CP-01
Customer Lifelong Prototype Pre-Launch Production Date (Orig.) 1/5/2018
Part Number/Latest Change Needle Core Team Mr. Rahul, Mr. Vishesh, Dharmender
Level Date (Rev.)
Part Name/Description Needle Key Contact /Phone No. Rev. 0
PROCESS MACHINE, CHARACTERISTICS METHODS
PART/ SPECIAL
NAME/ DEVICE, JIG, EVALUTION/ SAMPLE
PROCESS CHAR. PRODUCT/ PROCESS CONTROL REACTION
OPERATION TOOLS FOR NO. PRODUCT PROCESS MEASUREMENT
NUMBER CLASS SPECIFICATION/ TOLERANCE SIZE FREQ. METHOD PLAN
DESCRIPTION MFG. TECHNIQUE
1 Injection time
2 Cooling Time
3 Holding Time
4 Cycle Time
5 Nozzle Temp.
6 Z1 Temp. As per process
As per store standard & parameter Inform To
7 Z2 Temp. PLC Display Screen 100% 2 hour
procedure Sheet F-QAD- Supervisor
Molding Process & Injection Molding 8 Z3 Temp. 01-05A
40
Inspection Machine 9 Z4 Temp.
10 Injection Pressure
11 Locking Pressure
12 Holding Pressure
Molding Inprocess
1 No molding defects allowed Visual n=3 per FOA / MOA /
defect Inspection 3 pcs Reject/ rework
shift LOA
2 Fitment As Fitment As per mating part
Supplier EVERSHINE FINISHES CONTROL PLAN Control Plan No. CP-01
Customer Lifelong Prototype Pre-Launch Production Date (Orig.) 1/5/2018
Part Number/Latest Change
Needle Core Team Mr. Rahul, Mr. Vishesh, Dharmender
Level Date (Rev.)
Part Name/Description Needle Key Contact /Phone No. Rev.
CHARACTERISTICS METHODS
MACHINE,
PART/ PROCESS NAME/ SPECIAL SAMPLE
DEVICE, JIG, PRODUCT/ PROCESS EVALUTION/
PROCESS OPERATION CHAR. CONTROL
TOOLS FOR NO. PRODUCT PROCESS SPECIFICATION/ MEASUREMENT REACTION PLAN
NUMBER DESCRIPTION CLASS SIZE FREQ. METHOD
MFG. TOLERANCE TECHNIQUE
Checking (Visual) & Material Visual & As per packing
50 Manual 1 As per WI 100% Per Lot Repacking
Packing (Components) Counting/Weighing std.
By Measuring Final
Final Inspection Segregation /
60 Instruments / 1 Molding defect Inspection As per FOA / MOA / LOA Visual 3 pcs Per lot FOA MOA LOA
(PDI) Rework
Checking Aids Process
REACTION PLAN
Repacking
Segregation /
Rework
Supplier SRG MOULDINGS PFMEA No. PFMEA/SRG/RB/01
Customer RINDER INDIA (P.) LTD.
PROCESS FAILURE MODE & EFFECTS ANALYSIS Date (Orig.) 1/5/2018
Core Team- Mr. Ravi Ranjan, Mr. Kamal Bhatt, Mr.Ram Mahesh, Mr. Sunil Mourya, Mr.
Part Number 70043-01 Mulayam Rajput Date(Rev.)
2/4/2018
Part Name Tail Lamp Reflector- Key Contact/Phone No.- 0124-4379845 Rev. 1
Action Results
RESPONSIBILITY
REQUIREMENTS
RECOMMENDED
CLASSIFICATION
OCCURRENCE
COMPLETION
DETECTION
OCCURRENCE
& TARGET
SEVERITY
CURRENT CURRENT
DETECTION
ACTION
SEVERITY
PROCESS POTENTIAL POTENTIAL POTENTIAL ACTION
DATE
PROCESS PROCESS
STEP/ FAILURE EFFECT(S) OF CAUSE OF RPN TAKEN &
CONTROLS CONTROLS RPN
FUNCTION MODE FAILURE FAILURE EFFECTIVE
PREVENTION DETECTION
DATE
Manufacturing: Stop
Material grade Wrong Grade shipment and additional Wrong Material Receiving
as required Material sort and rework due to supply by supplier Inspection report
affected material.
Operation 10:
Incoming
Proper Inspection Of
Incoming Manufacturing: Line 5 Un Skilled 2 5 50
inspection as per Wrong Inspection Inspection Std. Raw Material &
Inspection shutdown Inspector
Standard BOP
(RM & BOP)
Inspection Wrong Incoming
Manufacturing: Wrong
Report / Test Inspection Un Calibrated Document & Data
material supply to
Certificate by Report / Test Instrument Control
production
Supplier Certificate
Manufacturing: Wrong
Material location Material location Untrained Man- Guidelines for new Identification on
material supply to
identified Not Identified power comers Bags
production
1. Inadequate
1.Inventory normal
Stack height Improper Stacking Manufacturing: Mix-up space 2.Stacking
Operation 20 defined set Identification
of Raw Material of material height not
& 30: 2.Stacking Height
standardize
4 2 5 40
R/M storage Manufacturing: 1.No syatem
& Issue Of FIFO system FIFO system not Improper tracebility in defined Work Instruction
Raw Material followed Identification
followed next operation 2.Unskilled For FIFO
personnel
1.Lack of
Manufacturing: Wrong
Specified Wrong Material knowledge Guidelines for new
part produce and Line Training
material issued Issued 2.Unidentified comers
shutdown
material
RESPONSIBILITY
REQUIREMENTS
RECOMMENDED
CLASSIFICATION
OCCURRENCE
COMPLETION
DETECTION
OCCURRENCE
& TARGET
SEVERITY
CURRENT
DETECTION
ACTION
SEVERITY
PROCESS POTENTIAL CURRENT PROCESS ACTION
DATE
POTENTIAL EFFECT(S) OF POTENTIAL CAUSE OF PROCESS
STEP/ FAILURE CONTROLS RPN TAKEN &
FAILURE FAILURE CONTROLS RPN
FUNCTION MODE PREVENTION EFFECTIV
DETECTION
E DATE
MAJOR
due to affected material.
No short
Short Moulding 6 2 5 60
moulding
Temp. Controller & pressure
Calibration of pressure Daily machine
gauge not functioning
gauge & temp. controller checking method
properly
Decrease in Injection
Process data & Inprocess In-Process Inspection
pressure, Injection time &
inspection standard Method
End User: Asthetic problem. coolong time
MAJOR
Manufacturing and Assembly: Line
No sink marks Sink Mark 5 2 5 50
shutdown and additional sort and rework
due to affected material.
Pressure gauge not Calibration of pressure Daily machine
functioning properly gauge & temp. controller checking method
In-Process Inspection
Increase in injection Process data & Inprocess
Method & Statistical
pressure & barrel temp. inspection standard
Process Control
Operation 50:
End User: Tight fitment with the
Moulding assembly part.
MAJOR
Process & Dia./ Dim. Over Manufacturing and Assembly: Line Temp. Controller & pressure
Inspection 4 Calibration of pressure 2 Daily machine 5 40
Size shutdown and additional sort and rework gauge not functioning
due to affected material. gauge & temp. controller checking method
properly
Part Name Tail Lamp Reflector- Key Contact/Phone No.- 0124-4379845 Rev. 1
Action Results
RESPONSIBILITY
CLASSIFICATION
RECOMMENDED
REQUIREMENTS
PROCESS STEP/
OCCURRENCE
COMPLETION
DETECTION
OCCURRENCE
& TARGET
SEVERITY
FUNCTION
CURRENT CURRENT
DETECTION
ACTION
SEVERITY
POTENTIAL POTENTIAL POTENTIAL ACTION
DATE
PROCESS PROCESS
FAILURE EFFECT(S) OF CAUSE OF RPN TAKEN &
CONTROLS CONTROLS RPN
MODE FAILURE FAILURE EFFECTIV
PREVENTION DETECTION
E DATE