x pipa 18,333.33
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 105,000.00
Tukang batu L.02 OH 0.400 125,000.00
Kepala tukang L.03 OH 0.040 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.000 32,500.00
Sealtape Buah 0.025 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.20. Pemasangan 1m' pipa galvanis diameter 3/4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.054 105,000.00
Tukang batu L.02 OH 0.090 125,000.00
Kepala tukang L.03 OH 0.009 145,000.00
Mandor L.04 OH 0.027 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4" M 1.200 35,000.00
Perlengkapan % 35.000 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.21. Pemasangan 1m' pipa galvanis diameter 1"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.054 105,000.00
Tukang batu L.02 OH 0.090 125,000.00
Kepala tukang L.03 OH 0.009 145,000.00
Mandor L.04 OH 0.027 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1" M 1.200 42,250.00
Perlengkapan % 35.000 42,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.22. Pemasangan 1m' pipa galvanis diameter 1 1/2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.108 105,000.00
Tukang batu L.02 OH 0.180 125,000.00
Kepala tukang L.03 OH 0.018 145,000.00
Mandor L.04 OH 0.005 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1 1/2" M 1.200 71,750.00
Perlengkapan % 35.000 71,750.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.23. Pemasangan 1m' pipa galvanis diameter 3"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.135 105,000.00
Tukang batu L.02 OH 0.225 125,000.00
Kepala tukang L.03 OH 0.023 145,000.00
Mandor L.04 OH 0.007 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3" M 1.200 145,625.00
Perlengkapan % 35.000 145,625.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.24. Pemasangan 1m' pipa galvanis diameter 4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.135 105,000.00
Tukang batu L.02 OH 0.225 125,000.00
Kepala tukang L.03 OH 0.023 145,000.00
Mandor L.04 OH 0.007 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4" M 1.200 231,250.00
Perlengkapan % 35.000 231,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.25. Pemasangan 1m' pipa PVC tipe AW diameter 1/2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.036 105,000.00
Tukang batu L.02 OH 0.060 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.002 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2" M 1.200 278,750.00
Perlengkapan % 35.000 278,750.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.26. Pemasangan 1m' pipa PVC tipe AW diameter 3/4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.036 105,000.00
Tukang batu L.02 OH 0.060 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.002 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4" M 1.200 5,500.00
Perlengkapan % 35.000 5,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.27. Pemasangan 1m' pipa PVC tipe AW diameter 1"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.036 105,000.00
Tukang batu L.02 OH 0.060 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.002 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1" M 1.200 7,500.00
Perlengkapan % 35.000 7,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.29. Pemasangan 1m' pipa PVC tipe AW diameter 2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.054 105,000.00
Tukang batu L.02 OH 0.090 125,000.00
Kepala tukang L.03 OH 0.009 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2" M 1.200 11,250.00
Perlengkapan % 35.000 11,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.31. Pemasangan 1m' pipa PVC tipe AW diameter 3"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.081 105,000.00
Tukang batu L.02 OH 0.135 125,000.00
Kepala tukang L.03 OH 0.0135 145,000.00
Mandor L.04 OH 0.004 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3" M 1.200 20,500.00
Perlengkapan % 35.000 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.32. Pemasangan 1m' pipa PVC tipe AW diameter 4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.081 105,000.00
Tukang batu L.02 OH 0.135 125,000.00
Kepala tukang L.03 OH 0.0135 145,000.00
Mandor L.04 OH 0.004 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M 1.200 41,000.00
Perlengkapan % 35.000 41,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

346,500.00
137,500.00
1,450.00
24,800.00
510,250.00

2,962,700.00
177,762.00
3,140,462.00

-
-
3,650,712.00
547,606.80
4,198,318.80

Jumlah Harga
(Rp.)

105,000.00
187,500.00
21,750.00
24,800.00
339,050.00

191,000.00
9,000.00
1,200.00
201,200.00

-
-
540,250.00
81,037.50
621,287.50

Jumlah Harga
(Rp.)

105,000.00
125,000.00
14,500.00
7,750.00
252,250.00

2,000,000.00
9,000.00
1,200.00
600,000.00
2,610,200.00

-
-
2,862,450.00
429,367.50
3,291,817.50

Jumlah Harga
(Rp.)

126,000.00
181,250.00
21,750.00
9,300.00
338,300.00

1,200,000.00
9,000.00
1,200.00
120,000.00
1,330,200.00

-
-
1,668,500.00
250,275.00
1,918,775.00

Jumlah Harga
(Rp.)

315,000.00
562,500.00
7,250.00
139,500.00
1,024,250.00

280,000.00
33,600.00
313,600.00

-
-
1,337,850.00
200,677.50
1,538,527.50

Jumlah Harga
(Rp.)

31,500.00
56,250.00
65,250.00
2,325.00
155,325.00

280,000.00
33,600.00
313,600.00

-
-
468,925.00
70,338.75
539,263.75

Jumlah Harga
(Rp.)

3,150.00
37,500.00
4,350.00
2,325.00
47,325.00

650,000.00
319,100.00
969,100.00

-
-
1,016,425.00
152,463.75
1,168,888.75

Jumlah Harga
(Rp.)

1,050.00
12,500.00
1,450.00
775.00
15,000.00
319,100.00
319,100.00

-
-
334,100.00
50,115.00
384,215.00

Jumlah Harga
(Rp.)

56,700.00
11,250.00
1,305.00
418.50
69,673.50

22,000.00
6,416.67
28,416.67

-
-
98,090.17
14,713.53
112,803.69

Jumlah Harga
(Rp.)

1,050.00
50,000.00
5,800.00
775.00
57,625.00
32,500.00
375.00
32,875.00

-
-
90,500.00
13,575.00
104,075.00

Jumlah Harga
(Rp.)

5,670.00
11,250.00
1,305.00
4,185.00
22,410.00

42,000.00
12,250.00
54,250.00

-
-
76,660.00
11,499.00
88,159.00

Jumlah Harga
(Rp.)

5,670.00
11,250.00
1,305.00
4,185.00
22,410.00
50,700.00
14,787.50
65,487.50

-
-
87,897.50
13,184.63
101,082.13

Jumlah Harga
(Rp.)

11,340.00
22,500.00
2,610.00
775.00
37,225.00

86,100.00
25,112.50
111,212.50

-
-
148,437.50
22,265.63
170,703.13

Jumlah Harga
(Rp.)

14,175.00
28,125.00
3,335.00
1,085.00
46,720.00

174,750.00
50,968.75
225,718.75

-
272,438.75
40,865.81
313,304.56

Jumlah Harga
(Rp.)

14,175.00
28,125.00
3,335.00
1,085.00
46,720.00

277,500.00
80,937.50
358,437.50

-
405,157.50
60,773.63
465,931.13

Jumlah Harga
(Rp.)

3,780.00
7,500.00
870.00
310.00
12,460.00

334,500.00
97,562.50
432,062.50

-
444,522.50
66,678.38
511,200.88

Jumlah Harga
(Rp.)

3,780.00
7,500.00
870.00
310.00
12,460.00

6,600.00
1,925.00
8,525.00

-
20,985.00
3,147.75
24,132.75

Jumlah Harga
(Rp.)

3,780.00
7,500.00
870.00
310.00
12,460.00

9,000.00
2,625.00
11,625.00

-
24,085.00
3,612.75
27,697.75

Jumlah Harga
(Rp.)

5,670.00
11,250.00
1,305.00
465.00
18,690.00

13,500.00
3,937.50
17,437.50

-
36,127.50
5,419.13
41,546.63

Jumlah Harga
(Rp.)

8,505.00
16,875.00
1,957.50
620.00
27,957.50

24,600.00
7,175.00
31,775.00

-
59,732.50
8,959.88
68,692.38

Jumlah Harga
(Rp.)

8,505.00
16,875.00
1,957.50
620.00
27,957.50

49,200.00
14,350.00
63,550.00

-
91,507.50
13,726.13
105,233.63
A.8.4.1. Harga Satuan Pekerjaan Pemasangan Pipa di Luar Gedung

A.8.4.1.1. (K3) Pemasangan 1 m pipa PVC diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.081 105000
Tukang pipa L.02 OH 0.041 125000
Mandor L.04 OH 0.008 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.006
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.2. (K3) Pemasangan 1 m pipa PVC diameter 90 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.094 105000
Tukang pipa L.02 OH 0.047 125000
Mandor L.04 OH 0.009 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 90 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.008
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.3. (K3) Pemasangan 1 m pipa PVC diameter 110 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.105 105000
Tukang pipa L.02 OH 0.053 125000
Mandor L.04 OH 0.011 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 110 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.010
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.4. (K3) Pemasangan 1 m pipa PVC diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.118 105000
Tukang pipa L.02 OH 0.059 125000
Mandor L.04 OH 0.012 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.012
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.5. (K3) Pemasangan 1 m pipa PVC diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.189 105000
Tukang pipa L.02 OH 0.095 125000
Mandor L.04 OH 0.019 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.024
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.6. (K3) Pemasangan 1 m pipa PVC diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.256 105000
Tukang pipa L.02 OH 0.128 125000
Mandor L.04 OH 0.026 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.034
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.7. (K3) Pemasangan 1 m pipa PVC diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.294 105000
Tukang pipa L.02 OH 0.147 125000
Mandor L.04 OH 0.029 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.040
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.8. (K3) Pemasangan 1 m pipa PVC diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.544 105000
Tukang pipa L.02 OH 0.272 125000
Mandor L.04 OH 0.054 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.080
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.9. (K3) Pemasangan 1 m pipa PVC diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.669 105000
Tukang pipa L.02 OH 0.335 125000
Mandor L.04 OH 0.067 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.100
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.10. (K3) Pemasangan 1 m pipa PVC diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.809 105000
Tukang pipa L.02 OH 0.405 125000
Mandor L.04 OH 0.081 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.122
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.11. (K3) Pemasangan 1 m pipa PVC diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.957 105000
Tukang pipa L.02 OH 0.479 125000
Mandor L.04 OH 0.096 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.145
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.12. (K3) Pemasangan 1 m pipa PVC diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.618 105000
Tukang pipa L.02 OH 0.809 125000
Mandor L.04 OH 0.162 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.250
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.13. (K3) Pemasangan 1 m pipa PVC diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.691 105000
Tukang pipa L.02 OH 0.846 125000
Mandor L.04 OH 0.169 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.262
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.14. (K3) Pemasangan 1 m pipa PVC diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.895 105000
Tukang pipa L.02 OH 0.948 125000
Mandor L.04 OH 0.190 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.294
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.15. (K3) Pemasangan 1 m pipa PVC diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.099 105000
Tukang pipa L.02 OH 1.050 125000
Mandor L.04 OH 0.210 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.327
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.16. (K3) Pemasangan 1 m pipa PVC diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.303 105000
Tukang pipa L.02 OH 1.152 125000
Mandor L.04 OH 0.230 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.359
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.17. (K3) Pemasangan 1 m pipa HDPE diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.035 105000
Tukang pipa L.02 OH 0.017 125000
Mandor L.04 OH 0.003 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.019
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.18. (K3) Pemasangan 1 m pipa HDPE diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.040 105000
Tukang pipa L.02 OH 0.020 125000
Mandor L.04 OH 0.004 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.019
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.19. (K3) Pemasangan 1 m pipa HDPE diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.045 105000
Tukang pipa L.02 OH 0.023 125000
Mandor L.04 OH 0.005 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.019
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.062 105000
Tukang pipa L.02 OH 0.031 125000
Mandor L.04 OH 0.006 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.019
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.102 105000
Tukang pipa L.02 OH 0.051 125000
Mandor L.04 OH 0.010 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.019
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.133 105000
Tukang pipa L.02 OH 0.067 125000
Mandor L.04 OH 0.013 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.042
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.170 105000
Tukang pipa L.02 OH 0.085 125000
Mandor L.04 OH 0.017 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.065
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.290 105000
Tukang pipa L.02 OH 0.145 125000
Mandor L.04 OH 0.029 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.152
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE diameter 450 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.359 105000
Tukang pipa L.02 OH 0.180 125000
Mandor L.04 OH 0.036 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.200
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE diameter 500 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.433 105000
Tukang pipa L.02 OH 0.216 125000
Mandor L.04 OH 0.043 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.251
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE diameter 600 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.512 105000
Tukang pipa L.02 OH 0.256 125000
Mandor L.04 OH 0.051 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.307
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE diameter 800 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.893 105000
Tukang pipa L.02 OH 0.446 125000
Mandor L.04 OH 0.089 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.573
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.29 (K3) Pemasangan 1 m pipa HDPE diameter 900 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.353 105000
Tukang pipa L.02 OH 0.677 125000
Mandor L.04 OH 0.135 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.883
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.30 (K3) Pemasangan 1 m pipa HDPE diameter 1000 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.659 105000
Tukang pipa L.02 OH 0.830 125000
Mandor L.04 OH 0.166 155000
JUMLAH TENAGA KERJA
B BAHAN

m 1.000
Pipa HDPE diameter 1000 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.093
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.31 (K3) Pemasangan 1 m pipa HDPE diameter 1100 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.818 105000
Tukang pipa L.02 OH 0.909 125000
Mandor L.04 OH 0.182 155000
JUMLAH TENAGA KERJA
B BAHAN

m 1.000
Pipa HDPE diameter 1100 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.205
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.32 (K3) Pemasangan 1 m pipa HDPE diameter 1200 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.370 105000
Tukang pipa L.02 OH 1.185 125000
Mandor L.04 OH 0.237 155000
JUMLAH TENAGA KERJA
B BAHAN

m 1.000
Pipa HDPE diameter 1200 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.584
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP diameter 63 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.345 105000
Tukang pipa L.02 OH 0.172 125000
Mandor L.04 OH 0.034 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.400 105000
Tukang pipa L.02 OH 0.200 125000
Mandor L.04 OH 0.040 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.448 105000
Tukang pipa L.02 OH 0.224 125000
Mandor L.04 OH 0.045 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP diameter 150 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.506 105000
Tukang pipa L.02 OH 0.253 125000
Mandor L.04 OH 0.051 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.796 105000
Tukang pipa L.02 OH 0.398 125000
Mandor L.04 OH 0.080 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.38 (K3) Pemasangan 1 m pipa GIP diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.949 105000
Tukang pipa L.02 OH 0.475 125000
Mandor L.04 OH 0.095 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.39 (K3) Pemasangan 1 m pipa GIP diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.958 105000
Tukang pipa L.02 OH 0.479 125000
Mandor L.04 OH 0.096 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.40 (K3) Pemasangan 1 m pipa GIP diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.212 105000
Tukang pipa L.02 OH 0.606 125000
Mandor L.04 OH 0.121 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.41 (K3) Pemasangan 1 m pipa GIP diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.353 105000
Tukang pipa L.02 OH 0.676 125000
Mandor L.04 OH 0.135 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.42 (K3) Pemasangan 1 m pipa GIP diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.469 105000
Tukang pipa L.02 OH 0.735 125000
Mandor L.04 OH 0.147 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.43 (K3) Pemasangan 1 m pipa GIP diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.327 105000
Tukang pipa L.02 OH 0.664 125000
Mandor L.04 OH 0.133 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.44 (K3) Pemasangan 1 m pipa GIP diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.327 105000
Tukang pipa L.02 OH 1.163 125000
Mandor L.04 OH 0.233 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.45 (K3) Pemasangan 1 m pipa GIP diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.623 105000
Tukang pipa L.02 OH 1.312 125000
Mandor L.04 OH 0.262 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.46 (K3) Pemasangan 1 m pipa GIP diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.911 105000
Tukang pipa L.02 OH 1.456 125000
Mandor L.04 OH 0.291 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.1.47 (K3) Pemasangan 1 m pipa GIP diameter 1100 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.200 105000
Tukang pipa L.02 OH 1.600 125000
Mandor L.04 OH 0.320 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.48 (K3) Pemasangan 1 m pipa GIP diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.488 105000
Tukang pipa L.02 OH 1.744 125000
Mandor L.04 OH 0.349 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.489 105000
Tukang pipa L.02 OH 0.098 125000
Mandor L.04 OH 0.049 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.380
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.50 (K3) Pemasangan 1 m pipa DCI diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.547 105000
Tukang pipa L.02 OH 0.109 125000
Mandor L.04 OH 0.055 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.380
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.51 (K3) Pemasangan 1 m pipa DCI diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.613 105000
Tukang pipa L.02 OH 0.123 125000
Mandor L.04 OH 0.061 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.380
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.52 (K3) Pemasangan 1 m pipa DCI diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.855 105000
Tukang pipa L.02 OH 0.171 125000
Mandor L.04 OH 0.085 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.380
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.951 105000
Tukang pipa L.02 OH 0.190 125000
Mandor L.04 OH 0.095 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.050
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.54 (K3) Pemasangan 1 m pipa DCI diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.973 105000
Tukang pipa L.02 OH 0.195 125000
Mandor L.04 OH 0.097 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.071
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.55 (K3) Pemasangan 1 m pipa DCI diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.545 105000
Tukang pipa L.02 OH 0.309 125000
Operator alat berat L.08 OH 0.093 170000
Mandor L.04 OH 0.154 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.023
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.031
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.56 (K3) Pemasangan 1 m pipa DCI diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.813 105000
Tukang pipa L.02 OH 0.363 125000
Operator alat berat L.08 OH 0.143 170000
Mandor L.04 OH 0.181 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.029
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.039
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.57 (K3) Pemasangan 1 m pipa DCI diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.047 105000
Tukang pipa L.02 OH 0.409 125000
Operator alat berat L.08 OH 0.193 170000
Mandor L.04 OH 0.205 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.034
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.045
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.58 (K3) Pemasangan 1 m pipa DCI diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.011 105000
Tukang pipa L.02 OH 0.402 125000
Operator alat berat L.08 OH 0.293 170000
Mandor L.04 OH 0.201 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.058
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.077
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.59 (K3) Pemasangan 1 m pipa DCI diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.859 105000
Tukang pipa L.02 OH 0.772 125000
Operator alat berat L.08 OH 0.493 170000
Mandor L.04 OH 0.386 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.084
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.225
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.60 (K3) Pemasangan 1 m pipa DCI diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.995 105000
Tukang pipa L.02 OH 0.999 125000
Operator alat berat L.08 OH 0.593 170000
Mandor L.04 OH 0.499 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.093
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.248
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.61 (K3) Pemasangan 1 m pipa DCI diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.931 105000
Tukang pipa L.02 OH 1.186 125000
Operator alat berat L.08 OH 0.793 170000
Mandor L.04 OH 0.693 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.112
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.298
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.62 (K3) Pemasangan 1 m pipa DCI diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.949 105000
Tukang pipa L.02 OH 1.390 125000
Operator alat berat L.08 OH 0.793 170000
Mandor L.04 OH 0.695 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.152
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.304
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.63 (K3) Pemasangan 1 m pipa DCI diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 8.056 105000
Tukang pipa L.02 OH 1.611 125000
Operator alat berat L.08 OH 0.893 170000
Mandor L.04 OH 0.806 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.18
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.360
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.64 (K3) Pemasangan 1 m pipa baja diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.499 105000
Tukang pipa L.02 OH 0.100 125000
Mandor L.04 OH 0.050 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.65 (K3) Pemasangan 1 m pipa baja diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.579 105000
Tukang pipa L.02 OH 0.116 125000
Mandor L.04 OH 0.058 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.66 (K3) Pemasangan 1 m pipa baja diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.648 105000
Tukang pipa L.02 OH 0.130 125000
Mandor L.04 OH 0.065 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.67 (K3) Pemasangan 1 m pipa baja diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.708 105000
Tukang pipa L.02 OH 0.142 125000
Mandor L.04 OH 0.071 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.68 (K3) Pemasangan 1 m pipa baja diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.113 105000
Tukang pipa L.02 OH 0.223 125000
Mandor L.04 OH 0.111 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.69 (K3) Pemasangan 1 m pipa baja diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.325 105000
Tukang pipa L.02 OH 0.265 125000
Mandor L.04 OH 0.133 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.70 (K3) Pemasangan 1 m pipa baja diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.415 105000
Tukang pipa L.02 OH 0.283 125000
Mandor L.04 OH 0.141 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.71 (K3) Pemasangan 1 m pipa baja diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.366
Tukang pipa L.02 OH 0.473
Mandor L.04 OH 0.237
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.027
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.004
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.1.72 (K3) Pemasangan 1 m pipa baja diameter 450 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.231 105000
Tukang pipa L.02 OH 0.446 125000
Mandor L.04 OH 0.223 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 450 mm m 1.000
JUMLAH HARGA BAHAN
PERALATAN
Sewa escavator type 225 hari 0.026
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.037
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.73 (K3) Pemasangan 1 m pipa baja diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.432 105000
Tukang pipa L.02 OH 0.486 125000
Mandor L.04 OH 0.243 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.029
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.045
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.1.74 (K3) Pemasangan 1 m pipa baja diameter 600 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.208 105000
Tukang pipa L.02 OH 0.442 125000
Mandor L.04 OH 0.221 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.027
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.039
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.75 (K3) Pemasangan 1 m pipa baja diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.897 105000
Tukang pipa L.02 OH 0.779 125000
Mandor L.04 OH 0.390 155000
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.046
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.098
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.1.76 (K3) Pemasangan 1 m pipa baja diameter 900 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.403
Tukang pipa L.02 OH 0.081
Mandor L.04 OH 0.440
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.052
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.115
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.77 (K3) Pemasangan 1 m pipa baja diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.895
Tukang pipa L.02 OH 0.979
Mandor L.04 OH 0.489
JUMLAH TENAGA KERJA
B BAHAN

m 1.000
Pipa baja diameter 1000 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.058
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.133
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.78 (K3) Pemasangan 1 m pipa baja diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.387
Tukang pipa L.02 OH 1.077
Mandor L.04 OH 0.539
JUMLAH TENAGA KERJA
B BAHAN

m 1.000
Pipa baja diameter 1100 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.064
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.150
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.1.79 (K3) Pemasangan 1 m pipa baja diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.897
Tukang pipa L.02 OH 1.176
Mandor L.04 OH 0.588
JUMLAH TENAGA KERJA
B BAHAN

m 1.000
Pipa baja diameter 1200 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.07
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.167
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

8505
5125
1240
14870

0
0

0
0
14870
2230.5
17100.5

Jumlah Harga
(Rp.)

9870
5875
1395
17140

0
0

0
0
17140
2571
19711
Jumlah Harga
(Rp.)

11025
6625
1705
19355

0
0

0
0
19355
2903.25
22258.25

Jumlah Harga
(Rp.)

12390
7375
1860
21625

0
0

0
0
21625
3243.75
24868.75

Jumlah Harga
(Rp.)

19845
11875
2945
34665

0
0

0
0
34665
5199.75
39864.75

Jumlah Harga
(Rp.)

26880
16000
4030
46910

0
0

0
0
46910
7036.5
53946.5

Jumlah Harga
(Rp.)

30870
18375
4495
53740
0
0

0
0
-53740
-8061
-61801

Jumlah Harga
(Rp.)

57120
34000
8370
99490

0
0

0
0
99490
14923.5
114413.5

Jumlah Harga
(Rp.)

70245
41875
10385
122505

0
0
0
0
122505
18375.75
140880.75

Jumlah Harga
(Rp.)

84945
50625
12555
148125

0
0

0
0
148125
22218.75
170343.75

Jumlah Harga
(Rp.)

100485
59875
14880
175240

0
0

0
0
175240
26286
201526

Jumlah Harga
(Rp.)

169890
101125
25110
296125

0
0

0
0
296125
44418.75
340543.75

Jumlah Harga
(Rp.)

177555
105750
26195
309500

0
0

0
0
309500
46425
355925
Jumlah Harga
(Rp.)

198975
118500
29450
346925

0
0

0
0
346925
52038.75
398963.75

Jumlah Harga
(Rp.)

220395
131250
32550
384195

0
0

0
0
384195
57629.25
441824.25

Jumlah Harga
(Rp.)

241815
144000
35650
421465

0
0

0
0
421465
63219.75
484684.75

Jumlah Harga
(Rp.)

3675
2125
465
6265

0
0

0
0
6265
939.75
7204.75

Jumlah Harga
(Rp.)

4200
2500
620
7320
0
0

0
0
7320
1098
8418

Jumlah Harga
(Rp.)

4725
2875
775
8375

0
0

0
0
8375
1256.25
9631.25

Jumlah Harga
(Rp.)

6510
3875
930
11315

0
0
0
0
11315
1697.25
13012.25

Jumlah Harga
(Rp.)

10710
6375
1550
18635

0
0

0
0
18635
2795.25
21430.25

Jumlah Harga
(Rp.)

13965
8375
2015
24355

0
0

0
0
24355
3653.25
28008.25

Jumlah Harga
(Rp.)

17850
10625
2635
31110

0
0

0
0
31110
4666.5
35776.5

Jumlah Harga
(Rp.)

30450
18125
4495
53070

0
0

0
0
53070
7960.5
61030.5
Jumlah Harga
(Rp.)

37695
22500
5580
65775

0
0

65775
9866.25
75641.25

Jumlah Harga
(Rp.)

45465
27000
6665
79130

0
0

0
0
79130
11869.5
90999.5

Jumlah Harga
(Rp.)

53760
32000
7905
93665

0
0

0
0
93665
14049.75
107714.75

Jumlah Harga
(Rp.)

93765
55750
13795
163310

0
0

0
0
163310
24496.5
187806.5

Jumlah Harga
(Rp.)

142065
84625
20925
247615
0
0

0
0
247615
37142.25
284757.25

Jumlah Harga
(Rp.)

174195
103750
25730
303675

0
0

0
0
303675
45551.25
349226.25

Jumlah Harga
(Rp.)

190890
113625
28210
332725

0
0
0
0
332725
49908.75
382633.75

Jumlah Harga
(Rp.)

248850
148125
36735
396975

0
0

0
0
396975
59546.25
456521.25

Jumlah Harga
(Rp.)

36225
21500
5270
62995

0
0
62995
9449.25
72444.25

Jumlah Harga
(Rp.)

42000
25000
6200
73200

0
0

0
73200
10980
84180

Jumlah Harga
(Rp.)

47040
28000
6975
82015

0
0

0
82015
12302.25
94317.25
Jumlah Harga
(Rp.)

53130
31625
7905
92660

0
0

0
92660
13899
106559

Jumlah Harga
(Rp.)

83580
49750
12400
145730

0
0

0
145730
21859.5
167589.5

Jumlah Harga
(Rp.)
99645
59375
14725
173745

0
0

0
173745
26061.75
199806.75

Jumlah Harga
(Rp.)

100590
59875
14880
175345

0
0

0
175345
26301.75
201646.75

Jumlah Harga
(Rp.)

127260
75750
18755
221765

0
0

0
221765
33264.75
255029.75

Jumlah Harga
(Rp.)

142065
84500
20925
247490

0
0

0
247490
37123.5
284613.5

Jumlah Harga
(Rp.)

154245
91875
22785
268905

0
0
0
268905
40335.75
309240.75

Jumlah Harga
(Rp.)

139335
83000
20615
242950

0
0

0
242950
36442.5
279392.5

Jumlah Harga
(Rp.)

244335
145375
36115
425825

0
0

0
425825
63873.75
489698.75

Jumlah Harga
(Rp.)

275415
164000
40610
480025

0
0

0
480025
72003.75
552028.75

Jumlah Harga
(Rp.)

305655
182000
45105
532760

0
0

0
532760
79914
612674
Jumlah Harga
(Rp.)

336000
200000
49600
585600

0
0

0
585600
87840
673440

Jumlah Harga
(Rp.)

366240
218000
54095
638335

0
0

0
638335
95750.25
734085.25

Jumlah Harga
(Rp.)
51345
12250
7595
71190

0
0

0
71190
10678.5
81868.5

Jumlah Harga
(Rp.)

57435
13625
8525
79585

0
0

0
79585
11937.75
91522.75

Jumlah Harga
(Rp.)

64365
15375
9455
89195
0
0

0
89195
13379.25
102574.25

Jumlah Harga
(Rp.)

89775
21375
13175
124325

0
0

0
124325
18648.75
142973.75

Jumlah Harga
(Rp.)

99855
23750
14725
138330

0
0
0
138330
20749.5
159079.5

Jumlah Harga
(Rp.)

102165
24375
15035
141575

0
0

0
141575
21236.25
162811.25

Jumlah Harga
(Rp.)

162225
38625
15810
23870
240530

0
0
0
240530
36079.5
276609.5

Jumlah Harga
(Rp.)

190365
45375
24310
28055
288105

0
0

0
0
288105
43215.75
331320.75

Jumlah Harga
(Rp.)

214935
51125
32810
31775
330645

0
0
0

0
0
330645
49596.75
380241.75

Jumlah Harga
(Rp.)

211155
50250
49810
31155
342370

0
0

0
0
342370
51355.5
393725.5

Jumlah Harga
(Rp.)

405195
96500
83810
59830
645335

0
0

0
0
645335
96800.25
742135.25

Jumlah Harga
(Rp.)

524475.000
124875.000
100810.000
77345.000
827505.000

0
0

0
0
827505.000
124125.75
951630.750

Jumlah Harga
(Rp.)

622755
148250
134810
107415
1013230
0
0

0
0
1013230
151984.5
1165214.5

Jumlah Harga
(Rp.)

729645
173750
134810
107725
1145930

0
0

0
0
1145930
171889.5
1317819.5

Jumlah Harga
(Rp.)

845880
201375
151810
124930
1323995

0
0

0
0
1323995
198599.25
1522594.25

Jumlah Harga
(Rp.)

52395
12500
7750
72645

0
0

0
0
72645
10896.75
83541.75

Jumlah Harga
(Rp.)

60795
14500
8990
84285
0
0

0
0
84285
12642.75
96927.75

Jumlah Harga
(Rp.)

68040
16250
10075
94365

0
0

0
0
94365
14154.75
108519.75

Jumlah Harga
(Rp.)

74340
17750
11005
103095

0
0
0
0
103095
15464.25
118559.25

Jumlah Harga
(Rp.)

116865
27875
17205
144740

0
0

0
0
144740
21711
166451

Jumlah Harga
(Rp.)

139125
33125
20615
192865

0
0

0
0
192865
28929.75
221794.75

Jumlah Harga
(Rp.)

148575
35375
21855
205805

0
0

0
0
205805
30870.75
236675.75

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

234255
55750
34565
324570

0
0

0
0
324570
48685.5
373255.5

Jumlah Harga
(Rp.)

255360
60750
37665
353775

0
0

0
0
353775
53066.25
406841.25
Jumlah Harga
(Rp.)

231840
55250
34255
321345

0
0

0
0
321345
48201.75
369546.75

Jumlah Harga
(Rp.)

409185
97375
60450
567010

0
0

0
0
567010
85051.5
652061.5
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
A.8.4.2. Harga Satuan Pekerjaan Pemotongan Pipa

A.8.4.2.1. (K3) Pemotongan 1 m pipa PVC diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.005
Tukang pipa L.02 OH 0.002
Mandor L.04 OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.003
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.2. (K3) Pemotongan 1 m pipa PVC diameter 90 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.014
Tukang pipa L.02 OH 0.007
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 90 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.003
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.3. (K3) Pemotongan 1 m pipa PVC diameter 110 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.022
Tukang pipa L.02 OH 0.011
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 110 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.003
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.4. (K3) Pemotongan 1 m pipa PVC diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.031
Tukang pipa L.02 OH 0.015
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.003
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.5. (K3) Pemotongan 1 m pipa PVC diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.040
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.017
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.6. (K3) Pemotongan 1 m pipa PVC diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.128
Tukang pipa L.02 OH 0.064
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.030
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.7. (K3) Pemotongan 1 m pipa PVC diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.155
Tukang pipa L.02 OH 0.077
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan poong pipa T1/ hari 0.037
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.8. (K3) Pemotongan 1 m pipa PVC diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.331
Tukang pipa L.02 OH 0.166
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/ hari 0.086
manual (gergaji) / saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.9. (K3) Pemotongan 1 m pipa PVC diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.420
Tukang pipa L.02 OH 0.210
Mandor L.04 OH 0.042
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.054
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.10. (K3) Pemotongan 1 m pipa PVC diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.518
Tukang pipa L.02 OH 0.259
Mandor L.04 OH 0.052
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.069
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.11. (K3) Pemotongan 1 m pipa PVC diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.623
Tukang pipa L.02 OH 0.311
Mandor L.04 OH 0.062
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.086
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.12. (K3) Pemotongan 1 m pipa PVC diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.089
Tukang pipa L.02 OH 0.545
Mandor L.04 OH 0.109
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.160
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.13. (K3) Pemotongan 1 m pipa PVC diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.141
Tukang pipa L.02 OH 0.571
Mandor L.04 OH 0.114
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.168
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.14. (K3) Pemotongan 1 m pipa PVC diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.285
Tukang pipa L.02 OH 0.643
Mandor L.04 OH 0.129
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.191
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.15. (K3) Pemotongan 1 m pipa PVC diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.213
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.16. (K3) Pemotongan 1 m pipa PVC diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.573
Tukang pipa L.02 OH 0.787
Mandor L.04 OH 0.157
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.236
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.17. (K3) Pemotongan 1 m pipa HDPE diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.0002
Operator L.08 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.004
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.18. (K3) Pemotongan 1 m pipa HDPE diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.006
Tukang pipa L.02 OH 0.003
Mandor L.04 OH 0.001
Operator L.08 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.005
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.19. (K3) Pemotongan 1 m pipa HDPE diameter 125mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.009
Tukang pipa L.02 OH 0.005
Mandor L.04 OH 0.001
Operator L.08 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.006
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.20. (K3) Pemotongan 1 m pipa HDPE diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.016
Tukang pipa L.02 OH 0.008
Mandor L.04 OH 0.002
Operator L.08 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.009
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.21. (K3) Pemotongan 1 m pipa HDPE diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.044
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.004
Operator L.08 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.017
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.22. (K3) Pemotongan 1 m pipa HDPE diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.067
Tukang pipa L.02 OH 0.033
Mandor L.04 OH 0.007
Operator L.08 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.023
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.23. (K3) Pemotongan 1 m pipa HDPE diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.090
Tukang pipa L.02 OH 0.045
Mandor L.04 OH 0.009
Operator L.08 OH 0.271
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.030
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.24. (K3) Pemotongan 1 m pipa HDPE diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.177
Tukang pipa L.02 OH 0.088
Mandor L.04 OH 0.018
Operator L.08 OH 0.371
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.055
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.25. (K3) Pemotongan 1 m pipa HDPE diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.225
Tukang pipa L.02 OH 0.113
Mandor L.04 OH 0.023
Operator L.08 OH 0.421
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.070
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.26. (K3) Pemotongan 1 m pipa HDPE diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.277
Tukang pipa L.02 OH 0.139
Mandor L.04 OH 0.028
Operator L.08 OH 0.471
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.085
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.27. (K3) Pemotongan 1 m pipa HDPE diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.333
Tukang pipa L.02 OH 0.167
Mandor L.04 OH 0.033
Operator L.08 OH 0.571
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.101
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.28. (K3) Pemotongan 1 m pipa HDPE diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.601
Tukang pipa L.02 OH 0.301
Mandor L.04 OH 0.060
Operator L.08 OH 0.771
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.179
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.29. (K3) Pemotongan 1 m pipa HDPE diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.913
Tukang pipa L.02 OH 0.456
Mandor L.04 OH 0.091
Operator L.08 OH 0.871
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.270
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.30. (K3) Pemotongan 1 m pipa HDPE diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN

Pipa HDPE diameter 1000 mm buah 1.000


JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.332
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.31. (K3) Pemotongan 1 m pipa HDPE diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.238
Tukang pipa L.02 OH 0.619
Mandor L.04 OH 0.124
Operator L.08 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN

Pipa HDPE diameter 1100 mm buah 1.000


JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.365
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.32. (K3) Pemotongan 1 m pipa HDPE diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.619
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
Operator L.08 OH 1.171
JUMLAH TENAGA KERJA
B BAHAN

Pipa HDPE diameter 1200 mm buah 1.000


JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.477
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.33. (K3) Pemotongan 1 m pipa GIP diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.019
Tukang pipa L.02 OH 0.010
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.34. (K3) Pemotongan 1 m pipa GIP diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.058
Tukang pipa L.02 OH 0.029
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.35. (K3) Pemotongan 1 m pipa GIP diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.092
Tukang pipa L.02 OH 0.046
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.36. (K3) Pemotongan 1 m pipa GIP diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.131
Tukang pipa L.02 OH 0.066
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.37. (K3) Pemotongan 1 m pipa GIP diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.340
Tukang pipa L.02 OH 0.170
Mandor L.04 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.38. (K3) Pemotongan 1 m pipa GIP diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.475
Tukang pipa L.02 OH 0.237
Mandor L.04 OH 0.047
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.39. (K3) Pemotongan 1 m pipa GIP diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.504
Tukang pipa L.02 OH 0.252
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.40. (K3) Pemotongan 1 m pipa GIP diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.738
Tukang pipa L.02 OH 0.369
Mandor L.04 OH 0.074
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.41. (K3) Pemotongan 1 m pipa GIP diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.848
Tukang pipa L.02 OH 0.424
Mandor L.04 OH 0.085
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.42. (K3) Pemotongan 1 m pipa GIP diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.471
Mandor L.04 OH 0.094
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.43. (K3) Pemotongan 1 m pipa GIP diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.864
Tukang pipa L.02 OH 0.432
Mandor L.04 OH 0.086
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.44. (K3) Pemotongan 1 m pipa GIP diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.567
Tukang pipa L.02 OH 0.783
Mandor L.04 OH 0.157
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.45. (K3) Pemotongan 1 m pipa GIP diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.770
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.46. (K3) Pemotongan 1 m pipa GIP diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.974
Tukang pipa L.02 OH 0.987
Mandor L.04 OH 0.197
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.47. (K3) Pemotongan 1 m pipa GIP diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.178
Tukang pipa L.02 OH 1.089
Mandor L.04 OH 0.218
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.48. (K3) Pemotongan 1 m pipa GIP diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.382
Tukang pipa L.02 OH 1.191
Mandor L.04 OH 0.238
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari -
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.49. (K3) Pemotongan 1 m pipa DCI diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.071
Tukang pipa L.02 OH 0.014
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.003
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.50. (K3) Pemotongan 1 m pipa DCI diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.112
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.010
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.51. (K3) Pemotongan 1 m pipa DCI diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.159
Tukang pipa L.02 OH 0.032
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.018
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.52. (K3) Pemotongan 1 m pipa DCI diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.366
Tukang pipa L.02 OH 0.073
Mandor L.04 OH 0.037
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.054
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.53. (K3) Pemotongan 1 m pipa DCI diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.073
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.54. (K3) Pemotongan 1 m pipa DCI diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.102
Mandor L.04 OH 0.051
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.079
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.55. (K3) Pemotongan 1 m pipa DCI diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.188
Mandor L.04 OH 0.094
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.158
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.56. (K3) Pemotongan 1 m pipa DCI diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.137
Tukang pipa L.02 OH 0.227
Mandor L.04 OH 0.114
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.176
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.57. (K3) Pemotongan 1 m pipa DCI diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.312
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.192
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.58. (K3) Pemotongan 1 m pipa DCI diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.309
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.192
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.59. (K3) Pemotongan 1 m pipa DCI diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.598
Tukang pipa L.02 OH 0.520
Mandor L.04 OH 0.260
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.310
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.60. (K3) Pemotongan 1 m pipa DCI diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.370
Tukang pipa L.02 OH 0.674
Mandor L.04 OH 0.337
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.381
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.61. (K3) Pemotongan 1 m pipa DCI diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.021
Tukang pipa L.02 OH 0.804
Mandor L.04 OH 0.402
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.441
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.62. (K3) Pemotongan 1 m pipa DCI diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.506
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.63. (K3) Pemotongan 1 m pipa DCI diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.502
Tukang pipa L.02 OH 1.100
Mandor L.04 OH 0.55
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI diameter 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.576
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.64. (K3) Pemotongan 1 m pipa baja diameter 63 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.028
Tukang pipa L.02 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.037
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.65. (K3) Pemotongan 1 m pipa baja diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.085
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.040
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.66. (K3) Pemotongan 1 m pipa baja diameter 125 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.027
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.042
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.67. (K3) Pemotongan 1 m pipa baja diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.184
Tukang pipa L.02 OH 0.037
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.045
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.68. (K3) Pemotongan 1 m pipa baja diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.060
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.69. (K3) Pemotongan 1 m pipa baja diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.663
Tukang pipa L.02 OH 0.133
Mandor L.04 OH 0.066
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.068
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.70. (K3) Pemotongan 1 m pipa baja diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.745
Tukang pipa L.02 OH 0.149
Mandor L.04 OH 0.074
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.072
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.71. (K3) Pemotongan 1 m pipa baja diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.440
Tukang pipa L.02 OH 0.288
Mandor L.04 OH 0.144
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.105
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.72. (K3) Pemotongan 1 m pipa baja diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.399
Tukang pipa L.02 OH 0.280
Mandor L.04 OH 0.140
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.107
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.73. (K3) Pemotongan 1 m pipa baja diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.558
Tukang pipa L.02 OH 0.312
Mandor L.04 OH 0.156
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.107
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.74. (K3) Pemotongan 1 m pipa baja diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.437
Tukang pipa L.02 OH 0.287
Mandor L.04 OH 0.144
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.113
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.75. (K3) Pemotongan 1 m pipa baja diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.624
Tukang pipa L.02 OH 0.525
Mandor L.04 OH 0.262
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.166
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.76. (K3) Pemotongan 1 m pipa baja diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.971
Tukang pipa L.02 OH 0.594
Mandor L.04 OH 0.297
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.187
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.77. (K3) Pemotongan 1 m pipa baja diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.319
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.332
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.201
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.78. (K3) Pemotongan 1 m pipa baja diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.667
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.367
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.218
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.2.79. (K3) Pemotongan 1 m pipa baja diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.015
Tukang pipa L.02 OH 0.803
Mandor L.04 OH 0.402
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja diameter 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.236
mekanik/ cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
A.8.4.3. Harga Satuan Pekerjaan Pemasangan Aksesoris Pipa

A.8.4.3.1. (K3) Pemasangan 1 buah Valve diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.100
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.2. (K3) Pemasangan 1 buah Valve diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.300
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.3. (K3) Pemasangan 1 buah Valve diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.400
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.4. (K3) Pemasangan 1 buah Valve diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.000
Tukang pipa L.02 OH 1.000
Mandor L.04 OH 0.200
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.500
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.5. (K3) Pemasangan 1 buah Valve diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 1.000
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.6. (K3) Pemasangan 1 buah Valve diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 1.000
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.7. (K3) Pemasangan 1 buah Valve diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.000
Tukang pipa L.02 OH 2.000
Mandor L.04 OH 0.400
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 1.000
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.8. (K3) Pemasangan 1 buah Valve diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.421
Tukang pipa L.02 OH 0.711
Mandor L.04 OH 0.142
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.600
crane 2 T
Mobile crane ≤3 ton hari 0.300
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.9. (K3) Pemasangan 1 buah Valve diameter 700 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.500
crane 2 T
Mobile crane ≤ 3 ton hari 0.500
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.10. (K3) Pemasangan 1 buah Valve diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.786
Tukang pipa L.02 OH 0.893
Mandor L.04 OH 0.179
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.500
crane 2 T
Mobile crane ≤ 3 ton hari 0.500
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.11. (K3) Pemasangan 1 buah Valve diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.750
crane 2 T
Mobile crane ≤ 3 ton hari 0.750
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.12. (K3) Pemasangan 1 buah Valve diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.571
Tukang pipa L.02 OH 1.286
Mandor L.04 OH 0.257
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 1.000
crane 2 T
Mobile crane ≤ 3 ton hari 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.13. (K3) Pemasangan 1 buah Valve diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 1.000
crane 2 T
Mobile crane ≤ 3 ton hari 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.14. (K3) Pemasangan 1 buah Valve diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Valve diameter 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 1.000
crane 2 T
Mobile crane ≤ 3 ton hari 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.15. (K3) Pemasangan 1 buah Tee diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.028
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.3.16. (K3) Pemasangan 1 buah Tee diameter 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.216
Tukang pipa L.02 OH 0.108
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.029
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.17. (K3) Pemasangan 1 buah Tee diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.326
Tukang pipa L.02 OH 0.163
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.039
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.18. (K3) Pemasangan 1 buah Tee diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.436
Tukang pipa L.02 OH 0.218
Mandor L.04 OH 0.044
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.500
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.19. (K3) Pemasangan 1 buah Tee diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.656
Tukang pipa L.02 OH 0.328
Mandor L.04 OH 0.066
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.500
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.20. (K3) Pemasangan 1 buah Tee diameter 450 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.766
Tukang pipa L.02 OH 0.383
Mandor L.04 OH 0.077
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.500
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.21. (K3) Pemasangan 1 buah Tee diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.876
Tukang pipa L.02 OH 0.438
Mandor L.04 OH 0.088
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.600
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.22. (K3) Pemasangan 1 buah Tee diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.096
Tukang pipa L.02 OH 0.548
Mandor L.04 OH 0.11
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.193
crane 2 T
Mobile crane ≤ 3 ton
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.23. (K3) Pemasangan 1 buah Tee diameter 700 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.316
Tukang pipa L.02 OH 0.658
Mandor L.04 OH 0.132
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.225
crane 2 T
Mobile crane ≤ 3 ton hari 0.113
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.24. (K3) Pemasangan 1 buah Tee diameter 800 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.536
Tukang pipa L.02 OH 0.768
Mandor L.04 OH 0.154
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.257
crane 2 T
Mobile crane ≤ 3 ton hari 0.129
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.25. (K3) Pemasangan 1 buah Tee diameter 900 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.756
Tukang pipa L.02 OH 0.878
Mandor L.04 OH 0.176
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.321
crane 2 T
Mobile crane ≤ 3 ton hari 0.161
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.26. (K3) Pemasangan 1 buah Tee diameter 1000 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.976
Tukang pipa L.02 OH 0.988
Mandor L.04 OH 0.198
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.366
crane 2 T
Mobile crane ≤ 3 ton hari 0.183
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.27. (K3) Pemasangan 1 buah Tee diameter 1100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.196
Tukang pipa L.02 OH 1.098
Mandor L.04 OH 0.220
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.386
crane 2 T
Mobile crane ≤ 3 ton hari 0.193
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.3.28. (K3) Pemasangan 1 buah Tee diameter 1200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.416
Tukang pipa L.02 OH 1.208
Mandor L.04 OH 0.242
JUMLAH TENAGA KERJA
B BAHAN
Tee diameter 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot / Tackel & handle hari 0.450
crane 2 T
Mobile crane ≤ 3 ton hari 0.225
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
A.8.4.4. Harga Satuan Pekerjaan Penyambungan Pipa Baru ke Pipa Lama

A.8.4.4.1. (K3) Penyambungan pipa baru ke pipa yang ada diameter 80 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.466
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.147
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 80 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.606
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.075
Sewa pompa Submersible hari 0.968
3m3/h
Sewa Tripot / Tackel & handle hari 0.865
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.2. (K3) Penyambungan pipa baru ke pipa yang ada diameter 100 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.650
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.159
Sewa pompa Submersible hari 1.078
3m3/h
Sewa Tripot / Tackel & handle hari 0.911
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.3. (K3) Penyambungan pipa baru ke pipa yang ada diameter 150 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.760
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.369
Sewa pompa Submersible hari 1.353
3m3/h
Sewa Tripot / Tackel & handle hari 1.026
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.4. (K3) Penyambungan pipa baru ke pipa yang ada diameter 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.870
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.579
Sewa pompa Submersible hari 1.628
3m3/h
Sewa Tripot / Tackel & handle hari 1.141
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.5. (K3) Penyambungan pipa baru ke pipa yang ada diameter 250 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.980
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.789
Sewa pompa Submersible hari 1.903
3m3/h
Sewa Tripot / Tackel & handle hari 1.256
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.6. (K3) Penyambungan pipa baru ke pipa yang ada diameter 300 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.090
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.999
Sewa pompa Submersible hari 2.178
3m3/h
Sewa Tripot / Tackel & handle hari 1.371
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.7. (K3) Penyambungan pipa baru ke pipa yang ada diameter 400 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.435
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.310
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.419
Sewa pompa Submersible hari 2.728
3m3/h
Sewa Tripot / Tackel & handle hari 1.601
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.8. (K3) Penyambungan pipa baru ke pipa yang ada diameter 450 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.480
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.420
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.629
Sewa pompa Submersible hari 3.003
3m3/h
Sewa Tripot / Tackel & handle hari 1.716
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.9. (K3) Penyambungan pipa baru ke pipa yang ada diameter 500 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.530
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.839
Sewa pompa Submersible hari 3.278
3m3/h
Sewa Tripot / Tackel & handle hari 1.831
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.10. (K3) Penyambungan pipa baru ke pipa yang ada diameter 600 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.750
mekanik/ cilinder saw
Sewa genset 1500 watt hari 2.259
Sewa pompa Submersible hari 3.828
3m3/h
Sewa Tripot / Tackel & handle hari 2.061
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.11. (K3) Penyambungan pipa baru ke pipa yang ada diameter 700 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.970
mekanik/ cilinder saw
Sewa genset 1500 watt hari 2.679
Sewa pompa Submersible hari 4.378
3m3/h
Sewa Tripot / Tackel & handle hari 2.291
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.4.12. (K3) Penyambungan pipa baru ke pipa yang ada diameter 800 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 2.190
mekanik/ cilinder saw
Sewa genset 1500 watt hari 3.099
Sewa pompa Submersible hari 4.928
3m3/h
Sewa Tripot / Tackel & handle hari 2.521
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)

Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
A.8.4.5. Harga Satuan Pekerjaan Pengetesan Pipa

A.8.4.5.1. (K3) Pengetesan 1 m pipa diameter 50 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.2. (K3) Pengetesan 1 m pipa diameter 75 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.3. (K3) Pengetesan 1 m pipa diameter 100 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.008
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.4. (K3) Pengetesan 1 m pipa diameter 150 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.5. (K3) Pengetesan 1 m pipa diameter 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.6. (K3) Pengetesan 1 m pipa diameter 250 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.7. (K3) Pengetesan 1 m pipa diameter 300 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.8. (K3) Pengetesan 1 m pipa diameter 400 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.9. (K3) Pengetesan 1 m pipa diameter 500 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.5.10. (K3) Pengetesan 1 m pipa diameter 600 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.008 105000
Mandor L.04 OH 0.0008 155000
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.283
Bahan bakar liter 0.060
Oli liter 0.002 28800
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

0
0
1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)
840
124
964

0
0
57.6
57.6

0
1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)

840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84

Jumlah Harga
(Rp.)
840
124
964

0
0
57.6
57.6

1021.6
153.24
1174.84
A.8.4.6. Harga Satuan Pekerjaan Pekerjaan Elektrikal

A.8.4.6.1. (K3)Pemasangan 1 buah titik lampu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Upah % 100.000
JUMLAH TENAGA KERJA
B BAHAN
Pipa listrik 5/8" btg 3.000
Kabel m 24.000 Err:509
T Dus buah 3.000
L Bow buah 4.000
Las Dop buah 3.000
Klem buah 24.000 5800
Mongkok buah 1.000
Saklar buah 1.000
Fitting buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.8.4.6.1. (K3)Pemasangan 1 buah MCB


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Upah % 100.000
JUMLAH TENAGA KERJA
B BAHAN
Pipa listrik 5/8" btg 3.000
Kabel m 15.000 Err:509
T Dus buah 1.000
L Bow buah 2.000
Klem biasa buah 24.000
MCB buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

0
Err:509
0
0
0
139200
0
0
0
Err:509

0
Err:509
Err:509
Err:509

Jumlah Harga
(Rp.)

100.000

0
Err:509
0
0
0
0
Err:509
0
Err:509
Err:509
Err:509
Lampiran B
Contoh Menghitung HSP dengan menggunakan angka koefisien


Sebagai contoh perhitungan HSP disini diambil beberapa jenis pekerjaan dari sub level 2 dengan menggunakan format se
lampiran A. Contoh yang disajikan disini adalah :
1) Pekerjaan Persiapan
2) Pekerjaan Penutup atap
3) Pekerjan Pengecatan
4) Pekerjaan Kunci dan Kaca
5) Pekerjaan Sanitasi dalam Gedung
6) Pekerjaan Perpipaan Air Minum di Luar Gedung


HSD tenaga kerja dan HSD bahan diambil dari harga "franco ditempat" yang ditetapkan oleh pemerintah sete
hasil survey pasar
• Harga-harga dalam contoh ini berdasarkan survey pasar di kota Bandung tahun 2012

Contoh 1 : 1m2 Pengukuran dan pemasangan bouwplank

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang kayu L.02 OH 0.100 75,000
Kepala tukang L.03 OH 0.010 90,000
Mandor L.04 OH 0.005 90,000
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.012 3,500,000
Paku 2"-3" Kg 0.020 14,000
Kayu papan 3/20 M3 0.007 4,000,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Contoh 2 : Pemasangan 1m2 Atap genteng palentong kecil

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 50,000
Tukang kayu L.02 OH 0.075 75,000
Kepala tukang L.03 OH 0.0075 90,000
Mandor L.04 OH 0.008 90,000
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong buah 25.000 2,200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Contoh 3 : Pengecatan 1m2 bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 50,000
Tukang cat L.02 OH 0.009 75,000
Kepala tukang L.03 OH 0.006 90,000
Mandor L.04 OH 0.003 90,000
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200 20,000
Plamuur 0.150 18,000
Cat dasar 0.170 48,000
Cat penutup 0.260 48,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Contoh 4 : Pemasangan 1 buah kunci tanam antik


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 50,000
Tukang cat L.02 OH 0.600 75,000
Kepala tukang L.03 OH 0.06 90,000
Mandor L.04 OH 0.003 90,000
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1.000 175,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Contoh 5 : Pemasangan 1 buah closet jongkok porslen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang batu L.02 OH 0.150 75,000
Kepala tukang L.03 OH 0.015 90,000
Mandor L.04 OH 0.050 90,000
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok unit 1.000 200,000
Semen portland Kg 6.000 1,200
Pasir pasang M3 0.010 80,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Contoh 6 : Pemasangan1m2 pipa PVC diameter 4"

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.810 50,000
Tukang pipa L.02 OH 0.135 75,000
Kepala tukang L.03 OH 0.0135 90,000
Mandor L.04 OH 0.004 90,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M 1.000 110,000
Perlengkapan Ls 35% x pipa 110,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Contoh 7 : Pemasangan pipa PVC diameter 200 mm (per m)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
1 Pekerja L.01 OH 0.810 50,000
2 Tukang pipa L.02 OH 0.135 75,000
3 Mandor L.04 OH 0.004 90,000
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa PVC diamater 200mm 1.000 211,255
JUMLAH HARGA BAHAN
C PERALATAN
1 hari
Sewa Tripod / Tackel & handle 0.031 325,000
crane 2T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
an menggunakan format seperti pada

an oleh pemerintah setempat atau dari

Jumlah Harga
(Rp.)

5,000
7,500
900
450
13,850

42
280
28,000
28,322

42,172
6,325.80
48,497.80

Jumlah Harga
(Rp.)
7,500
5,625
675
720
14,520

55,000

59,520
10,428.00
79,948.00

Jumlah Harga
(Rp.)

3,500
675
540
270
4,985

4,000
2,700
8,160
12,480
27,340

32,325
4,848.75
37,173.75
Jumlah Harga
(Rp.)

3,000
45,000
5,400
270
53,670

175,000
27,340

228,670
34,300.50
262,970.50

Jumlah Harga
(Rp.)

5,000
11,250
13,500
4,500
34,250

200,000
7,200
800
208,000

242,250
36,337.50
278,587.50
Jumlah Harga
(Rp.)

4,050
10,125
1,215
360
15,750

38,500

54,250
8,137.50
62,387.50

Jumlah Harga
(Rp.)

5,346.00
4466.2
798
10610.2

211,255
211,255

10,075

10,075
231940.2
34,791.03
266,731.23
Lampiran C
Menghitung Rencana Anggaran Biaya

Untuk menghitung Rencana Anggaran Biaya (RAB) dapat digunakan program EXCEL, dengan langkah-langkah sebagai berikut :
1) Siapkan 4 sheet dalam program Excel
Sheet 1 untuk Daftar harga satuan bahan dan upah masukan semua jenis bahan dan upah OH dengan harga (franco dite
dengan harga resmi berdasarkan SK Bupati/Walikota atau hasil survey sendiri.

Sheet 2 untuk membuat analisis harga satuan pekerjaan, salin analisis jenis-jenis pekerjaan yang diperlukan dengan koef
koefisien tenaga sesuai dengan SNI-ABK 2008. Buat sheet 2 ini hyperlink dengan sheet 1.

Sheet 3 untuk membuat daftar harga satuan pekerjaan, buat tabel harga satuan samua jenis pekerjaan. Buat sheet 3 ini h
2.

Sheet 4 untuk membuat uraian RAB, membuat format RAB dengan memuat uraian pekerjaan, quantity, satuan harga satu
harga. Halaman terakhir dari sheet 4 adalah rekapitulasi. Buat sheet 4 ini hyperlink dengan sheet 3.

2) Buka sheet 1, masukkan data harga satuan bahan dan upah dengan satuan sesuai yang tercantum dalam analisis di shee
harga PC dalam satuan Kg (bukan zak), upah tukang dalam satuan OH

3) Dengan mengisi sheet 1, maka sheet 2 (analisis) akan terisi dengan sendirinya, deminikian juga dengan sheet 3 dan shee

4) Masing-masing kelompok uraian pekerjaan pada sheet 4 dipindahkan ke Form Rekapitulasi, kemudian tambahkan biaya ti
(Overhead dan keuntungan). Penjumlahan rekapitulasi merupakan jumlah akhir dari Rencana Anggaran Biaya (RAB).

Contoh sheet 1
Daftar Harga Satuan Bahan dan Upah

No Jenis Satuan Harga (Rp)


1 Semen PC Zak 53,000
2 Pasir beton M3 110,000
3 Kerikil beton buatan (pecah) M3 125,000
4 Paku ukuran 7-10 cm Kg 14,000
5 Cat kayu kualitas sedang Kg 38,000
6 Tukang batu OH 75,000
7 Pekerja/Laden OH 50,000
8 Kepala tukang OH 90,000
9 Mandor OH 90,000
10 Baja tulangan beton Kg 11,000

Contoh sheet 2
Pengukuran dan Pemasangan 1m2 Bouwplank
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.012
Paku 2"-3" Kg 0.020
Kayu papan 3/20 M3 0.007
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Contoh sheeet 3 :
Daftar Harga Satuan Pekerjaan

No Jenis Pekerjaan Satuan Harga (Rp)


1 Galian tanah biasa M3 42,712
2 Pemasangan pondasi batu belah 1SP:5PP M3 558,497
3 Pemasangan dinding bata 1/2 batu 1SP:5PP M2 95,226
4 Pemasangan beton mutu fc'22,50 M3 987,500
5 Pemasangan lantai keramik 30x30 M2 76,500
6 Pemasangan kusen kayu kelas 1 M3 7,571,880
7 Pemasangan pentutup atap genteng palentong M3 37,250
8 Pemasangan pipa air bersih PVC diamater 3/4" M' 21,400

Contoh sheeet 4 :
Rencana Anggaran Biaya

No JENIS PEKERJAAN SAT QUANT


A PEKERJAAN PERSIAPAN
1 Pemebersihan & perataan tanah m2 500.000
2 Pengukuran & pemasangan bouplank m' 150.000
3 ................................
4 ................................
B PEKERJAAN TANAH
1 Galian tanah biasa m3 124.800
2 Galian tanah keras/ cadas m3 60.750
3 ................................
C PEKERJAAN PONDASI BATU BELAH
1 Pemasangan batu kosong tebal 15cm m3 36.500
2 Pemasangan pondasi batu belah 1SP:4PP m3 128.300
3 ................................
an Biaya

dengan langkah-langkah sebagai berikut :

nis bahan dan upah OH dengan harga (franco ditempat) sesuai


endiri.

enis-jenis pekerjaan yang diperlukan dengan koefisien bahan dan


k dengan sheet 1.

a satuan samua jenis pekerjaan. Buat sheet 3 ini hyperlink dengan

muat uraian pekerjaan, quantity, satuan harga satuan dan Jumlah


hyperlink dengan sheet 3.

uan sesuai yang tercantum dalam analisis di sheet 2. misalnya

dirinya, deminikian juga dengan sheet 3 dan sheet 4

Form Rekapitulasi, kemudian tambahkan biaya tidak langsung


h akhir dari Rencana Anggaran Biaya (RAB).
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

50,000 5,000
75,000 7,500
90,000 900
90,000 450
JUMLAH TENAGA KERJA 13,850

3,500,000 420
14,000 280
4,000,000 28,000
JUMLAH HARGA BAHAN 28,700

JUMLAH HARGA ALAT


42,172
(maksimum) 6,325.80
48,497.80

HARGA SAT (Rp) JUMLAH (Rp)

20,000 10000000.000
90,450 13567500.000
45,712 5704857.600
110,250 6697687.500

258,400 10414100.000
558,497 71655165.000