Electricity
Substrate
Heat
Biomanure Bio-CNG
Gas grid
Utilization of Biogas
BIOGAS
Reformation
Compression (possibly)
Boiler CHP
Bottling or gas Filling Fuel
grid station cell
Time to market
• Environmental clearances
• Lack of dependency
Water issues
• Thermal plants closed during peak summer due water scarcity
• Hydro plants closed during monsoons due excessive silt
Some of the best wind sites were taken in initial years and thus
are having small turbines (installed prior to 2002?)