Proposed The Bellevue Resort - Phase 2 Bellesouth Pacific Properties Inc. FNB

The document contains diagrams showing details of floor tile installation and drain installation in a concrete slab. It includes diagrams of brass plugs countersunk into floor tiles, gravel beds below tiles, and cast iron drains with adjustable strainers and P-traps embedded in concrete slabs with reinforcing bars and lifting covers. Pipes connect to the drains.

Uploaded by

philip pacheco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Proposed The Bellevue Resort - Phase 2 Bellesouth Pacific Properties Inc. FNB

The document contains diagrams showing details of floor tile installation and drain installation in a concrete slab. It includes diagrams of brass plugs countersunk into floor tiles, gravel beds below tiles, and cast iron drains with adjustable strainers and P-traps embedded in concrete slabs with reinforcing bars and lifting covers. Pipes connect to the drains.

Uploaded by

philip pacheco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FIN.

FLOOR TILES
BRASS PLUG
COUNTERSUNK HEAD
FIN. FLOOR TILES

VARIES
R.C. SLAB

PLUG

VARIES
R.C. SLAB

GRAVEL
BED

1/8 (45°) BEND

1/8 (45°) BEND

1/8 (45°) BEND

ADJUSTABLE
STRAINER

CAST IRON
BODY DRAIN
STEEL
R.C. COVER W/ 15MM Ø
LIFTING COVER
L=0.15+DIAMETER OF PIPE+0.15
10mm Ø
BARS @ 0.20 O.C.
BOTHWAYS CB
R.C. SLAB

L=0.15+DIAMETER OF PIPE+0.15
EARTH FILL

DP DP

PIPE Ø

P-TRAP

PLAN
L=0.15+DIAMETER OF PIPE+0.15
100 100

100mm
ADJUSTABLE
STRAINER
CAST IRON
BODY DRAIN

200mm(MIN.)
4" CHB

VARIES
R.C. SLAB

min.
DP DP

200mm
P-TRAP WITH
CLEAN-OUT PLUG

150mm
SECTION

FOR BIDDING
DATE : 2019 JUNE 14

REVISIONS CADD BY DATE


These drawings are documents of
405 Greenbelt Mansion,
106 Perea St., Legaspi Village
Information to be used only by the
Architect and the General Contractor. PROPOSED THE BELLEVUE GENERAL NOTES (PLUMBING) WATER TANK SCHEDULE FNB COM - 17-06-01
1226 Makati City
John Patrick Anthony L. Buensalido
They are the sole property of BELLESOUTH PACIFIC LEGEND WATER HEATER SCHEDULE
RAMIL S. GUTIERREZ
04-05-19
Tel. +632.478.3445, +632.818.1111 loc. 252
Fax +632.817.4471
7347520 0019481
RESORT - PHASE 2 PROPERTIES INC.
PLUMBING FIXTURE CONN. SIZE SCH.
MATERIAL SPECIFICATION
MISCELLANEOUS DETAILS
PUMP SCHEDULE
and cannot be copied nor reproduced

P 01
[email protected]
www.buensalidoarchitects.com 01 JAN 2019 15 Feb 2005 without their written permission. THERMO PLASTIC PIPE SIZE EQUIVALENT
Makati City 31 Jan 2020 REP. ACT 9266 BRGY. DOLJO, PANGLAO ISLAND, BOHOL

You might also like