Analisa 2018 FIXX 14 Feb 2018
Analisa 2018 FIXX 14 Feb 2018
Analisa 2018 FIXX 14 Feb 2018
A. UPAH
1 Pekerja Org/hari L. 01
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listr Org/hari L. 02
3 Kepala Tukang Org/hari L. 03
4 Mandor Org/hari L. 04
5 Ahli alat berat (mekanik) Org/hari L. 07
6 Operator Alat Berat Org/hari L. 08
7 Pembantu Operator Org/hari L. 09
8 Supir Truk Org/hari L. 10
9 Kenek truk Org/hari L. 11
NO MATERIAL SATUAN
B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 3-5 cm M³
6 Batu pecah 2-3 cm M³
7 Batu pecah 1-2 cm M³
8 Batu pecah 0,5-1 cm M³
9 Stone Dust M³
10 Aspal Kg
11 Aspal Emulsi (Teak Coat) Kg
12 Aspal Emulsi (Prime Coat) Kg
13 Aspal Sealent Kg
14 Pasir Kasar M³
15 Pasir Halus M³
16 Semen PC Zak
17 Semen PC Kg
NO MATERIAL SATUAN
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³
10 Ky. Belian ketam Uk. 6/6 - 4 M M³
11 Ky. Belian ketam Uk. 7/7 - 4 M M³
12 Ky. Belian ketam Uk. 8/8 - 4 M M³
13 Ky. Belian ketam Uk. 5/10 - 4 M M³
14 Ky. Belian ketam Uk. 4/8 - 4 M M³
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
16 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam ) M³
20 Kusen Ky Belian uk. 5/10 Meter
21 Kusen Ky Kelas I Bangkirai uk. 5/10 Meter
22 Kusen Ky Kelas II uk. 5/10 Meter
23 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
33 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
34 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
35 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
36 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
37 Papan belian ketam (4m) M³
38 Papan belian tdk ketam (4m) M³
39 Papan kayu klas II (mabang) tdk ketam M³
40 Papan kayu klas II (mabang) ketam M³
41 Papan kayu klas I tdk ketam M³
42 Papan kayu klas I ketam M³
NO MATERIAL SATUAN
D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat setara Dulux Kg
4 Cat kilat setara Avian Kg
5 Plamur Kg
6 Cat Dasar Alkali Kg
7 Cat Akhir Interior setara Dulux Kg
8 Cat Akhir Eksterior (weather shield) setara Dulux Kg
9 Cat Dasar setara Mowilex Kg
10 Cat Akhir Interior setara Mowilex Kg
11 Cat Akhir Eksterior (weather shield) setara Mowilex Kg
12 Cat Dasar setara Vinilex Kg
13 Cat Akhir Interior setara Vinilex Kg
14 Cat seng (Zinc Chromate) Kg
15 Plitur Kg
16 Thiner Ltr
17 Melamic Ltr
18 Vernis Ltr
19 Meni Kg
20 Oker / Semen Warna Kg
21 Lem Kayu Kg
22 Sealent Kg
23 Soda Api Kg
24 Sabun / cream pembersih kotoran Kg
25 Teak Oil Ltr
26 Ter / Residu Ltr
27 Kuas 4" Bh
28 Cat Marka (non Thermoplas) Kg
29 Cat Marka (Thermoplastic) Kg
30 Cat Kansteen (ex. Matex) Kg
31 Cat Trotoar (ex. Tenokote) Kg
32 Glass Bead Kg
33 Weatherbond Emulsion ( cat kerb ) Kg
34 Cat Water Proofing Kg
F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku triplek Kg
20 Paku GRC Kg
21 Paku Zincalum Kg
22 Paku Onduline Bh
23 Sekrup Onduline Bh
24 Sekrup Gibsum Kg
25 Sekrup Fixer Bh
26 Sekrup Steel Sheet uk. 5 x 15 mm Bh
27 Sekrup Steel Sheet uk. 5 x 25 mm Bh
28 Sekrup Steel Sheet uk. 5 x 35 mm Bh
29 Sekrup Steel Sheet uk. 5 x 45 mm Bh
30 Sekrup Steel Sheet uk. 5 x 50 mm Bh
31 Sekrup Steel Sheet uk. 5 x 55 mm Bh
32 Sekrup Steel Sheet uk. 5 x 65 mm Bh
33 Sekrup Ulir Kayu Bh
34 Paku asbes Bh
35 Sekrup Zincalume Bh
36 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit
37 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit
38 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit
39 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit
G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Permata 0.30 Lbr
5 Genteng Metal Type Prima 0.30 Lbr
NO MATERIAL SATUAN
H. BAHAN KACA
1 Kaca Polos, t = 3 mm M²
2 Kaca Polos, t = 5 mm M²
3 Kaca Polos, t = 8 mm M²
4 Kaca Polos, t = 12 mm M²
5 Kaca Rayben, t = 3 mm M²
6 Kaca Rayben, t = 5 mm M²
7 Kaca Rayben, t = 8 mm M²
8 Kaca Rayben, t = 12 mm M²
9 Kaca Cermin t = 3 mm M²
10 Kaca Cermin t = 5 mm M²
11 Kaca Repsol, t = 5 mm M²
12 Sealent Kg
13 Nako + Bingkai (80 x 15) x 10 daun polos Bh
14 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
15 Kaca Es, t = 3 mm M²
16 Kaca Es, t = 5 mm M²
17 Kaca Raindown, t = 5 mm M²
NO MATERIAL SATUAN
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
5 Teakwood t = 3 mm Lbr
6 Formika t = 0,03 mm Lbr
7 Multiplex t = 6 mm Lbr
8 Multiplex t = 9 mm Lbr
9 Multiplex t = 10 mm Lbr
10 Multiplek t = 12 mm Lbr
11 Plywood 4' x 8' x 4mm Lbr
12 Panel GRC 120 x 240 x 40 Lbr
13 GypsumBoard t = 9 mm Lbr
14 Super Plank 10 x 240 x 9 cm Lbr
15 Super Plank 20 x 240 x 9 cm Lbr
16 Super Plank 30 x 240 x 9 cm Lbr
J. BAHAN SANITASI
1 Wastafel setara Toto Bh
2 Kloset duduk monoblok Bh
3 Kloset duduk putih (setaraf TOTO) Bh
4 Kloset duduk warna (setaraf TOTO) Bh
5 Kloset jongkok (setaraf TOTO) Bh
6 Kloset jongkok (setaraf INA) Bh
7 Urinoir setaraf Toto Unit
8 Bak air fibreglass uk. 55x55x60 cm Bh
9 Shower Spray setara Toto Unit
10 Sliding rail setara Toto Unit
11 Floordrain stainless steel setara Toto Bh
12 Floordrain PVC Bh
13 Tempat Sabun Setara Toto Bh
14 Kran zink setara Toto Bh
15 Kitchenzink stainless steel 1 lubang Unit
16 Kran dinding setara Toto Bh
17 Kran air uk 1/2" Bh
25 Pipa PVC dia 1/2" AW ex Wavin Btg
26 Pipa PVC dia 3/4" AW ex Wavin Btg
27 Pipa PVC dia 1" AW ex Wavin Btg
28 Pipa PVC dia 2" AW ex Wavin Btg
29 Pipa PVC dia 3" AW ex Wavin Btg
30 Pipa PVC dia 4" AW ex Wavin Btg
Pipa PVC dia 8" AW ex Wavin Btg
31 Pipa PVC dia 3/4" D ex Wavin Btg
32 Pipa PVC dia 1" D ex Wavin Btg
33 Pipa PVC dia 2" D ex Wavin Btg
34 Pipa PVC dia 3" D ex Wavin Btg
35 Pipa PVC dia 4" D ex Wavin Btg
36 Stop kran dia 1/2" ex onda Bh
37 Stop kran dia 3/4" ex onda Bh
38 Stop kran dia 1" ex onda Bh
39 Tangki air 1000 liter Bh
NO MATERIAL SATUAN
L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm M²
2 Batu Andesit Ukuran 15 x 30 cm M²
3 Batu Andesit Ukuran 20 x 40 cm M²
4 Batu Andesit Ukuran 30 x 60 cm M²
5 Batu Candi Ukuran 10 x 20 cm M²
6 Batu Candi Ukuran 15 x 30 cm M²
7 Batu Candi Ukuran 20 x 40 cm M²
8 Batu Pacitoroso Ukuran 10 x 20 cm M²
9 Batu Pacitoroso Ukuran 15 x 30 cm M²
10 Batu Pacitoroso Ukuran 20 x 40 cm M²
11 Batu Bali Green Ukuran 10 x 20 cm M²
12 Batu Bali Green Ukuran 15 x 30 cm M²
13 Batu Bali Green Ukuran 20 x 40 cm M²
14 Batu Prasasti Peresmian (batu hitam) ukuran 40 x 60 buah
15 Batu Prasasti Peresmian (batu hitam) ukuran 60 x 80 buah
16 Batu Koral (batu taman) kg
17 Batu Granit Ukuran Lebar 60 cm M²
105,000.00
125,000.00
145,000.00
155,000.00
125,000.00
170,000.00
100,000.00
115,000.00
80,000.00
275,000.00
320,000.00
335,000.00
350,000.00
405,000.00
435,000.00
475,000.00
500,000.00
350,000.00
13,500.00
13,500.00
13,500.00
35,000.00
120,000.00
120,000.00
75,000.00
1,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
300,000.00
350,000.00
3,750.00
4,000.00
2,000.00
1,800.00
2,500.00
2,300.00
20,000.00
60,500.00
81,600.00
98,000.00
95,000.00
95,000.00
100,000.00
111,000.00
243,000.00
243,000.00
154,000.00
155,000.00
320,000.00
323,000.00
98,750.00
102,000.00
1,400,000.00
420,000.00
11,600.00
61,000.00
16,600.00
1,072,500.00
1,108,250.00
1,194,050.00
1,329,800.00
1,372,800.00
1,430,000.00
1,530,100.00
1,601,600.00
1,673,100.00
38,300.00
11,300.00
1,260,000.00
1,440,000.00
1,650,000.00
1,770,000.00
2,340,000.00
2,240,000.00
3,825,000.00
1,122,000.00
1,158,300.00
1,380,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
1,725,000.00
2,070,000.00
33,000.00
3,000.00
60,000.00
50,000.00
11,805,000.00
11,700,000.00
8,950,000.00
8,750,000.00
9,567,900.00
10,000,000.00
13,020,900.00
10,416,700.00
11,500,000.00
12,800,000.00
12,500,000.00
11,015,700.00
11,000,000.00
11,718,750.00
7,421,875.00
7,500,000.00
7,800,000.00
7,840,000.00
9,050,000.00
120,000.00
80,000.00
65,000.00
4,440,000.00
4,716,717.69
5,070,000.00
4,755,000.00
3,355,000.00
3,576,000.00
4,224,000.00
5,468,750.00
4,589,000.00
4,634,000.00
4,531,000.00
5,600,000.00
2,500,000.00
2,083,000.00
14,814,000.00
13,880,000.00
7,060,000.00
8,300,000.00
10,819,800.00
11,188,300.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
2,558,000.00
18,000.00
35,000.00
9,000.00
12,000.00
85,000.00
150,000.00
11,000.00
77,500.00
12,000.00
3,500.00
36,000.00
70,000.00
70,000.00
31,500.00
140,000.00
104,000.00
107,000.00
70,000.00
84,000.00
104,000.00
27,000.00
28,000.00
44,000.00
64,000.00
25,000.00
67,000.00
45,000.00
52,000.00
14,000.00
18,500.00
35,900.00
24,500.00
15,700.00
60,000.00
58,400.00
24,000.00
65,000.00
95,000.00
53,750.00
41,250.00
30,000.00
39,000.00
78,500.00
12,000.00
13,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
13,000.00
13,000.00
13,000.00
23,000.00
5,000.00
16,000.00
15,000.00
310,000.00
13,500.00
5,300.00
28,500.00
35,000.00
16,000.00
140,000.00
110,000.00
169,000.00
227,000.00
287,000.00
375,000.00
450,000.00
582,500.00
925,000.00
1,071,300.00
1,721,700.00
715,000.00
85,000.00
95,000.00
1,500,000.00
120,000.00
85,000.00
75,000.00
235,200.00
272,500.00
250,000.00
304,100.00
175,000.00
225,400.00
193,900.00
257,000.00
52,500.00
82,000.00
75,000.00
5,700.00
6,000.00
800.00
800.00
800.00
908,700.00
1,339,100.00
130,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
145,000.00
69,600.00
266,000.00
14,400.00
15,400.00
135,000.00
18,800.00
29,000.00
18,900.00
8,800.00
179,100.00
162,500.00
47,500.00
57,500.00
78,800.00
190,000.00
88,750.00
20,900.00
20,500.00
31,400.00
20,500.00
21,300.00
10,700.00
1,300.00
1,500.00
53,000.00
2,500.00
300.00
300.00
400.00
500.00
500.00
500.00
700.00
700.00
600.00
500.00
5,500,000.00
2,500,000.00
1,750,000.00
850,000.00
5,300.00
57,200.00
68,400.00
63,000.00
66,600.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
66,600.00
66,600.00
51,800.00
51,800.00
51,800.00
275,000.00
173,000.00
200,000.00
59,000.00
54,000.00
100,000.00
110,000.00
110,000.00
93,000.00
89,500.00
89,500.00
57,000.00
92,000.00
65,000.00
59,000.00
80,000.00
80,000.00
81,300.00
111,900.00
47,000.00
64,000.00
100,000.00
112,300.00
78,300.00
46,000.00
75,000.00
50,000.00
96,900.00
109,500.00
123,100.00
72,000.00
47,400.00
55,000.00
68,000.00
20,000.00
55,000.00
75,900.00
73,000.00
70,000.00
83,800.00
80,000.00
55,000.00
46,500.00
55,000.00
15,200.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
55,000.00
60,000.00
65,000.00
50,000.00
57,000.00
67,000.00
72,000.00
55,000.00
60,500.00
66,000.00
71,500.00
62,700.00
73,700.00
79,200.00
84,700.00
22,000.00
24,000.00
26,000.00
20,000.00
22,800.00
26,800.00
28,800.00
30,800.00
33,000.00
36,000.00
39,000.00
30,000.00
34,200.00
40,200.00
43,200.00
46,200.00
150,000.00
200,000.00
398,000.00
640,000.00
200,000.00
200,000.00
550,000.00
900,000.00
275,000.00
418,000.00
550,000.00
35,000.00
400,000.00
469,000.00
275,000.00
267,500.00
550,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
70,000.00
140,000.00
115,000.00
111,000.00
220,000.00
278,000.00
282,000.00
120,000.00
79,700.00
74,600.00
65,000.00
70,000.00
78,000.00
1,000,000.00
2,962,700.00
2,246,800.00
2,500,000.00
330,000.00
191,000.00
2,000,000.00
280,000.00
230,000.00
500,000.00
319,100.00
18,500.00
65,200.00
307,000.00
650,000.00
150,000.00
32,500.00
1,115,000.00
22,000.00
30,000.00
45,000.00
82,000.00
164,000.00
254,000.00
23,500.00
30,000.00
48,000.00
86,000.00
130,000.00
43,000.00
51,200.00
115,500.00
2,500,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
2,000,000.00
75,000.00
75,000.00
115,000.00
1,440,000.00
550,000.00
8,100.00
7,400.00
28,800.00
9,600.00
28,800.00
170,000.00
70,000.00
70,000.00
66,400.00
180,000.00
210,000.00
230,000.00
260,000.00
180,000.00
210,000.00
230,000.00
180,000.00
210,000.00
230,000.00
180,000.00
200,000.00
220,000.00
2,500,000.00
4,000,000.00
15,000.00
2,000,000.00
298,500.00
228,000.00
155,350.00
1,687,000.00
462,000.00
311,930.00
179,000.00
180,000.00
120,000.00
40,000.00
40,000.00
170,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
117,750.00
240,000.00
250,000.00
32,000.00
35,500.00
51,250.00
3,500.00
2,695,650.00
781,700.00
13,300.00
3,500.00
11,000.00
41,000.00
17,500.00
51,500.00
73,500.00
35,000.00
12,000.00
16,000.00
7,000.00
1,000.00
35,000.00
31,600.00
33,000.00
62,000.00
29,000.00
62,000.00
37,500.00
44,800.00
33,000.00
33,000.00
2,500.00
110,000.00
484,500.00
672,000.00
495,000.00
89,000.00
50,000.00
45,000.00
15,000.00
45,000.00
56,000.00
20,000.00
6,500.00
7,000.00
7,350.00
8,000.00
9,500.00
12,600.00
18,100.00
19,100.00
5,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)
35,000.00
334,250.00
16,266.00
24,233.00
17,500.00
3,856,500.00
3,304,300.00
5,800.00
21,600.00
181,200.00
A.2.2.1 Harga Satuan Pekerjaan Persiapan
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.02 OH 0.400 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.020 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.250 12,000.00
Semen Portland Kg 2.500
Seng gelombang Lbr 1.200 47,400.00
Pasir Beton m3 0.005
Koral Beton m3 0.009
Kayu 5/7 m3 0.072 4,755,000.00
Paku Biasa 2"-5" Kg 0.060 20,500.00
Mini besi Liter 0.450 52,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.2.2.1.3 (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.02 OH 0.300 125,000.00
Kepala Tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.020 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.000 12,000.00
Semen Portland Kg 2.000 1,500.00
Kawat duri m 25.000 4,000.00
Pasir Beton m3 0.005 1,500.00
Koral Beton m3 0.009 120,000.00
Paku Biasa 2"-5" Kg 0.060 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN
21,000.00
50,000.00
2,900.00
3,100.00
77,000.00
15,000.00
-
56,880.00
-
-
342,360.00
1,230.00
23,400.00
438,870.00
515,870.00
77,380.50
593,250.50
Jumlah Harga
(Rp.)
21,000.00
37,500.00
2,900.00
3,100.00
64,500.00
12,000.00
3,000.00
100,000.00
7.50
1,080.00
1,230.00
117,317.50
181,817.50
27,272.63
209,090.13
Jumlah Harga
(Rp.)
10,500.00
12,500.00
1,450.00
775.00
25,225.00
57,060.00
410.00
17,906.00
75,376.00
100,601.00
15,090.15
115,691.15
Jumlah Harga
(Rp.)
210,000.00
250,000.00
125,000.00
43,500.00
7,750.00
636,250.00
15,000.00
849,009.18
1,640.00
14,850.00
52,500.00
18,000.00
12,000.00
75,000.00
60,000.00
13,750.00
80,000.00
12,000.00
8,625.00
7,200.00
1,219,574.18
1,855,824.18
278,373.63
2,134,197.81
Jumlah Harga
(Rp.)
10,500.00
7,750.00
10,500.00
10,500.00
1,575.00
12,075.00
Jumlah Harga
(Rp.)
105,000.00
775.00
105,775.00
52,500.00
30,150.00
1,200.00
83,850.00
189,625.00
28,443.75
218,068.75
Jumlah Harga
(Rp.)
1,400,070.00
103,230.00
1,503,300.00
1,436,630.00
215,494.50
1,652,124.50
Jumlah Harga
(Rp.)
700,035.00
51,615.00
751,650.00
718,315.00
107,747.25
826,062.25
A.2.3.1 Harga Satuan Pekerjaan Tanah
78,750.00
3,875.00
82,625.00
82,625.00
12,393.75
95,018.75
Jumlah Harga
(Rp.)
94,500.00
6,975.00
101,475.00
101,475.00
15,221.25
116,696.25
Jumlah Harga
(Rp.)
110,250.00
10,385.00
120,635.00
120,635.00
18,095.25
138,730.25
Jumlah Harga
(Rp.)
105,000.00
4,960.00
109,960.00
109,960.00
16,494.00
126,454.00
Jumlah Harga
(Rp.)
157,500.00
9,300.00
166,800.00
166,800.00
25,020.00
191,820.00
Jumlah Harga
(Rp.)
126,000.00
6,975.00
132,975.00
132,975.00
19,946.25
152,921.25
Jumlah Harga
(Rp.)
34,650.00
1,550.00
36,200.00
36,200.00
5,430.00
41,630.00
Jumlah Harga
(Rp.)
52,500.00
7,750.00
60,250.00
60,250.00
9,037.50
69,287.50
Jumlah Harga
(Rp.)
52,500.00
7,750.00
60,250.00
60,250.00
9,037.50
69,287.50
Jumlah Harga
(Rp.)
31,500.00
1,550.00
33,050.00
144,000.00
144,000.00
177,050.00
26,557.50
203,607.50
A.3.2.1 Harga Satuan Pekerjaan Pondasi
B BAHAN
Batu belah (10-15 cm) m3 1.200 350,000.00
Pasir urug m3 0.432 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1 SP : 2PB : 3 Kr dan 40% batu belah
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.400 105,000.00
Tukang batu L.02 OH 0.850 125,000.00
Kepala tukang L.03 OH 0.085 145,000.00
Mandor L.04 OH 0.170 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah (10-15 cm) m3 0.480 350,000.00
Semen Portland Kg 194.000 1,500.00
Pasir beton m3 0.312 120,000.00
Kerikil (1-2 cm) m3 0.468 475,000.00
Besi beton Kg 126.000 12,000.00
Kawat beton Kg 1.800 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN
157,500.00
93,750.00
10,875.00
11,625.00
273,750.00
420,000.00
303,000.00
58,200.00
781,200.00
1,054,950.00
158,242.50
1,213,192.50
Jumlah Harga
(Rp.)
157,500.00
93,750.00
10,875.00
11,625.00
273,750.00
420,000.00
244,500.00
62,400.00
726,900.00
1,000,650.00
150,097.50
1,150,747.50
Jumlah Harga
(Rp.)
81,900.00
48,750.00
5,655.00
6,045.00
142,350.00
420,000.00
51,840.00
471,840.00
614,190.00
92,128.50
706,318.50
Jumlah Harga
(Rp.)
357,000.00
106,250.00
12,325.00
26,350.00
501,925.00
168,000.00
291,000.00
37,440.00
222,300.00
1,512,000.00
41,400.00
2,272,140.00
2,774,065.00
416,109.75
3,190,174.75
Jumlah Harga
(Rp.)
252,000.00
100,000.00
11,600.00
18,445.00
382,045.00
157,500.00
291,000.00
37,440.00
222,300.00
708,240.00
1,090,285.00
163,542.75
1,253,827.75
A.4.1.1 Harga Satuan Pekerjaan Beton
A.4.1.1.1 Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 1,500.00
Pasir beton Kg 869.000 85.71
Kerikil (maks 30 mm) Kg 999.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.1.a Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 1,500.00
Pasir beton Kg 869.000 85.71
Kerikil (maks 30 mm) Kg 999.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.2 Membuat 1m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm ,w/c =0,78
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1500.00
Pasir beton Kg 828.000 85.71
Kerikil (maks 30 mm) Kg 1012.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.2.a Membuat 1m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm ,w/c =0,78 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1500.00
Pasir beton Kg 828.000 85.71
Kerikil (maks 30 mm) Kg 1012.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.3 Membuat 1m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm ,w/c =0,72
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 299.000 1,500.00
Pasir beton Kg 799.000 85.71
Kerikil (maks 30 mm) Kg 1017.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.3.a Membuat 1m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm ,w/c =0,72 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 299.000 1,500.00
Pasir beton Kg 799.000 85.71
Kerikil (maks 30 mm) Kg 1017.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.4 Membuat 1m3 lantai kerja beton mutu f'c = 7,4 MPa slump (3-6) cm, w/c =0,87
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 105,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.060 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 230.000 1,500.00
Pasir beton Kg 893.000 85.71
Kerikil (maks 30 mm) Kg 1027.000 351.85
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.5 Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000 1,500.00
Pasir beton Kg 760.000 85.71
Kerikil (maks 30 mm) Kg 1029.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.5.a Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000 1,500.00
Pasir beton Kg 760.000 85.71
Kerikil (maks 30 mm) Kg 1029.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.6 Membuat 1m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm ,w/c = 0,61
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 352.000 1,500.00
Pasir beton Kg 731.000 85.71
Kerikil (maks 30 mm) Kg 1031.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.6.a Membuat 1m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm ,w/c = 0,61 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 352.000 1,500.00
Pasir beton Kg 731.000 85.71
Kerikil (maks 30 mm) Kg 1031.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.7 Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000 1,500.00
Pasir beton Kg 698.000 85.71
Kerikil (maks 30 mm) Kg 1047.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.7.a Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000 1,500.00
Pasir beton Kg 698.000 85.71
Kerikil (maks 30 mm) Kg 1047.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.8 Membuat 1m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm ,w/c = 0,56
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 384.000 1,500.00
Pasir beton Kg 692.000 85.71
Kerikil (maks 30 mm) Kg 1039.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.8.a Membuat 1m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm ,w/c = 0,56 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 384.000 1,500.00
Pasir beton Kg 692.000 85.71
Kerikil (maks 30 mm) Kg 1039.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.9 Membuat 1m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm ,w/c = 0,53
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 406.000 1,500.00
Pasir beton Kg 684.000 85.71
Kerikil (maks 30 mm) Kg 1026.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.9.a Membuat 1m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm ,w/c = 0,53 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 406.000 1,500.00
Pasir beton Kg 684.000 85.71
Kerikil (maks 30 mm) Kg 1026.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.10 Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 105,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala tukang L.03 OH 0.028 145,000.00
Mandor L.04 OH 0.083 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 413.000 1,500.00
Pasir beton Kg 681.000 85.71
Kerikil (maks 30 mm) Kg 1021.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.10.a Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52 (menggunakan molen)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.323 105,000.00
Tukang batu L.02 OH 0.189 125,000.00
Kepala tukang L.03 OH 0.019 145,000.00
Mandor L.04 OH 0.066 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 413.000 1,500.00
Pasir beton Kg 681.000 85.71
Kerikil (maks 30 mm) Kg 1021.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.12 Membuat 1m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm ,w/c = 0,48
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 105,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala tukang L.03 OH 0.035 145,000.00
Mandor L.04 OH 0.105 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 448.000 1,500.00
Pasir beton Kg 667.000 85.71
Kerikil (maks 30 mm) Kg 1000.000 351.85
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 100 m³ 1.020 1,072,500.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 100 m³ 1.020 1,072,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
B. 13.b.1 Membuat 1 m³ beton ready mix K 125 menggunakan pompa
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 125 m³ 1.020 1,108,250.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 125 m³ 1.020 1,108,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 175 m³ 1.020 1,194,050.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 175 m³ 1.020 1,194,050.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 225 m³ 1.020 1,329,800.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 225 m³ 1.020 1,329,800.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 250 m³ 1.020 1,372,800.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 250 m³ 1.020 1,372,800.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 300 m³ 1.020 1,430,000.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 300 m³ 1.020 1,430,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 350 m³ 1.020 1,530,100.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 350 m³ 1.020 1,530,100.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 400 m³ 1.020 1,601,600.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 400 m³ 1.020 1,601,600.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 450 m³ 1.020 1,673,100.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00
2 Tukang L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.100 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix 450 m³ 1.020 1,673,100.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
370,500.00
74,485.71
351,500.00
796,485.71
1,021,035.71
153,155.36
1,174,191.07
enggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
370,500.00
74,485.71
351,500.00
796,485.71
972,010.71
145,801.61
1,117,812.32
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
414,000.00
70,971.43
356,074.07
841,045.50
1,065,595.50
159,839.33
1,225,434.83
nggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
414,000.00
70,971.43
356,074.07
841,045.50
1,016,570.50
152,485.58
1,169,056.08
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
448,500.00
68,485.71
357,833.33
874,819.05
1,099,369.05
164,905.36
1,264,274.40
enggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
448,500.00
68,485.71
357,833.33
874,819.05
1,050,344.05
157,551.61
1,207,895.65
Jumlah Harga
(Rp.)
126,000.00
25,000.00
2,900.00
9,300.00
163,200.00
345,000.00
76,542.86
361,351.85
782,894.71
946,094.71
141,914.21
1,088,008.92
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
489,000.00
65,142.86
362,055.56
916,198.41
1,140,748.41
171,112.26
1,311,860.67
menggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
489,000.00
65,142.86
362,055.56
916,198.41
1,091,723.41
163,758.51
1,255,481.92
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
528,000.00
62,657.14
362,759.26
953,416.40
1,177,966.40
176,694.96
1,354,661.36
menggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
528,000.00
62,657.14
362,759.26
953,416.40
1,128,941.40
169,341.21
1,298,282.61
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
556,500.00
59,828.57
368,388.89
984,717.46
1,209,267.46
181,390.12
1,390,657.58
menggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
556,500.00
59,828.57
368,388.89
984,717.46
1,160,242.46
174,036.37
1,334,278.83
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
576,000.00
59,314.29
365,574.07
1,000,888.36
1,225,438.36
183,815.75
1,409,254.11
menggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
576,000.00
59,314.29
365,574.07
1,000,888.36
1,176,413.36
176,462.00
1,352,875.36
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
609,000.00
58,628.57
361,000.00
-
1,028,628.57
1,253,178.57
187,976.79
1,441,155.36
menggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
609,000.00
58,628.57
361,000.00
-
1,028,628.57
1,204,153.57
180,623.04
1,384,776.61
Jumlah Harga
(Rp.)
173,250.00
34,375.00
4,060.00
12,865.00
224,550.00
619,500.00
58,371.43
359,240.74
1,037,112.17
1,261,662.17
189,249.33
1,450,911.49
menggunakan molen)
Jumlah Harga
(Rp.)
138,915.00
23,625.00
2,755.00
10,230.00
175,525.00
619,500.00
58,371.43
359,240.74
1,037,112.17
1,212,637.17
181,895.58
1,394,532.74
Jumlah Harga
(Rp.)
220,500.00
43,750.00
5,075.00
16,275.00
285,600.00
658,500.00
57,428.57
353,962.96
1,069,891.53
1,355,491.53
203,323.73
1,558,815.26
Jumlah Harga
(Rp.)
220,500.00
43,750.00
5,075.00
16,275.00
285,600.00
672,000.00
57,171.43
351,851.85
1,081,023.28
1,366,623.28
204,993.49
1,571,616.77
Jumlah Harga
(Rp.)
220,500.00
43,750.00
5,075.00
16,275.00
285,600.00
600,000.00
41.14
281.48
600,322.62
885,922.62
132,888.39
1,018,811.02
Jumlah Harga
(Rp.)
8,400.00
5,000.00
580.00
620.00
14,600.00
78,750.00
-
-
-
14,000.00
2,100.00
16,100.00
Jumlah Harga
(Rp.)
7,350.00
8,750.00
1,015.00
620.00
17,735.00
126,000.00
3,450.00
129,450.00
-
-
147,185.00
22,077.75
169,262.75
16,926.28
Jumlah Harga
(Rp.)
7,350.00
8,750.00
1,015.00
620.00
17,735.00
141,750.00
3,450.00
145,200.00
-
-
162,935.00
24,440.25
187,375.25
18,737.53
Jumlah Harga
(Rp.)
2,625.00
3,125.00
3,625.00
155.00
9,530.00
132,600.00
1,150.00
133,750.00
-
-
143,280.00
21,492.00
164,772.00
Jumlah Harga
(Rp.)
54,600.00
32,500.00
3,770.00
4,030.00
94,900.00
83,320.00
6,150.00
-
89,470.00
184,370.00
27,655.50
212,025.50
Jumlah Harga
(Rp.)
54,600.00
32,500.00
3,770.00
4,030.00
94,900.00
33,254.00
6,150.00
1,125.00
40,529.00
135,429.00
20,314.35
155,743.35
Jumlah Harga
(Rp.)
54,600.00
32,500.00
3,770.00
4,030.00
94,900.00
93,735.00
6,150.00
-
99,885.00
-
-
194,785.00
29,217.75
224,002.75
Jumlah Harga
(Rp.)
54,600.00
32,500.00
3,770.00
4,030.00
94,900.00
33,254.00
6,150.00
1,125.00
40,529.00
-
-
135,429.00
20,314.35
155,743.35
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
50,325.00
77,000.00
24,000.00
242,845.00
363,295.00
54,494.25
417,789.25
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
50,325.00
33,254.00
24,000.00
199,099.00
319,549.00
47,932.35
367,481.35
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
60,390.00
77,000.00
24,000.00
252,910.00
-
-
373,360.00
56,004.00
429,364.00
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
60,390.00
33,254.00
24,000.00
209,164.00
-
-
329,614.00
49,442.10
379,056.10
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
50,325.00
77,000.00
72,000.00
290,845.00
-
-
411,295.00
61,694.25
472,989.25
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
83,320.00
8,200.00
-
50,325.00
33,254.00
72,000.00
247,099.00
-
-
367,549.00
55,132.35
422,681.35
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
62,490.00
8,200.00
-
67,100.00
77,000.00
36,000.00
-
250,790.00
-
-
371,240.00
55,686.00
426,926.00
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
62,490.00
8,200.00
-
67,100.00
33,254.00
36,000.00
207,044.00
-
-
327,494.00
49,124.10
376,618.10
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
62,490.00
8,200.00
-
50,325.00
77,000.00
24,000.00
222,015.00
-
-
342,465.00
51,369.75
393,834.75
Jumlah Harga
(Rp.)
69,300.00
41,250.00
4,785.00
5,115.00
120,450.00
62,490.00
8,200.00
-
50,325.00
33,254.00
24,000.00
178,269.00
-
-
298,719.00
44,807.85
343,526.85
Jumlah Harga
(Rp.)
15,750.00
6,250.00
725.00
1,240.00
23,965.00
67,531.20
12,300.00
6,000.00
85,831.20
-
-
109,796.20
16,469.43
126,265.63
Jumlah Harga
(Rp.)
18,900.00
2,500.00
2,500.00
2,500.00
870.00
1,395.00
28,665.00
4,166.00
205.00
-
36,000.00
10,350.00
6,000.00
0.51
3.17
56,724.68
-
-
85,389.68
12,808.45
98,198.13
Jumlah Harga
(Rp.)
31,185.00
4,125.00
4,125.00
4,125.00
1,450.00
2,325.00
47,335.00
6,249.00
410.00
-
43,200.00
1,150.00
8,250.00
0.77
5.28
59,265.05
-
-
106,600.05
15,990.01
122,590.06
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,093,950.00
1,093,950.00
396,000.00
396,000.00
1,645,325.00
246,798.75
1,892,123.75
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,093,950.00
1,093,950.00
1,249,325.00
187,398.75
1,436,723.75
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,130,415.00
1,130,415.00
396,000.00
396,000.00
1,681,790.00
252,268.50
1,934,058.50
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,130,415.00
1,130,415.00
1,285,790.00
192,868.50
1,478,658.50
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,217,931.00
1,217,931.00
396,000.00
396,000.00
1,769,306.00
265,395.90
2,034,701.90
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,217,931.00
1,217,931.00
1,373,306.00
205,995.90
1,579,301.90
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,356,396.00
1,356,396.00
396,000.00
396,000.00
1,907,771.00
286,165.65
2,193,936.65
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,356,396.00
1,356,396.00
1,511,771.00
226,765.65
1,738,536.65
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,400,256.00
1,400,256.00
396,000.00
396,000.00
1,951,631.00
292,744.65
2,244,375.65
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,400,256.00
1,400,256.00
1,555,631.00
233,344.65
1,788,975.65
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,458,600.00
1,458,600.00
396,000.00
396,000.00
2,009,975.00
301,496.25
2,311,471.25
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,458,600.00
1,458,600.00
1,613,975.00
242,096.25
1,856,071.25
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,560,702.00
1,560,702.00
396,000.00
396,000.00
2,112,077.00
316,811.55
2,428,888.55
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,560,702.00
1,560,702.00
1,716,077.00
257,411.55
1,973,488.55
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,633,632.00
1,633,632.00
396,000.00
396,000.00
2,185,007.00
327,751.05
2,512,758.05
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,633,632.00
1,633,632.00
1,789,007.00
268,351.05
2,057,358.05
Jumlah Harga (Rp)
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,706,562.00
1,706,562.00
396,000.00
396,000.00
2,257,937.00
338,690.55
2,596,627.55
105,000.00
31,250.00
3,625.00
15,500.00
155,375.00
1,706,562.00
1,706,562.00
1,861,937.00
279,290.55
2,141,227.55
A.4.2.1 Harga Satuan Pekerjaan Besi dan Alumunium
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60x120 cm, untuk partisi
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 105,000.00
Tukang besi L.02 OH 0.250 125,000.00
Kepala tukang L.03 OH 0.025 145,000.00
Mandor L.04 OH 0.013 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
M1 3.500
Rangka metal hollow 40.40.2 mm
Assesoris ( perkuatan, las, dll) Ls 100%xrangka
JUMLAH HARGA BAHAN
C PERALATAN
M1 4.000
Rangka metal hollow 40.40.2mm
Assesoris ( perkuatan,las,dll) Ls 100%xrangka
JUMLAH HARGA BAHAN
C PERALATAN
6,300.00
8,700.00
870.00
465.00
16,335.00
15,525.00
15,525.00
-
-
31,860.00
4,779.00
36,639.00
Jumlah Harga
(Rp.)
6,300.00
7,500.00
870.00
465.00
15,135.00
15,525.00
15,525.00
-
-
30,660.00
4,599.00
35,259.00
Jumlah Harga
(Rp.)
10,500.00
12,500.00
145.00
775.00
23,920.00
8,100.00
2,880.00
10,980.00
56,000.00
56,000.00
90,900.00
13,635.00
104,535.00
Jumlah Harga
(Rp.)
4,200.00
2,900.00
290.00
310.00
7,700.00
11,400.00
2,430.00
1,152.00
14,982.00
11,900.00
11,900.00
34,582.00
5,187.30
39,769.30
Jumlah Harga
(Rp.)
4,515.00
5,375.00
623.50
325.50
10,839.00
82,500.00
5,000.00
2,100.00
89,600.00
-
-
100,439.00
15,065.85
115,504.85
Jumlah Harga
(Rp.)
8,925.00
12,325.00
1,305.00
775.00
23,330.00
330,000.00
900,000.00
9,450.00
1,239,450.00
-
-
1,262,780.00
189,417.00
1,452,197.00
Jumlah Harga
(Rp.)
175,350.00
242,150.00
24,215.00
12,865.00
454,580.00
-
-
-
-
-
454,580.00
68,187.00
522,767.00
Jumlah Harga
(Rp.)
10,500.00
14,500.00
1,450.00
775.00
27,225.00
-
-
-
-
-
-
27,225.00
4,083.75
31,308.75
Jumlah Harga
(Rp.)
21,000.00
29,000.00
2,900.00
155.00
53,055.00
-
-
-
-
-
-
53,055.00
7,958.25
61,013.25
Jumlah Harga
(Rp.)
21,000.00
29,000.00
2,900.00
155.00
53,055.00
21,000.00
307.50
134,140.00
155,447.50
-
-
208,502.50
31,275.38
239,777.88
Jumlah Harga
(Rp.)
15,750.00
43,500.00
4,350.00
1,240.00
64,840.00
21,000.00
205.00
-
21,205.00
-
-
86,045.00
12,906.75
98,951.75
Jumlah Harga
(Rp.)
26,250.00
31,250.00
3,625.00
2,015.00
63,140.00
-
#VALUE!
#VALUE!
Jumlah Harga
(Rp.)
A.4.4.1 Harga Satuan Pekerjaan Pasangan Dinding
A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 105,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala tukang L.03 OH 0.020 145,000.00
Mandor L.04 OH 0.030 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Buah 140.000 2,000.00
Semen portland Kg 26.550 1,500.00
Pasir pasang m3 0.093 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN
63,000.00
25,000.00
2,900.00
4,650.00
95,550.00
280,000.00
39,825.00
11,160.00
330,985.00
-
-
426,535.00
63,980.25
490,515.25
Jumlah Harga
(Rp.)
36,750.00
18,750.00
2,175.00
2,790.00
60,465.00
31,250.00
11,250.00
3,240.00
45,740.00
-
-
106,205.00
15,930.75
122,135.75
Jumlah Harga
(Rp.)
36,750.00
18,750.00
2,175.00
2,790.00
60,465.00
28,750.00
11,250.00
3,240.00
43,240.00
-
-
103,705.00
15,555.75
119,260.75
Jumlah Harga
(Rp.)
33,600.00
15,000.00
1,740.00
2,480.00
52,820.00
39,960.00
27,300.00
69,840.00
137,100.00
-
-
189,920.00
28,488.00
218,408.00
Jumlah Harga
(Rp.)
31,500.00
12,500.00
1,450.00
2,325.00
47,775.00
600,000.00
16,500.00
4,200.00
620,700.00
-
-
668,475.00
100,271.25
768,746.25
Jumlah Harga
(Rp.)
31,500.00
12,500.00
1,450.00
2,325.00
47,775.00
718,135.00
16,500.00
4,200.00
738,835.00
-
-
786,610.00
117,991.50
904,601.50
A.4.4.2 Harga Satuan Pekerjaan Plesteran
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
15,336.00
2,400.00
17,736.00
72,486.00
10,872.90
83,358.90
Jumlah Harga
(Rp.)
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
9,360.00
2,880.00
12,240.00
66,990.00
10,048.50
77,038.50
Jumlah Harga
(Rp.)
27,300.00
25,000.00
2,900.00
2,015.00
57,215.00
15,552.00
3,720.00
19,272.00
76,487.00
11,473.05
87,960.05
Jumlah Harga
(Rp.)
42,000.00
25,000.00
2,900.00
3,410.00
73,310.00
12,480.00
3,840.00
16,320.00
89,630.00
13,444.50
103,074.50
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
9,510.00
1,440.00
10,950.00
65,700.00
9,855.00
75,555.00
Jumlah Harga
(Rp.)
21,000.00
12,500.00
1,450.00
1,550.00
36,500.00
4,875.00
4,875.00
41,375.00
6,206.25
47,581.25
A.4.4.3 Harga Satuan Pekerjaan Penutup Lantai dan Penutup Dinding
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
336,000.00
12,285.00
5,400.00
7,000.00
360,685.00
488,435.00
73,265.25
561,700.25
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
339,150.00
12,285.00
5,400.00
7,000.00
363,835.00
491,585.00
73,737.75
565,322.75
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
161,700.00
12,285.00
5,400.00
7,000.00
186,385.00
314,135.00
47,120.25
361,255.25
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
162,750.00
12,285.00
5,400.00
7,000.00
187,435.00
315,185.00
47,277.75
362,462.75
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
99,750.00
15,000.00
5,400.00
7,000.00
127,150.00
254,900.00
38,235.00
293,135.00
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
99,750.00
15,000.00
5,400.00
7,000.00
127,150.00
254,900.00
38,235.00
293,135.00
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
105,000.00
15,000.00
5,400.00
7,000.00
132,400.00
260,150.00
39,022.50
299,172.50
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
116,550.00
15,000.00
5,400.00
7,000.00
143,950.00
271,700.00
40,755.00
312,455.00
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
85,680.00
15,600.00
5,400.00
7,000.00
113,680.00
241,430.00
36,214.50
277,644.50
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
102,900.00
15,600.00
5,400.00
7,000.00
130,900.00
258,650.00
38,797.50
297,447.50
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
1,484,000.00
12,285.00
5,400.00
1,876.00
1,503,561.00
1,631,311.00
244,696.65
1,876,007.65
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
441,000.00
11,100.00
452,100.00
579,850.00
86,977.50
666,827.50
Jumlah Harga
(Rp.)
94,500.00
56,250.00
6,525.00
6,975.00
164,250.00
104,675.00
13,950.00
2,160.00
27,160.00
147,945.00
312,195.00
46,829.25
359,024.25
Jumlah Harga
(Rp.)
94,500.00
56,250.00
6,525.00
6,975.00
164,250.00
102,000.00
13,950.00
2,160.00
44,620.00
162,730.00
326,980.00
49,047.00
376,027.00
Jumlah Harga
(Rp.)
136,500.00
81,250.00
9,425.00
10,075.00
237,250.00
1,484,000.00
18,660.00
3,000.00
9,100.00
7,575.00
1,522,335.00
1,759,585.00
263,937.75
2,023,522.75
Jumlah Harga
(Rp.)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
198,000.00
17,625.00
4,200.00
219,825.00
347,575.00
52,136.25
399,711.25
Jumlah Harga
(Rp.)
12,600.00
15,000.00
1,740.00
930.00
30,270.00
83,000.00
83,000.00
113,270.00
16,990.50
130,260.50
Jumlah Harga
(Rp.)
52,500.00
62,500.00
7,250.00
201.50
122,451.50
111,100.00
2,625.00
113,725.00
6,640.00
6,640.00
242,816.50
36,422.48
279,238.98
Jumlah Harga
(Rp.)
52,500.00
62,500.00
7,250.00
201.50
122,451.50
166,650.00
2,625.00
169,275.00
6,640.00
6,640.00
298,366.50
44,754.98
343,121.48
Jumlah Harga
(Rp.)
52,500.00
62,500.00
7,250.00
201.50
122,451.50
106,454.00
2,625.00
109,079.00
6,640.00
6,640.00
238,170.50
35,725.58
273,896.08
Jumlah Harga
(Rp.)
52,500.00
62,500.00
7,250.00
201.50
122,451.50
202,000.00
2,625.00
204,625.00
6,640.00
6,640.00
333,716.50
50,057.48
383,773.98
A.4.5.1 Satuan Pekerjaan Langit-Langit (plafond)
10,500.00
12,500.00
1,450.00
775.00
25,225.00
41,625.00
615.00
42,240.00
67,465.00
10,119.75
77,584.75
Jumlah Harga
(Rp.)
10,500.00
6,250.00
725.00
775.00
18,250.00
27,154.40
5,830.00
32,984.40
51,234.40
7,685.16
58,919.56
Jumlah Harga
(Rp.)
10,500.00
6,250.00
725.00
775.00
18,250.00
29,010.80
2,343.00
31,353.80
49,603.80
7,440.57
57,044.37
Jumlah Harga
(Rp.)
5,250.00
6,250.00
725.00
465.00
12,690.00
36,750.00
205.00
36,955.00
49,645.00
7,446.75
57,091.75
A.4.5.2 Harga Satuan Pekerjaan Penutup Atap
21,000.00
12,500.00
1,450.00
155.00
35,105.00
140,259.60
4,100.00
144,359.60
179,464.60
26,919.69
206,384.29
Jumlah Harga
(Rp.)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
148,051.80
4,100.00
152,151.80
187,256.80
28,088.52
215,345.32
Jumlah Harga
(Rp.)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
168,480.00
4,100.00
172,580.00
207,685.00
31,152.75
238,837.75
Jumlah Harga
(Rp.)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
215,784.00
4,100.00
219,884.00
254,989.00
38,248.35
293,237.35
Jumlah Harga
(Rp.)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
227,772.00
4,100.00
231,872.00
266,977.00
40,046.55
307,023.55
Jumlah Harga
(Rp.)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
259,200.00
4,100.00
263,300.00
298,405.00
44,760.75
343,165.75
Jumlah Harga
(Rp.)
17,430.00
31,250.00
3,625.00
1,240.00
53,545.00
159,000.00
4,100.00
163,100.00
216,645.00
32,496.75
249,141.75
Jumlah Harga
(Rp.)
26,250.00
18,750.00
2,175.00
2,015.00
49,190.00
55,000.00
1,025.00
56,025.00
105,215.00
15,782.25
120,997.25
Jumlah Harga
(Rp.)
13,125.00
31,250.00
3,625.00
930.00
48,930.00
27,200.00
1,025.00
1,025.00
29,250.00
78,180.00
11,727.00
89,907.00
Jumlah Harga
(Rp.)
12,600.00
7,500.00
870.00
930.00
21,900.00
50,400.00
410.00
50,810.00
51,740.00
7,761.00
59,501.00
Jumlah Harga
(Rp.)
15,750.00
8,750.00
1,015.00
930.00
26,445.00
20,400.00
820.00
21,220.00
22,150.00
3,322.50
25,472.50
Jumlah Harga
(Rp.)
15,750.00
93,750.00
11,600.00
930.00
122,030.00
79,695.00
410.00
80,105.00
202,135.00
30,320.25
232,455.25
Jumlah Harga
(Rp.)
15,750.00
93,750.00
11,600.00
930.00
122,030.00
87,990.00
410.00
88,400.00
210,430.00
31,564.50
241,994.50
Jumlah Harga
(Rp.)
10,500.00
125,000.00
14,500.00
7,750.00
157,750.00
60,000.00
820.00
60,820.00
218,570.00
32,785.50
251,355.50
Jumlah Harga
(Rp.)
15,750.00
6,250.00
725.00
1,240.00
23,965.00
57,750.00
8,662.50
32,627.50
4,894.13
37,521.63
A.4.6.1 Harga Satuan Pekerjaan Kayu
A.4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.000 105,000.00
Tukang Kayu L.03 OH 21.000 125,000.00
Kepala Tukang L.03 OH 2.100 145,000.00
Mandor L.04 OH 0.350 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Kayu Kelas 1 (bengkirai) m3 1.100 16,000,000.00
Paku 10cm kg 1.250 20,500.00
Lem kayu kg 1.000 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.1.a Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu belian
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.000 105,000.00
Tukang Kayu L.03 OH 21.000 125,000.00
Kepala Tukang L.03 OH 2.100 145,000.00
Mandor L.04 OH 0.350 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Kayu Belian m3 1.100 24,000,000.00
Paku 10cm kg 1.250 20,500.00
Lem kayu kg 1.000 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.000 105,000.00
Tukang Kayu L.03 OH 18.000 125,000.00
Kepala Tukang L.03 OH 1.800 145,000.00
Mandor L.04 OH 0.300 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen Kayu Kelas II m3 1.200 13,000,000.00
Paku 10cm kg 1.250 20,500.00
Lem kayu kg 1.000 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas 1 (bengkirai) m3 0.040 11,188,300.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.5.a Pembuatan dan pemasangan 1m2 daun pintu panel, kayu belian
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Belian m3 0.040 14,814,000.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.5.b Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II (mabang) m3 0.040 8,300,000.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00
Tukang Kayu L.03 OH 2.400 125,000.00
Kepala Tukang L.03 OH 0.240 145,000.00
Mandor L.04 OH 0.040 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas 1 (bengkirai) m3 0.024 11,188,300.00
Lem kayu kg 0.300 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.6.a Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00
Tukang Kayu L.03 OH 2.400 125,000.00
Kepala Tukang L.03 OH 0.240 145,000.00
Mandor L.04 OH 0.040 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II (mabang) m3 0.024 8,300,000.00
Lem kayu kg 0.300 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00
Kepala Tukang L.03 OH 0.300 145,000.00
Mandor L.04 OH 0.050 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.064 11,188,300.00
Lem kayu kg 0.500 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.8 Pembuatan dan pemasangan 1m2 pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00
Tukang Kayu L.03 OH 2.100 125,000.00
Kepala Tukang L.03 OH 0.210 145,000.00
Mandor L.04 OH 0.035 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kelas II m3 0.025 8,300,000.00
Paku 1cm-2,5 cm kg 0.030 20,500.00
Lem kayu kg 0.500 18,500.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.9 Pembuatan 1m2 pintu plywood rangkap, rangka expose kayu kelas I
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00
Tukang Kayu L.03 OH 2.100 125,000.00
Kepala Tukang L.03 OH 0.240 145,000.00
Mandor L.04 OH 0.040 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas I m3 0.0256 11,188,300.00
Paku 1cm-2,5 cm kg 0.030 20,500.00
Lem kayu kg 0.500 18,500.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.13.a Pemasangan 1m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.000 105,000.00
Tukang Kayu L.03 OH 12.000 125,000.00
Kepala Tukang L.03 OH 1.200 145,000.00
Mandor L.04 OH 0.200 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II uk. 6/12 m3 1.100 11,000.00
Paku 12 cm kg 5.600 20,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.25 Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00
Tukang Kayu L.03 OH 0.600 125,000.00
Kepala Tukang L.03 OH 0.060 145,000.00
Mandor L.04 OH 0.010 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
balok kayukelas II uk. 6/12 m3 0.028 4,224,000.00
Paku 5 dan 10 Kg 0.150 20,500.00
Plywood 4 mm,120 x 240 Lembar 0.860 120,000.00
Lem kayu Kg 0.560 18,500.00
JUMLAH HARGA BAHAN
C PERALATAN
735,000.00
2,625,000.00
304,500.00
54,250.00
3,718,750.00
17,600,000.00
25,625.00
18,500.00
17,644,125.00
21,362,875.00
3,204,431.25
24,567,306.25
Jumlah Harga
(Rp.)
735,000.00
2,625,000.00
304,500.00
54,250.00
3,718,750.00
26,400,000.00
25,625.00
18,500.00
26,444,125.00
30,162,875.00
4,524,431.25
34,687,306.25
Jumlah Harga
(Rp.)
630,000.00
2,250,000.00
261,000.00
46,500.00
3,187,500.00
15,600,000.00
25,625.00
18,500.00
15,644,125.00
18,831,625.00
2,824,743.75
21,656,368.75
Jumlah Harga
(Rp.)
36,750.00
131,250.00
15,225.00
2,790.00
186,015.00
332,000.00
1,025.00
333,025.00
519,040.00
77,856.00
596,896.00
Jumlah Harga
(Rp.)
105,000.00
375,000.00
43,500.00
7,750.00
531,250.00
447,532.00
9,250.00
456,782.00
988,032.00
148,204.80
1,136,236.80
Jumlah Harga
(Rp.)
105,000.00
375,000.00
43,500.00
7,750.00
531,250.00
592,560.00
9,250.00
601,810.00
1,133,060.00
169,959.00
1,303,019.00
Jumlah Harga
(Rp.)
105,000.00
375,000.00
43,500.00
7,750.00
531,250.00
332,000.00
9,250.00
341,250.00
872,500.00
130,875.00
1,003,375.00
Jumlah Harga
(Rp.)
84,000.00
300,000.00
34,800.00
6,200.00
425,000.00
268,519.20
5,550.00
274,069.20
699,069.20
104,860.38
803,929.58
Jumlah Harga
(Rp.)
84,000.00
300,000.00
34,800.00
6,200.00
425,000.00
199,200.00
5,550.00
204,750.00
629,750.00
94,462.50
724,212.50
Jumlah Harga
(Rp.)
105,000.00
375,000.00
43,500.00
7,750.00
531,250.00
716,051.20
9,250.00
725,301.20
1,256,551.20
188,482.68
1,445,033.88
73,500.00
262,500.00
30,450.00
5,425.00
371,875.00
207,500.00
615.00
9,250.00
120,000.00
337,365.00
709,240.00
106,386.00
815,626.00
Jumlah Harga
(Rp.)
84,000.00
262,500.00
34,800.00
6,200.00
387,500.00
286,420.48
615.00
9,250.00
120,000.00
416,285.48
803,785.48
120,567.82
924,353.30
Jumlah Harga
(Rp.)
70,350.00
250,000.00
29,000.00
51,925.00
401,275.00
671,298.00
3,075.00
1,075,648.00
1,104,648.00
165,697.20
1,270,345.20
Jumlah Harga
(Rp.)
420,000.00
1,500,000.00
174,000.00
31,000.00
2,125,000.00
12,100.00
114,800.00
126,900.00
2,251,900.00
337,785.00
2,589,685.00
Jumlah Harga
(Rp.)
703,500.00
2,512,500.00
291,450.00
51,925.00
3,559,375.00
10,860,000.00
-
114,800.00
10,974,800.00
14,534,175.00
2,180,126.25
16,714,301.25
Jumlah Harga
(Rp.)
703,500.00
2,512,500.00
291,450.00
51,925.00
3,559,375.00
3,690,500.00
-
61,500.00
3,752,000.00
7,311,375.00
1,096,706.25
8,408,081.25
Jumlah Harga
(Rp.)
12,600.00
15,000.00
1,740.00
930.00
30,270.00
70,980.00
1,168.50
72,148.50
73,078.50
10,961.78
84,040.28
Jumlah Harga
(Rp.)
15,750.00
37,500.00
4,350.00
11,625.00
69,225.00
73,227.00
4,100.00
77,327.00
88,952.00
13,342.80
102,294.80
Jumlah Harga
(Rp.)
21,000.00
37,500.00
4,350.00
1,550.00
64,400.00
77,506.50
5,125.00
82,631.50
84,181.50
12,627.23
96,808.73
Jumlah Harga
(Rp.)
10,500.00
25,000.00
2,900.00
775.00
39,175.00
120,833.64
2,050.00
122,883.64
123,658.64
18,548.80
142,207.44
Jumlah Harga
(Rp.)
10,500.00
25,000.00
2,900.00
775.00
39,175.00
123,071.30
1,025.00
124,096.30
124,871.30
18,730.70
143,602.00
Jumlah Harga
(Rp.)
15,750.00
56,250.00
6,525.00
1,240.00
79,765.00
132,068.10
3,075.00
135,143.10
136,383.10
20,457.46
156,840.56
Jumlah Harga
(Rp.)
21,000.00
75,000.00
8,700.00
1,550.00
106,250.00
118,272.00
3,075.00
103,200.00
10,360.00
234,907.00
341,157.00
51,173.55
392,330.55
Jumlah Harga
(Rp.)
63,000.00
225,000.00
26,100.00
4,650.00
318,750.00
78,318.10
2,050.00
3,075.00
83,443.10
88,093.10
13,213.97
101,307.07
Jumlah Harga
(Rp.)
2,625.00
9,375.00
1,160.00
155.00
13,315.00
48,000.00
1,025.00
62,340.00
63,500.00
9,525.00
73,025.00
A.4.6.2 Harga Satuan Pekerjaan Kunci dan Kaca
6,300.00
75,000.00
8,700.00
465.00
90,465.00
47,500.00
47,500.00
-
137,965.00
20,694.75
158,659.75
Jumlah Harga
(Rp.)
1,050.00
62,500.00
7,250.00
775.00
71,575.00
57,500.00
57,500.00
-
129,075.00
19,361.25
148,436.25
Jumlah Harga
(Rp.)
525.00
62,500.00
7,250.00
465.00
70,740.00
78,800.00
78,800.00
-
149,540.00
22,431.00
171,971.00
Jumlah Harga
(Rp.)
1,575.00
18,750.00
2,175.00
124.00
22,624.00
29,000.00
29,000.00
-
51,624.00
7,743.60
59,367.60
Jumlah Harga
(Rp.)
1,050.00
12,500.00
1,450.00
77.50
15,077.50
18,800.00
18,800.00
-
33,877.50
5,081.63
38,959.13
Jumlah Harga
(Rp.)
1,575.00
18,750.00
2,175.00
1,240.00
23,740.00
14,400.00
14,400.00
38,140.00
5,721.00
43,861.00
Jumlah Harga
(Rp.)
5,250.00
62,500.00
7,250.00
465.00
75,465.00
190,000.00
190,000.00
265,465.00
39,819.75
305,284.75
Jumlah Harga
(Rp.)
2,100.00
25,000.00
2,900.00
155.00
30,155.00
18,900.00
18,900.00
29,055.00
4,358.25
33,413.25
Jumlah Harga
(Rp.)
1,050.00
12,500.00
1,450.00
775.00
15,775.00
88,750.00
88,750.00
-
104,525.00
15,678.75
120,203.75
Jumlah Harga
(Rp.)
1,575.00
18,750.00
2,175.00
124.00
22,624.00
220,000.00
1,750.00
221,750.00
-
244,374.00
36,656.10
281,030.10
Jumlah Harga
(Rp.)
1,785.00
21,250.00
2,465.00
139.50
25,639.50
437,800.00
2,450.00
440,250.00
-
465,889.50
69,883.43
535,772.93
Jumlah Harga
(Rp.)
2,625.00
31,250.00
3,625.00
201.50
37,701.50
704,000.00
2,450.00
706,450.00
-
744,151.50
111,622.73
855,774.23
Jumlah Harga
(Rp.)
1,575.00
18,750.00
2,175.00
1,240.00
23,740.00
459,800.00
459,800.00
-
483,540.00
72,531.00
556,071.00
A.4.7.1 Harga Satuan Pekerjaan Pengecatan
A.4.7.1.4. 1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 105,000.00
Tukang cat L.02 OH 0.009 125,000.00
Kepala tukang L.03 OH 0.006 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200 52,000.00
Plamuur Kg 0.150 31,500.00
Cat dasar Kg 0.170 70,000.00
Cat penutup Kg 0.260 84,000.00
Kuas buah 0.010 24,000.00
Pengencer Kg 0.030 25,000.00
Ampelas Lbr 0.200 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.7.1.10. 1m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior setara Vinilex
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 105,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 31,500.00
Cat dasar Kg 0.100 27,000.00
Cat penutup Kg 0.260 28,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.11 1m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Interior setara Vinilex
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.280 105,000.00
Tukang cat L.02 OH 0.042 125,000.00
Kepala tukang L.03 OH 0.0042 145,000.00
Mandor L.04 OH 0.003 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.120 27,000.00
Cat penutup Kg 0.180 28,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.7.1.17. Pengecatan 1m2 permukaan baja dengan menie besi dengan perancah
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 105,000.00
Tukang cat L.02 OH 0.225 125,000.00
Kepala tukang L.03 OH 0.0225 145,000.00
Mandor L.04 OH 0.0075 155,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 52,000.00
Pengencer L 0.010 25,000.00
Kwas Lbr 0.010 24,000.00
Perancah kayu m2 0.002 467,762.50
JUMLAH HARGA BAHAN
C PERALATAN
15,750.00
465.00
16,215.00
1,225.00
1,225.00
-
17,440.00
2,616.00
20,056.00
Jumlah Harga
(Rp.)
15,750.00
465.00
16,215.00
785.00
785.00
-
17,000.00
2,550.00
19,550.00
Jumlah Harga
(Rp.)
15,750.00
1,240.00
16,990.00
785.00
785.00
-
17,775.00
2,666.25
20,441.25
Jumlah Harga
(Rp.)
7,350.00
1,125.00
870.00
465.00
9,810.00
10,400.00
4,725.00
11,900.00
21,840.00
240.00
750.00
700.00
50,555.00
-
60,365.00
9,054.75
69,419.75
Jumlah Harga
(Rp.)
7,350.00
13,125.00
580.00
465.00
21,520.00
10,400.00
4,725.00
11,900.00
29,400.00
240.00
750.00
700.00
58,115.00
-
79,635.00
11,945.25
91,580.25
Jumlah Harga
(Rp.)
4,200.00
78,750.00
9,135.00
465.00
92,550.00
21,600.00
21,600.00
-
114,150.00
17,122.50
131,272.50
Jumlah Harga
(Rp.)
4,200.00
7,500.00
23,200.00
465.00
35,365.00
9,600.00
23,808.00
7,000.00
40,408.00
-
75,773.00
11,365.95
87,138.95
Jumlah Harga
(Rp.)
10,500.00
930.00
11,430.00
20,440.00
20,440.00
-
31,870.00
4,780.50
36,650.50
Jumlah Harga
(Rp.)
16,800.00
20,000.00
2,320.00
465.00
39,585.00
6,750.00
1,575.00
350.00
8,675.00
-
48,260.00
7,239.00
55,499.00
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
2,700.00
7,280.00
13,130.00
-
24,483.50
3,672.53
28,156.03
Jumlah Harga
(Rp.)
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
2,700.00
21,840.00
27,690.00
-
39,043.50
5,856.53
44,900.03
Jumlah Harga
(Rp.)
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
2,700.00
27,040.00
32,890.00
-
44,243.50
6,636.53
50,880.03
Jumlah Harga
(Rp.)
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
2,700.00
27,040.00
32,890.00
-
44,243.50
6,636.53
50,880.03
Jumlah Harga
(Rp.)
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
2,700.00
27,820.00
33,670.00
-
45,023.50
6,753.53
51,777.03
Jumlah Harga
(Rp.)
2,100.00
7,875.00
913.50
465.00
11,353.50
14,000.00
27,820.00
41,820.00
-
53,173.50
7,976.03
61,149.53
Jumlah Harga
(Rp.)
29,400.00
5,250.00
609.00
465.00
35,724.00
3,240.00
5,040.00
8,280.00
-
44,004.00
6,600.60
50,604.60
Jumlah Harga
(Rp.)
29,400.00
5,250.00
609.00
465.00
35,724.00
15,120.00
15,120.00
-
50,844.00
7,626.60
58,470.60
Jumlah Harga
(Rp.)
29,400.00
5,250.00
609.00
465.00
35,724.00
18,720.00
18,720.00
-
54,444.00
8,166.60
62,610.60
Jumlah Harga
(Rp.)
29,400.00
5,250.00
609.00
465.00
35,724.00
18,720.00
18,720.00
-
54,444.00
8,166.60
62,610.60
Jumlah Harga
(Rp.)
29,400.00
5,250.00
609.00
465.00
35,724.00
19,260.00
19,260.00
-
54,984.00
8,247.60
63,231.60
Jumlah Harga
(Rp.)
2,100.00
25,000.00
2,900.00
387.50
30,387.50
5,200.00
240.00
5,440.00
-
35,827.50
5,374.13
41,201.63
Jumlah Harga
(Rp.)
26,250.00
28,125.00
3,262.50
1,162.50
58,800.00
5,200.00
250.00
240.00
935.53
6,625.53
-
65,425.53
9,813.83
75,239.35
A.5.1.1 Harga Satuan Pekerjaan Sanitasi Dalam Gedung
346,500.00
137,500.00
1,450.00
24,800.00
510,250.00
2,962,700.00
177,762.00
3,140,462.00
-
-
3,650,712.00
547,606.80
4,198,318.80
Jumlah Harga
(Rp.)
105,000.00
187,500.00
21,750.00
24,800.00
339,050.00
191,000.00
9,000.00
1,200.00
201,200.00
-
-
540,250.00
81,037.50
621,287.50
Jumlah Harga
(Rp.)
105,000.00
125,000.00
14,500.00
7,750.00
252,250.00
2,000,000.00
9,000.00
1,200.00
600,000.00
2,610,200.00
-
-
2,862,450.00
429,367.50
3,291,817.50
Jumlah Harga
(Rp.)
126,000.00
181,250.00
21,750.00
9,300.00
338,300.00
1,200,000.00
9,000.00
1,200.00
120,000.00
1,330,200.00
-
-
1,668,500.00
250,275.00
1,918,775.00
Jumlah Harga
(Rp.)
315,000.00
562,500.00
7,250.00
139,500.00
1,024,250.00
280,000.00
33,600.00
313,600.00
-
-
1,337,850.00
200,677.50
1,538,527.50
Jumlah Harga
(Rp.)
31,500.00
56,250.00
65,250.00
2,325.00
155,325.00
280,000.00
33,600.00
313,600.00
-
-
468,925.00
70,338.75
539,263.75
Jumlah Harga
(Rp.)
3,150.00
37,500.00
4,350.00
2,325.00
47,325.00
650,000.00
319,100.00
969,100.00
-
-
1,016,425.00
152,463.75
1,168,888.75
Jumlah Harga
(Rp.)
1,050.00
12,500.00
1,450.00
775.00
15,000.00
319,100.00
319,100.00
-
-
334,100.00
50,115.00
384,215.00
Jumlah Harga
(Rp.)
56,700.00
11,250.00
1,305.00
418.50
69,673.50
22,000.00
6,416.67
28,416.67
-
-
98,090.17
14,713.53
112,803.69
Jumlah Harga
(Rp.)
1,050.00
50,000.00
5,800.00
775.00
57,625.00
32,500.00
375.00
32,875.00
-
-
90,500.00
13,575.00
104,075.00
Jumlah Harga
(Rp.)
5,670.00
11,250.00
1,305.00
4,185.00
22,410.00
42,000.00
12,250.00
54,250.00
-
-
76,660.00
11,499.00
88,159.00
Jumlah Harga
(Rp.)
5,670.00
11,250.00
1,305.00
4,185.00
22,410.00
50,700.00
14,787.50
65,487.50
-
-
87,897.50
13,184.63
101,082.13
Jumlah Harga
(Rp.)
11,340.00
22,500.00
2,610.00
775.00
37,225.00
86,100.00
25,112.50
111,212.50
-
-
148,437.50
22,265.63
170,703.13
Jumlah Harga
(Rp.)
14,175.00
28,125.00
3,335.00
1,085.00
46,720.00
174,750.00
50,968.75
225,718.75
-
272,438.75
40,865.81
313,304.56
Jumlah Harga
(Rp.)
14,175.00
28,125.00
3,335.00
1,085.00
46,720.00
277,500.00
80,937.50
358,437.50
-
405,157.50
60,773.63
465,931.13
Jumlah Harga
(Rp.)
3,780.00
7,500.00
870.00
310.00
12,460.00
334,500.00
97,562.50
432,062.50
-
444,522.50
66,678.38
511,200.88
Jumlah Harga
(Rp.)
3,780.00
7,500.00
870.00
310.00
12,460.00
6,600.00
1,925.00
8,525.00
-
20,985.00
3,147.75
24,132.75
Jumlah Harga
(Rp.)
3,780.00
7,500.00
870.00
310.00
12,460.00
9,000.00
2,625.00
11,625.00
-
24,085.00
3,612.75
27,697.75
Jumlah Harga
(Rp.)
5,670.00
11,250.00
1,305.00
465.00
18,690.00
13,500.00
3,937.50
17,437.50
-
36,127.50
5,419.13
41,546.63
Jumlah Harga
(Rp.)
8,505.00
16,875.00
1,957.50
620.00
27,957.50
24,600.00
7,175.00
31,775.00
-
59,732.50
8,959.88
68,692.38
Jumlah Harga
(Rp.)
8,505.00
16,875.00
1,957.50
620.00
27,957.50
49,200.00
14,350.00
63,550.00
-
91,507.50
13,726.13
105,233.63
A.8.4.1. Harga Satuan Pekerjaan Pemasangan Pipa di Luar Gedung
m 1.000
Pipa HDPE diameter 1000 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.093
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa HDPE diameter 1100 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.205
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa HDPE diameter 1200 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.584
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa baja diameter 1000 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.058
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.133
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa baja diameter 1100 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.064
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.150
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa baja diameter 1200 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa escavator type 225 hari 0.07
kapasitas 0,5 - 1,0 m3
Sewa Tripot/ Tackel & handle hari 0.167
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)
8505
5125
1240
14870
0
0
0
0
14870
2230.5
17100.5
Jumlah Harga
(Rp.)
9870
5875
1395
17140
0
0
0
0
17140
2571
19711
Jumlah Harga
(Rp.)
11025
6625
1705
19355
0
0
0
0
19355
2903.25
22258.25
Jumlah Harga
(Rp.)
12390
7375
1860
21625
0
0
0
0
21625
3243.75
24868.75
Jumlah Harga
(Rp.)
19845
11875
2945
34665
0
0
0
0
34665
5199.75
39864.75
Jumlah Harga
(Rp.)
26880
16000
4030
46910
0
0
0
0
46910
7036.5
53946.5
Jumlah Harga
(Rp.)
30870
18375
4495
53740
0
0
0
0
-53740
-8061
-61801
Jumlah Harga
(Rp.)
57120
34000
8370
99490
0
0
0
0
99490
14923.5
114413.5
Jumlah Harga
(Rp.)
70245
41875
10385
122505
0
0
0
0
122505
18375.75
140880.75
Jumlah Harga
(Rp.)
84945
50625
12555
148125
0
0
0
0
148125
22218.75
170343.75
Jumlah Harga
(Rp.)
100485
59875
14880
175240
0
0
0
0
175240
26286
201526
Jumlah Harga
(Rp.)
169890
101125
25110
296125
0
0
0
0
296125
44418.75
340543.75
Jumlah Harga
(Rp.)
177555
105750
26195
309500
0
0
0
0
309500
46425
355925
Jumlah Harga
(Rp.)
198975
118500
29450
346925
0
0
0
0
346925
52038.75
398963.75
Jumlah Harga
(Rp.)
220395
131250
32550
384195
0
0
0
0
384195
57629.25
441824.25
Jumlah Harga
(Rp.)
241815
144000
35650
421465
0
0
0
0
421465
63219.75
484684.75
Jumlah Harga
(Rp.)
3675
2125
465
6265
0
0
0
0
6265
939.75
7204.75
Jumlah Harga
(Rp.)
4200
2500
620
7320
0
0
0
0
7320
1098
8418
Jumlah Harga
(Rp.)
4725
2875
775
8375
0
0
0
0
8375
1256.25
9631.25
Jumlah Harga
(Rp.)
6510
3875
930
11315
0
0
0
0
11315
1697.25
13012.25
Jumlah Harga
(Rp.)
10710
6375
1550
18635
0
0
0
0
18635
2795.25
21430.25
Jumlah Harga
(Rp.)
13965
8375
2015
24355
0
0
0
0
24355
3653.25
28008.25
Jumlah Harga
(Rp.)
17850
10625
2635
31110
0
0
0
0
31110
4666.5
35776.5
Jumlah Harga
(Rp.)
30450
18125
4495
53070
0
0
0
0
53070
7960.5
61030.5
Jumlah Harga
(Rp.)
37695
22500
5580
65775
0
0
65775
9866.25
75641.25
Jumlah Harga
(Rp.)
45465
27000
6665
79130
0
0
0
0
79130
11869.5
90999.5
Jumlah Harga
(Rp.)
53760
32000
7905
93665
0
0
0
0
93665
14049.75
107714.75
Jumlah Harga
(Rp.)
93765
55750
13795
163310
0
0
0
0
163310
24496.5
187806.5
Jumlah Harga
(Rp.)
142065
84625
20925
247615
0
0
0
0
247615
37142.25
284757.25
Jumlah Harga
(Rp.)
174195
103750
25730
303675
0
0
0
0
303675
45551.25
349226.25
Jumlah Harga
(Rp.)
190890
113625
28210
332725
0
0
0
0
332725
49908.75
382633.75
Jumlah Harga
(Rp.)
248850
148125
36735
396975
0
0
0
0
396975
59546.25
456521.25
Jumlah Harga
(Rp.)
36225
21500
5270
62995
0
0
62995
9449.25
72444.25
Jumlah Harga
(Rp.)
42000
25000
6200
73200
0
0
0
73200
10980
84180
Jumlah Harga
(Rp.)
47040
28000
6975
82015
0
0
0
82015
12302.25
94317.25
Jumlah Harga
(Rp.)
53130
31625
7905
92660
0
0
0
92660
13899
106559
Jumlah Harga
(Rp.)
83580
49750
12400
145730
0
0
0
145730
21859.5
167589.5
Jumlah Harga
(Rp.)
99645
59375
14725
173745
0
0
0
173745
26061.75
199806.75
Jumlah Harga
(Rp.)
100590
59875
14880
175345
0
0
0
175345
26301.75
201646.75
Jumlah Harga
(Rp.)
127260
75750
18755
221765
0
0
0
221765
33264.75
255029.75
Jumlah Harga
(Rp.)
142065
84500
20925
247490
0
0
0
247490
37123.5
284613.5
Jumlah Harga
(Rp.)
154245
91875
22785
268905
0
0
0
268905
40335.75
309240.75
Jumlah Harga
(Rp.)
139335
83000
20615
242950
0
0
0
242950
36442.5
279392.5
Jumlah Harga
(Rp.)
244335
145375
36115
425825
0
0
0
425825
63873.75
489698.75
Jumlah Harga
(Rp.)
275415
164000
40610
480025
0
0
0
480025
72003.75
552028.75
Jumlah Harga
(Rp.)
305655
182000
45105
532760
0
0
0
532760
79914
612674
Jumlah Harga
(Rp.)
336000
200000
49600
585600
0
0
0
585600
87840
673440
Jumlah Harga
(Rp.)
366240
218000
54095
638335
0
0
0
638335
95750.25
734085.25
Jumlah Harga
(Rp.)
51345
12250
7595
71190
0
0
0
71190
10678.5
81868.5
Jumlah Harga
(Rp.)
57435
13625
8525
79585
0
0
0
79585
11937.75
91522.75
Jumlah Harga
(Rp.)
64365
15375
9455
89195
0
0
0
89195
13379.25
102574.25
Jumlah Harga
(Rp.)
89775
21375
13175
124325
0
0
0
124325
18648.75
142973.75
Jumlah Harga
(Rp.)
99855
23750
14725
138330
0
0
0
138330
20749.5
159079.5
Jumlah Harga
(Rp.)
102165
24375
15035
141575
0
0
0
141575
21236.25
162811.25
Jumlah Harga
(Rp.)
162225
38625
15810
23870
240530
0
0
0
240530
36079.5
276609.5
Jumlah Harga
(Rp.)
190365
45375
24310
28055
288105
0
0
0
0
288105
43215.75
331320.75
Jumlah Harga
(Rp.)
214935
51125
32810
31775
330645
0
0
0
0
0
330645
49596.75
380241.75
Jumlah Harga
(Rp.)
211155
50250
49810
31155
342370
0
0
0
0
342370
51355.5
393725.5
Jumlah Harga
(Rp.)
405195
96500
83810
59830
645335
0
0
0
0
645335
96800.25
742135.25
Jumlah Harga
(Rp.)
524475.000
124875.000
100810.000
77345.000
827505.000
0
0
0
0
827505.000
124125.75
951630.750
Jumlah Harga
(Rp.)
622755
148250
134810
107415
1013230
0
0
0
0
1013230
151984.5
1165214.5
Jumlah Harga
(Rp.)
729645
173750
134810
107725
1145930
0
0
0
0
1145930
171889.5
1317819.5
Jumlah Harga
(Rp.)
845880
201375
151810
124930
1323995
0
0
0
0
1323995
198599.25
1522594.25
Jumlah Harga
(Rp.)
52395
12500
7750
72645
0
0
0
0
72645
10896.75
83541.75
Jumlah Harga
(Rp.)
60795
14500
8990
84285
0
0
0
0
84285
12642.75
96927.75
Jumlah Harga
(Rp.)
68040
16250
10075
94365
0
0
0
0
94365
14154.75
108519.75
Jumlah Harga
(Rp.)
74340
17750
11005
103095
0
0
0
0
103095
15464.25
118559.25
Jumlah Harga
(Rp.)
116865
27875
17205
144740
0
0
0
0
144740
21711
166451
Jumlah Harga
(Rp.)
139125
33125
20615
192865
0
0
0
0
192865
28929.75
221794.75
Jumlah Harga
(Rp.)
148575
35375
21855
205805
0
0
0
0
205805
30870.75
236675.75
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
234255
55750
34565
324570
0
0
0
0
324570
48685.5
373255.5
Jumlah Harga
(Rp.)
255360
60750
37665
353775
0
0
0
0
353775
53066.25
406841.25
Jumlah Harga
(Rp.)
231840
55250
34255
321345
0
0
0
0
321345
48201.75
369546.75
Jumlah Harga
(Rp.)
409185
97375
60450
567010
0
0
0
0
567010
85051.5
652061.5
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
A.8.4.2. Harga Satuan Pekerjaan Pemotongan Pipa
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
A.8.4.3. Harga Satuan Pekerjaan Pemasangan Aksesoris Pipa
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
A.8.4.4. Harga Satuan Pekerjaan Penyambungan Pipa Baru ke Pipa Lama
A.8.4.4.2. (K3) Penyambungan pipa baru ke pipa yang ada diameter 100 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.650
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.159
Sewa pompa Submersible hari 1.078
3m3/h
Sewa Tripot / Tackel & handle hari 0.911
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.3. (K3) Penyambungan pipa baru ke pipa yang ada diameter 150 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.760
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.369
Sewa pompa Submersible hari 1.353
3m3/h
Sewa Tripot / Tackel & handle hari 1.026
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.4. (K3) Penyambungan pipa baru ke pipa yang ada diameter 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.870
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.579
Sewa pompa Submersible hari 1.628
3m3/h
Sewa Tripot / Tackel & handle hari 1.141
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.5. (K3) Penyambungan pipa baru ke pipa yang ada diameter 250 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.980
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.789
Sewa pompa Submersible hari 1.903
3m3/h
Sewa Tripot / Tackel & handle hari 1.256
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.6. (K3) Penyambungan pipa baru ke pipa yang ada diameter 300 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.090
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.999
Sewa pompa Submersible hari 2.178
3m3/h
Sewa Tripot / Tackel & handle hari 1.371
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.7. (K3) Penyambungan pipa baru ke pipa yang ada diameter 400 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.435
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.310
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.419
Sewa pompa Submersible hari 2.728
3m3/h
Sewa Tripot / Tackel & handle hari 1.601
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.8. (K3) Penyambungan pipa baru ke pipa yang ada diameter 450 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.480
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.420
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.629
Sewa pompa Submersible hari 3.003
3m3/h
Sewa Tripot / Tackel & handle hari 1.716
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.9. (K3) Penyambungan pipa baru ke pipa yang ada diameter 500 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.530
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.839
Sewa pompa Submersible hari 3.278
3m3/h
Sewa Tripot / Tackel & handle hari 1.831
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.10. (K3) Penyambungan pipa baru ke pipa yang ada diameter 600 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.750
mekanik/ cilinder saw
Sewa genset 1500 watt hari 2.259
Sewa pompa Submersible hari 3.828
3m3/h
Sewa Tripot / Tackel & handle hari 2.061
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.11. (K3) Penyambungan pipa baru ke pipa yang ada diameter 700 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.970
mekanik/ cilinder saw
Sewa genset 1500 watt hari 2.679
Sewa pompa Submersible hari 4.378
3m3/h
Sewa Tripot / Tackel & handle hari 2.291
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.12. (K3) Penyambungan pipa baru ke pipa yang ada diameter 800 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 2.190
mekanik/ cilinder saw
Sewa genset 1500 watt hari 3.099
Sewa pompa Submersible hari 4.928
3m3/h
Sewa Tripot / Tackel & handle hari 2.521
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
Jumlah Harga
(Rp.)
A.8.4.5. Harga Satuan Pekerjaan Pengetesan Pipa
840
124
964
0
0
57.6
57.6
0
0
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
0
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
Jumlah Harga
(Rp.)
840
124
964
0
0
57.6
57.6
1021.6
153.24
1174.84
A.8.4.6. Harga Satuan Pekerjaan Pekerjaan Elektrikal
0
Err:509
0
0
0
139200
0
0
0
Err:509
0
Err:509
Err:509
Err:509
Jumlah Harga
(Rp.)
100.000
0
Err:509
0
0
0
0
Err:509
0
Err:509
Err:509
Err:509
Lampiran B
Contoh Menghitung HSP dengan menggunakan angka koefisien
•
Sebagai contoh perhitungan HSP disini diambil beberapa jenis pekerjaan dari sub level 2 dengan menggunakan format se
lampiran A. Contoh yang disajikan disini adalah :
1) Pekerjaan Persiapan
2) Pekerjaan Penutup atap
3) Pekerjan Pengecatan
4) Pekerjaan Kunci dan Kaca
5) Pekerjaan Sanitasi dalam Gedung
6) Pekerjaan Perpipaan Air Minum di Luar Gedung
•
HSD tenaga kerja dan HSD bahan diambil dari harga "franco ditempat" yang ditetapkan oleh pemerintah sete
hasil survey pasar
• Harga-harga dalam contoh ini berdasarkan survey pasar di kota Bandung tahun 2012
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang kayu L.02 OH 0.100 75,000
Kepala tukang L.03 OH 0.010 90,000
Mandor L.04 OH 0.005 90,000
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.012 3,500,000
Paku 2"-3" Kg 0.020 14,000
Kayu papan 3/20 M3 0.007 4,000,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 50,000
Tukang kayu L.02 OH 0.075 75,000
Kepala tukang L.03 OH 0.0075 90,000
Mandor L.04 OH 0.008 90,000
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong buah 25.000 2,200
JUMLAH HARGA BAHAN
C PERALATAN
Contoh 3 : Pengecatan 1m2 bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 50,000
Tukang cat L.02 OH 0.009 75,000
Kepala tukang L.03 OH 0.006 90,000
Mandor L.04 OH 0.003 90,000
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200 20,000
Plamuur 0.150 18,000
Cat dasar 0.170 48,000
Cat penutup 0.260 48,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang batu L.02 OH 0.150 75,000
Kepala tukang L.03 OH 0.015 90,000
Mandor L.04 OH 0.050 90,000
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok unit 1.000 200,000
Semen portland Kg 6.000 1,200
Pasir pasang M3 0.010 80,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.810 50,000
Tukang pipa L.02 OH 0.135 75,000
Kepala tukang L.03 OH 0.0135 90,000
Mandor L.04 OH 0.004 90,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M 1.000 110,000
Perlengkapan Ls 35% x pipa 110,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
1 Pekerja L.01 OH 0.810 50,000
2 Tukang pipa L.02 OH 0.135 75,000
3 Mandor L.04 OH 0.004 90,000
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa PVC diamater 200mm 1.000 211,255
JUMLAH HARGA BAHAN
C PERALATAN
1 hari
Sewa Tripod / Tackel & handle 0.031 325,000
crane 2T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
an menggunakan format seperti pada
Jumlah Harga
(Rp.)
5,000
7,500
900
450
13,850
42
280
28,000
28,322
42,172
6,325.80
48,497.80
Jumlah Harga
(Rp.)
7,500
5,625
675
720
14,520
55,000
59,520
10,428.00
79,948.00
Jumlah Harga
(Rp.)
3,500
675
540
270
4,985
4,000
2,700
8,160
12,480
27,340
32,325
4,848.75
37,173.75
Jumlah Harga
(Rp.)
3,000
45,000
5,400
270
53,670
175,000
27,340
228,670
34,300.50
262,970.50
Jumlah Harga
(Rp.)
5,000
11,250
13,500
4,500
34,250
200,000
7,200
800
208,000
242,250
36,337.50
278,587.50
Jumlah Harga
(Rp.)
4,050
10,125
1,215
360
15,750
38,500
54,250
8,137.50
62,387.50
Jumlah Harga
(Rp.)
5,346.00
4466.2
798
10610.2
211,255
211,255
10,075
10,075
231940.2
34,791.03
266,731.23
Lampiran C
Menghitung Rencana Anggaran Biaya
Untuk menghitung Rencana Anggaran Biaya (RAB) dapat digunakan program EXCEL, dengan langkah-langkah sebagai berikut :
1) Siapkan 4 sheet dalam program Excel
Sheet 1 untuk Daftar harga satuan bahan dan upah masukan semua jenis bahan dan upah OH dengan harga (franco dite
dengan harga resmi berdasarkan SK Bupati/Walikota atau hasil survey sendiri.
Sheet 2 untuk membuat analisis harga satuan pekerjaan, salin analisis jenis-jenis pekerjaan yang diperlukan dengan koef
koefisien tenaga sesuai dengan SNI-ABK 2008. Buat sheet 2 ini hyperlink dengan sheet 1.
Sheet 3 untuk membuat daftar harga satuan pekerjaan, buat tabel harga satuan samua jenis pekerjaan. Buat sheet 3 ini h
2.
Sheet 4 untuk membuat uraian RAB, membuat format RAB dengan memuat uraian pekerjaan, quantity, satuan harga satu
harga. Halaman terakhir dari sheet 4 adalah rekapitulasi. Buat sheet 4 ini hyperlink dengan sheet 3.
2) Buka sheet 1, masukkan data harga satuan bahan dan upah dengan satuan sesuai yang tercantum dalam analisis di shee
harga PC dalam satuan Kg (bukan zak), upah tukang dalam satuan OH
3) Dengan mengisi sheet 1, maka sheet 2 (analisis) akan terisi dengan sendirinya, deminikian juga dengan sheet 3 dan shee
4) Masing-masing kelompok uraian pekerjaan pada sheet 4 dipindahkan ke Form Rekapitulasi, kemudian tambahkan biaya ti
(Overhead dan keuntungan). Penjumlahan rekapitulasi merupakan jumlah akhir dari Rencana Anggaran Biaya (RAB).
Contoh sheet 1
Daftar Harga Satuan Bahan dan Upah
Contoh sheet 2
Pengukuran dan Pemasangan 1m2 Bouwplank
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.012
Paku 2"-3" Kg 0.020
Kayu papan 3/20 M3 0.007
JUMLAH HARGA BAHAN
C PERALATAN
Contoh sheeet 3 :
Daftar Harga Satuan Pekerjaan
Contoh sheeet 4 :
Rencana Anggaran Biaya
50,000 5,000
75,000 7,500
90,000 900
90,000 450
JUMLAH TENAGA KERJA 13,850
3,500,000 420
14,000 280
4,000,000 28,000
JUMLAH HARGA BAHAN 28,700
20,000 10000000.000
90,450 13567500.000
45,712 5704857.600
110,250 6697687.500
258,400 10414100.000
558,497 71655165.000