Quality Department Program 2019: If Employ Accepted If Arrived at Yard or Max 3 Month Never Visited

The document outlines a quality department program for 2019, listing activities scheduled for each month of the year. It includes the months of August through December and notes the dates various activities will take place but does not include details on the specific activities.

Uploaded by

Ferdie OS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Quality Department Program 2019: If Employ Accepted If Arrived at Yard or Max 3 Month Never Visited

The document outlines a quality department program for 2019, listing activities scheduled for each month of the year. It includes the months of August through December and notes the dates various activities will take place but does not include details on the specific activities.

Uploaded by

Ferdie OS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUALITY DEPARTMENT PROGRAM 2019

AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER


NO DESCRIPTION FREQUENCY

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9

1
2
3
4
5
6
7
8
9

1
2
3
4
5
6
7
8
9

1
2
3
4
5
6
7
8
9

1
2
3
4
5
6
7
8
9
A.QC MANAGEMENT
1. QC MANAGEMENT MEETING Every Monthly
2. QC MANAGEMNT REVIEW Every Monthly
3. QC Internal Audit Every Six Monthly
4. Toolbox Meeting Every Days

B.QUALITY INDUCTION
1. NEW PERSONEL QC if employ accepted
2. VISITOR if arrived at yard or max 3 month never visited 

C.QUALITY CAMPAIGN
QUALTY POLECY
1. AWARENESS OF THE QUALITY
QUALITY OBJECTIVE
D.SOSIALISATION
1. PROCEDURE Every 6 Monthly
2. QUALITY POLECY Every 6 Monthly
3. QUALITY OBJECTIVE Every Monthly
4. ACHIEVEMENT OF QUALITY TARGET Every Monthly
E.QUALITY TRANING
1. Certification ISO IF ANY
2. Certification welding inspector IF ANY
3. Certification NDT and DT IF ANY
4. Certification Welder IF ANY 
F.QMS INTERNAL AUDIT EVERY 6 MONTH
G.QMS EXTERNAL  AUDIT EVERY YEAR
H.QUALITY OBJECTIVES MEASUREMENT EVERY MONTH
I.HANDLING CLIENT'S COMPLAINT Each available Client's Complaint
J.CLIENT SATISFACTION SURVEY EVERY 6 MONTH
K.QUALITY AWARD
1 WELDER PERFORMANCE ( WRR)
EVERY 6 MONTH
2 FITTER PERFOMANCE
3 PAINTING PERFORMANCE (WRR)

PREPARED BY REVIEW BY APPROVED BY


QA/QC DEPARTMENT MANAGEMNT REPRESENTATIVE PROJECT MANAGER

NAME : WAHYUDI YANTO NAME : NAME :


DATE : 14 SEPTEMBER 2019 DATE : DATE :