Bluewater Resorts Sanitary
Bluewater Resorts Sanitary
Bluewater Resorts Sanitary
0 / 10 July 2017
BILLS OF QUANTITIES
BILLS OF QUANTITIES
PRELIMINARIES
Company Name :
Authorized Representative :
(Signature over Printed Name)
Position :
Php
Php
Php
Php Included
Php
QS-009 / Rev. 0 / 10 July 2017
BILLS OF QUANTITIES
Bill Page
BILLS OF QUANTITIES
Bill Page
SUMMARY / PAGE 1 OF 1
QS-009 / Rev. 0 / 10 July 2017
Amount
Page 3 of 3
Page 7 of 7
Page 19 of 19
Page 9 of 9
Page 16 of 16
Page 6 of 6
Php -
QS-009 / Rev. 0 / 10 July 2017
Amount
SUMMARY / PAGE 1 OF 1
QS-010 / Rev. 0 / 10 July 2017
Unit Rate
Item Description Unit Quantity
Materials Labor
07 10 00 Dampproofing And
Waterproofing
Ground Floor
C to PWD m2 7.00
Second Floor
Unit Rate
Item Description Unit Quantity
Materials Labor
OTHERS
A __________________ item
B __________________ item
C __________________ item
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
TO COLLECTION
Unit Rate
Item Description Unit Quantity
Materials Labor
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
Page 1 of 3
Page 2 of 3
To Summary Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Unit Rate
Item Description Unit Quantity
Materials Labor
21 00 00 Fire Suppression
B 65 mm diameter no 42.00
D 65 mm diameter no 12.00
F 65 mm diameter no 2.00
Unit Rate
Item Description Unit Quantity
Materials Labor
M 65 mm diameter no 1.00
A 65 mm diameter no 2.00
Unit Rate
Item Description Unit Quantity
Materials Labor
D 65 mm diameter nr 6.00
F 25 mm diameter nr 6.00
21 08 00 Commissioning of Fire
Suppression
Unit Rate
Item Description Unit Quantity
Materials Labor
21 11 00 Facility Fire-Suppression
Water-Service Piping
B 65 mm diameter m 307.00
C 50 mm diameter m 18.00
D 40 mm diameter m 108.00
E 32 mm diameter m 147.00
F 25 mm diameter m 1,051.00
G 65 x 50 mm diameter no 5.00
H 65 x 40 mm diameter no 6.00
Unit Rate
Item Description Unit Quantity
Materials Labor
I 65 x 32 mm diameter no 35.00
J 65 x 25 mm diameter no 47.00
K 50 x 32 mm diameter no 6.00
L 50 x 25 mm diameter no 10.00
M 40 x 32 mm diameter no 1.00
N 40 x 25 mm diameter no 2.00
21 11 19 Fire-Department Connections
Unit Rate
Item Description Unit Quantity
Materials Labor
(10 lbs. ABC), hose accessories,
consumables and other miscellaneous items
as shown and as required to complete the
system.
B 65 mm diameter no 12.00
21 13 00 Fire-Suppression Sprinkler
Systems
21 13 00 Fire-Suppression Sprinkler
Systems
D Sidewall no 30.00
E EC Sidewall no 66.00
21 20 00 Fire-Extinguishing System
Unit Rate
Item Description Unit Quantity
Materials Labor
21 30 00 Fire Pumps
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
OTHERS
A __________________ item
B __________________ item
C __________________ item
Unit Rate
Item Description Unit Quantity
Materials Labor
TO COLLECTION
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
Page 1 of 7
Page 2 of 7
Page 3 of 7
Page 4 of 7
Page 5 of 7
Page 6 of 7
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Summary Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Unit Rate
Item Description Unit Quantity
Materials Labor
DIVISION 22 - PLUMBING
22 00 00 Plumbing
A 40 mm diameter no 7.00
C 50 mm diameter no 4.00
D 40 mm diameter no 14.00
E 50 mm diameter no 36.00
F 40 mm diameter no 86.00
G 32 mm diameter no 46.00
H 25 mm diameter no 8.00
I 20 mm diameter no 396.00
J 15 mm diameter no 34.00
Unit Rate
Item Description Unit Quantity
Materials Labor
L 50 mm diameter no 12.00
M 40 mm diameter no 29.00
N 32 mm diameter no 14.00
O 25 mm diameter no 1.00
P 20 mm diameter no 198.00
Q 15 mm diameter no 17.00
R 50 mm diameter no 2.00
S 40 mm diameter no 14.00
T 32 mm diameter no 3.00
22 00 00 Plumbing (Cont'd)
A 50 mm diameter no 4.00
B 32 mm diameter no 2.00
Unit Rate
Item Description Unit Quantity
Materials Labor
Supply and installation of Surge Anticipating
Valve
D 32 mm diameter no 4.00
E 25 mm diameter no 3.00
22 08 00 Commissioning of Plumbing
Unit Rate
Item Description Unit Quantity
Materials Labor
22 10 00 Plumbing Piping
B 50 mm diameter m 105.00
C 40 mm diameter m 422.00
D 25 mm diameter m 136.00
E 20 mm diameter m 843.00
F 15 mm diameter m 14.00
G 50 mm diameter no 22.00
H 40 mm diameter no 93.00
I 25 mm diameter no 18.00
Unit Rate
Item Description Unit Quantity
Materials Labor
J 20 mm diameter no 392.00
K 15 mm diameter no 11.00
L 40 mm diameter no 54.00
M 20 mm diameter no 239.00
N 40 x 25 mm diameter no 2.00
O 40 x 20 mm diameter no 35.00
P 25 x 20 mm diameter no 19.00
Q 25 x 15 mm diameter no 11.00
22 00 00 Plumbing (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
A 40 x 25 mm diameter no 2.00
B 40 x 20 mm diameter no 3.00
C 25 x 20 mm diameter no 139.00
D 25 x 15 mm diameter no 2.00
E 25 mm diameter no 158.00
F 50 mm diameter m 396.00
G 40 mm diameter m 27.00
H 32 mm diameter m 16.00
I 25 mm diameter m 35.00
J 20 mm diameter m 414.00
L 50 mm diameter no 49.00
M 40 mm diameter no 5.00
N 32 mm diameter no 14.00
Unit Rate
Item Description Unit Quantity
Materials Labor
O 25 mm diameter no 3.00
P 20 mm diameter no 220.00
22 00 00 Plumbing (Cont'd)
B 50 mm diameter no 25.00
C 40 mm diameter no 7.00
D 20 mm diameter no 80.00
E 50 x 40 mm diameter no 1.00
F 50 x 25 mm diameter no 35.00
G 40 x 20 mm diameter no 4.00
Unit Rate
Item Description Unit Quantity
Materials Labor
H 32 x 20 mm diameter no 2.00
J 50 x 25 mm diameter no 1.00
K 50 x 20 mm diameter no 15.00
L 40 x 32 mm diameter no 1.00
M 40 x 20 mm diameter no 2.00
N 32 x 20 mm diameter no 1.00
O 25 x 20 mm diameter no 66.00
P 32 mm diameter no 2.00
Q 25 mm diameter no 65.00
Unit Rate
Item Description Unit Quantity
Materials Labor
22 00 00 Plumbing (Cont'd)
A 40 mm diameter m 498.00
B 25 mm diameter m 55.00
C 20 mm diameter m 660.00
D 15 mm diameter m 5.00
E 40 mm diameter no 79.00
F 25 mm diameter no 6.00
G 20 mm diameter no 360.00
H 15 mm diameter no 2.00
I 40 mm diameter no 38.00
J 25 mm diameter no 3.00
K 20 mm diameter no 85.00
Unit Rate
Item Description Unit Quantity
Materials Labor
L 40 x 20 mm diameter no 35.00
M 25 x 15 mm diameter no 7.00
N 40 x 20 mm diameter no 15.00
22 00 00 Plumbing (Cont'd)
Irrigation Pipeline
Unit Rate
Item Description Unit Quantity
Materials Labor
A 32 mm diameter m 9.00
B 32 mm diameter no 4.00
C 32 mm diameter no 3.00
D 32 mm diameter no 1.00
E 32 mm diameter no 1.00
F 32 mm diameter no 2.00
Unit Rate
Item Description Unit Quantity
Materials Labor
22 00 00 Plumbing (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Duty/Standby/Alternating
22 00 00 Plumbing (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Sewer Line
H 75 mm diameter m 132.00
I 50 mm diameter m 645.00
Unit Rate
Item Description Unit Quantity
Materials Labor
Supply and Installation of PVC elbow 90º
K 75 mm diameter no 2.00
L 50 mm diameter no 71.00
22 00 00 Plumbing (Cont'd)
D 75 mm diameter no 49.00
E 50 mm diameter no 306.00
F 50 mm diameter no 147.00
Unit Rate
Item Description Unit Quantity
Materials Labor
Supply and Installation of PVC tee reducer
K 75 mm diameter no 6.00
L 50 mm diameter no 209.00
S 75 x 50 mm diameter no 16.00
Unit Rate
Item Description Unit Quantity
Materials Labor
22 00 00 Plumbing (Cont'd)
C 75 mm diameter no 6.00
D 50 mm diameter no 1.00
H 75 mm diameter no 2.00
I 50 mm diameter no 71.00
J 50 mm diameter no 74.00
K 50 mm diameter no 5.00
Unit Rate
Item Description Unit Quantity
Materials Labor
L 50 mm diameter no 66.00
M 50 mm diameter no 145.00
22 00 00 Plumbing (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
A 150 mm diameter m 29.00
C 75 mm diameter m 3.00
I 75 mm diameter no 1.00
Unit Rate
Item Description Unit Quantity
Materials Labor
22 00 00 Plumbing (Cont'd)
Sump Pumps
Unit Rate
Item Description Unit Quantity
Materials Labor
E Sump pump, SP-1, (Lift Station) Duplex Type set 1.00
Multi-Stage Submersible Type, 80 GPM
40 ft. TDH, 2.5 HP, 400V/3ph/60Hz
Electric Motor Driven, Open Drip Proof
Duty/Standby/Alternating
Vent Line
H 50 mm diameter m 1,109.00
K 50 mm diameter no 871.00
M 50 mm diameter no 188.00
22 00 00 Plumbing (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Vent Line (cont'd)
G 50 mm diameter no 1.00
H 50 mm diameter no 3.00
I 50 mm diameter m 126.00
Unit Rate
Item Description Unit Quantity
Materials Labor
22 00 00 Plumbing (Cont'd)
C 75 mm diameter m 369.00
D 50 mm diameter m 358.00
Unit Rate
Item Description Unit Quantity
Materials Labor
G 75 mm diameter no 33.00
H 50 mm diameter no 99.00
K 75 mm diameter no 17.00
L 50 mm diameter no 189.00
N 75 mm diameter no 3.00
O 50 mm diameter no 33.00
S 75 x 50 mm diameter no 91.00
Unit Rate
Item Description Unit Quantity
Materials Labor
22 00 00 Plumbing (Cont'd)
B 50 mm diameter no 40.00
D 50 mm diameter no 2.00
E 50 mm diameter no 65.00
F 75 mm diameter no 6.00
G 50 mm diameter no 12.00
Unit Rate
Item Description Unit Quantity
Materials Labor
(PVC) Pipe including fittings, painting,
sleeves, hangers, supports, excavation,
backfilling and other miscellaneous items as
shown and as required to complete the
system.
H 50 mm diameter m 321.00
I 25 mm diameter m 179.00
22 00 00 Plumbing (Cont'd)
22 40 00 Plumbing Fixtures
Unit Rate
Item Description Unit Quantity
Materials Labor
A Water Closet Tank Type w/ Bidet hose set 3.00 OSM
Unit Rate
Item Description Unit Quantity
Materials Labor
OTHERS
A __________________ item
B __________________ item
C __________________ item
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
TO COLLECTION
Unit Rate
Item Description Unit Quantity
Materials Labor
DIVISION 22 - PLUMBING
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
by Others
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Page 1 of 19
Page 2 of 19
Page 3 of 19
Page 4 of 19
Page 5 of 19
Page 6 of 19
Page 7 of 19
Page 8 of 19
Page 9 of 19
Page 10 of 19
Page 11 of 19
Page 12 of 19
Page 13 of 19
Page 14 of 19
Page 15 of 19
Page 16 of 19
Page 17 of 19
Page 18 of 19
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Summary Php -
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
required by Owner, Designer and the Project
Manager).
23 07 00 HVAC Insulation
23 07 13 Duct Insulation
Fire Rated
A 50 mm thick m² 326.00
Unit Rate
Item Description Unit Quantity
Materials Labor
B Ga. 22 m² 117.00
C Ga. 20 m² 85.00
D Ga. 26 m² 6.00
E Ga. 24 m² 128.00
F Ga. 22 m² 68.00
G Ga. 20 m² 13.00
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
as required to complete the system.
E Ga. 18 m² 180.00
F Ga. 18 m² 146.00
Unit Rate
Item Description Unit Quantity
Materials Labor
23 34 00 HVAC Fans
Unit Rate
Item Description Unit Quantity
Materials Labor
294cfm , 10.4 kg, 138 watts, 509 rpm
220v/1ph/60hz
C Toilet Exhaust Fan, TEF-A, TEF-B & TEF-C set 65.00 OSM
230cfm , 5.6 kg, 61 watts, 540 rpm
220v/1ph/60hz
Unit Rate
Item Description Unit Quantity
Materials Labor
159cfm , 4.4 kg, 33 watts, 490 rpm
220v/1ph/60hz
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
23 38 00 Ventilation Hoods
Unit Rate
Item Description Unit Quantity
Materials Labor
OTHERS
A __________________ item
B __________________ item
C __________________ item
Unit Rate
Item Description Unit Quantity
Materials Labor
TO COLLECTION
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Included
Included
Included
Included
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
by Others
by Others
by Others
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php
Page 1 of 9
Page 2 of 9
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Page 3 of 9
Page 4 of 9
Page 5 of 9
Page 6 of 9
Page 7 of 9
Page 8 of 9
To Summary Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Unit Rate
Item Description Unit Quantity
Materials Labor
DIVISION 26 – ELECTRICAL
26 00 00 Electrical
B 3.5mm² m 19.00
C 5.5mm² m 1,112.00
D 8.0mm² m 3,079.00
E 14mm² m 3,117.00
F 22mm² m 327.00
G 30mm² m 99.00
H 50mm² m 130.00
I 60mm² m 335.00
J 125mm² m 63.00
K 200mm² m 369.00
###
Fire Rated Cable (Brand must be Phelps dodge)
Unit Rate
Item Description Unit Quantity
Materials Labor
M 3.5mm² m 108.00
N 5.5mm² m 434.00
O 8.0mm² m 113.00
P 14mm² m 356.00
Q 22mm² m 95.00
R 50mm² m 142.00
S 250mm² m 186.00
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Cable Ladder
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
26 08 00 Commissioning of Electrical
Systems
26 12 00 Medium-Voltage Transformers
Unit Rate
Item Description Unit Quantity
Materials Labor
Accessories
Branches:
2-400AT/400AF,3P,400V,50KAIC
1-300AT/400AF,3P,400V,50KAIC
1-250AT/400AF,3P,400V,50KAIC
1-200AT/225AF,3P,400V,50KAIC
5-150AT/225AF,3P,400V,50KAIC
Enclosure: NEMA-4X, Surface Mounted
26 16 00 Medium-Voltage Metering
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
E DP-ACCU-M set 1.00
Main:
400AF/250AT, 3P+N+G, 400VAC, 32KAIC MCCB
Branches:
12-50AT/100AF,1P,400/230V,22KAIC
1-150AT/225AF,3P,400/230V,32KAIC
1-125AT/225AF,3P,400/230V,32KAIC
1-50AT/100AF,3P,400/230V,32KAIC
1-100AT/100AF,3P,400/230V,32KAIC
Enclosure: NEMA-4X, Surface Mounted
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
Branches:
2-30AT/50AF,1P,400/230V,32 KAIC
22-20AT/20AF,1P,400/230V,32 KAIC
Enclosure: NEMA-4X, Surface Mounted
E PP - 2F set 1.00
Main:
225AF/105AT, 3P+N+G, 400VAC, 32 KAIC
MCCB
Branches:
1-70AT/100AF,1P,400/230V,32 KAIC
12-50AT/100AF,1P,400/230V,32 KAIC
5-20AT/50AF,1P,400/230V,32 KAIC
Enclosure: NEMA-4X, Surface Mounted
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
A PP - 4F set 1.00
Main:
225AF/105AT, 3P+N+G, 400VAC, 32 KAIC
MCCB
Branches:
1-70AT/100AF,1P,400/230V,32 KAIC
12-50AT/100AF,1P,400/230V,32 KAIC
5-20AT/50AF,1P,400/230V,32 KAIC
Enclosure: NEMA-4X, Surface Mounted
B PP - 6F set 1.00
Main:
225AF/105AT, 3P+N+G, 400VAC, 32 KAIC
MCCB
Branches:
1-70AT/100AF,1P,400/230V,32 KAIC
14-50AT/100AF,1P,400/230V,32 KAIC
3-20AT/50AF,1P,400/230V,32 KAIC
Enclosure: NEMA-4X, Surface Mounted
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
26 27 26 Wiring Devices
Unit Rate
Item Description Unit Quantity
Materials Labor
S Keycard with Energy Saver set 65.00 OSM
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
K 30AT , 1P , 32 KAIC set 3.00
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
wirings & conduiting; Supply of lube oil, fuel for
start-up & commissioning including replacement
of filters.
Unit Rate
Item Description Unit Quantity
Materials Labor
26 00 00 Electrical (Cont'd)
Unit Rate
Item Description Unit Quantity
Materials Labor
metallic raceways
26 51 00 Interior Lighting
L Light Creation Slim Box Type 1x40W, 220-240V, set 10.00 OSM
60Hz, Fluorescent Fixture in Enamel Powder
Coated
26 00 00 Electrical (Cont'd)
26 52 00 Emergency Lighting
B Light Creation Slim Box Type 1x40W, 220-240V, set 47.00 OSM
60Hz, Fluorescent Fixture with Battery Pack
Unit Rate
Item Description Unit Quantity
Materials Labor
26 53 00 Exit Signs
Unit Rate
Item Description Unit Quantity
Materials Labor
OTHERS
A __________________ item
B __________________ item
C __________________ item
Unit Rate
Item Description Unit Quantity
Materials Labor
TO COLLECTION
Unit Rate
Item Description Unit Quantity
Materials Labor
DIVISION 26 - ELECTRICAL
Unit Rate
Item Description Unit Quantity
Materials Labor
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
To Collection Php -
Page 1 of 16
Page 2 of 16
Page 3 of 16
Page 4 of 16
Page 5 of 16
Page 6 of 16
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
Page 7 of 16
Page 8 of 16
Page 9 of 16
Page 10 of 16
Page 11 of 16
Page 12 of 16
Page 13 of 16
Page 14 of 16
Page 15 of 16
To Summary Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Others Total
DIVISION 27 - COMMUNICATIONS
27 08 00 Commissioning of Communications
27 10 00 Structured Cabling
Telephone System
Boxes
K TTC no 6.00
B Wifi no 32.00
27 40 00 Audio-Video Communications
IPTV System
Boxes
27 40 00 Audio-Video
Communications(Cont'd)
A TV Outlet no 70.00
27 50 00 Adistributed Communications
and Monitoring Systems
27 50 00 Adistributed Communications
and Monitoring Systems (Cont'd)
Boxes
B PATB no 6.00
OTHERS
A __________________ item
B __________________ item
C __________________ item
TO COLLECTION
DIVISION 27 - COMMUNICATION
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
To Collection Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
To Collection Php -
Page 1 of 6
Page 2 of 6
Page 3 of 6
Page 4 of 6
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
Page 5 of 6
To Summary Php -
BILLS OF QUANTITIES
APRIL 2019
Unit Rate
Amount
Labor Others Total
PRELIMINARIES
A Mobilization/Demobilization item
C Alimak mos.
F Temporary Telecommunications
Telephone/Mobile Phone mo.
Radio Communication mo.
Internet Connection mo.
G Site Boundary
Temporary Perimeter Fence item
H Security
Security Guards mo.
Guard House item
J Toilet Facilities
Site Toilet Facilities (Portalets) including mo.
maintenance
Preliminaries (Cont'd)
G Nuisance item
Preliminaries (Cont'd)
A Statutory Obligations
Permits, Licenses & Taxes item
ECC Legwork (if applicable)
Locational and Barangay Clearance (if
required)
Demolition Permit
Excavation Permit
Building Permit
Occupancy Permit
Permit for Disposal/dumping of debris item
Permit for Use of private roads (if applicable) item
Contractor's Tax item
All other statutory requirements to permit item
construction
I Insurances
Contractor's All Risk Insurance item
Third Party Liability Insurance item
J Reports item
K Project Meetings
Representation expenses item
L Schedules item
Preliminaries (Cont'd)
A Material Standards
B Verification of Quality
C As-built Drawings
Others
NOTES:
1. Refer to Preliminaries - Terms and
Conditions
2. Fixed and time related costs together with
allowances for mobilization costs and
demobilization costs shall be validated prior to
issuance of the first progress billing.
3. Preliminaries for a total duration of 9
calendar months should be considered.
TO COLLECTION
Preliminaries
Rate Amount
By Gencon
By Gencon
By Gencon
Not applicable
By Gencon
By Gencon
By Gencon
By Gencon
Rate Amount
By Gencon
By Gencon
By Gencon
To Collection Php -
Rate Amount
Not required
By Gencon
By Gencon
By Gencon
By Gencon
Not Applicable
By Gencon
By Gencon
By Gencon
By Gencon
By Gencon
By Owner
Noted
Rate Amount
To Collection Php -
By Owner
By Gencon
By Gencon
By Owner
By Owner
By Gencon
By Gencon
By Gencon
By Gencon
By Gencon
Rate Amount
by Owner
by Owner
To Collection Php -
Not Applicable
Rate Amount
To Collection Php -
Rate Amount
Page 1 of 5
Page 2 of 5
Page 3 of 5
Page 4 of 5
To Summary Php
Rate Amount