contents ACCIONA, profitability,
development and
sustainability
04. 06. 08. 10.
Sustainability Technological Automation The complete
ACCIONA is a leader in providing sustainable solutions for infrastructure and
renewable energy projects across the world. Its offer covers the whole value chain,
and welfare innovation and control water cycle from design and construction to operation and maintenance. With a presence in
more than 30 countries, the Group develops its business activities based on the
desire to contribute to economic and social development in the communities in
which it operates.
sustainability
and welfare
automation
and control
the complete
water cycle
design and
constructions
of water
treatment plants
ACCIONA Agua is a water the application of state-of-the-
treatment industry leader art technologies, as well as to
which designs, builds and quality in all its activities.
operate drinking water
treatment plants, wastewater Its Design and Construction
treatment plants, tertiary (D&C) activities are deployed in
treatments for water reuse and two business models:
reverse-osmosis desalination Municipal.
plants. ACCIONA Agua is firmly Industrial.
committed to innovation and
Outstanding Projects
mundaring Saint John Putatan 2 Drinking
DRINKING WATER Drinking water Water Treatment
TREATMENT PLANT treatment plants Plant
Perth. Australia Saint John, Canada Muntinlupa, Manila
// Capacity: 165,000 m3/day // Capacity: 75,000 m3/day. // Capacity: 150,000 m3/day.
expandable to // Inhabitants: 70,000 lient: Maynilad Water
// C
240,000 m3/day. // Client: City of Saint John. Services Inc. (MWSI).
// Client: Water Corporation. // Type of contract: design,
// Type of contract: public- The project, involves the build and operate
private funded project renewal of part of the water
(PPP). distribution system in the The plant is situated in
city (the largest city in the Muntinlupa, in the south of the
ACCIONA Agua forms part Province of New Brunswick metropolitan area of Manila,
of the Helena Water and the oldest in the country) next to an existing Water
Consortium together with and consists of a drinking Treatment Plant (Putatan 1).
Trility. The Consortium water plant with a capacity of The new plant will provide
has built, designed and is 75 million liters per day and drinking water to almost
operating (under a 35 year storage capacity of 33 million 6 million people. The Plant will
concession) the plant. liters. have a capacity of 100,000 m3
The plant supplies the per day, extendable to
Goldfield and Agricultural Oum Azza 150,000 m3 per day.
Water System (G&AWS), DRINKING WATER
including Kalgoorlie.The TREATMENT PLANT One of the main characteristics
plant was given recognition Coastal Zone of the new plant is the advanced
as Best Contract of the Year Rabat-Casablanca. treatment of raw water from
by GWI magazine in 2011. Morocco Laguna de Bay, the biggest
// Client: Moroccan National lake in the Philippines and the
Electricity and Drinking second-biggest inland freshwater
Water Office. lake in South-East Asia, to deliver
// Capacity: 432,000 m3/day. clean drinking water with a very
low carbon footprint.
The project is part of the
drinking water supply The treatment plan for the new
improvement plan for the plant includes a number of
Rabat-Casablanca coastal advanced technical processes
zone. The plant is located in to ensure clean potable water.
the municipality of Oum Azza These techniques include
at about 30 km from Rabat. Dissolved Air Flotation (DAF),
It will reinforce drinking water Biological Aerated Filter (BAF),
supply in one of the areas with Ultrafiltration (UF), Reverse
fastest population growth in Osmosis (RO) and disinfection
the country which already in different stages through
has more than five million the oxidation of particular
inhabitants. compounds.
Mundaring DWTP, Perth, Australia
18 // 19 your partner in the water cycle
for municipal and industrial use Cap Milano Italy 6,480 50,000 n
Praia Cape Verde 5,000 40,000 n
ACCIONA Agua has more more than 13.4 million have been developed and Sataria Italy 3,014 3,849
than 75 reference plants people. Many of the implemented by ACCIONA Maggiuluvedi Italy 3,014 3,849
in this sector, with an technological innovations Agua. Talara Peru 2,200 25,000 n
37 additional smaller plants 51,444 333,000
installed capacity of 2.7 that are included in today’s
Total Capacity 2,7 M 13,4 M 2,2 M 409,000
million m3/day supplying designs of this type of plants
U/C Under Construction
n EPC Engineering, Procurement and Construction
n BOO / BOOT Build Own Operate / Build Own Operate and Transfer
20 // 21 your partner in the water cycle
Outstanding projects
ALCANTARA ATOTONILCO DIVINOPOLIS
WASTEWATER WASTEWATER WATER SYSTEM
TREATMENT PLANT TREATMENT PLANT Divinopolis,
São Gonçalo, Brazil Hidalgo. Mexico Minas Gerais, Brazil
// Capacity: // C apacity: // Client: COPASA.
103,680 m3/day. 3,024,000 m3/day.
// Equivalent population // E quivalent population ACCIONA Agua is carring out
250,000 inhabitants. 10,500,000 inhabitants. the design, construction and
// Client: State Secretariat for // C lient: CONAGUA (National start-up of two wastewater
the Environment in Rio de Water Commission). treatment stations, 16 pumping
Janeiro. stations for the system and the
The Atotonilco WWTP has construction of a wastewater
The action foresees an average rated treatment pipe network for the city. The
the construction of a capacity of 35 m3/s and a contract covers the operation
comprehensive sanitation maximum of 50 m3s, including and maintenance of the system
system which includes the the final disposal of solid waste for the next 26 years.
plant and relevant pumping and sludge. The plant is also
station with a flow rate of equipped with a cogeneration The biggest plant, which will
1.99 m3/second, as well as system to take advantage of have an initial capacity of
collector networks, collectors, a the biogas produced in the 400 liters per second, will be
Yamagata 1,560 l/s digester for maximum energy increased over the concession
pumping station, 8 small savings. The plant is the largest period to 600 liters per second
pumping stations and in the world and one of the to provide a service to a
house connections. largest works in the Mexico population of 228,600. The
Valley Basin Water. installation will also have
67.8 kilometers of sewers and
2011: Global Water Intelligence 6.1 kilometers of collector pipes.
award for Best Contract of
the Year.
30 // 31 your partner in the water cycle
BELLO WASTEWATER La Chira WASTEWATER ACCIONA Agua has designed, built GABAL EL ASFAR
TREATMENT PLANT Treatment Plant and is operating the Escalerilla WWTP. WASTEWATER TREATMENT
Medellin. Colombia Chorrillos, Lima, Peru PLANT
// C apacity: // Capacity: 544,320 m3/day. The project will help solve the Cairo, Egypt
432,000 m3/day. // E quivalent population sewage and environmental problems // C
apacity:
// T ype of contract: construction, 2.5 millions inhabitants. affecting the Northern cone of 500,000 m3/day.
design, operation and // Client: SEDAPAL. the metropolitan area of Arequipa, // E quivalent population
maintenance. ensuring the integral service of the 2,000,000 inhabitants.
// C lient: Aguas Nacionales EPM de ACCIONA Agua has designed, area, as well as to improve the quality // C lient: Construction Authority for
Medellín. built and is operating (25 years) life for locals. Potable Water and Wastewater
the La Chira WWTP as well as the (CAPW).
The objective is for the river to construction of an underwater The project boundary encompasses
surpass the levels of dissolved discharge pipeline. the Cerro Colorado and Yura areas, The contract includes the design,
oxygen which are globally accepted covering the Arequipa Metropolitan construction, operation and
as indicators of decontaminated The WWTP contribute to solving Area. maintenance and commissioning of
rivers. By reducing the organic Lima's sanitary and environmental the WWTP. After the construction of
load received by the river, the problems caused by the effluent SAN FERNANDO this new facility, the Gabal El Asfar
water quality established by the of the Surco and Circunvalación WASTEWATER TREATMENT complex will have a treatment
metropolitan area of the Aburrá collectors which discharge directly PLANT capacity of 2.5 million cubic meters
Valley will be achieved. The goal is into the sea without prior treatment. San Fernando, Trinidad per day, which will make the largest
to raise dissolved oxygen levels to a and Tobago treatment complex in the Middle East
minimum average of 5 mg/l. The new plant aids in the // Capacity: 45,000 m3/day. and Africa and the third-largest in the
environmental recovery of the // E quivalent population world.
existing beach areas that are currently 111,600 inhabitants.
Lugo Wastewater polluted, in order for their increased // C lient: Water and Sewerage
Treatment Plant use as recreational areas and for Authority (WASA).
Lugo, Spain tourism, and for tourism projects to The installation will consist of 16.3
// Capacity: 76,500 m3/day. be promoted in the area of influence. km of collectors of which 12.5 km will
// E quivalent population be maintained through a microtunnel,
200,000 inhabitants. Escalerilla WASTEWATER with 11,964 service connections and
// C lient: Ministry of the Treatment Plant seven pumping stations with flow
Environment Confederación Arequipa, Perú rates of 7 L/s to 203 L/s. The project
Hidrográfica del Norte. // Capacity: 34,800 m3/day. also provides includes the dismantling
// E quivalent population and remodelling of the existing
The construction of the new WWTP More than 150,000 people. WWTP and pumping stations.
is one of the activities included in // Client: SEDAPAR.
the Lugo Sanitation Improvement
Project. The installation will treat
urban and industrial wastewater
from the municipality of Lugo.
COMMERCIAL MGMT
COMMERCIAL MGMT
BULK WATER SUPPLY
WATER SUPPLY
WATER SUPPLY
WASTEWATER
WASTEWATER
// P opulation served: structure that works in a consists of a team of more SERVICES POPULATION SERVICES POPULATION
TREATMENT
TREATMENT
SEWERAGE
SEWERAGE
800,469 inhabitants. coordinated manner to ensure than 100 professionals, 30
the proper functioning of the vehicles equipped with the
ACCIONA Agua is present Valencia sanitation system. most advanced technological
ATLL 4,500,000 ● ● Toro (Zamora) 9,627 ● ● ● ● ●
in the City of Valencia systems and an organisational Lot 1 Sedapal. G. Management North (Lima, Peru) 3,580,353 ● Suances (Cantabria) 8,451 ● ● ● ●
since 2007, managing the MADRID structure that works in a Lot 2 Sedapal. G. Management Centre (Lima, Peru) 3,437,116 ● Cabezón de la Sal (Cantabria) 8,353 ● ● ●
Operation, Cleaning and // Client: Canal de Isabel II coordinated manner to ensure Corrective Maintenance Lot 1 Z. South (Lima, Peru) 1,309,410 ● ● Arévalo (Ávila) 8,118 ● ● ● ●
Conservation Service of the Management. the proper functioning of the Madrid sewer system Lot B 803,300 ● Dolores (Alicante) 7,362 ● ● ●
Municipal Sanitation System. / / Population served: Madrid sewer network. Sanitation in Valencia 797,028 ● ● Moraleja (Cáceres) 7,182 ● ● ● ●
SOMAJASA (Jaén 34 municipalities) 228,894 ● ● ● ● ● ● Lorqui (Murcia) 6,983 ● ● ●
It manages and supervises 803,300.
Costa Tropical, Granada 122,996 ● ● ● ● ● ● Almodóvar del Campo (Ciudad Real) 6,685 ● ● ●
the sanitation network and The Madrid sewer service is Getafe (road maintenance) 171,280 ● Montefrío (Granada) 6,054 ● ● ●
all related facilities, including ACCIONA Agua is present in provided with a system of Molina de Segura (SERCOMOSA) 67,382 ● ● ● ● Villanueva de Algaidas (Málaga) 4,485 ● ● ●
wastewater and rainwater Madrid since 2009, managing on-call teams available Úbeda (Jaén) 35,784 ● ● ● ● Paguera (Majorca) 3,880 ● ●
pumping stations, wastewater the City of Madrid Sewer 24 hours a day and 365 days Ames (Galicia) 30,267 ● ● ● ● Orba (Alicante) 2,604 ● ● ●
Network Operation Service, a year. Pilar de la Horadada (Alicante) 23,403 ● ● ● Alfoz de Lloredo (Cantabria) 2,514 ● ● ● ●
treatment plants, underpass
Manzanares (Ciudad Real) 19,237 ● ● ● ● ● Favara (Valencia) 2,456 ● ● ●
pumping and sluice gates. serving a population of more La Unión (Murcia) 19,009 ● ● ● Villanueva del Río Segura (Murcia) 2,445 ● ● ●
Behind all these facilities is than 940,000 inhabitants. Archena (Murcia) 18,496 ● ● ● Sierra de Fuentes (Cáceres) 2,056 ● ● ● ●
a team consisting of more ACCIONA Agua is in charge Osuna (Seville) 17,973 ● ● ● ● Ricote (Murcia) 1,452 ● ● ●
Zafra (Badajoz) 16,753 ● ● ● Llaurí (Valencia) 1,333 ● ● ●
Santomera (Murcia) 15,709 ● ● ● Corrales del Vino (Zamora) 1,088 ● ● ●
Villafranca de los Barros (Extremadura) 13,329 ● ● Ulea (Murcia) 926 ● ● ●
Andratx (Majorca) 12,149 ● ● Fontiveros (Ávila) 828 ● ● ● ●
Villarrubia de los Ojos (Ciudad Real) 11,116 ● ● ● ● Deià (Majorca) 747 ● ●
Ceutí (Murcia) 10,881 ● ● ● Ojos (Murcia) 562 ● ● ●
Yuncos (Toledo) 10,587 ● ● ● Total 15,370,592
42 // 43 your partner in the water cycle
Other Projects
GOTA PROJECT Peru. It was to carry out the municipalities of Andratx,
The GOTA Project, ACCIONA maintenance service networks Deià and Paguera (Calvià.
Agua’s work management in Lima, the drinking water and Majorca) since 1994 through
system, supported by the sewer systems in Gerencia de its subsidiaries GESBA, S.A. and
latest technology, is the fruit Servicios Sur, comprising eight company of waters Paguera,
of the company’s knowledge districts in the Peruvian capital, S.L., serving a population of
and experience in maintaining grouped in the so-called 23,000 people in low season
water supply and sanitation Centro de Servicios Surquillo. and 70,000 in high season.
networks worldwide. The work to be carried out
includes replacing 61 km Aguas y Servicios
The project concerns the of water supply and sewer Since 1996, it manages the
introduction of a global piping, replacing more than complete water cycle for the
information technology 17,300 house connections consortium of municipalities of
solution to manage the and maintaining valves, fire the Costa Tropical in Granada.
receipt, delegation and hydrants and bulk water The service covers an area
execution of orders for work meters. of 1,400 km2 and serves
in a planned and efficient a population of 110,000
way, based on the two-way The corrective maintenance inhabitants in the low season
transmission of information service is intended to and 330,000 in high season.
in real time, which allows the assure the operability of In 2016 Aguas y Servicios
client and the end user to the secondary drinking celebrated its 20th anniversary
know the status of the work in water supply and sewer of contract.
progress at any moment. systems and contributes
to the SEDAPAL's strategic SOMAJASA
The system has been installed objective of "improving Thanks to the alliance
on ACCIONA Agua’s corporate business management", which reached in 2007 with the
infrastructure, from where contributes to the efficient Jaén provincial government,
the company can supply optimisation and reliability of ACCIONA Agua manages all
services worldwide through the operation of the complete the complete water cycle
an Operations Center that water cycle. services in 34 villages in the
provides support 24 hours a province. The agreement
day, 7 days a week. GESBA means managing the water
The company has been supply to more than 250,000
2015, ACCIONA Agua was
In providing drinking water and inhabitants in these towns for
awarded its first tender in sanitation services to the a period of 25 years.
44 // 45 your partner in the water cycle
1
An industrial park located on the outskirts
PRIVATE HOMES
The installation of a water meter (1) inside the
A of Burgos, with 170 water meters.
C
is part of SmartWater4Europe, These innovations will also
home, residential buildings and industrial zones, B BARRIADA YAGÜE. B a European research involving The management system will result in environmental benefits,
together with water quality sensors around the A residential area, with 911 water meters. be governed by a Business since early detection of leaks
21 entities, including water
network. The data collected are sent via a special
transmitter (2) at a frequency of 868 Mhz.
C VIRGEN DEL MANZANO. companies, technology Intelligence platform to detect in will reduce the amount of water
A metropolitan area of the city, with
449 water meters. companies, universities and real time any fault, jam or leak used for final consumption.
research centres. and know the point in which it
occurs, which will reduce the The project will also incorporate
ACCIONA Agua has begun to time required to locate and a new real time network
1
2
implement a management repair. monitoring system to ascertain
system in the drinking water composition at any time
C water supply network which Another new feature brought for better quality assurance.
allows for instant remote by the project is remote
B supervision of water quality, meter reading and detection In addition, the company will
meter consumption and the of abnormal consumptions, improve its service management
condition of the network. A which will immediately alert models and optimise investment
consumers if there is a suspected plans to actual needs.
FIB
2
X
MA
PUBLIC SERVICES WI
Devices located in the city. This
3
equipment routes and stores data
from up to 500 meters distribution AGUAS DE BURGOS
with the area covered. The data stored in the water meters
in the three selected zones and the
ACCIONA Agua
network sensors are sent to the Data
Control Center located in the building
works in the digital
of Aguas de Burgos in the city center. transformation of
all areas of
This project is financed by the European Union
through the 7th Framework Program for research,
technological development and demonstration (GA 619024).
the company
Operation and ///// Drinking Water ProjectS (O&M) ///// O&M: Desalination Plants
ACCIONA Agua
Employees
EBT
(millions of euros)