T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 10 of 187
1.0 SCOPE
This procedure covers the Pre commissioning Test for current Transformers and the test
report format covers CT’s which is having 5 cores on its secondary.
2.0 PURPOSE
This procedure is prepared to carry out various pre- commissioning tests to be conducted in
systematic manner for Current Transformers to ensure the healthiness of the equipment.
3.0 PRE-REQUISITES
SYSTEM REQUIREMENTS
1. Relevant Drawings and layouts.
2. 415 V AC, 3 Ph power supply is available for Testing.
3. All Cables pertaining to current transformers were laid & terminated.
4. Make sure that the equipment erected is as per approved drawings & Layouts.
5. Check the Name Plate & Rating Plate Of the equipment Erected.
Equipment Required:
The major equipment required for performing IR measurement test are,
i) 0-10kV Meggar.
ii) Test Leads.
Test Procedure:
The above test to be conducted at following points,
a) Primary to Earth
b) Primary to Secondary
c) Secondary to Earth
d) Between Secondary Cores
a. Primary to earth
1) Connect the line terminal of the Meggar(5000V) to either P1 (or) P2 of the Current
Transformers
2) Connect the Earth terminal of the Meggar to the earth stud provided at the equipment
3) Switch on the Meggar
4) Take down the readings (It should be in Mega Ohms).
b. Primary to Secondary
1) Connect the line terminal of the Meggar(5000V) to either P1 (or) P2 of the Current
transformers
2) Connect the Earth terminal of the Meggar to the S1 (or) S2 of the Current transformers
3) Switch on the Meggar
c. Secondary to Earth
1) Connect the line terminal of the Meggar(500V) to either S1 (or) S2 of the Current
transformers
2) Connect the Earth terminal of the Meggar to the earth stud provided at the equipment
3) Switch on the Meggar.
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 15 of 187
Aim:
To check for the correct sequence of polarity on the primary and secondary side of the
current transformer. (for eg., When P1 is positive w.r.t. P2, then S1 also must be positive w.r.t S2,
according to the scheme requirement).
Equipments Required:
The equipments required for polarity tests are as follows,
i) Battery of suitable rating or Polarity tester.
ii) Analog Multimeter / Galvanometer.
iii) Connecting leads.
Test Procedure:
ANNEXURE – I
DATA OF EQUIPMENT (Rating Plate)
Make :
Type: :
Winding I
Winding II
Winding III
Winding IV
Winding V
ANNEXURE – II
Post Installation check list
S. No. Description Status Remarks, Record
Yes No discrepancies, if any
1. Equipment is cleaned and free from dust /
dirt, foreign materials etc.
2. Equipment is free from all visible defects on
physical inspection
3. Check CT tank has been provided with
double earthing
4. Check that CT junction box is earthed
5. All nuts and bolts are tightened correctly as
per specified torque
6. Check tightness of terminal connector
7. All fitting as per out line general
arrangement drawing
8. Levelling and alignment of structure and
base frame checked
9. Erection completion certificate along with
list of outstanding activities reviewed
10. Any paint removed / scratched in transit has
been touched up
11. Check primary polarity of CT erected as per
relevant drawing
12. Check hermetically sealing is intact
13. Check the oil level and leakage through any
joint / secondary terminals
14. Check oil drain valve is properly closed and
locked
15. Check oil level, nitrogen pressure and oil
sampling
16. Oil level in top chamber gauge glass
17. Check nitrogen pressure at Schrader valve
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 23 of 187
ANNEXURE – III
Insulation Resistance Measurement test
Core Phase
Primary – Core – I
MΩ
Primary – Core – II
MΩ
Primary – Core – IV
MΩ
Primary – Core – V
Primary – Earth
ANNEXURE – IV
Insulation Resistance Measurement test
Secondary to Earth
Permissible value for 1kV is 1Mohm.
Phase
Core
R- Phase Y- Phase B-Phase
ANNEXURE – V
Insulation Resistance Measurement test
Between Secondary Cores
Permissible value for 400 kV > 400 M Ω and for 220 kV > 220 M Ω
Core Phase
R- Phase Y- Phase B-Phase
Core I- Core II
Core I – Core III
Core I – Core IV
Core I – Core V
Core II – Core III
Core II – Core IV
Core II – Core V
Core III – Core IV
Core III – Core IV
Core IV – Core V
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 26 of 187
ANNEXURE – VI
Continuity Test
Core Between Phase
Terminal R- Phase Y- Phase B-Phase
1S1 – 1S2
Core I
1S1 – 1S3
1S1 – 1S4
2S1 – 2S2
Core II
2S1 – 2S3
2S1 – 2S4
3S1 – 3S2
Core III
3S1 – 3S3
3S1 – 3S4
4S1 – 4S2
Core IV
4S1 – 4S3
4S1 – 4S4
5S1 – 5S2
Core V
5S1 – 5S3
5S1 – 5S4
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 27 of 187
ANNEXURE – VII
Secondary Winding Resistance Test
Secondary winding resistance (In Ohms):
1S1 – 1S2
Core I
1S1 – 1S3
1S1 – 1S4
2S1 – 2S2
Core II
2S1 – 2S3
2S1 – 2S4
3S1 – 3S2
Core III
3S1 – 3S3
3S1 – 3S4
4S1 – 4S2
Core IV
4S1 – 4S3
4S1 – 4S4
5S1 – 5S2
Core V
5S1 – 5S3
5S1 – 5S4
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 28 of 187
ANNEXURE – VIII
Polarity Test
Polarity Test: (With 1.5 Volt DC supply)
Connect + ve at P1 and –ve at P2
Core Between Phase
R-Phase Y-Phase B-Phase
ANNEXURE – IX
Tan Delta & Capacitance Test
A.
5 kV
10 kV
B.
Remarks
Voltage Tan Delta (Measured Value)
Y-Phase B-Phase
R -Phase
Site Factory Site Factory Site Factory
5 kV
10 kV
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 30 of 187
ANNEXURE – X
Primary Injection Test
CORE PRIMARY CURRENT SECONDARY THEORETICAL ACTUAL % OF
S1 - S2 % ACTUAL CURRENT RATIO RATIO ERROR
CORE I 20%
60%
80%
CORE II 20%
60%
80%
60%
80%
CORE IV 20%
60%
80%
CORE V 20%
60%
80%
CORE I 20%
60%
80%
CORE II 20%
60%
80%
60%
80%
CORE IV 20%
60%
80%
CORE V 20%
60%
80%
CORE I 20%
(1S1-1S4) 40%
60%
80%
CORE II 20%
60%
80%
60%
80%
CORE IV 20%
60%
80%
CORE V 20%
60%
80%
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 32 of 187
ANNEXURE – XI
Magnetizing Current Characteristic (Knee Point Voltage) Test
R – Phase
Voltage Current Measurement
To be applied Actual Value Core - I Core II Core IV Core V
1S1 – 1S2 2S1 – 2S2 4S1 – 4S2 5S1 – 5S2
0.25 X KVp
0.50 X KVp
0.75 X KVp
1.00 X KVp
1.10 X KVp
Y- Phase
Voltage Current Measurement
To be applied Actual Value Core - I Core II Core IV Core V
1S1 – 1S2 2S1 – 2S2 4S1 – 4S2 5S1 – 5S2
0.25 X KVp
0.50 X KVp
0.75 X KVp
1.00 X KVp
1.10 X KVp
B-Phase
Voltage Current Measurement
To be applied Actual Value Core - I Core II Core IV Core V
1S1 – 1S2 2S1 – 2S2 4S1 – 4S2 5S1 – 5S2
0.25 X KVp
0.50 X KVp
0.75 X KVp
1.00 X KVp
1.10 X KVp
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 33 of 187
ANNEXURE – XII
Contact Resistance Measurement (For Connectors) Test
ANNEXURE – XIII
Secondary Injection Test
1S1 – 1S2
Core I
1S1 – 1S3
1S1 – 1S4
2S1 – 2S2
Core II
2S1 – 2S3
2S1 – 2S4
3S1 – 3S2
Core III
3S1 – 3S3
3S1 – 3S4
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 34 of 187
4S1 – 4S2
Core IV
4S1 – 4S3
4S1 – 4S4
5S1 – 5S2
Core V
5S1 – 5S3
5S1 – 5S4
ANNEXURE – XIV
Calibration Status Table
TEST INSTRUMENT DETAILS:
Sr no Instrument description Range Calibration status