Jha Solar Transformer Project
Jha Solar Transformer Project
Jha Solar Transformer Project
RMU SWITCHGEAR
TESTING
6 AO1 & AO2 LBS (C panel) Ergonomics -Slip, Trip, Fall. Maintain Only All ABB personnel
Open position - Caught in clear access authorized and its
between. Body/Physical Injury and good personnel subcontractors
· Measure the Physical -Exposure to arrangemen allowed must wear
following insulation heat t of tools, to during the required PPE's by
- Fall on same Muscle Strain. avoid falling, testing. MSPECTRUM
resistance of line side Electrical level. trip. Ensure to /PMFTC all
terminals. - Electrocution Put throughout the
o A-G, B-G, C-G Barricades course of this
Mechanical
during scope as
· Measure insulation execution indicated here
resistance of line side of testing
terminals with
respect to bus bar
terminals
o A- A’ , B-B’ &
C –C’
7 AO1 & AO2 LBS (C panel) Ergonomics -Slip, Trip, Fall. Body/Physical Injury Maintain Only All ABB personnel
- Caught in clear access authorized and its
Close position between. and good personnel subcontractors
Physical -Exposure to Muscle Strain. arrangemen allowed must wear
· Measure insulation heat t of tools, to during the required PPE's by
resistance of line side - Fall on same avoid falling, testing. MSPECTRUM
Electrical level. trip. Ensure to /PMFTC all
terminals - Electrocution Put throughout the
o A-B , B-C, & C- Mechanical Barricades course of this
during scope as
A execution indicated here
· Measure insulation of testing
resistance of line side
terminals
o A-G, B-G, C &
G
· Measure contact
resistance of LBS.
o Phase A,
Phase B &
Phases C
8 A03 (Metering Panel) Ergonomics -Slip, Trip, Fall. Body/Physical Injury Maintain Only All ABB personnel
· Fuse - Caught in clear access authorized and its
between. and good personnel subcontractors
o Measure fuse Physical -Exposure to Muscle Strain. arrangemen allowed must wear
resistance heat t of tools, to during the required PPE's by
- Fall on same avoid falling, testing. MSPECTRUM
Electrical level. trip. Ensure to /PMFTC all
- Electrocution Put throughout the
Barricades course of this
Mechanical during scope as
execution indicated here
of testing
9 A03 (Metering Panel) Ergonomics -Slip, Trip, Fall. Body/Physical Injury Maintain Only All ABB personnel
- Caught in clear access authorized and its
between. and good personnel subcontractors
· PT Physical -Exposure to Muscle Strain. arrangemen allowed must wear
o Measure heat t of tools, to during the required PPE's by
- Fall on same avoid falling, testing. MSPECTRUM
insulation Electrical level. trip. Ensure to /PMFTC all
resistance of - Electrocution Put throughout the
PT Barricades course of this
Mechanical during scope as
o Measure execution indicated here
winding of testing
resistance
o Measure turns
ratio
10 AO4 (V Panel) Ergonomics -Slip, Trip, Fall. Body/Physical Injury Maintain Only All ABB personnel
- Caught in clear access authorized and its
between. and good personnel subcontractors
Circuit breaker Physical -Exposure to Muscle Strain. arrangemen allowed must wear
Open position heat t of tools, to during the required PPE's by
- Fall on same avoid falling, testing. MSPECTRUM
· Measure insulation Electrical level. trip. Ensure to /PMFTC all
resistance of each - Electrocution Put throughout the
pole with respect to Barricades course of this
Mechanical
during scope as
ground execution indicated here
· Measure insulation of testing
resistance of each
pole (line side) with
respect to other pole
( bus side )
11 Close Position Ergonomics -Slip, Trip, Fall. Body/Physical Injury Maintain Only All ABB personnel
- Caught in clear access authorized and its
· Measure insulation between. and good personnel subcontractors
resistance of each Physical -Exposure to Muscle Strain. arrangemen allowed must wear
pole with respect to heat t of tools, to during the required PPE's by
- Fall on same avoid falling, testing. MSPECTRUM
ground Electrical level. trip. Ensure to /PMFTC all
o A- G, B-G, C-G - Electrocution Put throughout the
Barricades course of this
· Measure insulation Mechanical during scope as
resistance of each execution indicated here
pole with respect to of testing
other pole
o A- A’ B-B’, C-C’
· Measure contact
resistance
12 Arrester Ergonomics -Slip, Trip, Fall. Maintain Only All ABB personnel
- Caught in Body/Physical Injury clear access authorized and its
· Measure insulation between. and good personnel subcontractors
resistance Physical -Exposure to arrangemen allowed must wear
heat Muscle Strain. t of tools, to during the required PPE's by
testing. MSPECTRUM
Electrical - Fall on same avoid falling, Ensure to /PMFTC all
level. trip. Put throughout the
- Electrocution Barricades course of this
Mechanical during scope as
execution indicated here
of testing
13 Relay Ergonomics -Slip, Trip, Fall. Maintain Only All ABB personnel
- Caught in Body/Physical Injury clear access authorized and its
· Input relay final between. and good personnel subcontractors
settings Physical -Exposure to arrangemen allowed must wear
heat Muscle Strain. t of tools, to during the required PPE's by
· Perform secondary
- Fall on same avoid falling, testing. MSPECTRUM
current injection to Electrical level. trip. Ensure to /PMFTC all
verify relay - Electrocution Put throughout the
Barricades course of this
functionality. Mechanical
during scope as
· Perform actual execution indicated here
tripping of breaker of testing
thru relay.
· Relay will be tested
based on its final
relay settings c/o
MSPECTRUM.
TRANSFORMER
14 · Measure following Ergonomics -Slip, Trip, Fall. Maintain Only All ABB personnel
resistance - Caught in Body/Physical Injury clear access authorized and its
between. and good personnel subcontractors
o Primary Physical -Exposure to arrangemen allowed must wear
winding to heat Muscle Strain. t of tools, to during the required PPE's by
ground - Fall on same avoid falling, testing. MSPECTRUM
Electrical level. trip. Ensure to /PMFTC all
o Secondary - Electrocution Put throughout the
winding to Barricades course of this
Mechanical during scope as
ground
o Primary execution indicated here
of testing
winding to
secondary
winding
o Measure
Polarization
Index
· Measure primary
winding resistance
o A-B, B-C, C-A
· Measure secondary
winding resistance
o A-n, b-n, c-n
· Measure transformer
ratio
XLPE
15 · Measure insulation Ergonomics -Slip, Trip, Fall. Maintain Only All ABB personnel
- Caught in Body/Physical Injury clear access authorized and its
resistance between. and good personnel subcontractors
Physical -Exposure to arrangemen allowed must wear
heat Muscle Strain. t of tools, to during the required PPE's by
- Fall on same avoid falling, testing. MSPECTRUM
Electrical level. trip. Ensure to /PMFTC all
- Electrocution Put throughout the
Barricades course of this
Mechanical
during scope as
execution indicated here
of testing
16 Housekeeping. Strike Against/ Awareness All ABB personnel and
struck by Body/Physical Injury on workplace its subcontractors must
against moving wear required PPE’s by
or stationary MSPECTRUM /PMFTC all
objects throughout the course
of this scope as
indicated here.