There are three main ways to control which items are planned in an ASCP plan: 1) Setting the planning method item attribute and plan type, 2) Designating items as critical and including critical components in the plan, and 3) Setting the planned items plan option along with the include sales order flag. The planned items will vary depending on combinations of these settings, such as planning all items for a manufacturing plan but only demand schedule items and their components if the planned items option is set to demand schedule items only.

Uploaded by

Avinash Routray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views34 pages

Controlling Planned Items ASCP

There are three main ways to control which items are planned in an ASCP plan: 1) Setting the planning method item attribute and plan type, 2) Designating items as critical and including critical components in the plan, and 3) Setting the planned items plan option along with the include sales order flag. The planned items will vary depending on combinations of these settings, such as planning all items for a manufacturing plan but only demand schedule items and their components if the planned items option is set to demand schedule items only.

Uploaded by

Avinash Routray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 34

Controlling Planned Items

There are three interdependent ways of controlling which items are planned in and which are
excluded from an ASCP plan:

1. Setting the Planning Method item attribute in conjunction with selecting the Plan Type in
the Supply Chain Plan Names form
o The Planning Method item attribute can be set to:
 Not planned
 MPS planning
 MRP planning
 MRP/MPP Planned
 MPS/MPP Planned
 MPP Planned
o Plan Type can be set to:
 Manufacturing Plan
 Production Plan
 Master Plan
2. Setting critical items in conjunction with setting the Include Critical Components flag in
ASCP plan options

An item can be set to be critical in two ways:

o Explicitly, by checking its Critical Component item attribute


o Implicitly, by having a routing (primary or alternate) that includes a resource in
the ASCP plan's bottleneck resource group
3. Setting the value for the Planned Items plan option, along with setting the organization-
level Include Sales Order flag in the Organizations tab of the Plan Options form. Valid
values for the Planned Items plan option are:
o All planned items
o Demand schedule items only
o Supply schedule items only
o Demand & Supply schedule items
o Demand schedule and WIP components
o Demand schedule items and all sales orders
o Demand schedule items/WIP components/all sales orders

The following tables shows the items planned based on the Planned Items Plan Option, Plan
Type, Planning Method Item Attribute, Include Critical Component Plan Option, Critical
Component Item Attribute, and Include Sales Order Plan Option:

Planned Items Plan Type Include Planned Items


Plan Option Critical
Components
Plan Option
All Planned Manufacturing Unchecked All items in the planned organizations except
Items Plan ones having MRP planning code of Not
Planned.
All Planned Manufacturing Checked 1. All critical items.
Items Plan 2. Any assembly that has a critical item
anywhere in its supply chain bill.
3. All items sandwiched between 1 and
2.

Note: If the primary component is critical


then ASCP also selects the non-critical
substitute components.

If the primary component is not critical then


ASCP does not select the substitute
components even if these substitutes are
critical.

This behavior is applicable for all variations


of Plan Type and Planned Items plan option.
All Planned Production Unchecked 1. Items with Planning Method of MPS
Items Plan Planning or MPS/MPP Planned.
2. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill.
3. All items sandwiched between 1 and
2.

All Planned Production Checked 1. Items with Planning Method of MPS


Items Plan Planning or MPS/MPP Planned.
2. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill
3. All items sandwiched between 1 and
2.
4. All critical items.
5. Any assembly that has a critical item
anywhere in its supply chain bill.
6. All items sandwiched between 4 and
5.
All Planned Master Plan Unchecked 1. Items with Planning Method of MPP
Items Planned, MPS/MPP Planned, or
MRP/MPP Planned.
2. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill.
3. All items sandwiched between 1 and
2.

All Planned Master Plan Checked 1. Items with Planning Method of MPP
Items Planned, MPS/MPP Planned, or
MRP/MPP Planned.
2. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill.
3. All items sandwiched between 1 and
2.
4. All critical items.
5. Any assembly that has a critical item
anywhere in its supply chain bill.
6. All items sandwiched between 4 and
5.

Demand Manufacturing Unchecked 1. All items contained within demand


schedule items Plan schedules that are specified as input
only to the plan (Forecast, MDS, DP
Scenario).
2. All components and subcomponents
of 1.

Note: In this option (Demand schedule items


only) ASCP does not include sales orders for
those item/organizations that are not in the
demand schedule even if the Include Sales
Order checkbox is checked for the related
organizations.
Demand Manufacturing Checked 1. All items contained within demand
schedule items Plan schedules that are specified as input
only to the plan (Forecast, MDS, DP
Scenario).
2. Only critical components and
subcomponents of 1.
3. All items sandwiched between 1 and
2.

Demand Production Unchecked 1. Items with Planning Method of MPS


schedule items Plan Planning or MPS/MPP Planned
only contained within demand schedules
that are specified as input to the plan
(Forecast, MDS, DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within demand schedules.
4. All items sandwiched between 1 and
3.

Demand Production Checked 1. Items with Planning Method of MPS


schedule items Plan Planning or MPS/MPP Planned
only contained within demand schedules
that are specified as input to the plan
(Forecast, MDS, DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within demand schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5

Demand Master Plan Unchecked 1. Items with Planning Method of MPP


schedule items Planned, MPS/MPP Planned, or
only MRP/MPP Planned contained within
demand schedules that are specified
as input to the plan (Forecast, MDS,
DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand
schedules.
4. All items sandwiched between 1 and
3.

Demand Master Plan Checked 1. Items with Planning Method of MPP


schedule items Planned, MPS/MPP Planned, or
only MRP/MPP Planned contained within
demand schedules that are specified
as input to the plan (Forecast, MDS,
DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand
schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5.

Supply Manufacturing Unchecked 1. All items contained within supply


schedule items Plan schedules that are specified as input
only to the plan.
2. All components and subcomponents
of 1.

Note: In this option (Supply schedule items


only) ASCP does not include sales orders for
those item/organizations that are not in the
supply schedule even if the Include Sales
Order checkbox is checked for the related
organizations.
Supply Manufacturing Checked 1. All items contained within supply
schedule items Plan schedules that are specified as input
only to the plan.
2. Only critical components and
subcomponents of 1.
3. All items sandwiched between 1 and
2.

Supply Production Unchecked 1. Items with Planning Method of MPS


schedule items Plan Planning or MPS/MPP Planned
only contained within supply schedules
that are specified as input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within supply schedules.
4. All items sandwiched between 1 and
3.

Supply Production Checked 1. Items with Planning Method of MPS


schedule items Plan Planning or MPS/MPP Planned
only contained within supply schedules
that are specified as input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within supply schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5.
Supply Master Plan Unchecked 1. Items with Planning Method of MPP
schedule items Planned, MPS/MPP Planned, or
only MRP/MPP Planned contained within
supply schedules that are specified as
input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within supply
schedules.
4. All items sandwiched between 1 and
3.

Supply Master Plan Checked 1. Items with Planning Method of MPP


schedule items Planned, MPS/MPP Planned, or
only MRP/MPP Planned contained within
supply schedules that are specified as
input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within supply
schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5.

Demand & Manufacturing Unchecked 1. All items contained within demand or


Supply Plan supply schedules that are specified as
schedule items input to the plan.
2. All components and subcomponents
of 1.
Note: In this option (Demand & Supply
schedule items) ASCP does not include sales
orders for those item/organizations that are
not in the demand or supply schedules even
if the Include Sales Order checkbox is
checked for the related organizations.
Demand & Manufacturing Checked 1. All items contained within demand or
Supply Plan supply schedules that are specified as
schedule items input to the plan.
2. Only critical components and
subcomponents of 1.
3. All items sandwiched between 1 and
2.

Demand & Production Unchecked 1. Items with Planning Method of MPS


Supply Plan Planning or MPS/MPP Planned
schedule items contained within demand or supply
schedules that are specified as input
to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within demand or supply schedules.
4. All items sandwiched between 1 and
3.

Demand & Production Checked 1. Items with Planning Method of MPS


Supply Plan Planning or MPS/MPP Planned
schedule items contained within demand or supply
schedules that are specified as input
to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within demand or supply schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5.

Demand & Master Plan Unchecked 1. Items with Planning Method of MPP
Supply Planned, MPS/MPP Planned, or
schedule items MRP/MPP Planned contained within
demand or supply schedules that are
specified as input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand or
supply schedules.
4. All items sandwiched between 1 and
3.

Demand & Master Plan Checked 1. Items with Planning Method of MPP
Supply Planned, MPS/MPP Planned, or
schedule items MRP/MPP Planned contained within
demand or supply schedules that are
specified as input to the plan.
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand or
supply schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
3.

Demand Manufacturing Unchecked 1. All items contained within demand


schedule and Plan schedules that are specified as input
WIP to the plan (Forecast, MDS, DP
Components Scenario).
2. All components and subcomponents
of 1.
3. All WIP components used in existing
work orders (discrete job, lot-based
job, process batch).

Note: In this option (Demand schedule and


WIP Components) ASCP does not include
sales orders for those item/organizations that
are not in the demand schedule even if the
Include Sales Order checkbox is checked for
the related organizations.
Demand Manufacturing Checked 1. All items contained within demand
schedule and Plan schedules that are specified as input
WIP to the plan (Forecast, MDS, DP
Components Scenario).
2. Only critical components and
subcomponents of 1.
3. All items sandwiched between 1 and
2.
4. All critical WIP components used in
existing work orders (discrete job,
lot-based job, process batch) .

Demand Production Unchecked 1. Items with Planning Method of MPS


schedule and Plan Planning or MPS/MPP Planned
WIP contained within demand schedules
Components that are specified as input to the plan
(Forecast, MDS, DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within demand schedules.
4. All items sandwiched between 1 and
3.
5. All WIP components with Planning
Method of MPS Planning or
MPS/MPP Planned used in existing
work orders (discrete job, lot-based
job, process batch).

Demand Production Checked 1. Items with Planning Method of MPS


schedule and Plan Planning or MPS/MPP Planned
WIP contained within demand schedules
Components that are specified as input to the plan
(Forecast, MDS, DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPS
Planning or MPS/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPS Planning or
MPS/MPP Planned anywhere in its
supply chain bill and contained
within demand schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5.
7. All critical WIP components with
Planning Method of MPS Planning or
MPS/MPP Planned used in existing
work orders (discrete job, lot-based
job, process batch).

Demand Master Plan Unchecked 1. Items with Planning Method of MPP


schedule and Planned, MPS/MPP Planned, or
WIP MRP/MPP Planned contained within
Components demand schedules that are specified
as input to the plan (Forecast, MDS,
DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand
schedules.
4. All items sandwiched between 1 and
3.
5. All WIP components with Planning
Method of MPP Planned, MPS/MPP
Planned, or MRP/MPP Planned used
in existing work orders (discrete job,
lot-based job, process batch).

Demand Master Plan Checked 1. Items with Planning Method of MPP


schedule and Planned, MPS/MPP Planned, or
WIP MRP/MPP Planned contained within
Components demand schedules that are specified
as input to the plan (Forecast, MDS,
DP Scenario).
2. All components and subcomponents
of 1 with Planning Method of MPP
Planned, MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has an item with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned anywhere in its supply chain
bill and contained within demand
schedules.
4. All items sandwiched between 1 and
3.
5. All critical components of 1.
6. All items sandwiched between 1 and
5.
7. All critical WIP components with
Planning Method of MPP Planned,
MPS/MPP Planned, or MRP/MPP
Planned used in existing work orders
(discrete job, lot-based job, process
batch).

Planned Plan Type Include Include Sales Planned Items


Items Plan Critical Order Plan
Option Components Option
Plan Option (organization
specific)
Demand Manufacturing Unchecked Unchecked 1. All items contained
schedule Plan within demand
items and all schedules that are
sales orders specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with sales
orders.
3. All components and
subcomponents of 1
and 2.

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Manufacturing Unchecked Checked 1. All items contained
schedule Plan within demand
items and all schedules that are
sales orders specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with sales
orders.
3. All components and
subcomponents of 1
and 2.

Note: Sales order demands are


planned.
Demand Manufacturing Checked Unchecked 1. All items contained
schedule Plan within demand
items and all schedules that are
sales orders specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with sales
orders.
3. Only critical
components and
subcomponents of 1
and 2.
4. All items sandwiched
between 1 and 3 as
well as 2 and 3.

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Manufacturing Checked Checked 1. All items contained
schedule Plan within demand
schedules that are
items and all specified as input to
sales orders the plan (Forecast,
MDS, DP Scenario).
2. All items with sales
orders.
3. Only critical
components and
subcomponents of 1
and 2.
4. All items sandwiched
between 1 and 3 as
well as 2 and 3.

Note: Sales order demands are


planned.
Demand Production Unchecked Unchecked 1. Items with Planning
schedule Plan Method of MPS
items and all Planning or MPS/MPP
sales orders Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPS Planning or
MPS/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Production Unchecked Checked 1. Items with Planning
schedule Plan Method of MPS
items and all Planning or MPS/MPP
sales orders Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPS Planning or
MPS/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.

Note: Sales order demands are


planned.
Demand Production Checked Unchecked 1. Items with Planning
schedule Plan Method of MPS
items and all Planning or MPS/MPP
sales orders Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPS Planning or
MPS/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.
5. All critical components
of 1.
6. All items sandwiched
between 1 and 5.

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Production Checked Checked 1. Items with Planning
schedule Plan Method of MPS
items and all Planning or MPS/MPP
sales orders Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPS Planning or
MPS/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.
5. All critical components
of 1.
6. All items sandwiched
between 1 and 5.

Note: Sales order demands are


planned.
Demand Master Plan Unchecked Unchecked 1. Items with Planning
schedule Method of MPP
items and all Planned, MPS/MPP
sales orders Planned, or MRP/MPP
Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Master Plan Unchecked Checked 1. Items with Planning
schedule Method of MPP
items and all Planned, MPS/MPP
sales orders Planned, or MRP/MPP
Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.

Note: Sales order demands are


planned.
Demand Master Plan Checked Unchecked 1. Items with Planning
schedule Method of MPP
items and all Planned, MPS/MPP
sales orders Planned, or MRP/MPP
Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.
5. All critical components
of 1.
6. All items sandwiched
between 1 and 5.
Note: Sales order demands are
ignored and not seen in the
plan.
Demand Master Plan Checked Checked 1. Items with Planning
schedule Method of MPP
items and all Planned, MPS/MPP
sales orders Planned, or MRP/MPP
Planned contained
within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All components and
subcomponents of 1
with Planning Method
of MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned.
3. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
4. All items sandwiched
between 1 and 3.
5. All critical components
of 1.
6. All items sandwiched
between 1 and 5.

Note: Sales order demands are


planned.
Demand Manufacturing Unchecked Unchecked 1. All items contained
schedule Plan within demand
items / WIP schedules that are
components / specified as input to
all sales the plan (Forecast,
orders MDS, DP Scenario).
2. All items with sales
orders.
3. All components and
subcomponents of 1
and 2.
4. All WIP components
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Manufacturing Unchecked Checked 1. All items contained
schedule Plan within demand
items / WIP schedules that are
components / specified as input to
all sales the plan (Forecast,
orders MDS, DP Scenario).
2. All items with sales
orders.
3. All components and
subcomponents of 1
and 2.
4. All WIP components
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


planned.
Demand Manufacturing Checked Unchecked 1. All items contained
schedule Plan within demand
items / WIP schedules that are
components / specified as input to
all sales the plan (Forecast,
orders MDS, DP Scenario).
2. All items with sales
orders.
3. Only critical
components and
subcomponents of 1
and 2.
4. All items sandwiched
between 1 and 3 as
well as 2 and 3.
5. All critical WIP
components used in
existing work orders
(discrete job, lot-based
job, process batch).

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Manufacturing Checked Checked 1. All items contained
schedule Plan within demand
items / WIP schedules that are
components / specified as input to
all sales the plan (Forecast,
orders MDS, DP Scenario).
2. All items with sales
orders.
3. Only critical
components and
subcomponents of 1
and 2.
4. All items sandwiched
between 1 and 3 as
well as 2 and 3.
5. All critical WIP
components used in
existing work orders
(discrete job, lot-based
job, process batch).

Note: Sales order demands are


planned.
Demand Production Unchecked Unchecked 1. Items with Planning
schedule Plan Method of MPS
items / WIP Planning or MPS/MPP
components / Planned contained
all sales within demand
orders schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPS Planning or
MPS/MPP Planned
and with sales orders.
3. All components and
subcomponents of 1
and 2 with Planning
Method of MPS
Planning or MPS/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All WIP components
with Planning Method
of MPS Planning or
MPS/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch)

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Production Unchecked Checked 1. Items with Planning
schedule Plan Method of MPS
items / WIP Planning or MPS/MPP
components / Planned contained
all sales within demand
orders schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPS Planning or
MPS/MPP Planned
and with sales orders.
3. All components and
subcomponents of 1
and 2 with Planning
Method of MPS
Planning or MPS/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All WIP components
with Planning Method
of MPS Planning or
MPS/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


planned.
Demand Production Checked Unchecked 1. Items with Planning
schedule Plan Method of MPS
items / WIP Planning or MPS/MPP
components / Planned contained
all sales within demand
orders schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPS Planning or
MPS/MPP Planned
and with sales orders.
3. All components and
subcomponents of and
2 with Planning
Method of MPS
Planning or MPS/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All critical components
of 1.
8. All items sandwiched
between 1 and 7.
9. All critical WIP
components with
Planning Method of
MPS Planning or
MPS/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Production Checked Checked 1. Items with Planning
schedule Plan Method of MPS
items / WIP Planning or MPS/MPP
components / Planned contained
all sales within demand
orders schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPS Planning or
MPS/MPP Planned
and with sales orders.
3. All components and
subcomponents of and
2 with Planning
Method of MPS
Planning or MPS/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPS
Planning or MPS/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All critical components
of 1.
8. All items sandwiched
between 1 and 7.
9. All critical WIP
components with
Planning Method of
MPS Planning or
MPS/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


planned.
Demand Master Plan Unchecked Unchecked 1. Items with Planning
schedule Method of MPP
items / WIP Planned, MPS/MPP
components / Planned, or MRP/MPP
all sales Planned contained
orders within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
and with sales orders.
3. All components and
subcomponents of 1
and 2 with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All WIP components
with Planning Method
of MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Master Plan Unchecked Checked 1. Items with Planning
schedule Method of MPP
items / WIP Planned, MPS/MPP
components / Planned, or MRP/MPP
all sales Planned contained
orders within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
and with sales orders.
3. All components and
subcomponents of 1
and 2 with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between a and d as
well as 2 and 4.
7. All WIP components
with Planning Method
of MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


planned.
Demand Master Plan Checked Unchecked 1. Items with Planning
schedule Method of MPP
items / WIP Planned, MPS/MPP
components / Planned, or MRP/MPP
all sales Planned contained
orders within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
and with sales orders.
3. All components and
subcomponents of 1
and 2 with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All critical components
of 1.
8. All items sandwiched
between 1 and 7.
9. All critical WIP
components with
Planning Method of
MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch) .

Note: Sales order demands are


ignored and not seen in the
plan.
Demand Master Plan Checked Checked 1. Items with Planning
schedule Method of MPP
items / WIP Planned, MPS/MPP
components / Planned, or MRP/MPP
all sales Planned contained
orders within demand
schedules that are
specified as input to
the plan (Forecast,
MDS, DP Scenario).
2. All items with
Planning Method of
MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
and with sales orders.
3. All components and
subcomponents of 1
and 2 with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned.
4. Any assembly that has
an item with Planning
Method of MPP
Planned, MPS/MPP
Planned, or MRP/MPP
Planned anywhere in
its supply chain bill
and contained within
demand schedules.
5. All items sandwiched
between 1 and 3 as
well as 2 and 3.
6. All items sandwiched
between 1 and 4 as
well as 2 and 4.
7. All critical components
of 1.
8. All items sandwiched
between 1 and 7.
9. All critical WIP
components with
Planning Method of
MPP Planned,
MPS/MPP Planned, or
MRP/MPP Planned
used in existing work
orders (discrete job,
lot-based job, process
batch).

Note: Sales order demands are


planned.

Consider items A and B with the following bills of materials and demands at organizations M1
and M2:

In the Organizations tab of the Plan Options form, the Include Sales Order flag is set as follows
for M1 and M2:
Organization Include Sales Order
M1 Yes
M2 No

Item A has demand schedules and sales orders for both organizations M1 and M2. Item B has
only sales orders in organizations M1 and M2.

The following table shows what items are planned in a Manufacturing Plan. It references some
scenarios.

Scenario 1 - Demand schedule items only and Include Critical Component is not checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. All
components of item A (A1, A2, A3, A4) are also planned in both organizations. Item B with only
sales orders in organizations M1 and M2 is not planned.

Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.

Scenario 2 - Demand schedule items only and Include Critical Component is checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. Only
critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. Item B with only sales orders in organizations M1 and M2 is not planned.

Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.

Scenario 3 - Demand schedule items and all sales orders and Include Critical Component is
not checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. All
components of item A (A1, A2, A3, A4) are also planned in both organizations. In addition item
B with sales orders in organizations M1 and M2 is planned. All components of item B (A1, A2,
A3, A4) are also planned in both organizations.

Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.

Scenario 4 - Demand schedule items and all sales orders and Include Critical Component is
checked
In this case ASCP plans item A with demand schedules in organizations M1 and M2. Only
critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. In addition item B with sales orders in organizations M1 and M2 is planned. Only
critical component of item B (B3) and sandwiched item B2 are planned in both organizations.

Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.

Item Organization Planned Items Planned Items Planned Items Planned Items
with Demand with Demand with Demand with Demand
schedule items schedule items schedule items schedule items
only and only and and all sales and all sales
Include Critical Include Critical orders and orders and
Component Component Set Include Critical Include Critical
Option Set to to Yes Component Set Component Set
No (Scenario 1) (Scenario 2) to No (Scenario to Yes (Scenario
3) 4)
A M1 Yes Yes Yes Yes
A1 M1 Yes Yes Yes Yes
A2 M1 Yes Yes Yes Yes
A3 M1 Yes Yes Yes Yes
A4 M1 Yes No Yes No
B M1 No No Yes Yes
B1 M1 No No Yes No
B2 M1 No No Yes Yes
B3 M1 No No Yes Yes
B4 M1 No No Yes No
A M2 Yes Yes Yes Yes
A1 M2 Yes Yes Yes Yes
A2 M2 Yes Yes Yes Yes
A3 M2 Yes Yes Yes Yes
A4 M2 Yes No Yes No
B M2 No No Yes Yes
B1 M2 No No Yes No
B2 M2 No No Yes Yes
B3 M2 No No Yes Yes
B4 M2 No No Yes No
This table shows what items are planned in a Production Plan assuming items A and B are MPS
Planning (or MPS/MPP Planned) items and their components are not MPS Planning (or
MPS/MPP Planned) items. It references some scenarios.

Scenario 1 - Demand schedule items only and Include Critical Component is not checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. Item B
with only sales orders in organizations M1 and M2 is not planned.

Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.

Scenario 2 - Demand schedule items only and Include Critical Component is checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. In addition
all critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. Item B with only sales orders in organizations M1 and M2 is not planned.

Sales order demands of item A for organization M1 are planned. Sales order demands of item A
for organization M2 are ignored because the Include Sales Order flag for organization M2 is
unchecked.

Scenario 3 - Demand schedule items and all sales orders and Include Critical Component is
not checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. In addition
item B with sales orders in organizations M1 and M2 is planned.

Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.

Scenario 4 - Demand schedule items and all sales orders and Include Critical Component is
checked

In this case ASCP plans item A with demand schedules in organizations M1 and M2. In addition
all critical components of item A (A1, A3) and sandwiched item A2 are planned in both
organizations. Item B with sales orders in organizations M1 and M2 is also planned. In addition
critical component of item B (B3) and sandwiched item B2 are planned in both organizations.

Sales order demands of items A and B for organization M1 are planned. Sales order demands of
items A and B for organization M2 are ignored because the Include Sales Order flag for
organization M2 is unchecked.
Item Organization Planned Items Planned Items Planned Items Planned Items
with Demand with Demand with Demand with Demand
schedule items schedule items schedule items schedule items
only and only and and all sales and all sales
Include Critical Include Critical orders and orders and
Component Component Set Include Critical Include Critical
Option Set to to Yes Component Set Component Set
No (Scenario 1) (Scenario 2) to No (Scenario to Yes (Scenario
3) 4)
A M1 Yes Yes Yes Yes
A1 M1 No Yes No Yes
A2 M1 No Yes No Yes
A3 M1 No Yes No Yes
A4 M1 No No No No
B M1 No No Yes Yes
B1 M1 No No No No
B2 M1 No No No Yes
B3 M1 No No No Yes
B4 M1 No No No No
A M2 Yes Yes Yes Yes
A1 M2 No Yes No Yes
A2 M2 No Yes No Yes
A3 M2 No Yes No Yes
A4 M2 No No No No
B M2 No No Yes Yes
B1 M2 No No No No
B2 M2 No No No Yes
B3 M2 No No No Yes
B4 M2 No No No No

You might also like