Document Title Project No.: Job No.: Doc No.:: New 48" Crude Transit Line From North Kuwait To CMM
Document Title Project No.: Job No.: Doc No.:: New 48" Crude Transit Line From North Kuwait To CMM
HEAT DISSIPATION
POS. ST / RN LOCATION Q.ty EQUIPMENT kW NOTE
per unit total
A.10 RN ELR 1 LV load bank breaker & busbars 0.04 0.04 Only for test period
7/20/2018
NEW 48” CRUDE TRANSIT LINE FROM NORTH KUWAIT TO CMM
HEAT DISSIPATION
POS. ST / RN LOCATION Q.ty EQUIPMENT kW NOTE
per unit total
B.4 ST DGC 1 Engine preheating system 1.4 1.40 Estimated average value
B.6 ST DGC 1 Alternator anticondensation system 0.4 0.40 Estimated average value
B.7 ST / RN DGC 2 Starting battery bank 0.3 0.60 Estimated average value
C.1 RN DGR 1 Radiated from noise enclosure 1 1.00 Estimated average value
D.2 RN OUT 1 Diesel generator canopy ventilation 381.40 381.40 See previous Item D
7/20/2018