Commissioning Procedure MCC
Commissioning Procedure MCC
:
Project : Plant Water Package RAPP-7&8
RAPP-7&8-52540-CP-2-R1
Issue No: 02 Rev No: 1
Commissioning Procedure for 415 V of L&T Page 1 of 55
Date of Issue: Dec 2018
Commissioning Procedure
for
415 V AC OF L&T
Tag No.: 0-5254-MCC-M417,M418,M415,M416
and 0-7113-SDB-7110, 7002
Rev. Details of
Date Prepared By Reviewed By Approved By
No. Revision
1.0 Title:
Commissioning Procedure for 415 V AC PMCC and SDB of CLO2 Plant (Tag No.:
0-5254-MCC-M417, M418 and 0-7113-SDB-7110, 7002).
USI – 52540
2.0 Purpose:
This procedure is prepared for carrying out the commissioning checks,
energisation and post energisation checks on Class IV 415 V AC PMCCs/
SDBs of RAPP-7 & 8, Main Plant Water Package (M/s IOT).
3.0 Pre-requisites:
3.1 Requirement of other system:
)1 Class-IV 415 V AC power supply from Class-II, III & IV 415 V switchgear is
commissioned and is available.
)2 Adequate lighting is available.
3.2 System requirements:
)1 Installation of 415 V PMCC/SDB is completed and erection completion
certificate is obtained from electrical (construction).
)2 Installation related checks are completed.
)3 Power & control cabling up to 415V MCC/PMCC is completed.
)4 Fire-fighting system is available, completely installed and tested.
)5 Ventilation system (permanent or temporary) is functional and available.
)6 Building illumination (permanent or temporary) is available.
)7 3-phase 415 V AC power supply is available for testing.
)8 Telephone system is available near the equipment.
)9 Relevant approved drawings, Instruction manual, catalogues of MCC
components, PO copies; factory test reports, approved settings of relays
are available.
)10Keep the documents ready for collecting data during commissioning tests.
Consolidation of commissioning
documentation
11.0 References
)1 Procurement specification of 415V motor control centers (PC-E-378, R-1
/E-4).
)2 Manufacturers scheme drawing for various typical feeders.
)3 Manufacturer’s instruction manual.
2. 5.
3. 6.
By
Name & Designation Signature
Unit No. :
Board No. : Location :
Date : Feeder No. :
4) Ratio Test:
Remark
Sr. In (%) Injected Primary Measured Secondary Ratio Error (%)
No Current (A) Current (A)
s
R Y B R Y B R Y B
1) 20
2) 40
3) 60
4) 80
5) 100
Acceptance limit for ratio error shall be as per name plate of CT.
5) Secondary Winding Resistance:
Observed Value (Ω)
Rated Current Remarks
R-Phase Y-Phase B-Phase
R Y B
4) Ratio Test:
Annexure-8: Testing of PT
Unit No : Board No : Location:
Feeder No : Date :
3) Polarity Check :
R Y B
4) Ratio Test:
Sr. Vn Injected Primary Voltage Measured Secondary Remarks
No. (%) (V) Voltage(V)
R Y B R Y B
1)
2)
3)
4)
Note: 1) Acceptance criteria for ration error and phase error shall be as per IS
3156:1992
2) Compare the result with factory test result and note deviation, if any
deviation is observed then confirm for acceptance of test.
Sr.
Check Description Observation Remarks
No.
% Error
Remarks
Sr. % Value of Applied Expected Observed
Acceptance Criteria
No. Current Current (as Per Reading of Reading of
Applied Requirement) Ammeter (A) Ammeter
(A) (A)
1)
2)
3)
4)
5)
% Error
Acceptance Criteria
Remarks
Sr. % Voltage Value of Expected Observed
No Applied Applied Reading of Reading of
Voltage (V) Voltmeter (V) Voltmeter (V)
1)
2)
3)
4)
5)
Sr.
Check Description Observation Remarks
No.
Sr. Expected
Check Description Observation Remarks
No. value
Check Relay type and name plate
1) details as per drawing. Record the
same.
Check Relay physically for any
2)
damage.
Check the cables connected to relay
3)
as per scheme.
Remove the relay from cell for
4)
calibration.
Check the continuity of power
5) Continuity
contact.
Set the relay as per relay setting As per setting
6) Ith=____Amp
sheet and note down the value. sheet.
Connect all three phase in series and
inject the AC current and note down Injected
7) the value of injected current. current=
(For relay setting up to 80A: Inject 2 _______Amp
times current of Ith.)
Check the changeover of relay Should
8)
auxiliary contacts. change
Check the auto/manual reset function
9) of the relay. Keep reset function on On Manual
MANUAL.
No
Inject AC Current equal to Ith (setting)
Tripping/No
10) and observe for 10 minutes with
Contact
current in service.
Change Over
Install the relay in the MCC cell,
11) normalize relay connection and carry Normalised
out tightness on the relay terminals.
Contact Resistance
Acceptance Criteria
(in µ Ω)
Joint No.
Remarks
Sr
No
R Y B R’ Y’ B’ N
<5 µ Ω Per
Joint
Minimum Acceptance
Sr. Measured
clearance location criteria Remarks
No in mm
between
1) R---E >19mm
2) Y---E >19mm
3) B---E >19mm
4) R---Y >25mm
5) Y---B >25mm
6) B---R >25mm
Note: 1) HV test acceptance criteria – HV test withstood for one minute & no
increase in
Leakage current from start of the test to end of the test.
2) Insulation resistance test acceptance criteria – Value shall be > 1 MΩ
(Ref IS 10118 PART-III)
3)This Annexure is applicable for MCC/PMCC and bus ducts.
Remarks
Sr Cable Cable Availability of Termination Insulation Check
No Number Size Cable Glanding Resistance Continuity
/Tag/Ferrule Value (OK/Not
(Yes/No) OK)
From To
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
2) Number of phases 3
3)
CS CCE
4)
TSS ACE (Planning)
5)
MS
6)
OS