0% found this document useful (0 votes)
136 views13 pages

E9000 Exam Questions

The document contains multiple choice questions about the configuration and components of the Huawei E9000 server. It asks about settings like fan module status indicators, switch module types, management interfaces, storage capacity and types of supported modules. It also contains questions about concepts like external storage, instruction sets, operating systems, upgrade processes and network connection methods.

Uploaded by

asim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views13 pages

E9000 Exam Questions

The document contains multiple choice questions about the configuration and components of the Huawei E9000 server. It asks about settings like fan module status indicators, switch module types, management interfaces, storage capacity and types of supported modules. It also contains questions about concepts like external storage, instruction sets, operating systems, upgrade processes and network connection methods.

Uploaded by

asim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

When CX switch modules are not stacked, the binding mode for

NICs can be set to LACP mode. ( )

True

False

When the MZ910 is configured in slot MEZZ1 on the CH121 and

CX911s are configured in slots 2X and 3X, the number of Ethernet

cards on the CH121 in slot 8 is equal to that of Ethernet cards on

the CH121 in slot 16. ( )

True

False

The E9000 is a high-performance, high-end enterprise server

designed for elastic computing and telecom computing. It is

positioned as a high-end computing platform.

True

False

The full-width CH222 supports 15 x 2.5-inch disks with a

maximum storage capacity of 15 TB. It suits big data processing

and distributed computing applications.


True

False

Which CPU frequency control technology is based on power

management. (? )

A. Turbo Boost

B. Hyper-Threading

C. Multi-core

D. SMP

If the fan module status indicator is blinking green, what does it

indicate? ( )

A. The fan module is operating properly.

B. The fan module requests activation.

C. The fan module is not operating properly.

D. The fan module is in the standby state.

In which VLAN setting method, you need to set the VLAN again when the host
is changed to another port? ( )

A. By MAC
B. By IP subnet
C. By port
D. All above
Typically, power cables between PDUs and PDFs are provided by

customers. The cable quantity is determined by cable routing

length. The diameters of cores vary with currents. What is the

recommended cable for 16 A PDUs? ( )

A. 1 mm2

B. 6 mm2

C. 16 mm2

D. 2.5 mm2

When four CH121s are installed in the E9000, what are the

installation slots? ( )

A. 9, 10, 11, and 12

B. 1, 2, 3, and 4

C. 1, 2, 9, and 10

D. 7, 8, 15, and 16

Which description is false about the master and slave links? ( )

A. A smart link group cannot detect the unidirectional link fault of the master and slave links

without another protocol, for example, DLDP.

B. A smart link group can have only one pair of master and slave ports.
C. The master and slave ports of the smart link group can forward traffic from multiple VLANs,

support the load sharing and mutual backup function.

D. The master and slave ports can be added to different VLANs

Which port of the E9000 cannot be used as Monitor group uplink? ( )


A. Eth-Trunk1

B. 10GE2/17/1</p>

C. VlanIf

D. Smart Link group

If the health indicator on the CH121 is blinking red at 4 Hz, what

does it indicate? ( )

A. The CH121 is being powered on.

B. Critical alarm

C. The CH121 is not inserted into the slot completely.

D. Major alarm

Which description is false about an E9000 management plane? ( )

A. Any switch module can provide one GE port for communicating with MM910s, providing

external management interface from switch modules.

B. Two MM910s work in active/standby mode. There are heartbeat monitoring signals and

data synchronization channels between them.


C. Each of BMC modules on blades and switch modules can provide two GE channels that are

connected to the Lan switch of two MM910s respectively.

D. Each MM910 provides I2C buses for fan and PSU management.

On the PSU & Fan page, you can view the installation status and

health status for all fan modules. If the server operates properly,

which fans have the same speed? ( )

A. Fan 6 and Fan 12 to Fan 14

B. Fan 13 and fan 14

C. Fan 8 to fan 14

D. Fan 1 to fan 7

Which description is false about E9000 chassis cascading? ( )

A. The E9000 chassis supports cascading when management network ports on the MM910s

are used.

B. Cascading ports are used only when multiple chassis are cascaded.

C. The MM910 provides only one management network port and one cascading network port.

D. The E9000 chassis does not support cascading when management network ports on the

switch modules are used.

Which interface standard is used by servers for managing

hardware? (? )
A. SNMP

B. IPMI

C. RAID

D. SCSI

Which description is false about ISL Trunking and N_Port

Trunking? ( )

A. When an error is detected on N_Port Trunking, the HBA needs to register again.

B. ISL Trunking applies only when the CX210 connects to the Brocade switch and a new

license is required.

C. When an error is detected on ISL Trunking, the HBA needs to register again.

D. When an error is detected, the service interruption time of ISL Trunking is smaller than that

of N_Port Trunking.

Which sequence is correct about replacing an intelligent LCD? ( )

(1). Place the removed LCD in an ESD bag. (2). Use the Phillips

screwdriver to tighten the two captive screws to secure the LCD.

(3). Pull the LCD out of the chassis horizontally. (4). Use the

Phillips screwdriver to remove the two captive screws on the LCD.

(5). Insert a new LCD into the chassis horizontally. (6). Determine

the positions of captive screws that secure the LCD.

A. (4)(3)(1)(6)(5)(2)
B. (6)(4)(3)(1)(5)(2)

C. (3)(4)(1)(5)(6)(2)

D. (6)(3)(1)(5)(4)(2)

Multi

Which switch modules are 10GE switch modules? ( )

A. CX610

B. CX310

C. CX110

D. CX311

Which file systems does Windows support? (? )

A. FAT32
B. FAT16
C. NTFS
D. EXT3

Which mezz module binding can allow mezz module redundancy? ( )

A. Two mezz module are bound to four network ports.


B. The mezz module is bound to two network ports.
C. The mezz module is bound to four network ports.
D. A port on a mezz module is bound to a port on another mezz module.

Which redundant modules are hot-swappable? (? )

A. Fan module

B. Hard disk
C. Mainboard

D. PSU

External storage types contain (? ).

A. RAID

B. DAS

C. NAS

D. SAN

Which modules can be upgraded by using the MM910 WebUI? ( )

A. Switch module

B. Fan module

C. MM

D. Compute node

Which physical ports can be used for managing the E9000? ( )

A. GE service network ports on switch modules in slots 2X and 3X

B. COM port on the MM910

C. Mgmt port on the MM910

D. RS485 port on the MM910

Which switch modules contain an FC switching plane? ( )


A. CX210

B. CX912

C. CX911

D. CX915

Which MEth IP address configuration methods does a switch

module support? ( )

A. Using the MM910 WebUI

B. Over SOL

C. Using the MM910 CLI

D. Over a serial port on a switch module

Which instruction sets are supported by x86 server CPUs? (? )

A. RISC

B. EPIC

C. CISC

D. Serial instruction set

Common Unix OSs are (? ).

A. Solaris

B. AIX

C. HP-UN
D. Windows 7

Which information can be collected quickly by using the HMM

WebUI? ( )

A. Fan module and PSU installation

B. Switch module SELs

C. MM910 SEL

D. Compute node SELs

Which steps are performed to configure stacking on E9000 switch

modules? ( )

A. Set?ports?to stack mode.

B. Change the stack ID.

C. Create stack ports and add physical member ports to stack ports.

D. Set the stack priority and domain ID.

Which methods can be used for setting the BMC IP address? ( )

A. Use the MM910 CLI.

B. Use the local KVM to set the IP address in the BIOS.

C. Use the BMC that is logged in to over the local serial port.

D. Use the MM910 WebUI.

Which methods can be used for installing an OS? ( )


A. Install an OS directly.

B. Install an OS by using the ServiceCD

C. Install an OS by producing an installation source.

D. Install an OS by loading a RAID controller card driver.

The Eth-Trunk interface working modes include ( )

A. Dynamic LACP

B. Manual

C. Static LACP

Which steps does the upgrade process include? ( )

A. Verify the upgrade.

B. Perform the upgrade.

C. Prepare for the upgrade.

D. Perform the pre-upgrade check.

The E9000 is a converged infrastructure blade server, the word

"converged" indicates what does the E9000 integrate? ( ).

A. Computing resource

B. Storage resource

C. Network resource

D. Application resource
Which descriptions are true about FC network connection of

CX311s? ( )

A. When the CX311s directly connect to a FC switch, it is recommended that each CX311

connect to one FC switch.

B. When CX311s directly connect to FC storage devices with two storage controllers, it is

recommended that each CX311 connect to two storage controllers.

C. When the CX311s directly connect to an FC storage device, configure zones based on ports.

D. The CX311s connect to multiple FC links to increase link bandwidth and reliability.

Huawei provides 42 U rack and PDUs and two 32 A@380 V three-

phase power inputs. Which scenarios are supported? ( )

A. Two E9000 chassis with the power consumption of 10,000 W per chassis and configured

with 3000 W AC PSUs in 4+1 redundancy mode

B. Three E9000 chassis with the power consumption of 6000 W per chassis and configured

with 2000 W AC PSUs in 3+3 redundancy mode

C. Two E9000 chassis with the power consumption of 6000 W per chassis and configured with

2000 W AC PSUs in 3+3 redundancy mode

D. Three E9000 chassis with the power consumption of 6000 W per chassis and configured

with 2000 W AC PSUs in 3+1 redundancy mode

Which I/O modules are GE I/O modules? ( )

A. CX310
B. CX911

C. CX116

D. CX110

Which functions does the E9000 MM910 support? ( )

A. Intelligent fan speed adjustment

B. KVM over IP and centralized KVMdisplay

C. Management over the CLI or WebUI

D. Devices in the chassis/sensor/event management

You might also like