Controlling Planned Items ASCP
Controlling Planned Items ASCP
There are three interdependent ways of controlling which items are planned in and which are
excluded from an ASCP plan:
1. Setting the Planning Method item attribute in conjunction with selecting the Plan Type in
the Supply Chain Plan Names form
o The Planning Method item attribute can be set to:
Not planned
MPS planning
MRP planning
MRP/MPP Planned
MPS/MPP Planned
MPP Planned
o Plan Type can be set to:
Manufacturing Plan
Production Plan
Master Plan
2. Setting critical items in conjunction with setting the Include Critical Components flag in
ASCP plan options
The following tables shows the items planned based on the Planned Items Plan Option, Plan
Type, Planning Method Item Attribute, Include Critical Component Plan Option, Critical
Component Item Attribute, and Include Sales Order Plan Option:
All Planned Master Plan Checked 1. Items with Planning Method of MPP
Items Planned, MPS/MPP Planned, or
MRP/MPP Planned.
2. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill.
3. All items sandwiched between 1 and
2.
4. All critical items.
5. Any assembly that has a critical item
anywhere in its supply chain bill.
6. All items sandwiched between 4 and
5.
Demand & Master Plan Unchecked 1. Items with Planning Method of MPP
Supply Planned, MPS/MPP Planned, or
schedule items MRP/MPP Planned contained within
demand or supply schedules that are
specified as input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand or
supply schedules.
4. All items sandwiched between 1 and
3.
Demand & Master Plan Checked 1. Items with Planning Method of MPP
Supply Planned, MPS/MPP Planned, or
schedule items MRP/MPP Planned contained within
demand or supply schedules that are
specified as input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand or
supply schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
3.
Consider items A and B with the following bills of materials and demands at organizations M1
and M2:
In the Organizations tab of the Plan Options form, the Include Sales Order flag is set as follows
for M1 and M2:
Organization Include Sales Order
M1 Yes
M2 No
Item A has demand schedules and sales orders for both organizations M1 and M2. Item B has
only sales orders in organizations M1 and M2.
The following table shows what items are planned in a Manufacturing Plan. It references some
scenarios.
Scenario 1 - Demand schedule items only and Include Critical Component is not checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. All
components of item A (A1, A2, A3, A4) are also planned in both organizations. Item B with only
sales orders in organizations M1 and M2 is not planned.
Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.
Scenario 2 - Demand schedule items only and Include Critical Component is checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. Only
critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. Item B with only sales orders in organizations M1 and M2 is not planned.
Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.
Scenario 3 - Demand schedule items and all sales orders and Include Critical Component is
not checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. All
components of item A (A1, A2, A3, A4) are also planned in both organizations. In addition item
B with sales orders in organizations M1 and M2 is planned. All components of item B (A1, A2,
A3, A4) are also planned in both organizations.
Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.
Scenario 4 - Demand schedule items and all sales orders and Include Critical Component is
checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. Only
critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. In addition item B with sales orders in organizations M1 and M2 is planned. Only
critical component of item B (B3) and sandwiched item B2 are planned in both organizations.
Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.
Item Organization Planned Items Planned Items Planned Items Planned Items
with Demand with Demand with Demand with Demand
schedule items schedule items schedule items schedule items
only and only and and all sales and all sales
Include Critical Include Critical orders and orders and
Component Component Set Include Critical Include Critical
Option Set to to Yes Component Set Component Set
No (Scenario 1) (Scenario 2) to No (Scenario to Yes (Scenario
3) 4)
A M1 Yes Yes Yes Yes
A1 M1 Yes Yes Yes Yes
A2 M1 Yes Yes Yes Yes
A3 M1 Yes Yes Yes Yes
A4 M1 Yes No Yes No
B M1 No No Yes Yes
B1 M1 No No Yes No
B2 M1 No No Yes Yes
B3 M1 No No Yes Yes
B4 M1 No No Yes No
A M2 Yes Yes Yes Yes
A1 M2 Yes Yes Yes Yes
A2 M2 Yes Yes Yes Yes
A3 M2 Yes Yes Yes Yes
A4 M2 Yes No Yes No
B M2 No No Yes Yes
B1 M2 No No Yes No
B2 M2 No No Yes Yes
B3 M2 No No Yes Yes
B4 M2 No No Yes No
This table shows what items are planned in a Production Plan assuming items A and B are MPS
Planning (or MPS/MPP Planned) items and their components are not MPS Planning (or
MPS/MPP Planned) items. It references some scenarios.
Scenario 1 - Demand schedule items only and Include Critical Component is not checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. Item B
with only sales orders in organizations M1 and M2 is not planned.
Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.
Scenario 2 - Demand schedule items only and Include Critical Component is checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. In addition
all critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. Item B with only sales orders in organizations M1 and M2 is not planned.
Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.
Scenario 3 - Demand schedule items and all sales orders and Include Critical Component is
not checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. In addition
item B with sales orders in organizations M1 and M2 is planned.
Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.
Scenario 4 - Demand schedule items and all sales orders and Include Critical Component is
checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. In addition
all critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. Item B with sales orders in organizations M1 and M2 is also planned. In addition
critical component of item B (B3) and sandwiched item B2 are planned in both organizations.
Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.
Item Organization Planned Items Planned Items Planned Items Planned Items
with Demand with Demand with Demand with Demand
schedule items schedule items schedule items schedule items
only and only and and all sales and all sales
Include Critical Include Critical orders and orders and
Component Component Set Include Critical Include Critical
Option Set to to Yes Component Set Component Set
No (Scenario 1) (Scenario 2) to No (Scenario to Yes (Scenario
3) 4)
A M1 Yes Yes Yes Yes
A1 M1 No Yes No Yes
A2 M1 No Yes No Yes
A3 M1 No Yes No Yes
A4 M1 No No No No
B M1 No No Yes Yes
B1 M1 No No No No
B2 M1 No No No Yes
B3 M1 No No No Yes
B4 M1 No No No No
A M2 Yes Yes Yes Yes
A1 M2 No Yes No Yes
A2 M2 No Yes No Yes
A3 M2 No Yes No Yes
A4 M2 No No No No
B M2 No No Yes Yes
B1 M2 No No No No
B2 M2 No No No Yes
B3 M2 No No No Yes
B4 M2 No No No No